www.dredging.org 1 Management of dredged material: small-scale dredging CEDA Seminar 13-14 October 2009 St. Petersburg Daan Rijks ([email protected] ) www.dredging.org 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available Dredging Techniques 4. Transport and Disposal Methods 5. Case Study: Jakarta Pilot Dredging Project Contents

Upload: others

Post on 25-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org1

Management of dredged material:

small-scale dredging

CEDA Seminar13-14 October 2009

St. Petersburg

Daan Rijks ([email protected])

www.dredging.org2

1. Introduction DHV

2. Project phases small-scale dredging

3. Available Dredging Techniques

4. Transport and Disposal Methods

5. Case Study: Jakarta Pilot Dredging Project

Contents

Page 2: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org3

- Worldwide presence

- Approx. 5,500 employees

- Annual turnover 2008: ca. € 470 million

Relevant in-house expertise:

- Dredging & Land Reclamation

- Ports & Waterways

- Civil & Maritime Infrastructure

- Waterfront Development & Marinas

- Flood Management & Coastal Protection

DHV Consulting and Engineering

www.dredging.org4

- Feasibility studies on dredging projects

- Environmental Impact Assessments (EIA)

- Analysis of equipment requirements

- Cost/benefit analysis of dredging operations

- Advise on capital and maintenance dredging

- Preliminary and final design

- Preparation of international tender documents

- Contract management and supervision

- Etc.

DHV Dredging services and expertiseProvide consultancy from start:

To supervision and Technical Assistance

Page 3: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org5

Definition: an effective and efficient dredging process, usually carried out in confined, difficultly accessible channels

and lakes whilst adhering to pre-defined environmental standards, laws and regulations

This can be translated to:

“Small-scale dredging needs tailor-made solutions,

each project is unique!”

Management of Dredged Material:

small-scale dredging

www.dredging.org6

1. Water discharge (e.g. floodwaters)

2. Navigation (commercial and recreation)

3. Water quality enhancement (oC, O2)

4. Remediation of pollution (sediment)

5. Recreation and residential (floating houses)

6. Sand-, gravel- or clay-mining and/or disposal

7. Nature creation (deepening lakes, biodiversity), environmentally friendly embankments

Maintenance- and capital dredging

Purpose of dredging

Page 4: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org7

- Accessibility along and in channels and lakes

- Logistics and transport of material in populated areas (traffic)

- Limited space for disposal of sediment and waste

- Sensitive project environment: hinder to surroundings, highly visible, public opinion and interest

- (Old) embankments, low bridges, etc

- Household waste & objects

- Unexploded ordinance

Critical factors in small-scale dredging

www.dredging.org8

Traffic congestionDifficult access

Waste and large objectsRecreation

Page 5: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org9

Diffic

ult access

www.dredging.org10

Urban / industrial hinder:

1. Noise, light and air emissions

2. Transport of dredged material (low bridges, road congestion)

3. Hinder for navigation and recreation / tourism

4. Public opinion and participation

Rural hinder:

5. Natural Protected Areas (fish, protected birds and animals)

Sensitive Project Environment: Hinder

Page 6: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org11

Urban / industrial:

1. Work during restricted hours and seasons

2. Create nearby temporary disposal sites and transport at night

3. Confer with residents and stakeholders

4. Communication (explain necessity) and create positive project image

Rural

5. Work outside of breeding seasons

6. Building with Nature (e.g. re-use)

Mitigation measures for Hinder

www.dredging.org12

Management of dredged material in small-scale projects starts at the beginning of the project:

- Plan work and carry out surveys

- Choice of dredging equipment

- Choice of transport method

- Choice of disposal method

Start dredging, but be prepared

for the unexpected!!

Project phases

Page 7: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org13

DredgingDesign Contract O & M

Project strategy

First focus

on final

objective

Research

Fin

al o

bje

ctiv

e,

resu

lt an

d q

uality

sta

keh

old

ers

,

pro

ject s

co

pe

time, b

ud

get, ris

ks

qu

ality

Stra

teg

y d

ete

rmin

es

inp

ut n

ecessary

1234

Tenderingstrategy

Plan Work: Functional Design -> strategy

5

www.dredging.org14

Floating bulldozer

Grab dredger:

- from the side

- floating

Bucket dredger

Dredging location Equipment

Mechanical

Dredging

Drainage channel

Canal

Lake

Small-scale

Urban

Transport

-Road transport

-(Split) Barges

-Hydraulic pipe

-Combination

Placement in CDF

-Crane over dike

-Sail into CDF

-Diffuser/pontoon

-Combination

25 - 150 m3 / hour

1 – 2 m

Dredging production rates

Water depth

NumbersParameters

25 - 150 m3 / hour

1 – 2 m

Dredging production rates

Water depth

NumbersParameters

Plan Work: Dredging Process

Page 8: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org15

Cutter dredger

Suction dredgerPumps

Auger Dredger

Dredging location Equipment

Hydraulic

Dredging

Drainage channel

CanalLake

Small-scale

Urban

Transport

-Hydraulic pipe

- Split barges

- Combination

Placement in CDF

-Pipeline with

diffuser/pontoon

-Dumping or

pipeline-Combination

100 - 200 m3 / hour

1 – 5 m

Dredging production rates

Water depth

NumbersParameters

100 - 200 m3 / hour

1 – 5 m

Dredging production rates

Water depth

NumbersParameters

Dike

Li ner Drain 100 m m 25 m spacing 30 – 50 cm

Drainage layer

3m – 5m

Plan Work: Dredging Process

www.dredging.org16

Start with surveying

Profile and sediment volume

Sediment quality

Depth

Slope

Design ProfileVariation

Width

Depth

Slope

Design ProfileVariation

Width

Search for objects

Page 9: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org17

Survey status project area

Examine transport route

Examine state of

embankments

Lower water level for

underwater survey

www.dredging.org18

Dredging techniques: mechanical

Grab and small low barges

Closed environmental grabs

Page 10: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org19

Dredging techniques: mechanical

Low-lying specialized bucket dredger

Low-lying silt pusher (floatingbulldozer)

Amphibiousdredger

www.dredging.org20

Dredging techniques: rural areas

Simple dredging in rural areas

Placement of dredged material on adjacent land

Page 11: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org21

Transport techniques: mechanical

Transport with small

vehicles

www.dredging.org22

Transport techniques: hydraulic

Cutter suction dredger

Small cutter suction dredger that can pass under bridges

Page 12: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org23

Transport techniques: hydraulic

Environmentally friendly cutter dredger

Mechanical dredging, hydraulictransport

www.dredging.org24

Experience: DisposalDisposal techniques

Page 13: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org25

Disposal techniques

Temporary basinTemporary disposal sites

www.dredging.org26

Transfer to disposal site

Disposal techniques

Page 14: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org27

Case Study: Jakarta dredging

Situation: Drainage channels and retention basins are full of

sediment and waste

Result: Insufficient drainage capacity. Flooding in residential

areas endangering peoples lives and creating economic

losses, unhygienic conditions

Measures: (Regular) Maintenance dredging, waste management and

new channels & retention basins increasing capacity

Aim: Reduce flood risk to acceptable level, create safe living

and working areas

www.dredging.org28

Case Study: Jakarta dredging

Page 15: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org29

Case Study: Jakarta dredging

Project content:

- Find range of optimal small-scale dredging techniques

for Jakarta situation

- Go through entire dredging process from start (preparation) to finish including logistics

- Procurement of dredging equipment

- Train local staff for replication and operation and

maintenance after project ends (continuation)

- Boost public image of dredging through ‘visible’ project

- Facilitate public information and community participation

- Carry out Pilot: dredging, transport and separation of sediment and waste

www.dredging.org30

Case Study: Jakarta dredging

Dredging

Page 16: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available

www.dredging.org31

Case Study: Jakarta dredging

Separation of sediment and waste for re-use

Rotating drum separator

www.dredging.org32

Case Study: Jakarta dredging

Reuse ofdredged material

Page 17: Management of dredged material: small-scale dredging · St. Petersburg Daan Rijks ( daan.rijks@dhv.com ) 2 1. Introduction DHV 2. Project phases small-scale dredging 3. Available