Page 1: Mahogany place 3 new

COVER PAGE

DIANNE PALMARIO

TEL NO. 0916-2397032/ 0939-

2501667 / 0922-8624308

Email Address:

[email protected]

Page 2: Mahogany place 3 new

PROJECT DETAILS

DIANNE PALMARIO

TEL NO. 0916-2397032/ 0939-2501667 / 0922-

8624308

Email Address: [email protected]

Page 3: Mahogany place 3 new

Location Map

DIANNE PALMARIO

TEL NO. 0916-2397032/ 0939-2501667 / 0922-

8624308

Email Address: [email protected]

Page 4: Mahogany place 3 new

LAND USE TABULATION

Total Saleable Area 42,155.50 sqm 55.36%

Total Roads, Etc. 27,144.96 sqm 35.74%

Total Parks & Amenities 6,774.70 sqm 8.90%

__________________________________________

Gross Area 76,075.16 sqm 100.00%

Site Development Plan

DIANNE PALMARIO

TEL NO. 0916-2397032/

0939-2501667 /

0922-8624308

Email Address:

[email protected]

Page 5: Mahogany place 3 new

Launched Units

DUPLEX (Helena) : 20 units

DUPLEX (Tamara) : 18 units

SINGLE DETACHED

(Bela) : 12 units

SINGLE DETACHED

(Ariana) : 16 units

66 units

Page 6: Mahogany place 3 new

UNITS LAUNCHED

Page 7: Mahogany place 3 new

Available Units (as of Jan. 15, 2009)

DUPLEX (Helena) : 6 units

DUPLEX (Tamara) : 10 units

SINGLE DETACHED

(Bela) : 5 units

SINGLE DETACHED

(Ariana) : 9 units

30 units

Page 8: Mahogany place 3 new

DUPLEX UNITS

DIANNE PALMARIO

TEL NO. 0916-2397032/ 0939-2501667 /

0922-8624308

Email Address:

[email protected]

Page 9: Mahogany place 3 new

Unit Façade : Tamara

Lot Size : 8mtrs x 15mtrs

Lot Area : 120.00 sqm

Gross Floor Area : 206.60 sqm

Covered Floor Area: 159.50 sqm

Page 10: Mahogany place 3 new

Ground Floor : Tamara

Area : 53.20 sqm

Page 11: Mahogany place 3 new

Second Floor : Tamara

Area : 59.90 sqm Area : 54.70 sqm

Page 12: Mahogany place 3 new

Third Floor : Tamara

Area : 46.40 sqm

Page 13: Mahogany place 3 new

Unit Façade: Helena

Lot Size : 8mtrs x 15mtrs

Lot Area : 120.00 sqm

Gross Floor Area : 251.00 sqm

Covered Floor Area : 182.40 sqm

Page 14: Mahogany place 3 new

Ground Floor : Helena

Area : 114.30 sqm

Standard Unit Upgraded Unit

Page 15: Mahogany place 3 new

Second Floor : Helena

Area : 60.60 sqmStandard Unit

KITCHEN KITCHEN

Upgraded Unit

Page 16: Mahogany place 3 new

Third Floor : Helena

Area : 73.30 sqm

Standard Unit Upgraded Unit

Page 17: Mahogany place 3 new

Interior Images

Living Room with High Ceiling

Page 18: Mahogany place 3 new

Interior Images

Dining Area

Page 19: Mahogany place 3 new

Interior Images

Kitchen

Page 20: Mahogany place 3 new

Interior Images

Family Area

Page 21: Mahogany place 3 new

Interior Images

Master’s Bedroom

Page 22: Mahogany place 3 new

SINGLE-DETACHED

UNITS

Page 23: Mahogany place 3 new

Unit Façade: Bela

Lot Size : 16mtrs x 15mtrs

Lot Area : 240.00 sqm

Gross Floor Area : 307.10 sqm

Covered Floor Area : 205.30 sqm

Page 24: Mahogany place 3 new

Ground Floor : Bela

Area : 90.00 sqm

Page 25: Mahogany place 3 new

Second Floor : Bela

Area : 115.30 sqm

Page 26: Mahogany place 3 new

Unit Façade : Ariana

Lot Size : 16mtrs x 15mtrs

Lot Area : 240.00 sqm

Gross Floor Area : 378.80 sqm

Covered Floor Area: 253.20 sqm

Gross Floor Area : 378.80 sqm

Covered Floor Area : 253.20 sqm

Page 27: Mahogany place 3 new

Ground Floor : Ariana

Area : 195.70 sqm

Page 28: Mahogany place 3 new

Second Floor : Ariana

Area : 112.40 sqm

Page 29: Mahogany place 3 new

Third Floor : Ariana

Area : 85.70 sqm

Page 30: Mahogany place 3 new

STANDARD UNIT

FINISHES FOR

BELA & TAMARA

Page 31: Mahogany place 3 new

A. FLOOR FINISHES

Living/ Dining/ KitchenHomogeneous Granite Tiles

(Stairs: Tanguile Wood Planks)

Bedrooms/Family Hall/ Study

Area/HallwayLow-maintenance resilient flooring

Maid's Room Ceramic Tiles

Driver's Room Ceramic Tiles

Toilet & Bath Unglazed Ceramic Tiles

Porch/Patio/Carport Ceramic Tiles with pebble washout

Service/Laundry Area Ceramic Tiles

Pathwalk / Garden Paver blocks

Balcony/Garage Deck Ceramic Tiles

Bela & Tamara Finishes

Page 32: Mahogany place 3 new

B. COUNTERTOPS

Kitchen Countertop

Granite countertop with base &

overhead cabinets in laminate

finish

Laundry Countertop Ceramic Tiles

Master T&B Countertop Granite countertop

Bela & Tamara Finishes

Page 33: Mahogany place 3 new

C. WALL FINISHES

All Interior Walls Paint Finish w/ wood baseboard

All Exterior Walls Paint Finish w/ stone cladding

Toilets Paint finish above ceramic tiles

Stair AreaPainted Finish (w/ Ashlar marble

Wall Accent for Tamara)

Bela & Tamara Finishes

Page 34: Mahogany place 3 new

D. CEILING FINISHES

Ground Floor Painted Plain Cement Finish

Second Floor

Gypsum board in paint finish

(Bela)

Painted Plain Cement Finish

(Tamara)

Third FloorGypsum board in paint finish

(Tamara)

All T&B Fiber cement board in paint finish

Stair Area Gypsum board in paint finish

Bela & Tamara Finishes

Page 35: Mahogany place 3 new

E. DOORS

Main EntranceSolid wood panel door with fixed

glass panel on metal jamb

Dining Area to Pocket

Garden

Sliding glass door on powder

coated aluminum frame

BedroomsSolid wood panel door on metal

jamb

Kitchen to Service AreaSolid wood panel door on metal

jamb

Balcony Door/ Deck/

Lanai

Sliding glass door on aluminum

frame

Toilet Solid wood panel door on metal

jamb

Bela & Tamara Finishes

Page 36: Mahogany place 3 new

STANDARD UNIT

FINISHES FOR

HELENA & ARIANA

Page 37: Mahogany place 3 new

A. FLOOR FINISHES

Living, Dining & Kitchen Homogeneous Granite Tiles

Bedrooms/ Family Hall/ Study Area/

Hallway Natural Wood Flooring

Porch/Lanai Ceramic Tiles w/ pebble washout

Maid’s Room/ Driver’s Room Ceramic Tiles

Service/ Laundry Area/ Balcony/ Deck Ceramic Tiles

Toilet & Bath (Master’s & Secondary) Homogenous Granite Tiles

Path walk/ Garage Paving Blocks

B. COUNTERTOP

Kitchen Countertop

Natural Granite w/ base &

overhead cabinets

Laundry Countertop Ceramic Tile Finish

Master T & B Countertop Natural Granite

All T&B Countertop Natural Granite

* Bedroom Closets also provided.

Ariana & Helena Finishes

Page 38: Mahogany place 3 new

D. CEILING FINISHES

Ground Floor Painted Gypsum Board

Second Floor Painted Gypsum Board

Third Floor Painted Gypsum Board

Toilet & Bath Painted Gypsum Board

Stairs Area Painted Gypsum Board

C. WALL FINISHES

Interior Walls

Painted finish w/ painted wooden

baseboard

Exterior Walls Painted finish w/ stone cladding

Toilet & Bath

Painted plain cement finish above

tile

Ariana & Helena Finishes

Page 39: Mahogany place 3 new

E. DOOR

Main Entrance Solid wood panel door on metal jamb

Dining Area to Pocket Garden /

Lanai Swing-type doors with glass panels

Bedrooms Solid wood panel door on metal jamb

Kitchen to Service Area Solid wood panel door on metal jamb

Balcony / Deck Swing-type doors

Toilet & Bath Solid wood panel door on metal jamb

F. WINDOWS

Windows

Aluminum analok framed tinted glass

windows

G. FINISHING HARDWARE

Main Entrance Lever type entrance lockset

Bedrooms/ Kitchen/ Balcony/ T &

B Lever type lockset

H. CLOSETS

Closets

Sliding doors with Mirrors, with Laminated

PVC or Marine Plywood Carcass

Ariana & Helena Finishes

Page 40: Mahogany place 3 new

I. TOILET & KITCHEN FIXTURES / ACCESSORIES

Water Closet & Fittings

Master's T&B One piece, Elongated

Bedroom T&B One piece, Elongated

Lavatory

Master’s/ Guest Room

T&B Basin type, Above the counter lavatory

Bedrooms’ T&B Basin type, Above the counter lavatory

Maid’s/Driver’s Room Wall-hung lavatory w/ lever type faucet

Shower Head/Valve, Tap & Fittings

Master’s/Bedrooms’

T&B:

Exposed pipe bath & shower mixer w/

telephone shower & faucet

Maid’s T&B Wall-mounted showerhead valve & faucet

Kitchen sink Stainless steel twin bowl with drainboard

Kitchen faucet Single lever faucet

Ariana & Helena Finishes

Page 41: Mahogany place 3 new

UPGRADE OPTIONS

Page 42: Mahogany place 3 new

Option B

Convert Family

Area into

Bedroom

Php 275,000

Option A

Swimming Pool

Length : 3.50 m

Width : 3.20 m

Depth : 4’4”

Php 420,000

Upgrade Options for Helena

GROUND FLOOR

Page 43: Mahogany place 3 new

Option C

Convert Bedroom 1

In 3rd floor into

Family Area

(Php 92,000)

Upgrade Options for Helena

Option D

Replace Master’s

Shower with Bath

Tub

Php 75,000

THIRD FLOOR

Option E

Add Balcony at

Bedroom 2

Php 61,200

Page 44: Mahogany place 3 new

Option A

Plunge Pool

Length : 10.50 m

Width: 1.85 m

Depth : 4’4”

Php 680,000

Upgrade Options for Ariana

GROUND FLOOR

Option B

Add Driver’s

Quarters

Page 45: Mahogany place 3 new

Option C

Convert Family

Area to additional

Bedroom

Php 420,000

Option D

Replace Master’s

Shower with Bath

tub

Php 75,000

Upgrade Options for Ariana

SECOND FLOOR

Option E

Convert Open Area

to BR w/ 1 T&B

Php 638,000

Page 46: Mahogany place 3 new

Third Floor : Ariana

THIRD FLOOR

Option F

Convert Bedroom 1

to Family Area

(Php 77,100)

Option G

Convert T&B to

Storage

(Php 135,000)

Page 47: Mahogany place 3 new

Prices for Upgrade

HELENA ( DUPLEX)

Option A Swimming Pool 420,000.00

Option B Convert Family Area to Bedroom 275,000.00

Option C Convert BR 1 in 3rd Floor to Family Area (92,000.00)

Option D Replace Master’s Shower with a Bath tub 75,000.00

Option E Add Balcony at Bedroom 2 61,200.00

ARIANA ( SINGLE)

Option A Plunge Pool 680,000.00

Option B Add Driver’s Quarters

Option C Convert Family Area to BR w/ T&B 420,000.00

Option D Replace Master Shower to Tub 75,000.00

Option E Convert Open Area to BR w/ T&B 638,000.00

Option F Convert BR at the 3rd Floor to Family Area (77,100.00)

Option G Convert T&B 1 at the 3rd Floor to Storage (135,100.00)

Page 48: Mahogany place 3 new

PROCESS FLOW FOR

UPGRADED UNITS

Page 49: Mahogany place 3 new

• Buyer to Select Unit

• If option for upgrade is chosen, the option

should be reflected in the R.A.

• Accomplish upgrade form and updated

computation sheet

• If the client chooses not to upgrade, the

regular process for documentation shall

apply.

Page 50: Mahogany place 3 new

UPGRADES ON THE

MODEL UNIT

Page 51: Mahogany place 3 new

Option A

Plunge Pool

Length : 10.50 m

Width: 1.85 m

Depth : 4’4”

GROUND FLOOR

Option B

Add Driver’s

Quarters

Page 52: Mahogany place 3 new

Option D

Replace Master’s

Shower with bath

tub

SECOND FLOOR

Page 53: Mahogany place 3 new

OTHER UPGRADES(I.D. Add-ons specific only to the Model Unit)

Page 54: Mahogany place 3 new

I.D. UPGRADE vs. STANDARDUPGRADE STANDARD

1 Travertine Marble Cladding in Living Room None

2 Airconditioners ( 5 Units) None ( Provision only: Conduits)

3Sliding Wood Doors with Glass Panels at

Dining and DenNone

4 Plumbing Fixtures HCG Brand

5 Lighting Fixtures Single light receptacle per room

6 Wood Flooring - Den Homogenous Granite Tiles

7 Wood Cladding at Balconies, CanopyStucco finish, same as house

exterior

8 Araal Stone Flooring at Driveway Stamped concrete pavers

9 Ceramic Tiles T&B Homogenous Granite Tiles

10 Kitchen Cabinets Different Design

11 Roof Eaves in Wood planksMoisture Resistant Gypsum

Boards

12 Landscaping None

Page 55: Mahogany place 3 new

Travertine Marble Cladding in

Living Room

Sliding Wood Doors with

Glass Panels at Dining

and Den

Roof Eaves in Wood Planks

Wood Cladding

at Balconies and

Canopy

Page 56: Mahogany place 3 new

PRICING

Page 57: Mahogany place 3 new

PRICING

Ariana – P17.170M to 19.390M

Helena – P10.990M to 11.720M

Page 58: Mahogany place 3 new

PRICING

Tamara – P11.920M to 12.110M

Bela – P17.990M to 18.310M

Page 59: Mahogany place 3 new

PAYMENT SCHEMES

• Minimum of 30% DP spread over

construction period or until RFO date for

ALL unit types

– Fixed RFO dates for Bela & Tamara Units

– 12-month construction period for Ariana &

Helena

• Construction starts after payment of 1st DP

• Unit is completed & ready for turnover after 12-

month period & client’s completion of 30% DP

Page 60: Mahogany place 3 new

Construction Milestones

Page 61: Mahogany place 3 new

• Model Unit : 1st QTR 2009

• Entrance gate : 1st QTR 2009

• Clubhouse : 2nd QTR 2009

Construction Milestones

Page 62: Mahogany place 3 new

Construction Milestones

Entrance Gate and Perimeter Fence

As of December 23, 2008

Page 63: Mahogany place 3 new

Construction Milestones

Clubhouse and Amenities Area

As of December 23, 2008

Page 64: Mahogany place 3 new

Swimming Pool

Construction MilestonesAs of December 23, 2008

Page 65: Mahogany place 3 new

For inquiry please contact:

Dianne Palmario

Tel No.

0916-2397032/ 0939-2501667 /0922-8624308

Email Address: [email protected]

Page 66: Mahogany place 3 new

END OF

PRESENTATION