maintenance plans and tasks: eliminating non-value added maintenance activities for improved...
TRANSCRIPT
![Page 1: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/1.jpg)
Maintenance Plans and Tasks:Eliminating Non-Value Added Maintenance
Activities for Improved Reliability
Robert WigginsShowa Denko Carbon, Inc
Maintenance Planning and Scheduling Supervisor
![Page 2: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/2.jpg)
•Robert Wiggins is a graduate of Trident Technical College with a diploma in the Industrial Electrical program and holds a BS degree in Business Administration/Management from Limestone College. •He has over 27+ years experience with Showa Denko Carbon, Inc. (SDKC) and working in industrial maintenance and manufacturing. •Robert joined SDKC in 1984 as a shift electrician. He has served as a maintenance supervisor, planner and planner-scheduler. •Robert currently serves as the maintenance planning and scheduling supervisor and is responsible for managing four maintenance planners, and the maintenance planning and scheduling activities for 37 technicians and numerous contractor services. •Robert is actively involved with updating and creating maintenance items, tasks, and maintenance plans, as part of a reliability effort to establish an SAP database maintenance library for routine and corrective type maintenance activities.
![Page 3: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/3.jpg)
Toky
o, Ja
pan
Ridg
evill
e, S
C
Om
achi
, Jap
an
GLOBAL CAPABILITY
QUALITY SERVICE RELIABILITY
![Page 4: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/4.jpg)
GRAPHITE ELECTRODES
GRANULAR GRAPHITE
FINE CARBONS
MARKET PLACE
QUALITY SERVICE RELIABILITY
![Page 5: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/5.jpg)
Large-Diameter Ultra High Powered Graphite Electrodes used in the Electric Furnace Steelmaking
Industry
GRAPHITE ELECTRODES
QUALITY SERVICE RELIABILITY
![Page 6: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/6.jpg)
QUALITY SERVICE RELIABILITY
QUALITY SERVICE RELIABILITY
•Friction Materials•Lubricants•Conductive Coatings•Carbon & Graphite Shapes
HIGH PERFORMANCE GRAPHITE FOR AUTOMOTIVE & INDUSTRIAL APPLICATIONS
GRANULAR GRAPHITE
![Page 7: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/7.jpg)
QUALITY SERVICE RELIABILITY
GRAPHITE TECHNOLOGIES FOR ADVANCED ENERGY SYSTEMS
•Vapor Grown Carbon Fiber•Shape Controlled Micro Graphite Powder•Impervious Graphite Composite Plate•Ultra Fine Graphite Powder
FINES CARBON
![Page 8: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/8.jpg)
Construction of Ridgeville plant
Shipment of first 24” electrodes
Shipment of first 28” electrodes
Acquired by Showa Denko KK
PIP plant expansion
ISO9002 registration
KDAC plant expansionOver $100 million sales
Shipment of first 30” electrodes
Shipment of first 32” electrodes
1982 1983 1985 1988 1990 1995 1996 1997 2008
Over $200 million sales
2006
QUALITY SERVICE RELIABILITY
CORPORATE HISTORY
![Page 9: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/9.jpg)
•Petroleum Needle Coke
•Binder Pitch
•Iron Oxide
•Stearic Acid
Petr
oleu
m R
efine
ryD
istil
latio
n Pr
oces
s
Stee
l Pic
klin
g Pr
oces
s
RAW MATERIALS
QUALITY SERVICE RELIABILITY
![Page 10: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/10.jpg)
•Iron Oxide
Mix
Extrude Bake Impregnate
RebakeGraphitizeMachine
FormulateNeedle Coke StorageScreen
Binder Pitch
Petroleum Pitch
QUALITY SERVICE RELIABILITY
PROCESS OVERVIEW
![Page 11: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/11.jpg)
QUALITY SERVICE RELIABILITY
SAP RELEASE 4.7
![Page 12: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/12.jpg)
Maintenance Plans and Tasks:Eliminating Non-Value Added Maintenance
Activities For Improved Reliability
Robert WigginsShowa Denko Carbon, Inc
Maintenance Planning and Scheduling Supervisor
![Page 13: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/13.jpg)
Preventative Maintenance Plans and Tasks:
•Eliminating Waste
•Increasing Value and Reliability
![Page 14: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/14.jpg)
QUALITY SERVICE RELIABILITY
Inspect???
Check???
Verify???
Ensure???
![Page 15: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/15.jpg)
QUALITY SERVICE RELIABILITY
Inspect???
Check???
Verify???
Ensure???
![Page 16: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/16.jpg)
QUALITY SERVICE RELIABILITY
Update Procedures
Combine Tasks
Adjust Frequencies
Change Crew Assignments
![Page 17: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/17.jpg)
QUALITY SERVICE RELIABILITY
Update Procedures
Combine Tasks
Adjust Frequencies
Change Crew Assignments
![Page 18: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/18.jpg)
QUALITY SERVICE RELIABILITY
Maintenance Frequencies
Poorly Identified
Duplication Of Maintenance
Tasks.
Incorrect Labor &
Craftsmen Identified
Maintenance Tasks
Assigned With No
Procedures
Shutdown Requirements
Not Adequately Identified
Production Equipment Not
Properly Prepared For Service
![Page 19: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/19.jpg)
QUALITY SERVICE RELIABILITY
First Pass To Pick The Low Hanging Fruit:
Review All Maintenance Plans/Task To
Determine The Actual Job Requirement.
Second Pass: Review All Maintenance
Plans/Task Procedures For Duplications. 15-20% Of PM
Tasks Issued To Maintenance
Technicians Are Most Likely
Performed By Operators As Part
Of Their SOP
![Page 20: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/20.jpg)
QUALITY SERVICE RELIABILITY
Change!!!
Replace!!!
Adjust!!!
Document!!!
![Page 21: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/21.jpg)
QUALITY SERVICE RELIABILITY
Change!!!
Replace!!!
Adjust!!!
Document!!!
![Page 22: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/22.jpg)
QUALITY SERVICE RELIABILITY
Review Tasks For Measurement Points
and Adjustments. Make certain This
Information Is Documented In The
PM Text.
Run To Failure: Carrying Critical Spares And Long
Lead Items. Some Equipments May Be More Cost Effective To Allow To Run to Failure Than Spend
Labor on Inspections.Inspecting Belts, Sheaves, Chains,
Sprockets – Versus Periodic
Replacement Based On Mfg Data And Known Failure
Rates
![Page 23: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/23.jpg)
QUALITY SERVICE RELIABILITY
What Do You Expect To Gain From Your Preventative Maintenance Program?
• Safety: Safety And Health Is Priority For People And Equipment
• Visibility: Well Maintained Equipment Looks Good• Availability: Equipment Runs On Demand• Reliability: People – Processes – Equipment• Maintainability: Ease Of Maintenance • Profitability: Low Maintenance Cost Per Production Unit • Sustainability: Provides Improved Maintenance Program For
Future Workforce
![Page 24: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/24.jpg)
QUALITY SERVICE RELIABILITY
•Maintenance Item Descriptions Should State The Expected Outcome Of The Order
•Item Descriptions Should Be Standardized For Consistency
![Page 25: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/25.jpg)
QUALITY SERVICE RELIABILITY•Maintenance Task Operations Should Be Titled To Indicate The Exact Task Assignment
•Tasks Should Be Broken Out By Craft And By Sequence Of Order
•Each Operation Has Correct Estimate Of Labor Required
![Page 26: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/26.jpg)
QUALITY SERVICE RELIABILITY
![Page 27: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/27.jpg)
QUALITY SERVICE RELIABILITY
Equipment Type
Number of
Equipments
Number of
Maintenance
Orders Issued
Man-
hours/
Orders
Total Cost @
$51.00/hr Materials Total
Bake Furnace
Zone Fans @
Quarterly
Inspections 48 384 2 $39,168.00 none $39,168.00
Bake Furnace
Zone Fans @ 2-
Year Belt
Replacements 48 48 7 $17,136.00 $3936.00 $21,072.00
SAVINGS $18,096.00
![Page 28: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/28.jpg)
QUALITY SERVICE RELIABILITY
Equipment Type
Number of
Equipments
Number of
Maintenance
Orders Issued
Man-
hours/
Orders
Total Cost @
$51.00/hr Materials Total
ID Fans @ Quarterly
Visual Inspections 12 96 1 $4,896.00 none $4,896.00
ID Fans @ 2-Year
Belt Replacements 12 12 2.5 $1,530.00 $1600.00 $3,130.00
SAVINGS $1,766.00
![Page 29: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/29.jpg)
QUALITY SERVICE RELIABILITY
Equipment Type
Number of
Equipments
Number of
Maintenance
Orders Issued
Man-hours/
Orders
Total Cost @
$51.00/hr Materials Total
Pre-heater Fans
@ Quarterly
Inspections 8 64 1 $3,264.00 none $3,264.00
Pre-heater Fans
@ 2-Year Belt
Replacements 8 8 2 $816.00 $160.00 $976.00
SAVINGS $2,288.00
![Page 30: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/30.jpg)
QUALITY SERVICE RELIABILITY
![Page 31: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/31.jpg)
QUALITY SERVICE RELIABILITY
![Page 32: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/32.jpg)
QUALITY SERVICE RELIABILITY
Purpose Statement: Why is job being requested
Special tools and Equipment
Drawings
![Page 33: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/33.jpg)
QUALITY SERVICE RELIABILITY
Safety Procedure
Maintenance Procedure
![Page 34: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/34.jpg)
QUALITY SERVICE RELIABILITY
Maintenance Procedure Details Exact Requirements For Completing Task
![Page 35: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/35.jpg)
QUALITY SERVICE RELIABILITY
Maintenance Procedure
![Page 36: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/36.jpg)
QUALITY SERVICE RELIABILITY
Equipment Checkout
Housekeeping
![Page 37: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/37.jpg)
QUALITY SERVICE RELIABILITY
Materials
![Page 38: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/38.jpg)
QUALITY SERVICE RELIABILITY
What is a Maintenance
Task?
![Page 39: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/39.jpg)
QUALITY SERVICE RELIABILITY
Anything pertaining to the necessary basic support and repair
of equipment.
In SAP: A maintenance task is any single maintenance activity.
What is a Maintenance
Task?
![Page 40: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/40.jpg)
QUALITY SERVICE RELIABILITY
Tasks Such As:– Lubrications– Infrared Thermo Graphics– Vibration Analysis– Inspections– Corrective Type Repairs
• Electrical - Replacement of motor• Mechanical – Replacement of gearboxes• Mobil - Replacement of batteries• HVAC – Replacement of filters• Welding - Containers
What is a Maintenance
Task?
![Page 41: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/41.jpg)
QUALITY SERVICE RELIABILITY
Tasks Such As:– Adjustments– Rebuilds– Predictive Monitoring & Analyzing– Wear Based Component Replacements
• Sheaves / Belts• Sprockets / Chains• Shaft Seals• Armor Plates
What is a Maintenance Task?
![Page 42: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/42.jpg)
QUALITY SERVICE RELIABILITY
Maintenance Tasks Importance?
•Write maintenance task to document the knowledge acquired by your senior maintenance technicians, planners and staff before they retire
• Write maintenance tasks to reduce “reinventing the wheel”
• Knowledge Transfer
• Planners and Technicians can issue orders from tasks quickly
![Page 43: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/43.jpg)
QUALITY SERVICE RELIABILITY
• Write maintenance tasks to help bring your new maintenance force up to same level of expertise as existing maintenance personnel and quickly reduce learning curve.
• Write maintenance tasks to eliminate safety issues for employees and equipment.
• Reduces unexpected incidents.
• SAFETY FIRST!!
![Page 44: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/44.jpg)
QUALITY SERVICE RELIABILITY
Maintenance Frequencies
Properly Aligned
Correct Labor &
Craftsmen Identified
Maintenance Tasks With
Well Defined Procedures
Duplication Tasks
Eliminated
Shutdown Requirements
Properly Identified
Production Operations
Established On Maintenance
Plans To Properly Prepared For
Service
![Page 45: Maintenance Plans and Tasks: Eliminating Non-Value Added Maintenance Activities for Improved Reliability Robert Wiggins Showa Denko Carbon, Inc Maintenance](https://reader038.vdocuments.mx/reader038/viewer/2022103005/56649d145503460f949e979e/html5/thumbnails/45.jpg)
QUALITY SERVICE RELIABILITY
Thank You for your attention and interest!