30
BLAST FURNACE AREA 1 530 Cu.M BF - Structural fabrication VISL Client 6.5 2 600 Cu.M BF - Equipment & Structures erection NACAST Client 100 00 3 500 Cu.M BF - Equipment & Structures erection SJK Client 90.5 4 250 Cu.M BF - Equipment & Structures erection VISA Client 30.8 5 351 Cu.M BF 1 - Equipment & Structures erection JSPL Client 50 6 1250 Cu.M BF 1 - Equipment & Structures erection JSW Client 75 7 1680 Cu.M BF 2 - Equipment & Structures erection JSW Client 95 8 1680 Cu.M BF 2 - Equipment & Structures erection JSPL Client 135 9 1680 Cu.M BF 1 - Equipment & Structures erection BSSL Client 110 10 2000 Cu.M BF-7 - Dismantling, Supply & Erection BSP Danieli Corns 275 11 Sinter Fines Disposal System for BF-4 & 5 - Turnkey BSP Own 19.6 12 Sinter Transportation from SP3 to BFs - Turnkey BSP Own 118.8 13 Hot Blast Stoves for BF 4 - Dismantling & Erection DSP Client 53.5 14 Rotor Charging Unit for BF 3 - Supply & Installation BSP Totem, Russia 72 15 Iron Ore screening facilities for BF7 BSP Own 4 16 Disposal System for Granulated Slag from BF-4,5 & 6 - Turnkey BSP Own 144.2 17 BF 5 Stockhouse conveyorisation BSP Own 8.9 18 BF 2 Stockhouse conveyorisation BSP Own 10.8 19 Hot Blast Stoves for BF 2 - Dismantling & Erection BSL Client 189 20 250 Cu.M BF - Equipment & Structures erection Monnet Client 95 MILLS AREA 1 Water cooled Skid system for Reheating Furnaces in RSM - Dismantling, Supply & Erection BSP Cameron, UK 19.8 2 Walking Beam Cooling Bed, Roller Tables, Precambering, etc. for Lonq Rail Project - Supply & Erection incl. civil works BSP Siemens VAI 226 3 Transfer Beds, Roller Tables, Rail Handling System, etc. for Long Rail Project incl. civil works - Supply & Erection incl. civil works BSP Siemens VAI 268 4 NDT Station under Long Rail Project in RAIL & Structural Mill - PKG-III - Supply & Erection incl. civil works BSP NDT Tech., Canada 306.49 5 3 nos. Carbide Saws under Long Rail Project - Supply & Erection incl. civil works BSP Linsigner, Austria 6.5 6 3 Nos. Hydraulic Press under Long Rail Project - Supply & Erection incl. civil works BSP Berner, Germany 11.13 7 Long Rail Handling System for Rail Welding Plant - Supply & Erection BSP Siemens VAI 112.25 8 Equipment for Hydraulic automatic gauge control system in Plate Mill - Supply & Erection incl. civil works BSP Danieli India 30 9 Revamp of Hot Strip Mill - Dismantling, supply & erection BSL Siemens VAI 25 10 End Forging Plant for Thick Web Rail - Supply & Erection incl. civil works BSP Hydraulico, Denmark 82 11 Cooling Beds, Pilers & Other equipment for Plate Mill - Supply, erection, civil & structural works BSP Vitkovice, Czech 1,328.00 MAJOR CONSTRUCTION WORKS EXECUTED BY BEEKAY FOR STE SL. NO. NAME OF PROJECT CLIENT COLLABORATOR FOR TECHNOLOGY CONTRACT Value Rs. Million

Upload: truongduong

Post on 06-Feb-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

BLAST FURNACE AREA

1 530 Cu.M BF - Structural fabrication VISL Client 6.5

2 600 Cu.M BF - Equipment & Structures erection NACAST Client 100 00

3 500 Cu.M BF - Equipment & Structures erection SJK Client 90.5

4 250 Cu.M BF - Equipment & Structures erection VISA Client 30.8

5 351 Cu.M BF 1 - Equipment & Structures erection JSPL Client 50

6 1250 Cu.M BF 1 - Equipment & Structures erection JSW Client 75

7 1680 Cu.M BF 2 - Equipment & Structures erection JSW Client 95

8 1680 Cu.M BF 2 - Equipment & Structures erection JSPL Client 135

9 1680 Cu.M BF 1 - Equipment & Structures erection BSSL Client 110

10 2000 Cu.M BF-7 - Dismantling, Supply & Erection BSP Danieli Corns 275

11 Sinter Fines Disposal System for BF-4 & 5 - Turnkey BSP Own 19.6

12 Sinter Transportation from SP3 to BFs - Turnkey BSP Own 118.8

13 Hot Blast Stoves for BF 4 - Dismantling & Erection DSP Client 53.5

14 Rotor Charging Unit for BF 3 - Supply & Installation BSP Totem, Russia 72

15 Iron Ore screening facilities for BF7 BSP Own 4

16 Disposal System for Granulated Slag from BF-4,5 & 6 - Turnkey BSP Own 144.2

17 BF 5 Stockhouse conveyorisation BSP Own 8.9

18 BF 2 Stockhouse conveyorisation BSP Own 10.8

19 Hot Blast Stoves for BF 2 - Dismantling & Erection BSL Client 189

20 250 Cu.M BF - Equipment & Structures erection Monnet Client 95

MILLS AREA

1 Water cooled Skid system for Reheating Furnaces in RSM -

Dismantling, Supply & Erection

BSP Cameron, UK 19.8

2Walking Beam Cooling Bed, Roller Tables, Precambering, etc. for

Lonq Rail Project - Supply & Erection incl. civil works

BSP Siemens VAI 226

3 Transfer Beds, Roller Tables, Rail Handling System, etc. for Long

Rail Project incl. civil works - Supply & Erection incl. civil works

BSP Siemens VAI 268

4 NDT Station under Long Rail Project in RAIL & Structural Mill -

PKG-III - Supply & Erection incl. civil works

BSPNDT Tech., Canada

306.49

5 3 nos. Carbide Saws under Long Rail Project - Supply & Erection

incl. civil works

BSP Linsigner, Austria 6.5

6 3 Nos. Hydraulic Press under Long Rail Project - Supply &

Erection incl. civil works

BSP Berner, Germany 11.13

7 Long Rail Handling System for Rail Welding Plant - Supply &

Erection

BSP Siemens VAI 112.25

8 Equipment for Hydraulic automatic gauge control system in Plate

Mill - Supply & Erection incl. civil works

BSP Danieli India 30

9 Revamp of Hot Strip Mill - Dismantling, supply & erection BSL Siemens VAI 25

10 End Forging Plant for Thick Web Rail - Supply & Erection incl.

civil works

BSP Hydraulico,

Denmark

82

11 Cooling Beds, Pilers & Other equipment for Plate Mill - Supply,

erection, civil & structural works

BSP Vitkovice, Czech 1,328.00

MAJOR CONSTRUCTION WORKS EXECUTED BY BEEKAY FOR STEEL INDUSTRY

SL. NO. NAME OF PROJECT CLIENT

COLLABORATOR

FOR

TECHNOLOGY

CONTRACT

Value Rs.

Million

MINES AREA

1 Cold Bonded Pellet Plant for Iron Ore Fines at Gua Mines - TK RDCIS Own 69.8

2 Crushing, Screening, Washing & Slurry Disposal Plant for Iron

Ore at Dalli Mines - 4 Pacakqes - Turnkey

BSP Own 202

3 Crushing & Screening Plant for Limestone at ILQ Satna - TK RSP Own 55.2

4 Teritary Crushing & Screening System for Iron Ore at Rajhara - TK BSP Own 7930

5 Primary Crushing & Conveying Facilities at Dalli Mines - TK BSP Own 398.8

COKE OVEN AREA

1Quenching System for Coke Oven Battery No.5 - Dismantling,

Supply & Erection of eguipment incl. civil works

BSL Giprokoks 115

2Partial Briquette Coal Charging Plant for Coke Ovens - Supply &

Erection of equipment incl. civil works on Turnkey basis

RSP CdF Ing. France 537.4

3 Independent Coke Route for Coke Oven Battery 9 & 10 - Supply

& Erection of equipment incl. civil works

BSP Own 36.6

4 Revamping of By Product Plant - Supply & Erection of equipment

incl. civil works

BSP Own 102

5 Rebuilding of Coke Oven Battery No.5 - Dismantling, Supply &

Erection of equipment incl. civil works

BSP Giprokoks 620

6 Rebuilding of COB-6 (Works Pkg.2) - Dismantling, Supply &

Erection of equipment incl. civil works

BSP Own 213

7 Quenching System (Pkg-2A) COB-1 - Dismantling, Supply &

Erection of equipment incl. civil works

BSL Hutni, Czech 280

8 Coke Ovens & Aux. shops - Structural Fabrication & Erection VSP Own 74.8

SMS AREA

1 4 strand Bloom Caster - Supply & Erection of Equipment DSP Danieli & C 210

2 130T RH Deqasser - Supply & Erection of equipment BSP Siemens VAI 100

3 130T Ladle Furnace - Supply & Erection of equipment incl. civil

works

BSP Danieli & C 80

4 Hot Metal Desulphurisation for SMS-II - Supply & Erection of

equipment incl. civil works

BSP ESM INC. USA 285

5 Slab Caster - Supply & Erection of equipment BSP Danieli & C 510

6 Hot Metal Desulphurisation Unit Plant - Supply & Erection of

equipment

VSP ESM INC. USA 270

7 Hot Metal Desulphurisation Plant SMS-III - Supply & Erection of

equipment

BSP ESM INC. USA 291

OTHERS

1 Complete Conveyor System for RMHS of SP 3 - Supply &

erection

BSP L&T 67

2 Hydroblast unit for Grey Iron Foundry at RSP - Supply & erection

incl. civil works

RSP OWN 16.9

3 Gas Cleaning Plant - Structural fabrication & Erection VSP OWN 24

4 Stacker & Reclaimer - Erection & Commissioning L&T OWN 2.09

SL. NO. NAME OF PROJECT CLIENT

COLLABORATOR

FOR

TECHNOLOGY

CONTRACT

Value Rs.

Million

8,461

Page 1

M3 T T T

22.01.92 30.05.94 2,000 -

09.02.95 30.09.96 - 6,000 1,500

02.09.96 31.03.99 - - 4,500 1,500

26.11.03 22.03.05 - - 3,300 1,400

15.01.01 09.04 02 - - 4,500 2

21.02.03 31.12.04 - 5,100 1.995

16.09.04 10.08.06 - 10,000 1,610

30.07.04 15.10.06 - 13,800 3,500

18.10.05 under execution - 12,550 1,650

21.03.05 8.06.07 1,700 5,000 1,000 4,000

05.09.89 05.02.90 650 - 375 225

08.01.99 03.04.2000 1,280 - 1,000 300

31.01.91 04.04.96 - 9,000 1,500 200

13.08.95 30.12.97 - - 250

27.05.91 12.08.91 - - 100

12.08.91 18.12.93 5.2 2,200 350

12.08.91 12.0592 - 200 200

19.0393 20.08.93 200 200

27.05.08 under execution 325 8,250 800 -

31.01.08 under execution - 4, BOO 2,400

04.07.86 06.06.88 2,100 300 100

18.10.02 18.04.04 12,000 - - 2,200

18.10.02 18.06.04 8,000 - 800 2,400

06.05.03 20.11.04 400 - - 200

22.11.02 29.09.04 100 - - 100

27.11.02 29.09.04 100 150

30.09.03 31.03.05 - 1,000 200

22.02.05 30.06.08 200 100 500

15.08.05 under execution - - 100 500

20.12.07 NOV. '08 600 100 500

24.07 08 under execution 10,000 - 700 3,000

MAJOR CONSTRUCTION WORKS EXECUTED BY BEEKAY FOR STEEL INDUSTRY

CONTRACT

DATE

COMPLETION

DATE

VOLUME OF SITE WORKS

Concrete | Refractory | Structures | Equipment

27 07.87 15.12.90 6,375 - 900 450

21.11.88 30.09.91 10,000 - 1,050 2,100

06.06.91 01.10.94 3.25 - 500 400

21.10.91 07.06.94 1,150 - 200 240

08.05.95 30.12.97 10,500 - 650 820

2.05.05 12.10.07 3,000 - 300 500

03.12.92 27.11.96 6,200 - 3,000 2,500

04.01.95 11.11.96 350 - 450 150

22.01.05 30.09.08 100 - 250 650

26.02.05 12.02.09 7,000 12,700 1,800 5,000

01.09.08 under execution 1,000 12,700 450 3,000

19.09.08 under execution 3,000 - 100 200

29.05.82 30.05.90 - 10,000 -

03.09.04 2.08.07 - 500 3,000

23.08.05 3.05.08 - 500 - 1.5

02.09.05 2.06.08 2,000 300 700 500

18.02.06 30.08.08 2,400 300 700 600

05.12.05 OCT. '08 700 - 4,500

17.01.08 under execution - 300 700 300

06.10.08 under execution - 300 700 400

16.12.97 30.04.00 - - 1,900 1,700

23.07.90 30.06.92 300 - 100 250

24.06.86 31.07.88 - - 1,500 -

24.11.97 31.10.99 - - - 600

VOLUME OF SITE WORKS

Concrete

CONTRACT

DATE

COMPLETION

DATE

97,180 52,650 82,575 56,190