    30000 Tons per Year Multi-function fertilizer equipments line 

    No Product Name Specification and ModelSet 

    1Electronic belt

    scale

    Model:B650,Length of the

    belt=2m,Power=0.75kw×33

    2 Screw conveyor φ400X2000mm,Power=2.2x2

    3t

    2

    3

    Feed hopper,

    Protective net

    1600x1600mmx4 sets;

    900x900mmx2 sets;5t

    6

    Cage grinder(mill)Model:FLS60

    Power=15kw+11kw,Weight=2.8t 1

    5Belt conveyor

    1-11#

    Model:B650

    Total Length of 11 sets Belt=157.5m

    Speed=0.8m/s

    Total Power of 11 sets belt

    conveyor=48.5kw

    11

  • 8/18/2019 Main Equipment List

    2/6

     

    6Double shaft

    mixer

    Model:WJ500,Power=15kw,Weight=

    2t 1

    7 Drum granulator

    Model:φ1500×6000mm Speed

    reducer is ZQ400

    Power=11kw Weight=11t 1

    8Rotary dryer 1#

    HG1800×18000mm

    Style of speed reducer is ZQ650,

    Power=22kw ,Weight=27t  1

    9 Rotary dryer 2#

    HG1800×18000mm

    Style of speed reducer is ZQ650,

    Power=22kw,Weight=26t  1

    10

    Rotary screen 1#

    φ1500×5000mm,

    Speed reducer is ZQ400,

    Power=11kw. Weight= 5t 

    1

    .

    11 Vertical grinderModel:LF600

    Power=18.5kw ,Weight=0.7t 1

    12 Rotary cooler

    HL1200×12000mm

    Style of speed reducer is ZQ400,

    Power=11kw Weight=13.5t  1

    13Rotary screen 2#

    φ1200×5000mm,

    Speed reducer is ZQ350,

    Power=5.5kw. Weight=2.6t 

    1

    14 Coating machine Model:TM1000X4000,speed reducer

    is ZQ350,Power=5.5kw,Weight=5t 1

  • 8/18/2019 Main Equipment List

    3/6

     

    15 Stock bin 2m³1t

    1 The material is Q235B carbon steel,δ=6mm

  • 8/18/2019 Main Equipment List

    4/6

     

    18 Induced draft fan

    4‐72№10C,Flow=31237-43722m3/

    h,total press=1902-1505paPower=30kw,

    1 It is working for the rotary dryer 1#

    25 Steam boiler 2 ton steam boiler, Power=22kw  1Including steam boiler’s installation fees, pipes

    and valves.

  • 8/18/2019 Main Equipment List

    5/6

     

    26 Installation fees

    The buyer should pay 80-90 USD per day per

    worker, the travel expense, lodging and liftcharges will be responsible by the buyer.

    Total Factory Price power 354.1 kw

    FOB QINGDAO

    PROT,CHINA

    352,750+13000(land

    freight)=365,750USDIt’s about twelve 40 feet open top containers

    CIF Cat Lai Port, Ho

    Chi Minh, Vietnam

    365,750+12000(ocean

    freight)=377,750 USD

    REMARK:

    1.Manufacturing time:45-50 days after receiving the deposit.

    2. Delivery time: 15-20 working days

    3. Time of the installation, training and Trial production: 40-50 working days to install, commissioning and other

    things.

    4.Payment terms:100% by L/C ,30% of the total amount as deposit in advance after contract,50% of the total

    amount will be paid after shipping documents, the last 20% of the total amount will be paid after installation and

    commissioning.

  • 8/18/2019 Main Equipment List

    6/6

    泰安市利丰化工设备有限公司 

    Tai An Li Feng Chemical Equipments Co.,Ltd 

    5. Quantity of our technicians: 4-6 technicians. (Please look for some local workers, welding equipment and

    Lifting equipments to assist our technicians to install the fertilizer machines.)

    6. Daily salary of the technicians: USD 80 Per Working Day per person. And the flight tickets, lodging and

    accommodation fees will be borne by the buyer.

    Tai An Li Feng Chemical Equipment Co.,LTD