major refurbishmentand tiling of outdoor pool
TRANSCRIPT
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
REFURBISHMENT AND TILING OF AN EXISTING FIBREGLASS OUTDOOR POOL
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
REMOVAL OF EXISTING FIBRERGLASS LINER AND MOSIAC TILING OF POOL, PAINTING OF CONCRETE TILE SURROUND, ACID AND HOT WASH OF EXISTING FLAGS, FITTING NEW DOSING SYSTEM, REPAIR TO PIPEWORK, NEW POOL COVER, IMPROVEMENT TO CLEAN WATER DISTRIBUTION SYSTEM
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
ALL THE EXISTING FIBREGLASS LINING (510 SQUARE METRES) HAD TO BE REMOVED – THIS WAS A PAINSTAKING PROJECT
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
SHOWN IS ONE OF OUR OPERATIVES PAINSTAKINGLY REMOVING THE GLASS LINING AND SCABBLING THE NEWLY EXPOSED WALLS TO ENSURE CORRECT THOROUGH PREPARATION
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
PREPARED DEEP END FLOOR BEING THOROUGHLY CLEANED PRIOR TO BEING TILED
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
SHOWN IS THE POOL DEEP END IN THE PROCESS OF BEING MOSAIC TILED IN “POOL BLUE”
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
ONE OF OUR OPERATIVES QUALITY CHECKING AN AREA OF POOL WHICH HAS BEEN GROUTED
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
SHOWN IS ONE OF OUR FEMALE OPERATIVES GIVING THE FINISHED SHALLOW END THE “WOMANS TOUCH” PRIOR TO POOL FILLING
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
ACID AND HOT JET WASHING OF SURROUNDING FLAGS BEFORE AND AFTER
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
THE FINISHED POOL DURATION APPROX 5 WEEKS FROM START TO FINISH
BEFORE AND AFTER – WHAT A TRANSFORMATION
ON TIME AND IN BUDGET!!
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS