main high speed/high capacity railways · 2019-12-10 · main high speed/high capacity railways 10...
TRANSCRIPT
8.
11.
5.
14.
13.
6.
4.
2.1.
3.
7.
12.
9.
10.
ITALY“Fiorenza” Multipurpose Train Depot Milan(1987-2000)
SWITZERLANDGotthard Base TunnelBodio and Faido Lots(2001-2014)
FRANCETGV Nord Aronde
(Lot 19-16)(1989-1992)
FRANCETGV Lille and
A5 viaduct(1989-1992)
TURKEY“Orient Express”,High-Speed Railway Halkali-Kapikule(2019-in progress)
ITALYFlorence-Rome"Direttissima"High Speed Railway (1970-1983)
ITALYTurin-MilanHigh SpeedRailway System(2002-2009)
TURKEYKosekoy-Gebze,Section of the Ankara-IstanbulHigh Speed Train Project(2011-2016)
ITALYNaples-Bari High Capacity Railway Line Apice-Hirpinia section(2019-in progress)
FRANCETGV Line Rhone-Alpes
"Rhone" Viaduct"(1989-1992)
ITALY"The Brenner Base Tunnel", "IsarcoUnderpass" and "Tulfes-Pfons" sections(2014-in progress)
ITALYTerzo Valico dei Giovi,
Milan - GenoaHigh Speed, High-Capacity
Railway Line Section(2012-in progress)
ITALYBologna-FlorenceHigh Speed Railway System(1996-2009)
ITALYMilan-Naples High Speed Railway System “Bologna Junction” (2000-2009)
1998
2007
1999 2000 2001 2002 2003 2004 2005 2006 2008 2009 2010 2011
1981
1990
19821983198419851986198719881989
1971
1980
1972
1973
19741975
19761977
1978
1979
1970
1968
1969
1991
19921993 19
94
2012 2013 2014
2016 2017 2018 2019
2015
1997
1995 1996
COMPLETED AND ONGOING PROJECTSMAIN HIGH SPEED/HIGH CAPACITY RAILWAYS
10
10
88 11
1
4 11
2
7
1
7
6
3141516
12
245
5 9
9
13
13
End of worksXX
Work startXX
OngoingXX
ITALYPalermo-Catania RailwayBicocca-Catenanuovasection(2019-in progress)
15.
ITALYVerona-PaduaHigh Speed Railway(2019-in progress)
16.