First Line Operation & Maintenance – Training Course
For Consol Glass on all Installed Switchgear – All Plants
Index
INTRO An Introduction to the Consol Plants
SECTION 1 CONTAINS A BRIEF INTRODUCTION TO THE FOUR CONSOL PLANTS LOCATED IN GAUTENG WITH A BRIEF INTRODUCTION TO THE VARIOUS INSTALLED MEDIUM VOLTAGE SWITCHGEAR EQUIPMENT OF EACH PLANT. THEN SETIONS 2 TO 5 CONTAIN A MORE DETAILED DISCUSSION OF EACH SPECIFIC PLANTS MEDIUM VOLTAGE DISTRIBUTION LAYOUT, APPLICABLE ELECTRICAL SINGLE-LINE DRAWINGS & EQUIPMENT IN ORDER AS INDICATED BELOW.
1. An introduction to Consol in Gauteng
2. Electrical introduction to the Switchgear installed at the Clayville Plant
3. Electrical introduction to the Switchgear installed at the CSG Plant in PTA
4. Electrical introduction to the Switchgear installed at the Wadeville Plant
5. Electrical introduction to the Switchgear installed at the Nigel Plant
6. Siemens MV Switchgear Training Manual
7. GEC AGVB Switchgear Manual
8. Reyrolle LMS Switchgear Manual
9. ABB Unigear HD4 Switchgear Manual
10. Alstom SBV 24 / 3 / 4 Switchgear Manual
11. Johnson & Phillips PDB / B800 Switch Manual
12. GEC T-Series Switchgear Manual
13. Siemens Vacuum Switching Techn. Manual
14. Siemens 8BF Switchgear Manual
15. 3AH5 Vacuum Circuit Breaker Manual
16. 3TL6 Vacuum Contactor Manual
17. 3D Disconnectors & Earthing Switch Manual
18. SGC – DF2 Switchgear Description Manual
19. SGC – DF2 Switchgear Transport Manual
20. SGC – DF2 Switchgear Operator User Manual
21. Merlin Gerin Masterpact LV Breaker Manual
22. Electrical Plan & Review Support Manual
23. Circuit Schematic Drawing of Circuit Breaker
24. Circuit Schematic Drawing of Contactor
25. Sample Test Sheet for Panel Maintenance
26. Sample Test Sheet for Breaker Maintenance