1 Ossberger, HU 2010, Balaton, 17.03.2010 Maintenance procedures on Vienna‘s metro & tram Markus Ossberger Head of Business Unit Strategic Planning & Organisation , Wiener Linien GmbH & Co KG

Upload: others

Post on 28-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

1Ossberger, HU 2010, Balaton, 17.03.2010

Maintenance procedures on Vienna‘s metro & tram

Markus OssbergerHead of Business UnitStrategic Planning & Organisation , Wiener Linien GmbH & Co KG

Page 2: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

2

2Ossberger, HU 2010, Balaton, 17.03.2010

Organisational structure of maintenance process

legal constraints

organisational framework

scheduled activities

problems & solutions

EisbG :SMS §39c

Page 3: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

3

3Ossberger, HU 2010, Balaton, 17.03.2010

Legal Framework

� Austrian Railways Act� Decrees, prescriptions� Notification for construction and operation of railway

infrastructure� General rules� technical prescriptions (of operator)

Legal constraints

Organisational framework

Scheduled activities

Problems & solutions

Page 4: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

4

4Ossberger, HU 2010, Balaton, 17.03.2010

Legal conditions:Austrian Railways Act (EisbG)

§ 19a continuous monitoring

§ 40 railway engineering special fieldsRequired for continuous monitoring of railway infrastructure⇒⇒⇒⇒

� Railway undertakings without a certified safety management system due to§ 39c, have to undergo a routine periodic examination , stating that railway infrastructureis fulfilling the prescriptive values of the Austrian railway act (EisbG) (due to 31.12.2008for enterprises existing prior to April 1st, 2002)

� Examination is done by notified bodies, civil engineers,engineering offices and selected persons due to § 40 EisbG (with certain limitations)

==> national technical prescriptions remain vitally imp ortant !!!!

Page 5: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

5

5Ossberger, HU 2010, Balaton, 17.03.2010

Notification -Database

Main problem:localization / reference points

More than 1000 notifications

More than 4000 documents

> 80.000 pages

> 1000 maps

Page 6: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

6

6Ossberger, HU 2010, Balaton, 17.03.2010

Track database

Task:

1. complete digitalisation of

urban rail network [CUBAL]

2. automated actualization of

reference data [NetScan]

3. all-embracing coverage of

infrastructure data

Page 7: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

7

7Ossberger, HU 2010, Balaton, 17.03.2010

Track database

detail vs. overview

1. Technical control has to be

possible as well as

2. Economical design, planning

and control

Page 8: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

8

8Ossberger, HU 2010, Balaton, 17.03.2010

Activities of the operator

� Quality management� Activity scheme „track construction & maintenance“

Legal constraints

Organisational framework

Scheduled activities

Problems & solutions

Page 9: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

9

9Ossberger, HU 2010, Balaton, 17.03.2010

Structure of maintenance process

Maintenance

(scheduled) Preventive

maintenance

Correctivemaintenance

Inspection Servicing

RenewalInspection (technical monitoring)

measures to detect and assess the state of technical devices in the system(detect, assess, analyse, react)

Servicingmeasures to maintain the current technicalstandard of devices in the system

Page 10: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

10

10Ossberger, HU 2010, Balaton, 17.03.2010

Problems & Solutions

Research & Development

Legal constraints

Organisational framework

Scheduled activities

Problems & solutions

Page 11: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

11

11Ossberger, HU 2010, Balaton, 17.03.2010

Metro Network:

Commuter railway: ÖBB61 km line length = 186 km track length82 stationsvmedium = 31,3 km/h684 vehicles

Network Overview

Page 12: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

12

12Ossberger, HU 2010, Balaton, 17.03.2010

Tram network

31 lines231 km line length =445 km track length

1135 stations

vmedium = 15,2 km/h

901 vehicles

600 Volt DC

Database: April 2006

Network Overview

Page 13: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

13

13Ossberger, HU 2010, Balaton, 17.03.2010

Data survey:

Measurement cars

Network monitoring

Track geometry13 Mio. /640 Mio datapackages

Transverse profile points750 Mio. / 3 Mrd.

•Continuous measurement of the tramnetwork [ca. 5000 km/a]

•Continuous measurement of themetro network [6 times/year, ca. 1000 km/a]

Page 14: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

14

14Ossberger, HU 2010, Balaton, 17.03.2010

P

DC

A

plan

docheck

act

Maintenance Circle

Page 15: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

15

15Ossberger, HU 2010, Balaton, 17.03.2010

Theory & practice: documentationof measurement runs

Legal constraints

Organisational framework

Scheduled activities

Problems & solutions

Measurement CarServer

Request for measurement car

Quarterly schedule

Calibration schedule

Calibrated?

Depot reports eventual additional car passenger

Prepare meas. run

Calibration

Measurement runpossible?

Perform Run

Finish Run

Save data on meas. car server

Control measurements

Track Errors and Defects?

Switch to process: Servicing

yes

no

yes

no

yes Measurement runarchive

no

Page 16: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

16

16Ossberger, HU 2010, Balaton, 17.03.2010

Theory & practice: documentationof measurement runs (2)

Page 17: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

17

17Ossberger, HU 2010, Balaton, 17.03.2010

Practice: documentation of measurement runs

Page 18: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

18

18Ossberger, HU 2010, Balaton, 17.03.2010

Example:Ballast Tamping

Page 19: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

19

19Ossberger, HU 2010, Balaton, 17.03.2010

Example: inspection of technicalprescriptions

z.B.: due to §17 StrabVO 1999 (decree): Meas. run of 26.8.2008

Page 20: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

20

20Ossberger, HU 2010, Balaton, 17.03.2010

Example: inspection of technicalprescriptions

z.B.: due to §17 StrabVO 1999 (decree): Meas. run of 17.12.2003

Page 21: Maintenance procedures on Vienna‘s metro & tram · Maintenance procedures on Vienna‘s metro & tram Markus Ossberger ... Ossberger, HU 2010, Balaton, 17.03.2010 2 Organisational

21

21Ossberger, HU 2010, Balaton, 17.03.2010

Measure due to qualitymanagement system: tamping

Legal constraints

Organisational framework

Scheduled activities

Problems & solutions