Mahmoud Abd El Baset Mohamed Seismic Division Manager Bachelor Degree in Mechanical Engineering Cairo University Faculty of Engineering Mob: ‐ +971 50 812 05 15 or +971 50 24 7 25 24 ‐ UAE, Abu Dhabi E‐mail: [email protected] RESUME PROFILE 11 years of professional experience in Engineering, Sales, and Marketing for MEP Systems. Sectors: Commercial and Residential Buildings, Hospitals, Hotels, Infrastructure, and District Cooling Plants. Strong Health, Safety and Environment Values. Professional Memberships: Project Management Institute “PMI". ASHRAE Associate Member. ASHRAE Technical Committee for Seismic Restraint. ASHRAE Technical Committee for Seismic Vibration Control and Acoustic. EDUCATION AND PROFESSIONAL MEMBERSHIPS: Sr. Degree / Course / Organization University / Institute / Organization Year 1 Bachelor Degree of Mechanical Engineering Cairo University Faculty of Engineering 2006 2 Professional Project Management ‐ PMP CHICAGO Management Institute 2011 3 ASHRAE Technical Committee for Seismic and Wind Restraint Design ASHRAE Technical Committee – TC 2.7 4 ASHRAE Technical Committee for Sound and Vibration Control ASHRAE Technical Committee – TC 2.6 KEY SKILLS & EXPERIENCE: Operational: Manage entire product marketing cycle – Planning and applying the use of various sales strategies. Analyzing current market trend and competitor information.

Upload: mahmoud-abd-el-baset-mahmoud

Post on 13-Apr-2017

101 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mahmoud CV

Mahmoud Abd El Baset Mohamed Seismic Division Manager 

 Bachelor Degree in Mechanical Engineering 

Cairo University Faculty of Engineering  

Mob: ‐ +971 50 812 05 15 or +971 50 24 7 25 24       ‐ UAE, Abu Dhabi                

E‐mail: [email protected] 

 

RESUME 

PROFILE  11 years of professional experience in Engineering, Sales, and Marketing for MEP Systems.  Sectors: Commercial and Residential Buildings, Hospitals, Hotels, Infrastructure, and District Cooling 

Plants.  Strong Health, Safety and Environment Values.  Professional Memberships:  

‐ Project Management Institute “PMI". ‐ ASHRAE Associate Member. ‐ ASHRAE Technical Committee for Seismic Restraint. ‐ ASHRAE Technical Committee for Seismic Vibration Control and Acoustic. 

 

EDUCATION AND PROFESSIONAL MEMBERSHIPS:  

Sr.  Degree / Course / Organization  University / Institute / Organization  Year 

1  Bachelor Degree of Mechanical Engineering  Cairo University Faculty of Engineering   2006 

2  Professional Project Management ‐ PMP  CHICAGO Management Institute   2011 

3  ASHRAE Technical Committee for Seismic and Wind 

Restraint Design 

ASHRAE Technical Committee – TC 2.7   

4  ASHRAE Technical Committee for Sound and 

Vibration Control 

ASHRAE Technical Committee – TC 2.6   

 

KEY SKILLS & EXPERIENCE:  Operational: ‐ Manage entire product marketing cycle – Planning and applying the use of various sales strategies. ‐ Analyzing current market trend and competitor information. 

Page 2: Mahmoud CV

‐ Preparing the pricing strategy of the product based on the market demand in order to achieve the target. 

‐ Work in coordination with the top level management to set up short term and long term goals. ‐ Assist the top level management in preparing strategies to achieve the goals and objectives. ‐ Produce and managing different divisional budgeting and individual projects budget. ‐ Develop and implementing long‐term financial planning and sales quotas. ‐ Management of project team functions. ‐ Following up for Invoicing and Payment Collection. ‐ Effect close contact with client reps. ‐ Planning for different activity and to be parallel. ‐ Avoiding and solving staff conflicts.  ‐ Motivated executives, managers and employees to devote their best to achieving the business goals. ‐ Handing over all activity to client representative. ‐ Ensure that my team has a clear understanding of planning and sales target. ‐ Ensure compliance with client quality objectives. ‐ Handling Meeting with Client Representatives and Consultant. ‐ Ensure all operations are undertaken in a safe manner in accordance with Country laws and project 

/ company policy.  ‐ Carry out technical presentation for new products and technical system. 

 

Engineering:  

‐ Responsible for overall management of projects from conception to completion (Initiating, Planning, Execution, Monitor, Control, and Closing). 

‐ Complying with the project Specification, Codes, International Standards in order to meet the client requirements. 

‐ Establishment and responsibility for project communications with client, sub‐contractors. ‐ Preparation project weekly and monthly reports to project client and project senior management. ‐ Co‐ordination and preparation of project close out reports. ‐ Formulation, installation / construction methods. ‐ Preparation and development of method statements and procedures. ‐ Technical reviews and development of reports. ‐ Review and preparing design calculations. ‐ Co‐ordination of all engineering / design functions. ‐ Co‐ordination and preparation of as‐built drawings and documentation. ‐ Co‐ordination of variations and project changes. ‐ Support site operations as required. ‐ Vibration Control and Seismic Restraint Designing, Engineering, and Supervision for Floor Mounted 

Equipments (Water Cooled Chiller, Air Cooled Chiller, Cooling Towers, Pumps, AHU, DB, MCC, Generators… etc.). 

‐ Vibration Control and Seismic Restraint Designing, Engineering, and Supervision for Suspended Equipments (Fans, FCU, AHU, VAV, CAV… etc.). 

‐ Vibration Control and Seismic Restraint Designing, Engineering, and Supervision for Suspended and Floor Mounted Pipes, Duct, Bus Bar and Electrical Services. 

‐ Thermal Expansion, Contraction, and Seismic Restraint Designing, Engineering, and Supervision for Vertical CHW and HW Pipe Risers. 

Page 3: Mahmoud CV

‐ Pipe stress analysis for Mechanical Pipes and Steel Support Design. ‐ Seismic Restraint Designing, Engineering, and Supervision for Duct Risers, and Electrical Risers. ‐ Co‐ordination of Seismic Bracing with Other Services and guiding BIM team. ‐ Calculating and designing the Seismic force on each equipment / or service floor per floor. ‐ Calculation and designing the vibration isolation efficiency for rotating equipments.  ‐ Working according to seismic codes and international standards requirements (UBC, IBC, ASCE, MSS 

SP‐127, AISC, NFPA, SMACNA, ASHRAE. Etc.)  

 

Main Project Served in UAE for the Last 8 Years:‐ Abu Dubai International Airport – Midfield Terminal Building. ‐ Opera House. ‐ Warner Bros. ‐ Dubai Mall. ‐ Madeint Jumeriah. ‐ Al Habtoor City. ‐ Cleveland Clinic ‐ Abu Dhabi. ‐ Presidential Palace ‐ Abu Dhabi. ‐ Capital Plaza ‐ Abu Dhabi. ‐ Dubai Mixed Used ‐ Dubai. ‐ Dragon Mart ‐ Dubai. ‐ Etihad Towers ‐ Abu Dhabi. ‐ Abu Dhabi Financial Center. ‐ Shams Abu Dhabi ‐ Abu Dhabi. ‐ Al Mafraq Hospital Abu Dhabi ‐ Yas Mall ‐ Abu Dhabi. ‐ MASDAR Institute ‐ Abu Dhabi. ‐ ADNOC Head Quarter ‐ Abu Dhabi. ‐ Sheikh Nahyan Project. ‐ RUWAIS HOUSING COMPLEX. ‐ EMAL. ‐ Emirates Engine Maintenance. ‐ Khalifa Data Center – Abu Dhabi 

 

Main Project Served in Egypt: ‐ Golden Pyramids Plaza (City Stars). ‐ Cairo International Airport Terminal 3. ‐ AUC New Campus. ‐ Nile City. ‐ Grand Egyptian Museum. ‐ Emaar Sales Center. ‐ Modern Education Building. ‐ Vodafone Smart Village. ‐ Misr Insurance Building. ‐ Royal Museum. ‐ Amarantee El Nile Hotel  

Page 4: Mahmoud CV

EMPLOYMENT HISTORY  

1‐ COMPANY: The VMC Group Middle East  From: June, 2006 ‐  till October, 2008  Position: Senior Design Engineer.  

 

2‐ COMPANY:  InterCool Central Air Condition ‐  MASON Industries Representative in UAE, Qatar, and Kuwait. 

From: November, 2008 ‐  till date  Position: Division Manager.  

 

LANGUAGE SKILLS:  

Arabic – Mother Tongue.  English – Excellent in Reading, Writing, and Speaking. 

 

PERSONAL DETAILS:  

Name:  Mahmoud Abd El Baset Mohamed Mahmoud 

Sex:  Male 

Date of Birth:  01 September 1982 

Nationality:  Egyptian 

Marital Status: 

Email:  

Mobile: 

Married 

[email protected] 

+971 50 812 05 15 or +97150 24 725 24        

 

 

 

 

 

Page 5: Mahmoud CV

‐ Preparing the pricing strategy of the product based on the market demand in order to achieve the target. 

‐ Work in coordination with the top level management to set up short term and long term goals. ‐ Assist the top level management in preparing strategies to achieve the goals and objectives. ‐ Produce and managing different divisional budgeting and individual projects budget. ‐ Develop and implementing long‐term financial planning and sales quotas. ‐ Management of project team functions. ‐ Following up for Invoicing and Payment Collection. ‐ Effect close contact with client reps. ‐ Planning for different activity and to be parallel. ‐ Avoiding and solving staff conflicts.  ‐ Motivated executives, managers and employees to devote their best to achieving the business goals. ‐ Handing over all activity to client representative. ‐ Ensure that my team has a clear understanding of planning and sales target. ‐ Ensure compliance with client quality objectives. ‐ Handling Meeting with Client Representatives and Consultant. ‐ Ensure all operations are undertaken in a safe manner in accordance with Country laws and project 

/ company policy.  ‐ Carry out technical presentation for new products and technical system. 

 

Engineering:  

‐ Responsible for overall management of projects from conception to completion (Initiating, Planning, Execution, Monitor, Control, and Closing). 

‐ Complying with the project Specification, Codes, International Standards in order to meet the client requirements. 

‐ Establishment and responsibility for project communications with client, sub‐contractors. ‐ Preparation project weekly and monthly reports to project client and project senior management. ‐ Co‐ordination and preparation of project close out reports. ‐ Formulation, installation / construction methods. ‐ Preparation and development of method statements and procedures. ‐ Technical reviews and development of reports. ‐ Review and preparing design calculations. ‐ Co‐ordination of all engineering / design functions. ‐ Co‐ordination and preparation of as‐built drawings and documentation. ‐ Co‐ordination of variations and project changes. ‐ Support site operations as required. ‐ Vibration Control and Seismic Restraint Designing, Engineering, and Supervision for Floor Mounted 

Equipments (Water Cooled Chiller, Air Cooled Chiller, Cooling Towers, Pumps, AHU, DB, MCC, Generators… etc.). 

‐ Vibration Control and Seismic Restraint Designing, Engineering, and Supervision for Suspended Equipments (Fans, FCU, AHU, VAV, CAV… etc.). 

‐ Vibration Control and Seismic Restraint Designing, Engineering, and Supervision for Suspended and Floor Mounted Pipes, Duct, Bus Bar and Electrical Services. 

‐ Thermal Expansion, Contraction, and Seismic Restraint Designing, Engineering, and Supervision for Vertical CHW and HW Pipe Risers. 

Page 6: Mahmoud CV

‐ Pipe stress analysis for Mechanical Pipes and Steel Support Design. ‐ Seismic Restraint Designing, Engineering, and Supervision for Duct Risers, and Electrical Risers. ‐ Co‐ordination of Seismic Bracing with Other Services and guiding BIM team. ‐ Calculating and designing the Seismic force on each equipment / or service floor per floor. ‐ Calculation and designing the vibration isolation efficiency for rotating equipments.  ‐ Working according to seismic codes and international standards requirements (UBC, IBC, ASCE, MSS 

SP‐127, AISC, NFPA, SMACNA, ASHRAE. Etc.)  

 

Main Project Served in UAE for the Last 8 Years:‐ Abu Dubai International Airport – Midfield Terminal Building. ‐ Opera House. ‐ Warner Bros. ‐ Dubai Mall. ‐ Madeint Jumeriah. ‐ Al Habtoor City. ‐ Cleveland Clinic ‐ Abu Dhabi. ‐ Presidential Palace ‐ Abu Dhabi. ‐ Capital Plaza ‐ Abu Dhabi. ‐ Dubai Mixed Used ‐ Dubai. ‐ Dragon Mart ‐ Dubai. ‐ Etihad Towers ‐ Abu Dhabi. ‐ Abu Dhabi Financial Center. ‐ Shams Abu Dhabi ‐ Abu Dhabi. ‐ Al Mafraq Hospital Abu Dhabi ‐ Yas Mall ‐ Abu Dhabi. ‐ MASDAR Institute ‐ Abu Dhabi. ‐ ADNOC Head Quarter ‐ Abu Dhabi. ‐ Sheikh Nahyan Project. ‐ RUWAIS HOUSING COMPLEX. ‐ EMAL. ‐ Emirates Engine Maintenance. ‐ Khalifa Data Center – Abu Dhabi 

 

Main Project Served in Egypt: ‐ Golden Pyramids Plaza (City Stars). ‐ Cairo International Airport Terminal 3. ‐ AUC New Campus. ‐ Nile City. ‐ Grand Egyptian Museum. ‐ Emaar Sales Center. ‐ Modern Education Building. ‐ Vodafone Smart Village. ‐ Misr Insurance Building. ‐ Royal Museum. ‐ Amarantee El Nile Hotel  

Page 7: Mahmoud CV

EMPLOYMENT HISTORY  

1‐ COMPANY: The VMC Group Middle East  From: June, 2006 ‐  till October, 2008  Position: Senior Design Engineer.  

 

2‐ COMPANY:  InterCool Central Air Condition ‐  MASON Industries Representative in UAE, Qatar, and Kuwait. 

From: November, 2008 ‐  till date  Position: Division Manager.  

 

LANGUAGE SKILLS:  

Arabic – Mother Tongue.  English – Excellent in Reading, Writing, and Speaking. 

 

PERSONAL DETAILS:  

Name:  Mahmoud Abd El Baset Mohamed Mahmoud 

Sex:  Male 

Date of Birth:  01 September 1982 

Nationality:  Egyptian 

Marital Status: 

Email:  

Mobile: 

Married 

[email protected] 

+971 50 812 05 15 or +97150 24 725 24        

 

 

 

 

 

Page 8: Mahmoud CV

 

 

 

 

 

 

Some Information for Major Projects 

Carried out within the Eight Years. 

 

Page 9: Mahmoud CV

           

  

  

Name of Project :  Cleveland Clinic Abu Dhabi  Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC Piping, 

Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking, Medical Gas, LPG, Steam, Pneumatic... etc.)  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted and 

Ceiling Suspended).  Vibration Control for HVAC Piping and HVAC Ducting in Plant 

Rooms.  Vibration Control for All MEP Equipments.  Pipe Stress Analysis for Chilled Water Pipes.  Steel Structure Support Design for All MEP Services (Horizontal and 

Vertical).  Thermal Expansion and Contraction for All MEP Horizontal Pipes.  Thermal Expansion and Contraction for All MEP Vertical Pipe 

Risers.  Design for All MEP Services Crossing the Building Expansion Joint.  Installation Supervision.  Installation Inspection and Installation Clearance.  Professional Indemnity Insurance. 

InterCool Started Date:  August 2010. 

InterCool Completed Date: 

December 2013. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total project area 5.1 million square feet, including the 2.2 million‐square‐foot hospital, a 50,000 square foot Central Utility Plant area and 2.2 million square feet of parking for 3,200 vehicles 

 

Page 10: Mahmoud CV

           

  

 

 

Name of Project :  Presidential Palace Abu Dhabi.  Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC 

Piping, Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking... etc.)  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted 

and Ceiling Suspended).  Vibration Control for HVAC Piping and HVAC Ducting in Plant 

Rooms.  Vibration Control for All MEP Equipments.  Pipe Stress Analysis for Chilled Water Pipes.  Steel Structure Support Design for CHW Pipes.  Thermal Expansion and Contraction for Horizontal CHW 

Pipes.  Thermal Expansion and Contraction for CHW Vertical Pipe 

Risers.  Design for CHW Pipes Crossing the Building Expansion Joint.  Installation Supervision.  Installation Inspection and Installation Clearance.  Professional Indemnity Insurance. 

InterCool Started Date: 

May 2012. 

InterCool Completed Date: 

November 2013. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total Project Area is 2.02 Million Square Feet. 

Page 11: Mahmoud CV

           

  

 

Name of Project :  Etihad Towers ‐ Abu Dhabi.  Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC 

Piping, Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking... etc.)  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted 

and Ceiling Suspended).  Vibration Control for HVAC Piping in Plant Rooms.  Vibration Control for All MEP Equipments.  Thermal Expansion and Contraction for CHW Vertical Pipe 

Risers.  Installation Supervision.  Installation Inspection and Installation Clearance. 

InterCool Started Date: 

February 2009. 

InterCool Completed Date: 

October 2012. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total Project Build Up Area is 5.37 Million Square Feet. 5‐tower Project Building height ranging from 62 to 82 stories building. 

 

 

Page 12: Mahmoud CV

           

  

 

Name of Project :  Capital Plaza ‐ Abu Dhabi.  Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC 

Piping, Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking... etc.)  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted 

and Ceiling Suspended).  Vibration Control for HVAC Piping in Plant Rooms.  Vibration Control for All MEP Equipments.  Thermal Expansion and Contraction for CHW Vertical Pipe 

Risers.  Installation Supervision.  Installation Inspection and Installation Clearance. 

InterCool Started Date: 

August 2008. 

InterCool Completed Date: 

March 2011. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total Project Area is 2.36 Million Square Feet. 5 towers; a 37 story hotel tower offering 250 rooms, a 37 story office tower and 3 residential towers; of which 2 are 43 stories while the remaining third is 49 stories. The towers offer 4 basement car parking levels and a common 8 level podium. 

Page 13: Mahmoud CV

           

  

 

 

 

Name of Project :  Abu Dhabi Financial Center ‐ Abu Dhabi.  Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC 

Piping, Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking... etc.)  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted 

and Ceiling Suspended).  Vibration Control for HVAC Piping in Plant Rooms.  Vibration Control for All MEP Equipments.  Installation Supervision.  Installation Inspection and Installation Clearance. 

InterCool Started Date: 

April 2009. 

InterCool Completed Date: 

September 2012. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total Surface Area Covered is 6.45 Million Square Feet. 4 towers (32 and 39 stories high), raised urban highways at 2 levels, 2 road bridges, 2 parking lots (6 levels, 100,000 m² each), the stock exchange, 2 levels of luxury stores, external facilities. 

 

Page 14: Mahmoud CV

           

  

 

 

 

Name of Project :  Yas Mall ‐ Abu Dhabi. Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC 

Piping, Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking... etc.)  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted 

and Ceiling Suspended).  Vibration Control for HVAC Piping in Plant Rooms.  Vibration Control for All MEP Equipments.  Installation Supervision.  Installation Inspection and Installation Clearance.  Professional Indemnity Insurance. 

InterCool Started Date: 

January 2013. 

InterCool Completed Date: 

February 2014. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total Surface Area Covered is 2.52 Million Square Feet. 

 

Page 15: Mahmoud CV

           

  

 

 

 

 

 

Name of Project :  MASDAR Institute ‐ Abu Dhabi.  Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC 

Piping, Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking... etc.)  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted 

and Ceiling Suspended).  Vibration Control for HVAC Piping in Plant Rooms.  Vibration Control for All MEP Equipments.  Installation Supervision.  Installation Inspection and Installation Clearance. 

 

InterCool Started Date: 

March 2010. 

InterCool Completed Date: 

January 2012. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total Surface Area Covered is 3.65 Million Square Feet. 

 

Page 16: Mahmoud CV

           

  

 

 

 

 

 

Name of Project :  Dragon Mart ‐ Dubai. Scope of Work:  Seismic Restraint Firefighting Pipes.  

Pipe Stress Analysis for CHW Pipe and Firefighting Pipe.  Design for Firefighting Pipes Crossing the Building Expansion 

Joint.  Installation Supervision.  Installation Inspection and Installation Clearance. 

 

InterCool Started Date: 

September 2013. 

InterCool Completed Date: 

January 2014. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total Surface Area Covered is 1.90 Million Square Feet. 

 

 

Page 17: Mahmoud CV

           

  

 

Name of Project :  Al Mafraq Hospital ‐ Abu Dhabi  Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC Piping, 

Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking, Medical Gas, LPG, Pneumatic, Water Feature, Irrigation... etc.).  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted and 

Ceiling Suspended).  Vibration Control for HVAC Piping and HVAC Ducting in Plant 

Rooms.  Vibration Control for All MEP Equipments.  Pipe Stress Analysis for Chilled Water Pipes.  Steel Structure Support Design for Cooling Plant Room and CHW 

Pipe Risers  Thermal Expansion and Contraction for All MEP Horizontal Pipes.  Thermal Expansion and Contraction for All MEP Vertical Pipe 

Risers.  Design for All MEP Services Crossing the Building Expansion Joint.  Installation Supervision.  Installation Inspection and Installation Clearance.  Professional Indemnity Insurance. 

InterCool Started Date:  November 2012. 

InterCool Expected Completed Date: 

December 2014. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total project area 2.68 million square feet. 

Page 18: Mahmoud CV

           

  

 Name of Project :  New Abu Dhabi International Airport 

Midfield Terminal Building Scope of Work:  Seismic Restraint Design, Calculation, Supply of Material, and 

Installation Supervision for MEP Services based on UBC 1997 Zone 2A for occupied spaces and Life Safety System. 

Seismic Restraint Design, Calculation, Supply of Material, and Installation Supervision for Electrical Equipments. 

Piping Stress Analysis for CHW Pipes, EGW Water, and Cold Water Pipes for the Piers, Main Ring, Pump Rooms, and AHU Rooms. 

Steel Support Design for CHW Pipes, EGW Water, Cold Water Pipes, and Other Services. 

Installation Supervision.  Installation Inspection and Installation Clearance. 

InterCool Started Date:  August 2013. 

InterCool Expected Completed Date: 

April 2016 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total project area 6.77 million square feet to 7.55 million square feet. 

 

 

Page 19: Mahmoud CV

           

  

 

 

 

Name of Project :  Louvre Museum  ‐ Abu Dhabi  Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC Piping, 

Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking... etc.).  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted and 

Ceiling Suspended).  Vibration Control for HVAC Piping and HVAC Ducting in Plant 

Rooms.  Vibration Control for All MEP Equipments.  Thermal Expansion and Contraction for All MEP Horizontal Pipes.  Thermal Expansion and Contraction for All MEP Vertical Pipe 

Risers.  Design for All MEP Services Crossing the Building Expansion Joint.  Installation Supervision.  Installation Inspection and Installation Clearance.  Professional Indemnity Insurance. 

InterCool Started Date:  January 2014. 

InterCool Expected Completed Date: 

December 2014. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total project area 258,201.00 square feet. 

 

Page 20: Mahmoud CV

           

  

 

 

Name of Project :  Fairmont Hotel  ‐ Abu Dhabi  Scope of Work:  Seismic Restraint for All MEP Horizontal Services (HVAC 

Piping, Ducting, Firefighting, Plumbing, Electrical Cable Tray, Truncking... etc.).  

Seismic Restraint for All MEP Vertical Risers.  Seismic Restraint for All MEP Equipments (Floor Mounted 

and Ceiling Suspended).  Vibration Control for HVAC Piping and HVAC Ducting in Plant 

Rooms.  Vibration Control for All MEP Equipments.  Design for All MEP Services Crossing the Building Expansion 

Joint.  Installation Supervision.  Installation Inspection and Installation Clearance.  Professional Indemnity Insurance. 

InterCool Started Date: 

January 2014. 

InterCool Expected Completed Date: 

December 2014. 

  

 

Extensions Of Time:  No Extensions of Time Requested by InterCool. 

Penalties Deduction:  No Penalties Applied. 

 Total Area of the Building: 

Total project area 1.66 Million square feet.