maintain control of wireless permits and adapting to ab 57 requirements

8
Tellus Venture Associates ® Maintaining control of wireless permits and adapting to AB 57 requirements 8 March 2016

Upload: stephen-blum

Post on 13-Jan-2017

124 views

Category:

Mobile


1 download

TRANSCRIPT

Page 1: Maintain control of wireless permits and adapting to AB 57 requirements

Tellus VentureAssociates

®

Maintaining control of wireless permits and adapting to AB 57 requirements 8 March 2016

Page 2: Maintain control of wireless permits and adapting to AB 57 requirements

Shot clocks designed for fast decisions: yes or no

• Same rules but new process• Requires change of culture• 150 day clock = less than 90 days

working time• Assume colocations fall under 60-day

clock• No more back and forth with

applicants

Tellus Venture Associates

Page 3: Maintain control of wireless permits and adapting to AB 57 requirements

Front load application process

• Justification for less than 150-day window• All state & federal permits, licenses done• Photo simulations, including future modifications• CEQA studies, including seasonal bio surveys• All information for all local permits, e.g.

encroachment• Valid permit for existing structures• Neighborhood meeting

Tellus Venture Associates

Page 4: Maintain control of wireless permits and adapting to AB 57 requirements

Encourage pre-application consultation

• Allow waivers for favored designs, locations such as facade mounts, light poles

• Fast track city property, ROW• If OK waive neighborhood meeting,

allow negative declaration• Denial of waiver is denial of application

Tellus Venture Associates

Page 5: Maintain control of wireless permits and adapting to AB 57 requirements

Set up review for quick initial decision

• Publish detailed checklist• Request additional info within 30 days• Administrative approval/denial without

hearing• Incomplete application, design

changes grounds for denial• No additions, changes, amendments

without mutual agreement to pause (toll)

Tellus Venture Associates

Page 6: Maintain control of wireless permits and adapting to AB 57 requirements

Automatic appeal of denials to city council

5 days to appeal approvals, assume clock keeps running

Tellus Venture Associates

Page 7: Maintain control of wireless permits and adapting to AB 57 requirements

Establish stringent standard permit conditions

Waivers only possible by affirmative grant

Tellus Venture Associates

Page 8: Maintain control of wireless permits and adapting to AB 57 requirements

Tellus VentureAssociates

®

Tellus Venture Associates

Contact:Steve BlumTellus Venture Associates+1-831-582-0700steveblum@tellusventure.comwww.tellusventure.com

Adapting to AB 57 requirements

8 March 2016