Francis T. Maloney High SchoolCity of Meriden

May 5, 2011

Page 2: Maloney renovation plans

Team Introductions:Team Introductions:Maloney High SchoolMaloney High School

Fletcher Thompson:Fletcher Thompson:Joe Costa, AIA, LEED AP Joe Costa, AIA, LEED AP –– Principal KPrincipal K--1212Curt Krushinsky, RA, LEED AP Curt Krushinsky, RA, LEED AP –– Project ManagerProject ManagerAngela Cahill, Angela Cahill, AIAAIA, , LEEDLEED AP AP –– Assistant PMAssistant PMDan Davis, AIA, LEED AP Dan Davis, AIA, LEED AP –– Director of DesignDirector of DesignMike Berger, LEED AP Mike Berger, LEED AP –– Senior DesignerSenior Designer

Blades and Goven:Blades and Goven:Earl Goven, ASLA Earl Goven, ASLA –– Landscape ArchitectLandscape Architect

Leach Consulting, LLCLeach Consulting, LLCKevin Leach, P.E. Kevin Leach, P.E. –– EstimatorEstimator

May 5, 2011May 5, 2011

Page 3: Maloney renovation plans

Design Approach:Design Approach:High School High School –– ProgrammingProgramming

Program AnalysisProgram Analysis

Drawing on Our Expertise/Research/Tools

Communicating/Listening/Implementing

Program: Foundation of a Successful School

Avoiding Facilities That Are Not Needed

Space Allocation/Distribution Critical

Program Approved on April 7thProgram Approved on April 7

TOTAL:    271,553 SF

May 5, 2011May 5, 2011

Page 4: Maloney renovation plans

Design Approach:Design Approach:Maloney High School Maloney High School –– Existing School PlanExisting School Plan

1970’s Original Building 1958

Addition 1970s

Code/Safety Issues

Hazardous Materials

Facility Needs Modernization

Enabling a 21 Century Curriculum

1958

Enabling a 21 Century Curriculum

May 5, 2011May 5, 2011

Page 5: Maloney renovation plans

Design Approach:Design Approach:Maloney High School Maloney High School –– Existing School PlanExisting School Plan

May 5, 2011May 5, 2011

Page 6: Maloney renovation plans

Design Approach:Design Approach:Maloney High School Maloney High School –– Challenges and OpportunitiesChallenges and Opportunities

Site Configuration

Entrance Drive/Fields/Parking

Loop Circulation Patterns

Distribution of Large Spaces

Community Uses of Facility

Construction PhasingConstruction Phasing

Coordination with Platt HS

d i ili

May 5, 2011May 5, 2011

Modernize Facility

Page 7: Maloney renovation plans

Design Approach:Design Approach:Maloney High School Maloney High School –– Concept Design (Work in Progress)Concept Design (Work in Progress)

Site Influences Building Design

Entry/Graduation/Service

FIELDS

Zoning: Public/Private

Loop Circulation Patterns

Display History/Learning

Library/Media CenterFIELDS

GALLER

Y

Library/Media Center

Freshman Academy/Bridge

FIELDS

Natural Light Throughout

Improve Curb AppealGRADUATION

May 5, 2011May 5, 2011

Page 8: Maloney renovation plans

Main Level PlanMain Level Plan

M i L l T lMain Level Total:

160,949 sf

May 5, 2011May 5, 2011

Page 9: Maloney renovation plans

Upper Level PlanUpper Level Plan

U L l T lUpper Level Total:

38,422 sf

May 5, 2011May 5, 2011

Page 10: Maloney renovation plans

Pool Level PlanPool Level Plan

P l L l T lPool Level Total:

48,344 sf

May 5, 2011May 5, 2011

Page 11: Maloney renovation plans

Lower Level PlanLower Level Plan

L L l T lLower Level Total:

19,534 sf

May 5, 2011May 5, 2011

Page 12: Maloney renovation plans

Building Area SummaryBuilding Area Summary

Upper Level:

f38,422 sf

Main Level:

160,949 sf

Pool Level:

48,344 sf

Lower Level:Lower Level:

19,534 sf

May 5, 2011May 5, 2011

Building Total:  267,249 sf

Page 13: Maloney renovation plans

Building DesignBuilding Design

May 5, 2011May 5, 2011

Page 14: Maloney renovation plans

Building DesignBuilding Design

May 5, 2011May 5, 2011

Page 15: Maloney renovation plans

Building DesignBuilding Design

May 5, 2011May 5, 2011

Page 16: Maloney renovation plans

Building DesignBuilding Design

May 5, 2011May 5, 2011

Page 17: Maloney renovation plans

Phasing PlanPhasing Plan

EXISTING CLASSROOM WING TO REMAINPHASES 1 ‐ 4

May 5, 2011May 5, 2011

Page 18: Maloney renovation plans

Phasing PlanPhasing Plan

PHASE 1• ACADEMIC CR WING ADDITION• CORRIDOR BRIDGE (STAIR & ELEV.)

May 5, 2011May 5, 2011

Page 19: Maloney renovation plans

Phasing PlanPhasing Plan

PHASE 2• FRESHMAN ACADEMY RENOVATIONS• STAIR ADDITION

May 5, 2011May 5, 2011

Page 20: Maloney renovation plans

Phasing PlanPhasing Plan

PHASE 3• NATATORIUM RENOVATIONS• PHYSICAL ED RENOVATIONS• PHYSICAL ED ADDITION NEW ELEVATOR• NEW ELEVATOR

May 5, 2011May 5, 2011

Page 21: Maloney renovation plans

Phasing PlanPhasing Plan

PHASE 4RENOVATIONS & ADDITIONS:• CAFETERIA• KITCHEN / SERVERYCUSTODIAL• CUSTODIAL

• ART• TECHNOLOGY ED• AUDITORIUM• MUSIC • VOCATIONAL ED

May 5, 2011May 5, 2011

Page 22: Maloney renovation plans

Phasing PlanPhasing Plan

PHASE 5RENOVATIONS & ADDITIONS:• ADMINISTRATION• HEALTH CLINICGUIDANCE• GUIDANCE

• LIBRARY• FRESHMAN SCIENCE• GALLERY DEMOLISH EXISTING 

CLASSROOM WING 

May 5, 2011May 5, 2011

Page 23: Maloney renovation plans

Site DesignSite Design

May 5, 2011May 5, 2011

Page 24: Maloney renovation plans

Site DesignSite Design

May 5, 2011May 5, 2011

Page 25: Maloney renovation plans

Project Schedule:Project Schedule:Maloney High SchoolMaloney High School

Design Documents CompletedDesign Documents Completed Aug 2012 Aug 2012

BSF SubmissionBSF Submission Nov 2012Nov 2012

Bidding & AwardBidding & Award Feb 2013Feb 2013

Start ConstructionStart Construction Mar / Apr 2013Mar / Apr 2013

Ph 1 Ph 1 C i A d i Cl Addi iC i A d i Cl Addi i A 1 A 1 A 1A 1Phase 1 Phase 1 –– Construction: Academic Classroom AdditionConstruction: Academic Classroom Addition Apr 2013 Apr 2013 –– Aug 2014Aug 2014

Phase 2 Phase 2 –– Construction: Freshman Academy RenovationsConstruction: Freshman Academy Renovations June 2014 June 2014 –– Aug 2015Aug 2015

Phase 3 Phase 3 Construction: Natatorium & PE Renovations / AddConstruction: Natatorium & PE Renovations / Add June 2014 June 2014 Aug 2015Aug 2015Phase 3 Phase 3 –– Construction: Natatorium & PE Renovations / AddConstruction: Natatorium & PE Renovations / Add June 2014 June 2014 –– Aug 2015Aug 2015

Phase 4 Phase 4 –– Construction: Cafe, Vocational Ed, Auditorium & ArtConstruction: Cafe, Vocational Ed, Auditorium & Art June 2015 June 2015 –– Aug 2016Aug 2016

Phase 5 Phase 5 –– Construction: Admin, Heath, Library, Science, GalleryConstruction: Admin, Heath, Library, Science, Gallery June 2016 June 2016 –– Aug 2017Aug 2017Phase 5 Phase 5 Construction: Admin, Heath, Library, Science, GalleryConstruction: Admin, Heath, Library, Science, Gallery June 2016 June 2016 Aug 2017Aug 2017

Project CompletedProject Completed September 2017September 2017

May 5, 2011May 5, 2011

Page 26: Maloney renovation plans

Cost / Budget Analysis:Cost / Budget Analysis:Maloney High SchoolMaloney High School

Hard Cost

Phase 1 Phase 1 –– Academic Classroom AdditionAcademic Classroom Addition $27,668,642$27,668,642

Hard Cost

Phase 2 Phase 2 –– Freshman Academy RenovationsFreshman Academy Renovations $ 7,959,221$ 7,959,221Phase 3 Phase 3 Natatorium & PE Renovations / AdditionsNatatorium & PE Renovations / Additions $18 112 910$18 112 910Phase 3 Phase 3 –– Natatorium & PE Renovations / AdditionsNatatorium & PE Renovations / Additions $18,112,910$18,112,910Phase 4 Phase 4 –– Cafeteria, Kitchen, Art, Tech Ed, AuditoriumCafeteria, Kitchen, Art, Tech Ed, Auditorium

Music & Vocational Education Renovation / AdditionMusic & Vocational Education Renovation / Addition $22,780,339$22,780,339Phase 5 Phase 5 –– Admin, Health Clinic, Library, Science, Gallery AdditionAdmin, Health Clinic, Library, Science, Gallery Addition $14,438,846$14,438,846y yy y

Subtotal: Subtotal: $90,959,958$90,959,958Site WorkSite Work $ 6,377,042$ 6,377,042

Hard Cost Subtotal: Hard Cost Subtotal: $97,337,000$97,337,000a d Cost Subtota : a d Cost Subtota : $9 ,33 ,000$9 ,33 ,000

Soft Cost

Fees, Expenses, Bonding, Printing, FF&EFees, Expenses, Bonding, Printing, FF&E $ 13,634,342$ 13,634,342Owner’s Contingency (5%)Owner’s Contingency (5%) $ 5,548,659$ 5,548,659

Subtotal: Subtotal: $19,183,000$19,183,000

May 5, 2011May 5, 2011

Total Project Budget:Total Project Budget: $116,520,000$116,520,000