main equipment list
TRANSCRIPT
-
8/18/2019 Main Equipment List
1/6
30000 Tons per Year Multi-function fertilizer equipments line
No Product Name Specification and ModelSet
s
1Electronic belt
scale
Model:B650,Length of the
belt=2m,Power=0.75kw×33
2 Screw conveyor φ400X2000mm,Power=2.2x2
3t
2
3
Feed hopper,
Protective net
1600x1600mmx4 sets;
900x900mmx2 sets;5t
6
4
Cage grinder(mill)Model:FLS60
Power=15kw+11kw,Weight=2.8t 1
5Belt conveyor
1-11#
Model:B650
Total Length of 11 sets Belt=157.5m
Speed=0.8m/s
Total Power of 11 sets belt
conveyor=48.5kw
11
-
8/18/2019 Main Equipment List
2/6
6Double shaft
mixer
Model:WJ500,Power=15kw,Weight=
2t 1
7 Drum granulator
Model:φ1500×6000mm Speed
reducer is ZQ400
Power=11kw Weight=11t 1
8Rotary dryer 1#
HG1800×18000mm
Style of speed reducer is ZQ650,
Power=22kw ,Weight=27t 1
9 Rotary dryer 2#
HG1800×18000mm
Style of speed reducer is ZQ650,
Power=22kw,Weight=26t 1
10
Rotary screen 1#
φ1500×5000mm,
Speed reducer is ZQ400,
Power=11kw. Weight= 5t
1
.
11 Vertical grinderModel:LF600
Power=18.5kw ,Weight=0.7t 1
12 Rotary cooler
HL1200×12000mm
Style of speed reducer is ZQ400,
Power=11kw Weight=13.5t 1
13Rotary screen 2#
φ1200×5000mm,
Speed reducer is ZQ350,
Power=5.5kw. Weight=2.6t
1
14 Coating machine Model:TM1000X4000,speed reducer
is ZQ350,Power=5.5kw,Weight=5t 1
-
8/18/2019 Main Equipment List
3/6
15 Stock bin 2m³1t
1 The material is Q235B carbon steel,δ=6mm
-
8/18/2019 Main Equipment List
4/6
18 Induced draft fan
4‐72№10C,Flow=31237-43722m3/
h,total press=1902-1505paPower=30kw,
1 It is working for the rotary dryer 1#
25 Steam boiler 2 ton steam boiler, Power=22kw 1Including steam boiler’s installation fees, pipes
and valves.
-
8/18/2019 Main Equipment List
5/6
26 Installation fees
The buyer should pay 80-90 USD per day per
worker, the travel expense, lodging and liftcharges will be responsible by the buyer.
Total Factory Price power 354.1 kw
FOB QINGDAO
PROT,CHINA
352,750+13000(land
freight)=365,750USDIt’s about twelve 40 feet open top containers
CIF Cat Lai Port, Ho
Chi Minh, Vietnam
365,750+12000(ocean
freight)=377,750 USD
REMARK:
1.Manufacturing time:45-50 days after receiving the deposit.
2. Delivery time: 15-20 working days
3. Time of the installation, training and Trial production: 40-50 working days to install, commissioning and other
things.
4.Payment terms:100% by L/C ,30% of the total amount as deposit in advance after contract,50% of the total
amount will be paid after shipping documents, the last 20% of the total amount will be paid after installation and
commissioning.
-
8/18/2019 Main Equipment List
6/6
泰安市利丰化工设备有限公司
Tai An Li Feng Chemical Equipments Co.,Ltd
5. Quantity of our technicians: 4-6 technicians. (Please look for some local workers, welding equipment and
Lifting equipments to assist our technicians to install the fertilizer machines.)
6. Daily salary of the technicians: USD 80 Per Working Day per person. And the flight tickets, lodging and
accommodation fees will be borne by the buyer.
Tai An Li Feng Chemical Equipment Co.,LTD