mall expansion project
TRANSCRIPT
Engineering
Design &
Development
Engineering
Design &
Development
CITY -BALIWAG EXPANSION
AS OF OCTOBER 15, 2014
Engineering
Design &
Development
Engineering
Design &
Development
I. PERMITS/CLEARANCES
ITEM STATUS
1.0 Traffic Study SECURED
2.0 ECC SECURED
3.0 Barangay Clearance SECURED
4.0 Building Permits / Clearances
ALL SECURED
Engineering
Design &
Development
Engineering
Design &
Development
II. OVER-ALL PROJECT STATUS Milestone Dates
Construction Day One (Site Development) – January 07, 2014
Construction Day One (Building) - March 07, 2014
Start of Fit-out Works - August 11, 2014
Concrete Topping Off(Flat Slab) - August 31, 2014
Tenant Preview - August 20, 2014
Concrete Topping Off (Ramp) - September 07, 2014
Water Tightness (Mall) - October 15, 2014
Tenant Turn over (Batch Plan No. 01) - September 30, 2014
Project Completion - October 31, 2014
Energization (New EMB) - November 20, 2014
Engineering
Design &
Development
Engineering
Design &
Development
• Project Status
Engineering
Design &
Development
Engineering
Design &
Development
OVER-ALL PROJECT STATUS AS OF OCTOBER 15, 2014
Previous Projected
(As of October 09, 2014) Prev. Actual Projected to Date Actual to Date Variance
Equivalent in
Days
89.15% 87.53% 92.15% 89.80% -2.35% Two (2) days
Delayed
Engineering
Design &
Development
Engineering
Design &
Development
BREAKDOWN OF OVER-ALL PROJECT STATUS AS OF OCTOBER 15, 2014
Previous Projected (As of October 02, 2014)
Prev. Actual Projected to Date Actual to Date Variance
General Contractor (Concreting Works)
100.00% 100.00% 100.00% 100.00% 0.00%
Architectural Works 63.00% 62.00% 65.25% 64.00% -1.25%
Sanitary/Plumbing 79.30% 79.30% 82.40% 82.40% 0.00%
Fire Protection 68.60% 68.60% 71.80% 71.80% 0.00%
Mechanical 64.76% 64.14% 68.80% 68.10% -0.70%
Electrical 67.40% 67.40% 70.95% 70.55% 0.40%
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS (4TH FLOOR)
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESSPHOTOS MASONRY WORK
Last Week This Week
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESSPHOTOS Installed Glass Framing at
BPO (3rd Floor Area)
Installed Glass @
Ground Floor Area
Status of Delivery - 100.00%
Status of Installed IGU – 60%
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS – (RAMP AREA)
Concreted Roof beam
@ Helical Ramp
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS – INSTALLED PRECAST FIN
Last Week This Week
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
Installed Drainage Pipe at Roof
Deck Installed Gate Valve for Tenant
Requirement
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
Completion of Roughing-ins for Main
Power Feederline and Telephone at Roof
Deck
Completion of Roughing-ins for
Lightings, Power and Tenant Feederlines
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
Completion of Droppings for
Lightings at Mall Area
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
Ongoing Wiring for Telephone and Data
Provisions
Installation of Intermediate Distribution
Frame (IDF)
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
On-going Installation of Chilled
Water Pipes
Dropping of Sprinkler Heads at Ground
and Second Floor (Tenant Area)
On-going Installation of Supply and Kitchen Exhaust Duct
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
On-going Installation of Metal Furring and Ceiling
Boards at Ground Floor Mall Area
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
On-going Installation of Metal Furring and Ceiling Boards
at 2nd Floor Mall Area
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
Installed Escalator 1 & 2
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
Installed Gypsum Board @ 2nd Floor
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
On-going installation of Floor Tiles at Ground Floor
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
On-going installation of Floor Tiles at 2nd Floor
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
Waterproofing @ 4th Floor
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
Installed Roof sheet at Canopy
Engineering
Design &
Development
Engineering
Design &
Development
EMB RETROFITTING WORKS
Stressed Tendons
@ Genset Room
Stressed Tendons
@ Chiller Room
Stressed Tendons
@ Sub-station
Stressed Tendons
@ Girder
Engineering
Design &
Development
Engineering
Design &
Development
PROGRESS PHOTOS
Installed I-Columns and I-Beams at EMB
Engineering
Design &
Development
Engineering
Design &
Development
MECHANICAL WORKS – (68.10%)
GROUND FLOOR : CHILLED WATER PIPE SECOND FLOOR : CHILLED WATER PIPE
Engineering
Design &
Development
Engineering
Design &
Development
ELECTRICAL WORKS – (70.55%)
Ground Floor : Ongoing Wiring for Lightings
Second Floor : Ongoing Wiring for Lightings
Engineering
Design &
Development
Engineering
Design &
Development
Ground Floor : Ongoing Wiring for Power Provision and Convenience Outlets
ELECTRICAL WORKS – (70.55%)
Second Floor : Ongoing Wiring for Power Provision and Convenience Outlets
Engineering
Design &
Development
Engineering
Design &
Development
Second Floor : Ongoing Wiring for Fire Detection & Alarm System
FIRE DETECTION & ALARM SYSTEM WORKS – (71.00%)
Ground Floor : Ongoing Wiring for Fire Detection & Alarm System
Engineering
Design &
Development
Engineering
Design &
Development
Ground Floor : Installed Roughing-ins for Structured Cabling
Second Floor : Installed Roughing-ins for Structured Cabling
STRUCTURED CABLING WORKS – (61.00%)
Engineering
Design &
Development
Engineering
Design &
Development
Second Floor : Water Supply Distribution System Layout
Ground Floor: Water Supply Distribution System Layout
SANITARY /PLUMBING WORKS - (82.40%)
Engineering
Design &
Development
Engineering
Design &
Development
Fourth Floor : Water Supply Distribution System Layout
Third Floor: Water Supply Distribution System Layout
SANITARY /PLUMBING WORKS - (82.40%)
Engineering
Design &
Development
Engineering
Design &
Development
Second Floor: Sewer, Waste and Vent System Layout, Storm Drainage and FCU/AHU System Layout
Ground Floor : Sewer, Waste and Vent System Layout, Storm Drainage and FCU/AHU System Layout
SANITARY /PLUMBING WORKS - (82.40%)
Engineering
Design &
Development
Engineering
Design &
Development
SANITARY /PLUMBING WORKS - (82.40%)
Fourth Floor: Sewer, Waste and Vent System Layout, Storm Drainage and FCU/AHU System Layout
Third Floor: Sewer, Waste and Vent System Layout, Storm Drainage and FCU/AHU System Layout
Engineering
Design &
Development
Engineering
Design &
Development
FIRE PROTECTION WORKS – (71.80%)
Second Floor : Installation of Crossmain and
Branchline Ground Floor: Installation of Branchline
Engineering
Design &
Development
Engineering
Design &
Development
FIT-OUT WORKS
Second Floor : Ground Floor:
Cyberzone Fit-Out Works
(69.10%)
Mall Fit-Out Works
(45.00%)
Engineering
Design &
Development
Engineering
Design &
Development
TILE WORKS – (55.00%)
Second Floor : Installed Tiles at Mall Area Ground Floor: Installed Tiles at Mall Area
Engineering
Design &
Development
Engineering
Design &
Development
RETROFITTING WORKS (45.01%)
Engineering
Design &
Development
Engineering
Design &
Development
III. DESIGN ISSUES RFI/RFA
ITEMS/ DESCRIPTION ATTN DATE ISSUED DATED NEEDED STATUS
A. STRUCTURAL WORKS
1.0 RFI-ST-036 – Seismic Gap between Partition of Existing Mall & Mall Expansion
JSLA 9-21-14 October 16, 2014
2.0 RFI-ST-040 – Structural Details of Stair at EMB JSLA 9-21-14 October 16, 2014 RESOLVED
3.0 RFA-ST-019 – Proposed Location of CHB Wall Partition @ AHU room due to conflict of Exhaust Duct & Kitchen Supply Duct Block out & Riser
JSLA 10-14-14 October 16, 2014
B. ARCHITECTURAL WORKS
1.0 RFI-AR-036 – Finish of Ramp Slab Soffit Parapet Wall (Ramp) & 4th floor Parking
JSLA 9-21-14 October 16, 2014 RESOLVED
2.0 RFI-AR-037 – Elevation details of EE Room & Telco Rooms at 4th Floor Roof Deck
JSLA 9-23-14 October 15, 2014 RESOLVED
3.0 RFI-AR-044– Provide schedule of the following for New EMB - Doors – Cyclone wire partition JSLA 10-14-14 October 15, 2014 RESOLVED
Engineering
Design &
Development
Engineering
Design &
Development
Phase 1
GENERAL WORK SCHEDULE
Phase 2
BIDDING and AWARD STATUS
Phase 3
SITE DEV’T WORKS
Phase 4 CONSTRUCTION
PHASE
Engineering
Design &
Development
Engineering
Design &
Development
IV. PROCUREMENT (OSM)
REBARS Overall Rebars Requirements (kgs.) = 2,341,166.43kgs Delivered On Site = 1,932,394.89 kgs Balance Remaining = 58,771.54 kgs CEMENT IN BULK Overall Estimated Cement Requirements (Bags) = 311,100.00 Bags Delivered On Site = 280,000.00 Bags Balance Remaining = 31,100.00 Bags CEMENT IN BAGS Overall Estimated Cement Requirements (Bags) = 21,000.00 Bags Delivered On Site = 8,500.00 Bags Balance Remaining = 12,500.00 Bags
Engineering
Design &
Development
Engineering
Design &
Development
(RETROFITTING WORKS)
IV. STATUS UPDATE AT EXISTING EMB CIVIL / ARCHITECTURAL WORKS
Engineering
Design &
Development
Engineering
Design &
Development
TIMELINE OF
FIT-OUT WORKS
Engineering
Design &
Development
Engineering
Design &
Development
CYBERZONE SCHEDULE
Engineering
Design &
Development
Engineering
Design &
Development
MALL SCHEDULE
Engineering
Design &
Development
Engineering
Design &
Development
SUMMARY OF
PROJECT COST REPORT
Engineering
Design &
Development
Engineering
Design &
Development
PROJECT COST REPORT
Engineering
Design &
Development
Engineering
Design &
Development
PROJECT COST REPORT
Engineering
Design &
Development
Engineering
Design &
Development
CITY -BALIWAG EXPANSION
THANK YOU