major issues of managing development projects in nepal by bhim upadhyaya
TRANSCRIPT
Major Issues in Managing Major Issues in Managing Development Projects in Nepal Development Projects in Nepal
for for High Level Management of Dept of Hydrology High Level Management of Dept of Hydrology
and Meteorology and Meteorology
Bhim UpadhyayaBhim Upadhyaya
Joint Secretary MoPRJoint Secretary MoPR1414thth Jan, 2015 Jan, 2015
01/14/15Major Issues in Managing Development Projects in Nepal 1
Issues in Development Projects in Nepal
Identification of Need of the ProjectGoal SettingPlanning & Funding: Govt. & Donors Grant and
LoanImplementation and ManagementControl of Scope, Cost, Quality and Time MonitoringHandover, Operation & MaintenanceFeed Back and EvaluationReconstruction and Renovation
01/14/15Major Issues in Managing Development Projects in Nepal 2
What is a Development Project?What is a Development Project?A Project is attributed by:A Project is attributed by:• Objective or GoalObjective or Goal• TimeTime• CostCost• Location or space; andLocation or space; and• A Team-work of expertsA Team-work of experts
01/14/15Major Issues in Managing Development Projects in Nepal 3
A Project has mainly 3+1 Stakeholders: A Project has mainly 3+1 Stakeholders: 4C's4C's
1.Client (or Employer) 1.Client (or Employer) 2.Consultant (or Engineer)2.Consultant (or Engineer)3.Contractor (or Consumer 3.Contractor (or Consumer Group)Group)
4.Consumer4.Consumer
01/14/15Major Issues in Managing Development Projects in Nepal 4
Project PhasesProject Phases1.1. Study (Data collection & Need)Study (Data collection & Need)2.2. Design Phase (Detailing for Goal)Design Phase (Detailing for Goal)3.3. Development Phase (Input-Development Phase (Input-
Output Mngt.)Output Mngt.)4.4. Operation Phase (Service Mngt.)Operation Phase (Service Mngt.)
01/14/15Major Issues in Managing Development Projects in Nepal 5
CPM- Project Implementation control
01/14/15Major Issues in Managing Development Projects in Nepal 10
01/14/15Major Issues in Managing Development Projects in Nepal 11
PROJECT MGMT(Input & Output)
PROCUREMENTMGMT,Goods, works,
services
FINANCIALMGMT
CONTRACTMGMT
QLTY/LAB MGMT
SITE MGMT
PROJECT Management Breakdown
TechnicalAudit
QAP
WORK PLAN payment in t ime
DISBURSEMENT
Report ing
Mobil ization
Insurance
Claim & Refund
Detail Project Report•Selection, Walkover
•EIRR,IEE, Resett lement•Land Acquisit ion
•Detail Survey, Design•Estimate Approval
ContractorsRBG, VIUGConsultants
CONSTRUCTION MGMT
Public Works PartiesClient or Employer
Engineers or Consultants
Contractor or Builder
or UC
Client+Contractor+Consultant
Contractor or UC
Client + Engineer
01/14/15Major Issues in Managing Development Projects in Nepal 12
Standard 3 party Int'l Practice for large Works 2 Party Nepali(Local Body) Practice
for small and medium sized Works
Phases of Public Works
Works
Precons-truction Phase
Construction Phase
Operation and Maintenance
Phase01/14/15
Major Issues in Managing Development Projects in Nepal 13
3 Parties Mutual Check and Balance
Project Manager or Client'sRepresentative
Consultant
Contractor
01/14/15Major Issues in Managing Development Projects in Nepal 17
Supervisonof Works
Process(Quality
System or control)
Payment(Cost
Control: directindirect)
Time(Progress)
Performance(Output)
01/14/15Major Issues in Managing Development Projects in Nepal 19
Aspects
Scheduling, Gantt, CPM, PERTDrawing, Specification, Lab Tests, Qualified Supervisors
ConstructionSupervison
Money(Finance,Account)
Men(Labor,
Consultants)
Machine(Equipments,
Tools)
Materials(Site Store,
Quarry,Fuel)
Components
01/14/15Major Issues in Managing Development Projects in Nepal 20
01/14/15Major Issues in Managing Development Projects in Nepal 23
Cost Control through Time, Cost Control
01/14/15Major Issues in Managing Development Projects in Nepal 24
2 Functions of a Project: 9 knowledge Areas
Project
01/14/15Major Issues in Managing Development Projects in Nepal 25
Scope, Time and Cost
management for Success of
Project
Conclusions
Issues at Identification and PlanningIssues during ImplementationIssues during completion hand overIssues during follow ups and operation and
maintenanceIssues after project implementation complete but
during its service periodIssues during project life periodContinuity and Replacement
01/14/15Major Issues in Managing Development Projects in Nepal 26
01/14/15Major Issues in Managing Development Projects in Nepal 27
Any Question
Thank You
Cell no [email protected]