Page 1: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

“Managing ConstructionManaging Construction Claims”

Calvey Consulting, LLC8473 Settlers PassageCleveland, OH 44141

440-740-1132

Page 2: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Managing Construction ClaimsManaging Construction Claims

Why are Claims are disputed.Why are Claims are disputed.What is Typical ClaimWhat does a Consultant use to develop aWhat does a Consultant use to develop a Claim.What are the Key ComponentsWhat are the Key Components. What are Accepted Methods of Analysis

Calvey Consulting, LLC 440-740-1132

Page 3: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

h i l i i dWhy are Construction Claims Disputed ?The Issues are complex.The Issues are complex.The Claims are loosely documented.Breakdown in communicationBreakdown in communication.There is an honest difference in opinion. No budget dollarsNo budget dollars.

Calvey Consulting, LLC 440-740-1132

Page 4: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

What is a “Typical Construction Claim”?

Claimant – Multi Prime ContractorClaimant Multi Prime ContractorMoneyTimeTimeSource of the Dispute – Third Party No Exact AccountingNo Exact Accounting

Calvey Consulting, LLC 440-740-1132

Page 5: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

What does a Claims Consultantuse to develop his analysis?

ContractContractProject SchedulesPay ApplicationsPay ApplicationsCertified PayrollsProject Meeting noteProject Meeting noteDaily Logs

Calvey Consulting, LLC 440-740-1132

Page 6: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

What are the Key Components of a Typical Contractor’s Claim?

The Planned ScheduleThe Planned Schedule The Actual SchedulePredecessor DelayPredecessor DelayImpact on the ContractorQuantify the DamagesQuantify the Damages

Calvey Consulting, LLC 440-740-1132

Page 7: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Methods of Delay AnalysisTi I A l iTime Impact Analysis

Impacted As PlannedImpacted As PlannedAdjusted As BuiltWindowsWindowsConstructive Acceleration

Calvey Consulting, LLC 440-740-1132

Page 8: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Calculating Damages

Extension of General ConditionsExtension of General ConditionsExtension of Home Office OverheadEscalationEscalationLoss of Productivity

Calvey Consulting, LLC 440-740-1132

Page 9: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

AACE - Purpose of Recommended Practice

Identify Lost Productivity EstimatingIdentify Lost Productivity Estimating MethodologiesRank Order the MethodologiesgDefine and Discuss Each MethodologyIdentify Selected Studies Applicable to EachIdentify Selected Studies Applicable to Each Methodology

Calvey Consulting, LLC 440-740-1132

Page 10: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Methods of Estimating Lost ProductivityMethods of Estimating Lost Productivity

Project Specific StudiesProject Specific StudiesProject Comparison StudiesSpecialty Industry StudiesSpecialty Industry StudiesGeneral Industry StudiesCost BasisCost Basis

Calvey Consulting, LLC 440-740-1132

Page 11: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

What is Productivity?What is Productivity?

Productivity =Productivity Output (units completed)

Input (work or equipment hours)Input (work or equipment hours)

Productivity Factor =Productivity Factor = Actual ProductivityBaseline or PlannedBaseline or Planned

Productivity

Calvey Consulting, LLC 440-740-1132

Page 12: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Common Causes of Lost ProductivityCommon Causes of Lost Productivity

Acceleration (directed or constructive)Acceleration (directed or constructive)Crowding of labor or stacking of tradesOver manningOver manningLearning CurveExcessive overtimeExcessive overtimeAdverse or unusually severe weatherDilution of SupervisionDilution of Supervision

Calvey Consulting, LLC 440-740-1132

Page 13: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Common Causes of Lost ProductivityCommon Causes of Lost Productivity

Changes, ripple impact, cumulative impact ofChanges, ripple impact, cumulative impact of multiple changes and rework Defective engineering, recycle and/or reworkg g, yAbsenteeism and the missing man syndromeCraft turnoverCraft turnoverMaterial, tools and equipment shortagesSite or work area access restrictionsSite or work area access restrictions

Calvey Consulting, LLC 440-740-1132

Page 14: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Project Specific StudiesProject Specific Studies

Measured Miles StudyMeasured Miles StudyEarned Value AnalysisWork Sampling MethodWork Sampling MethodCraftsmen Questionnaire Sampling Method

H l i i ?How long is it?

Calvey Consulting, LLC 440-740-1132

Page 15: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Measured Mile – Physical UnitsMeasured Mile Physical Units

Measured Mile10 Miles of pipe installed – 1,000 manhours

100 manhours/mileImpact4 Miles of pipe installed – 640 manhours

/160 manhours/mileLoss of Productivity

60 manhours/mile60 manhours/milex4 miles

240 manhours

Calvey Consulting, LLC 440-740-1132

240 manhours

Page 16: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Earned Value AnalysisEarned Value Analysis

Measured Mile70% Labor Complete – 1,000 manhours

14.3 manhours/1%Impact30% Labor Complete – 640 manhours

/ %21.3 manhours/1%Loss of Productivity

7 manhours/1%7 manhours/1%30%

240 manhours

Calvey Consulting, LLC 440-740-1132

240 manhours

Page 17: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Project Specific StudiesProject Specific Studies

Measured Miles StudyMeasured Miles StudyEarned Value AnalysisWork Sampling MethodWork Sampling MethodCraftsmen Questionnaire Sampling Method

H l i i ?How long is it?

Calvey Consulting, LLC 440-740-1132

Page 18: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Project Comparison StudiesProject Comparison Studies

Comparable Work StudyComparable Work StudyComparable Project Study

Calvey Consulting, LLC 440-740-1132

Page 19: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Specialty Industry StudiesSpecialty Industry Studies

AccelerationAccelerationChanges, Cumulative Impact and ReworkLearning CurveLearning CurveOvertime and Shift WorkProject CharacteristicsProject CharacteristicsProject ManagementWeatherWeather

Calvey Consulting, LLC 440-740-1132

Page 20: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Specialty Industry StudiesSpecialty Industry Studies

Selected StudiesSelected Studies

Weather Impact on ProductivityWeather Impact on Productivity

Overtime Impact on Productivity

Calvey Consulting, LLC 440-740-1132

Page 21: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Weather Impact on ProductivityWeather Impact on Productivity

120

100

120

60

80

ffici

ency

20

40% E

f

0

20

-20 -10 0 10 20 30 40 50 60 70 80 90 100

Eff ti T t (F)

Calvey Consulting, LLC 440-740-1132

Effective Temperature (F)

Page 22: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Weather Impact on Productivity (NECA Studies)

Temperature (effective) ImpactTemperature (effective) Impact

Eff ti T t R °FEfficiency

Effective Temperature Range °F%

+40 to 80 100

-20 to +20 20 – 95

80 to 100 85 - 60

Calvey Consulting, LLC 440-740-1132

Page 23: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Weather Impact on ProductivityWeather Impact on Productivity

Daily Log Documentationy gFrequency (AM, Noon, PM)TemperatureWindPrecipitation (rain, snow, sleet)E i H iditExcessive Humidity

Historic DataNational Oceanic & Atmospheric AdminNational Oceanic & Atmospheric Admin. (NOAA) – National Climatic Data Center

Calvey Consulting, LLC 440-740-1132

Page 24: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Overtime Industry StudiesOvertime Industry Studies

Bureau Labor Statistics – 1947 (Mfg.)Bureau Labor Statistics 1947 (Mfg.)Business Roundtable – 1980

10 year study of P&G plant projects10 year study of P&G plant projectsNational Electrical Contractors Assn.

1969 (rev 1989)1969 (rev. 1989)Construction Industry Institute – 1988

7 projects all crafts7 projects, all craftsCost Engineering Composite - 2004

Calvey Consulting, LLC 440-740-1132

Page 25: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Overtime Impact on ProductivityOvertime Impact on ProductivityNECA Study

90

100

e

60

70

80

rodu

ctiv

40

50

60

% P

r

301 2 3 4 5 6 7 8 9 10 11 12

Weeks

Calvey Consulting, LLC 440-740-1132

Weeks

Page 26: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Overtime Impact on ProductivityOvertime Impact on Productivity

Days – hours per day Productivity Range2 wks to 12 wks

5 - 10’s 95 % to 70 %

6 - 10’s 91 % to 62 %

5 - 12’s 85 % to 52 %6 - 12’s 75 % to 45 %

7 - 12’s 70 % to 40 %

Calvey Consulting, LLC 440-740-1132

Page 27: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

General Industry StudiesGeneral Industry Studies

U.S. Army Corps of Engineers ModificationU.S. Army Corps of Engineers Modification Impact Evaluation GuideMechanical Contractor’s Association of AmericaNational Electrical Contractor’s AssociationEstimating Guides

Calvey Consulting, LLC 440-740-1132

Page 28: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

General Industry StudiesGeneral Industry Studies

MCAAMCAA16 FactorsRange of LossRange of Loss

NECA25 Factors Checklist25 Factors ChecklistNormal – Difficult – Most Difficult

US Army Corps of EngineersUS Army Corps of EngineersNumber of FactorsNo Longer Published

Calvey Consulting, LLC 440-740-1132

o o ge ub s ed

Page 29: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Cost BasisCost Basis

Total Unit Cost MethodTotal Unit Cost MethodModified Total Labor Cost MethodTotal Labor Cost MethodTotal Labor Cost Method

Calvey Consulting, LLC 440-740-1132

Page 30: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Measured MileMeasured Mile

MEASURED MILE40,000

Actual Production

32,668

MEASURED MILE

30,000

er P

erce

nt

20,000

Man

hour

s pe

60% Complete: 14,762 Manhours

-

10,000

Calvey Consulting, LLC 440-740-1132

-

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Percent based on Foundation Concrete

Page 31: “Managing ConstructionManaging Construction Claims” · PDF fileManaging Construction ClaimsManaging Construction Claims Why are Claims are disputed.Why are Claims are disputed

Court Case (A) – Clark Concrete Contractors, I 99 1 BCA ¶30 280 [1]Inc., 99-1 BCA ¶30,280 [1]

“[The Government] is correct in asserting that the work [ ] gperformed during the periods compared by [the Contractor] was not identical in each period. We would be surprised to learn that work performed inwould be surprised to learn that work performed in periods being compared is ever identical on a construction project, however. And it need not be; the

f f ffascertainment of damages for labor inefficiency is not susceptible to absolute exactness. (Citation omitted). We will accept a comparison if it is between kinds of p pwork which are reasonably alike, such that the approximations it involves will be meaningful.”

Calvey Consulting, LLC 440-740-1132