managing civil engineering projects / site layout design

15
Water supply line Water nozzle with hose coupler Water meter with isolator valve Well with hydrophore Isolator valve Sedimentation tank Temporary sewer line Existing public sewer line High-voltage (primary) transmission line High-voltage (secondary) transmission line Buried cable Rubber cable Electric junction box with fuse block Lamp / lamp post Cable post Service box with main switch Transformer station with electric meter Temporary water supply and sewer system Temporary electric power supply double-sized container 4.94 x 6.05 m single container 2.44 x 6.05 m Timber yard : 200 – 220 m 2 Steel yard : 350 – 400 m 2 Concrete mixing plant : R ~ 10 m Studio Work Developing a General Site Layout Design (Legend and Needs) Budapest University of Technology and Economics – Department of Construction Technology and Management Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

Upload: ledat

Post on 23-Dec-2016

228 views

Category:

Documents


0 download

TRANSCRIPT

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized

container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Timber yard : 200 – 220 m2

Steel yard : 350 – 400 m2

Concrete mixing plant : R ~ 10 m

Studio WorkDeveloping a General

Site Layout Design

(Legend and Needs)

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 0

Site Survey Report

(Grid Size 2x2 m)

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

gate

keeper

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 1

Getting the Site

(isolation/access)

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

gate

keeper

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 2

Main Equipment

(here: Tower Crane)

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

timber yard steel yard

gate

keeper

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 3

Auxiliary Yards

Plants and Workshops

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

timber yard steel yard

office

office

meeting

room

canteen

office

locker

toalet

dining

room

gate

keeper

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 4

Site Offices

(Container Village)

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

timber yard steel yard

office

office

meeting

room

canteen

office

store

Subcontr.

locker

toalet

dining

room

store

Subcontr.

store

Subcontr.

open

store

open

store

gate

keeper

open deposit

( short term )

open deposit

( short term )

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 5

Short and Long Term

Deposits and Stores

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

timber yard steel yard

office

office

meeting

room

canteen

office

store

Subcontr.

locker

toalet

dining

room

store

Subcontr.

store

Subcontr.

open

store

open

store

gate

keeper

open deposit

( short term )

open deposit

( short term )

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 6

Temporary

Road System

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

timber yard steel yard

office

office

meeting

room

canteen

office

store

Subcontr.

locker

toalet

dining

room

store

Subcontr.

store

Subcontr.

open

store

open

store

gate

keeper

open deposit

( short term )

open deposit

( short term )

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 7

Temporary

Water Supply

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

timber yard steel yard

office

office

meeting

room

canteen

office

store

Subcontr.

locker

toalet

dining

room

store

Subcontr.

store

Subcontr.

open

store

open

store

gate

keeper

open deposit

( short term )

open deposit

( short term )

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 8

Waste & Storm Water

(Treatment)

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

timber yard steel yard

office

office

meeting

room

canteen

office

store

Subcontr.

locker

toalet

dining

room

store

Subcontr.

store

Subcontr.

open

store

open

store

gate

keeper

open deposit

( short term )

open deposit

( short term )

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Developing Concept

STEP 9

Temporary Electric

Supply

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

office

office

meeting

room

toalet

locker

gate

keeper

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Adjusting to Phases

of Construction

Earthworks and

Foundation Works

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

timber yard steel yard

office

office

meeting

room

canteen

office

store

Subcontr.

locker

toalet

dining

room

gate

keeper

open deposit

( short term )

open deposit

( short term )

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Adjusting to Phases

of Construction

Structural Works

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

timber yard steel yard

office

office

meeting

room

canteen

office

store

Subcontr.

locker

toalet

dining

room

store

Subcontr.

store

Subcontr.

open

store

open

store

gate

keeper

open deposit

( short term )

open deposit

( short term )

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Adjusting to Phases

of Construction

Structural Works and

Finishing Works

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018

public road ( existing )

-2 to +10 floor monolithic

R.C. frame structured building

to be built

Car/Van

parking and waiting zone

office

office

meeting

room

canteen

office

store

Subcontr.

locker

toalet

dining

room

store

Subcontr.

store

Subcontr.

open

store

open

store

gate

keeper

open deposit

( optional)

open deposit

( optional)

Water supply line

Water nozzle with hose coupler

Water meter with isolator valve

Well with hydrophore

Isolator valve

Sedimentation tank

Temporary sewer line

Existing public sewer line

High-voltage (primary) transmission line

High-voltage (secondary) transmission line

Buried cable

Rubber cable

Electric junction box with fuse block

Lamp / lamp post

Cable post

Service box with main switch

Transformer station with electric meter

Temporary water supply and sewer system

Temporary electric power supply

double-sized container

4.94 x 6.05 m

single container

2.44 x 6.05 m

Concrete mixing plant : R ~ 10 m

Adjusting to Phases

of Construction

Finishing Works

Budapest University of Technology and Economics – Department of Construction Technology and Management

Civil Engineering Courses – Engineering Programs in English – [BMEEPEKAT41] Construction Management

Site Layout Design – Studio Work Dr. László Neszmélyi – Dr. Zoltán András Vattai 2018