Make it so: Pushing UPDM to Production Against ArcGIS 10.5 and APR ESRI Petroleum User Group (PUG) – Houston, TX April 13, 2017 Anthony Herman Supervisor GIS, Drafting, and Technical Records Express-Platte Pipelines – Technical Services ENBRIDGE | CELL: 403-919-8479 | [email protected] | Peter Veenstra Principal GIS Technologist Oil and Gas, TRC KANSAS CITY | CELL: 816-820-7841 | [email protected] |

Upload: trancong

Post on 01-Jul-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Make it so:Pushing UPDM to Production Against ArcGIS 10.5 and APR

ESRI Petroleum User Group (PUG) – Houston, TX

April 13, 2017

Anthony HermanSupervisor GIS, Drafting, and Technical

Records

Express-Platte Pipelines – Technical Services

ENBRIDGE| CELL: 403-919-8479 |[email protected] |

Peter VeenstraPrincipal GIS Technologist

Oil and Gas, TRC

KANSAS CITY| CELL: 816-820-7841 |

[email protected] |

Page 2: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Express-Platte Pipeline System

Page 3: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Express-Platte Pipeline System

Page 4: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

HCAContract role vacant

GIS Analyst

EP – Geospatial Data Management (GDM) Team

Anthony Herman Supervisor GIS

Jeff AndersonGIS Analyst

John FinneganGIS Coordinator

Stephen NingGIS Specialist

CP

ILI

Risk Run

CIS/DOC

Geotechnical

DIGS

Integrity

UAT

Application Development

Planning

IT apps and management

systems

RASCI

Projects

10X thinking

Field support User

support

Project support

Engineering

Operations

LMS

Lands

Business Development

Page 5: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Investigation

Unsecured and unmanaged data; notable example being an early interview with KM staff who moved over to Spectra Energy Liquids: why the portable hard-drives? It s GIS data the stuff on the server is old . One employee had ¼ million files equating to 5 times the size of server based geodatabases.

Local, desktop ArcGIS licenses were the norm, as was keeping data locally on workstations.

Express-Platte s history of multiple ownerships created a vast disconnect between geospatial data and technical records.

No data model was used to manage the data resulting in multiple attributes being replicated across featureclasses.

Multiple versions of the truth for multiple datasets, i.e.: digs, ILI, and centrelines.

Data was disconnected and misaligned, i.e.: coatings were spatially independent the pipeline.

Spectra Energy Due Diligence of GIS Data

Page 6: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

GIS Production Databases | Spatial Data >

Integrity Databases and supporting data > Cathodic Protection >

Lands > EHS >

Facility Records >

Engineering >

Drafting >

DA

TAD

ATA

DA

TA

DA

TA

DA

TA

DA

TA

DA

TA

DA

TA

Geodatabases – no data model structure, un-versioned, unmanaged User data – 200 GB of unmanaged folders / 4 TB Ext HD s of unknown data*

Non-spatialized databases User data – unmanaged folders / duplications / TVC Non-spatialized databases User data – unmanaged folders / duplications / TVC

Non-spatialized databases Unmanaged spatial data

Un-spatialized pipeline attribute database

Access Database User data – unmanaged folders / duplications / TVC

Drafting Database User data – unmanaged business processes Records Project - Facility Records Database

History – Data Map – 2013 - Present

Pipe Facilities CP Cartopac Base

DRAS

Shapefiles FGDB GDB KML

Cambio Excel Data ILI DIGS CPDM Excel Data ILI DIGS

LMS PAD EHS

FRD Prebish

Eng DB Excel Data ILI DIGSIRTH

MeridianOverdue Projects

Current Projects

xlsx csv ASA

Page 7: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

ESRI ArcGIS | CARTOPAC | XMAP | SHEETCUTTER | XTOOLS | EDGE LIQUIDS | PORTAL

DRAS AND MS EXCEL CPDM

WEB WEB

WEB (FILE SERVER BACKEND)

MS ACCESS

MERIDIAN

GIS

INTE

GR

ITY

CP

LAN

DS

EHS

REC

OR

DS

ENG

INEE

RIN

G

DR

AFT

ING

Non-spatialized databases Unmanaged spatial data

History – Data to Technology Map

Pipe Facilities CP Cartopac Base

DRAS

Shapefiles FGDB GDB KML

Cambio Excel Data ILI DIGS CPDM Excel Data ILI DIGS

LMS PAD EHS

FRD Prebish

Eng DB Excel Data ILI DIGSIRTH

MeridianOverdue Projects

Current Projects

xlsx csv ASA

Page 8: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Lands

ASA

Cartopac

Integrity

Legacy Transformation

Spatial Data

GIS Production Databases

Eng EHS

Out of the chaos

Working from a philosophy centered around pipeline integrity data, a plan was struck to deal with past failures.

Page 9: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

GDI

-A Geospatial Data Infrastructure – GDI – is the construct of creating a hardware and software ecosystem that permits

geospatial data to be modelled, maintained, and served up to a user base, through intuitive, dynamic, and scalable portals, to

elucidate complex geospatial data and queries. -

GDI is the framework for Geospatial Operational Excellence-

Express-Platte s (EP) GDI mission is to model EP s real-world pipeline assets. EP s GDI is based on ESRI s Utility and Pipeline

Data Model (UPDM) and will leverage ESRI s ArcGIS 10.5 Enterprise, ArcGIS Event Editor, ArcGIS Pro, Advanced Pipeline

Referencing (APR) tools, and Portal. -

GOE and GDI

Page 10: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Express-Platte Pipeline System

Geospatial Operational Excellence

Page 11: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Steps to achieve Geospatial Operational Excellence

contemporary data model and tools-

data verification | consolidation | accuracy/precision-

referential integrity-

single version of the truth -

documentation-

scope and governance-

production---

As stated the goal is for GDI to virtually model all product carrying pipeline; linking those geospatial features to

the record of truth.

GOE Measures of Success

Page 12: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

GOE: Data Model Why ESRI s UPDM and APR toolset

EP is an ESRI shop: UPDM was chosen to stay in-line

with the current ESRI development focus and

ArcGIS Pipeline Referencing (APR) hooks into UPDM.

Expectation: ESRI will handle the core data

management functionality decreasing SEL s reliance

on 3rd party tools.

Established: ESRI APR is based on ESRI s established Roads and Highways apps.

Vision: ESRI is planning to release OOTB templates,

reports, functionalities based on UPDM and APR.

Cost: reducing reliance on 3rd party vendors eases management of IT/GIS

infrastructure and lowers licensing and maintenance

costs.

Future: UPDM is built to allow growth, able to handle

gathering, transmission, and distribution pipeline

networks.

Page 13: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

SDE

Recap – current data environment

Geodatabases

\\FileServer\Geodata

DRAS

Cambio CPDM

DIGS

LMS

PAD

EHS

FRD

Eng DBILI

IRTH

SQL Server 2008

Shapefiles FGDB GDB KML

Excel Dataxlsx csv ASA

CartopacCP BasePipe Facilities

\\FileServer\SE Liquids

Multiple \\FileServers

Page 14: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

SQL Server 2012

GOE: data verification | consolidation | accuracy/precision

Geodatabases

\\FileServer\Geodata

DRAS

Cambio CPDM

DIGS

LMS

PAD

EHS

FRD

Eng DBILI

IRTH

Shapefiles FGDB GDB KML

Excel Dataxlsx csv ASA

CartopacCP BasePipe Facilities

\\FileServer\SE Liquids

Multiple \\FileServers

GDI.GDIUS GDI.GDICAN

Imperial Metric

SDE

FME

ModelBuilder

QA

Page 15: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Referential Integrity

Implementation of an architecture which ensures entries into the GDI database maintain the integrity of the data.

-Referential Integrity is architected through the GDI data model, ESRI and SQL

versioning, and permission group authentications, and ESRI APR toolset.-

Goals being to eliminate data duplication, increase data accuracy, and link data to other data to elucidate complex interdependencies.

GOE: referential integrity

Page 16: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

TraceableVerifiableComplete

GOE: single version of the truth

Page 17: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

The Source

\\FileServer

GOE: documentation

GDI DocumentationGeospatial Data Management (GDM)

Documentation

Enterprise Architect File

Data Dictionary

Schema Change Log

ESRI Documentation

Governance

Process Documents

Procedures

Projects

PHMSA Readiness

User Support

NPMS

Data Use Agreements

Workflows

SharePoint

Document Repositories

Page 18: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Apr 14 Jul 14 Oct 14 Jan 15 Apr 15 Jul 15 Oct 15 Jan 16 Apr 16 Jul 16 Oct 16 Jan 17

GOE: GDI Development

Dec 15

Phase 1 DeliverableJan 15

RFP

Jan 14

Budget Approval

Jan 17

Budget Approval

Feb 17

Phase 2 DeliverableApr 14

Review Deliverable

Mar 14

3rd Party Review

Mar 17

ProductionApr 16 - Aug 16

Integrity Design

Mar 15 - Aug 15

Data model Design

Aug 16 - Dec 16

Data Migration

May 14

SOW

Jan 15

Budget Approval

Mar 16

Phase 2 Kickoff

Jun 14 - Dec 14

SEL internal work

Jan 16

Budget Approval

Feb 15

Phase 1 Kickoff

Sep 15 - Dec 15

Data Migration

Page 19: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Jeff Anderson

Stephen Ning

Integrity Team

GOE: team

John FinneganGIS Coordinator

UPDM / APR / 10.5 Enterprise

Rick Morley

Pete Veenstra

Tim Monnig

Shawn McCormackIT Support

TRC

Robert Gardner

Hari Adduri

Additional Contractors

IT apps and management

systems

Tom Coolidge

Jeff Allen

Anjali Bhangay

APR TeamTom

DeWitt

William Isley

ESRI

Nathan Easley

Terry Delong Anthony Herman

Supervisor GIS

Page 20: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Event Editor

APR

ArcGIS Portal

ArcGIS Pro

ArcMap

ESRI 10.5 Enterprise*

GMAF

Lands

EHS

Geocortex

GDI SQL 2012

hosting GDIUS and GDICAN

HCA

GDM & other FileServers

P_Integrity

P_Pipeline

FRDIntegrity

other

ENG

ASA

GOE: GDI Production Architecture (projected)

*As part of the early adopter program we are using evaluation licensing to support GDI until we can stand up the 10.5 ArcGIS environment.

SheetCutter

Pipe viewer

Page 21: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Project Investment

Project Comps – Natural Gas (NGT) and Liquids (LT) Transmission Pipeline Operators

Bu

rnB

urn

Bu

rn

2017 | Phase 32014 | Phase 0 2015 | Phase 1 2016 | Phase 2

$23,500

Budget $62,000

$243,490

Budget $250,000

$252,762

Budget $235,000 Budget $115,000

$5,000

$890,000* $2,000,000 $930,000

Data model config and data migration, development of toolsets.

Database migration to new toolset and configuration of tools; add other data feeds.

Data model development and data migration, development of toolsets.

1 year 2 years 1 year

SE Transmission US NGT Operator US NGT & LT Operator

$3,800,000

Data model change and data migration.

4 years

US LT Operator

$247,000

Data migration and conversion.

2 years

European Offshore LT Operator

$519,752

Data model development, data migration, and implementation of new toolsets.

3 years

SE Liquids

*Does not include internal costs

GOE: GDI Investment

Page 22: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

ESRI UPDM and ArcGIS for Pipeline Referencing

• Migration Plan

• Source Data

• Building the Centerline

• Source Data after the Source Data

• What is APR going to be used for again?

• Configuring APR (the lessons)

• Operational Excellence

Page 23: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

• Migration Plan• Create UPDM Model (Release, Re-visit and Revise)

• Create a Lexicon Update the Data Dictionary

• Create a Mapping File (Source Data to UPDM, Existing Pipeline DM to UPDM)

• Create a Change Log (who changed, what, how and why?)

• Oh wait … new release …

• Create the Centerline

• Synchronize with the previous GIS data

• Add the dig sheet information

ESRI UPDM and ArcGIS for Pipeline Referencing

Page 24: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

• Source Data• Multiple sources of the truth

• Created a MASTER Weld List of ID’s

ESRI UPDM and ArcGIS for Pipeline Referencing

ILI Vendor 1

ILI Vendor 2

ILI Vendor 3

Existing GIS Welds

XYZM

XYZM

XYZM

XYZM

Page 25: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Express-Platte Pipeline System

Page 26: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

• Building the Centerline

ESRI UPDM and ArcGIS for Pipeline Referencing

Page 27: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

• Source Data after the Source Data• When using ILI to create a centerline

calculate measured distance from XY distance not joint lengths

• Then calibrate to the welds and KEEP the offset distance

• Not all ILI’s called out the welds the same• But bend apex’s were not stored• Had to synchronize with the GIS bend apexs

to build the ‘real’ centerline• And we needed to manage this in two

geodatabases – CAN/US• This was a manual task but it would sure be

nice to have a ‘align’ function in APR and have the Geodatabase allow two LRS systems in a single geodatabase

ESRI UPDM and ArcGIS for Pipeline Referencing

Page 28: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

• What is APR going to be used for again?

• Managing the centerline – engineering stationing and continuous measure stationing

• Replacing pipe (not often) – adding engineering equations

• Using the ‘event’ editor to load dig data –excavation, defect locations, pipe-replacements, coating condition and replacement

• That was the plan … not fully flushed out

ESRI UPDM and ArcGIS for Pipeline Referencing

Page 29: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

• Configuring APR (the lessons)

• APR requires specification of M-Unit of Measure.

• Geodatabase does not require this.

• Configuring the M-Tolerance in the GeoDB, loading data

• Record and document your settings (you will do them over again)

ESRI UPDM and ArcGIS for Pipeline Referencing

Page 30: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

• Learning APR• Build 10 engineering series (0-10, 11-20, 21-30 … etc.)

• Map the APR required tables and fields to your (UPDM) tables and fields

• Operational Excellence• Worked with champion

• Had a manager

• The approach was focused on making this the system of record

ESRI UPDM and ArcGIS for Pipeline Referencing

Page 31: Make it so - Recent Proceedingsproceedings.esri.com/library/userconf/petrol17/papers/... · 2017-04-19 · Make it so: Pushing UPDM to ... GDI is the framework for Geospatial Operational

Make it so:Pushing UPDM to Production Against ArcGIS

10.5 and APR

Anthony HermanSupervisor GIS, Drafting, and Technical

Records

Express-Platte Pipelines – Technical Services

ENBRIDGE| CELL: 403-919-8479 |[email protected] |

Peter VeenstraPrincipal GIS Technologist

Oil and Gas, TRC

KANSAS CITY| CELL: 816-820-7841 |

[email protected] |