mahmood, tareq jaime garcia...project manager, infrastructure programming and studies...

26
From: Mahmood, Tareq To: [email protected] Cc: Jaime Garcia Subject: Albion-Vaughan Road and King Street Intersection Improvements EA Study Date: Thursday, December 6, 2018 3:30:24 PM Attachments: image001.gif List of Technical Reports.pdf Hello, The Region has initiated a Schedule ‘B’ Municipal Class Environmental Assessment (EA) for improvements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC was held on December 7th, 2017 . The limits of the study area are 300m back for each leg of the intersection. The intersection is located on the boundary between The Town of Caledon, Township of King, York Region and the Region of Peel. As a part of Albion Vaughan Road – King Street intersection improvements, technical studies have been conducted by CIMA. The consultant has submitted the technical reports in 2017 and due to staff changes; I’m not sure whether the attached technical reports have been circulated to stakeholders during the process. As far I know the reports have been reviewed by TRCA and we’re working on to address their comments. As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan, I would like to ensure that the stakeholders are engaged to review the technical reports and their inputs are properly embraced. The technical reports can be accessed via the following link. Please open the FTP link by using Google Chrome and open the ‘York Region” folder and “Albion- Vaughan Rd and King Street Intersection EA” sub-folder to view and download technical reports. https://efts.peelregion.ca ID: tmahmood Pw: tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no later than Tuesday, January 8th, 2019. Any questions, please let me know. Best regards, Tareq Mahmood Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4 th floor Brampton, ON L6T 4B9 Tel: 905-791-7800 ext. 7828 Cell:905-872-6475 Email: [email protected]

Upload: others

Post on 18-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

From Mahmood TareqTo rarcarokingcaCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 33024 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

From Mahmood TareqTo KantChawlacaledoncaCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 33834 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoTown of Caledonrdquo folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

From Jaime GarciaTo Annette ListerCc Mahmood Tareq Jessica DorgoSubject B000709 - Albion-Vaughan Road and King Street Intersection EA - PIC BoardsDate Thursday December 7 2017 35214 PMAttachments B709_Peel King Vaughan EA_PIC Boards_e04v01pdf

image001jpg

Annette As requested please find attached to this message an electronic copy of the information presentedin the PIC Drawings used for public discussion during the event will be provide to you in a separate message Regards

Jaime Garcia PEngPhDAssociate PartnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Annette Lister [mailtoalistertrcaonca] Sent Monday November 27 2017 1133 AMTo Mahmood Tareq lttareqmahmoodpeelregioncagtCc Jaime Garcia ltJaimeGarciacimacagtSubject CFN 56053 Albion-Vaughan Road and King Street Intersection EA - PIC Response Hello Tareq

PUBLIC INFORMATION CENTRE

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY FOR ALBION

VAUGHAN ROAD AND KING STREET INTERSECTION

December 5 2017Albion Bolton Community Centre ndash Auditorium Room150 Queen St S Bolton ON L7E 1E3600 PM to 800 PM

PURPOSE OF THE EVENT

bullReview project informationbullBackground to the studybullExisting conditions of the study areabullAlternative solutions bullEvaluation criteria and evaluation of alternative solutions

bullTechnically preferred alternative solution

bullAsk questions to the study teambullDiscuss areas of interest with the study team

bullProvide your comments by January 5 2018

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 2: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

From Mahmood TareqTo KantChawlacaledoncaCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 33834 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoTown of Caledonrdquo folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

From Jaime GarciaTo Annette ListerCc Mahmood Tareq Jessica DorgoSubject B000709 - Albion-Vaughan Road and King Street Intersection EA - PIC BoardsDate Thursday December 7 2017 35214 PMAttachments B709_Peel King Vaughan EA_PIC Boards_e04v01pdf

image001jpg

Annette As requested please find attached to this message an electronic copy of the information presentedin the PIC Drawings used for public discussion during the event will be provide to you in a separate message Regards

Jaime Garcia PEngPhDAssociate PartnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Annette Lister [mailtoalistertrcaonca] Sent Monday November 27 2017 1133 AMTo Mahmood Tareq lttareqmahmoodpeelregioncagtCc Jaime Garcia ltJaimeGarciacimacagtSubject CFN 56053 Albion-Vaughan Road and King Street Intersection EA - PIC Response Hello Tareq

PUBLIC INFORMATION CENTRE

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY FOR ALBION

VAUGHAN ROAD AND KING STREET INTERSECTION

December 5 2017Albion Bolton Community Centre ndash Auditorium Room150 Queen St S Bolton ON L7E 1E3600 PM to 800 PM

PURPOSE OF THE EVENT

bullReview project informationbullBackground to the studybullExisting conditions of the study areabullAlternative solutions bullEvaluation criteria and evaluation of alternative solutions

bullTechnically preferred alternative solution

bullAsk questions to the study teambullDiscuss areas of interest with the study team

bullProvide your comments by January 5 2018

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 3: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

From Mahmood TareqTo KantChawlacaledoncaCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 33834 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoTown of Caledonrdquo folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

From Jaime GarciaTo Annette ListerCc Mahmood Tareq Jessica DorgoSubject B000709 - Albion-Vaughan Road and King Street Intersection EA - PIC BoardsDate Thursday December 7 2017 35214 PMAttachments B709_Peel King Vaughan EA_PIC Boards_e04v01pdf

image001jpg

Annette As requested please find attached to this message an electronic copy of the information presentedin the PIC Drawings used for public discussion during the event will be provide to you in a separate message Regards

Jaime Garcia PEngPhDAssociate PartnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Annette Lister [mailtoalistertrcaonca] Sent Monday November 27 2017 1133 AMTo Mahmood Tareq lttareqmahmoodpeelregioncagtCc Jaime Garcia ltJaimeGarciacimacagtSubject CFN 56053 Albion-Vaughan Road and King Street Intersection EA - PIC Response Hello Tareq

PUBLIC INFORMATION CENTRE

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY FOR ALBION

VAUGHAN ROAD AND KING STREET INTERSECTION

December 5 2017Albion Bolton Community Centre ndash Auditorium Room150 Queen St S Bolton ON L7E 1E3600 PM to 800 PM

PURPOSE OF THE EVENT

bullReview project informationbullBackground to the studybullExisting conditions of the study areabullAlternative solutions bullEvaluation criteria and evaluation of alternative solutions

bullTechnically preferred alternative solution

bullAsk questions to the study teambullDiscuss areas of interest with the study team

bullProvide your comments by January 5 2018

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 4: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

From Mahmood TareqTo KantChawlacaledoncaCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 33834 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoTown of Caledonrdquo folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

From Jaime GarciaTo Annette ListerCc Mahmood Tareq Jessica DorgoSubject B000709 - Albion-Vaughan Road and King Street Intersection EA - PIC BoardsDate Thursday December 7 2017 35214 PMAttachments B709_Peel King Vaughan EA_PIC Boards_e04v01pdf

image001jpg

Annette As requested please find attached to this message an electronic copy of the information presentedin the PIC Drawings used for public discussion during the event will be provide to you in a separate message Regards

Jaime Garcia PEngPhDAssociate PartnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Annette Lister [mailtoalistertrcaonca] Sent Monday November 27 2017 1133 AMTo Mahmood Tareq lttareqmahmoodpeelregioncagtCc Jaime Garcia ltJaimeGarciacimacagtSubject CFN 56053 Albion-Vaughan Road and King Street Intersection EA - PIC Response Hello Tareq

PUBLIC INFORMATION CENTRE

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY FOR ALBION

VAUGHAN ROAD AND KING STREET INTERSECTION

December 5 2017Albion Bolton Community Centre ndash Auditorium Room150 Queen St S Bolton ON L7E 1E3600 PM to 800 PM

PURPOSE OF THE EVENT

bullReview project informationbullBackground to the studybullExisting conditions of the study areabullAlternative solutions bullEvaluation criteria and evaluation of alternative solutions

bullTechnically preferred alternative solution

bullAsk questions to the study teambullDiscuss areas of interest with the study team

bullProvide your comments by January 5 2018

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 5: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

From Jaime GarciaTo Annette ListerCc Mahmood Tareq Jessica DorgoSubject B000709 - Albion-Vaughan Road and King Street Intersection EA - PIC BoardsDate Thursday December 7 2017 35214 PMAttachments B709_Peel King Vaughan EA_PIC Boards_e04v01pdf

image001jpg

Annette As requested please find attached to this message an electronic copy of the information presentedin the PIC Drawings used for public discussion during the event will be provide to you in a separate message Regards

Jaime Garcia PEngPhDAssociate PartnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Annette Lister [mailtoalistertrcaonca] Sent Monday November 27 2017 1133 AMTo Mahmood Tareq lttareqmahmoodpeelregioncagtCc Jaime Garcia ltJaimeGarciacimacagtSubject CFN 56053 Albion-Vaughan Road and King Street Intersection EA - PIC Response Hello Tareq

PUBLIC INFORMATION CENTRE

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY FOR ALBION

VAUGHAN ROAD AND KING STREET INTERSECTION

December 5 2017Albion Bolton Community Centre ndash Auditorium Room150 Queen St S Bolton ON L7E 1E3600 PM to 800 PM

PURPOSE OF THE EVENT

bullReview project informationbullBackground to the studybullExisting conditions of the study areabullAlternative solutions bullEvaluation criteria and evaluation of alternative solutions

bullTechnically preferred alternative solution

bullAsk questions to the study teambullDiscuss areas of interest with the study team

bullProvide your comments by January 5 2018

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 6: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

From Jaime GarciaTo Annette ListerCc Mahmood Tareq Jessica DorgoSubject B000709 - Albion-Vaughan Road and King Street Intersection EA - PIC BoardsDate Thursday December 7 2017 35214 PMAttachments B709_Peel King Vaughan EA_PIC Boards_e04v01pdf

image001jpg

Annette As requested please find attached to this message an electronic copy of the information presentedin the PIC Drawings used for public discussion during the event will be provide to you in a separate message Regards

Jaime Garcia PEngPhDAssociate PartnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Annette Lister [mailtoalistertrcaonca] Sent Monday November 27 2017 1133 AMTo Mahmood Tareq lttareqmahmoodpeelregioncagtCc Jaime Garcia ltJaimeGarciacimacagtSubject CFN 56053 Albion-Vaughan Road and King Street Intersection EA - PIC Response Hello Tareq

PUBLIC INFORMATION CENTRE

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY FOR ALBION

VAUGHAN ROAD AND KING STREET INTERSECTION

December 5 2017Albion Bolton Community Centre ndash Auditorium Room150 Queen St S Bolton ON L7E 1E3600 PM to 800 PM

PURPOSE OF THE EVENT

bullReview project informationbullBackground to the studybullExisting conditions of the study areabullAlternative solutions bullEvaluation criteria and evaluation of alternative solutions

bullTechnically preferred alternative solution

bullAsk questions to the study teambullDiscuss areas of interest with the study team

bullProvide your comments by January 5 2018

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 7: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

From Jaime GarciaTo Annette ListerCc Mahmood Tareq Jessica DorgoSubject B000709 - Albion-Vaughan Road and King Street Intersection EA - PIC BoardsDate Thursday December 7 2017 35214 PMAttachments B709_Peel King Vaughan EA_PIC Boards_e04v01pdf

image001jpg

Annette As requested please find attached to this message an electronic copy of the information presentedin the PIC Drawings used for public discussion during the event will be provide to you in a separate message Regards

Jaime Garcia PEngPhDAssociate PartnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Annette Lister [mailtoalistertrcaonca] Sent Monday November 27 2017 1133 AMTo Mahmood Tareq lttareqmahmoodpeelregioncagtCc Jaime Garcia ltJaimeGarciacimacagtSubject CFN 56053 Albion-Vaughan Road and King Street Intersection EA - PIC Response Hello Tareq

PUBLIC INFORMATION CENTRE

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY FOR ALBION

VAUGHAN ROAD AND KING STREET INTERSECTION

December 5 2017Albion Bolton Community Centre ndash Auditorium Room150 Queen St S Bolton ON L7E 1E3600 PM to 800 PM

PURPOSE OF THE EVENT

bullReview project informationbullBackground to the studybullExisting conditions of the study areabullAlternative solutions bullEvaluation criteria and evaluation of alternative solutions

bullTechnically preferred alternative solution

bullAsk questions to the study teambullDiscuss areas of interest with the study team

bullProvide your comments by January 5 2018

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 8: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

PUBLIC INFORMATION CENTRE

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT STUDY FOR ALBION

VAUGHAN ROAD AND KING STREET INTERSECTION

December 5 2017Albion Bolton Community Centre ndash Auditorium Room150 Queen St S Bolton ON L7E 1E3600 PM to 800 PM

PURPOSE OF THE EVENT

bullReview project informationbullBackground to the studybullExisting conditions of the study areabullAlternative solutions bullEvaluation criteria and evaluation of alternative solutions

bullTechnically preferred alternative solution

bullAsk questions to the study teambullDiscuss areas of interest with the study team

bullProvide your comments by January 5 2018

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 9: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

PURPOSE OF THE EVENT

bullReview project informationbullBackground to the studybullExisting conditions of the study areabullAlternative solutions bullEvaluation criteria and evaluation of alternative solutions

bullTechnically preferred alternative solution

bullAsk questions to the study teambullDiscuss areas of interest with the study team

bullProvide your comments by January 5 2018

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 10: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

CLASS EA PROCESSbullThe Municipal Class EA is a planning and design process approved by the Ministry of

Environment and Climate Change to meet the requirements of the Ontario Environmental Assessment Act This Study follows the Class EA process for Schedule lsquoBrsquo projects Key components of the study include

Phase 1bullIdentify Problems and

Opportunities bullIssue Notice of Study

Commencement

Phase 2 bullIdentify and Evaluate

Alternative SolutionsbullPublic Information

CentrebullIdentify Preferred

Alternative Solution

Phase 3bullProject

Implementation (Design and Construction)

We are here

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 11: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

PROBLEM STATEMENT

bullCurrent traffic conditions (long queues and delay) at the intersection of Albion Vaughan Road and King Street East (Peel Regional Road 9)King Road (York Regional Road 11) are problematic

bull It is expected that these conditions will worsen in the future due to a significant increase of traffic along King Street and Albion Vaughan Road

bullThis intersection will significantly benefit from operational and safety improvements for all modes of transportation

bullCurrently all four sections of the intersection are owned by four different jurisdictions

Study Area

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 12: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

TRANSPORTATION

bullSignalized Intersection Posted speed limit within the study area is 60 kmh

bullRural area with residential homes scattered throughout

bullVehicular traffic at the intersection during the most travelled time of the day exceeds the capacity of the northbound portion which affects the entire operation of the intersection generating an increase on travel time of 70 seconds per vehicle

bullThe current rural nature of the intersection provides few opportunities for walking and cycling

EXISTING CONDITIONS

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 13: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

ENGINEERING

bullThere are 3 existing structures present in the study area

bullFrom a structural perspective existing conditions of all structures are adequate

bullFrom a hydraulic perspective - meaning the relationship between the geometrics of the structure and the corresponding watercourse all structures requires mitigation measures to comply with the Ministry of Transportation Ontario (MTO) requirements

AlbionVaughan Road Bridge

King Road Bridge

Caledon King Townline Bridge

EXISTING CONDITIONS

Freeboard clearance and relief flow depth

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 14: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

SOCIAL AND CULTURAL ENVIRONMENT

bullProperties within the study area are not considered to be of cultural heritage value or interestndash No further cultural heritage assessment of study is required

bullA Preliminary (Stage 1) and detailed (Stage 2) archaeology assessment was conductedndash No archaeological resources were identified

Archaeological Assessment ndash Stage 2

Archaeological Assessment ndash Stage 2

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 15: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

NATURAL ENVIRONMENT

bullThe majority of the study area is within the Greenbelt Plan area

bullToronto Region Conservation Authority (TRCA) Natural Heritage System extends into the study area

bullAlthough Species at Risk have been previously recorded in natural areas adjacent to the study area no Species at Risk or locally rare species were found in the immediate study area during field investigations

bullTwo watercourses designated as fish habitat are within the study areandashCold CreekndashHumber River

EXISTING CONDITIONS

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 16: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

NATURAL ENVIRONMENT

bull44 water well records were identified within 500m of the study area but no municipal or public wells were identified

bullA private well survey was completed for the study areas and 10 domestic well residences were identified

bullA meander belt assessment indicates that any necessary modifications andor reconstruction of the three structures should be conducted outside of the watercourse meander belt width to the extent possible

Albion Vaughan Road Crossing

EXISTING CONDITIONS

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 17: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

HEALTH RELATED ndash NOISE AND AIR QUALITYbullCurrently noise exceeds the Regional

standard noise level limit However since noise barrier walls are only installed to minimize the noise perceived at outside living spaces (ie backyards) this type of mitigation measure is not recommended in the study area

bullCurrent concentration of common air contaminants generated by internal combustion engine vehicles such as carbon monoxide and nitrogen oxides are below current standards and guidelines

bullOnly concentration of hydrocarbons (ie benzene) was found over applicable standards

EXISTING CONDITIONS

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 18: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashAM Peak Hour bullMost movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 19: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

bullThe results of the operational analysis for the future (2031) lsquoDo Nothingrsquo scenario projects the following conditions if intersection improvements are not implemented

ndashPM Peak Hour bullAll movements operating over capacity indicating that the intersection is operating over capacity

FUTURE PROJECTED TRAFFIC CONDITIONS

Legend

sRepresents the average number of seconds that a driver is delayed at the intersection

Represents congested conditions with slow operating speeds high delays and extensive queues at the intersection

Represents stable conditions with modest reduction in operating speeds minimal delays and at the intersection

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 20: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

ALTERNATIVE SOLUTIONS

Alternative Solutions

Do Nothing

Additional Northbound Right Turn

Lane

Double Left Turn

(Westbound)

Double Left Turn and

Road Widening

(North-South)

Widening to Four Lanes

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 21: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Alternative Solution 2 Additional Northbound Right Turn

Lane

Alternative Solution 3 Double Left Turn (Westbound)

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ALTERNATIVE SOLUTIONS

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 22: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Alternative Solution 4 Double Left Turn and Road

Widening (North-South)

Alternative Solution 5 Widening to Four Lanes

ALTERNATIVE SOLUTIONS

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 23: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

ACTIVE TRANSPORTATIONAll of the Alternative Solutions consider at minimum the following elements to improve active transportation

Pedestrian SafetybullSidewalk from the northwest

corner of the intersection to the GO Transit stop

bullIntersection modifications to improve pedestrian movements across intersection

Cycling OpportunitiesbullConsideration for future

implementation of bicycle lanes west of the intersection along King Street East as identified in the Region of Peel Sustainable Transportation Study

Accessibility related ImprovementsbullCurb cuts and ramps at cross-

walksbullAODA push buttons with locator

tonesbullTactile plates

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 24: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

EVALUATION CRITERIAbull The preferred alternative solution will be selected based on review of comments received from agencies

and members of the publicbull Alternative design concepts for the preferred alternative solution will be developed assessed and evaluated

based on the following factors

Transportation and Engineering

Intersection Operation

(2031)

Existing Structures

Planning Policies

Safety

Compliance with Design Standards

Social Environment

Noise

Property Impacts

Streetscape

Driveway Access

Natural Environment

Aquatic

Meander Belt

Riparian Cover

Natural Heritage

System Cover

Wildlife

Stormwater Management

Implementation

Utility Relocation

Operations and

Maintenance

Regulatory Framework

Ease of Construction

Construction Disturbance

Health

Accessibility

Air Quality

Active Transportation

Cultural Environment

BuiltCultural Heritage

Resources

Archaeological Features

Economic Environment

Capital Cost and value-of-

time

Utilizes the Environmental Assessment Health Criteria developed in partnership with Peel Health

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 25: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Transportation Does not meet Regional target

Intersection exceeds capacity in the AM peak hour (LOS E) and provides opportunities for active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D)and provides opportunities for additional active transportation facilities

Intersection below capacity in the AM (LOS D) and PM peak hour (LOS D) and provides opportunities for additional active transportation facilities

Fully complies with Regional target and provides opportunities for additional active transportation facilities

Engineering Does not address MTOrsquos requirements

Requires the construction of a retaining wall

Requires a retaining wall and widening of existing structures

Requires a retaining wall and widening of existing structures

Requires a retainingwall and widening of existing structures

Social Environment No impact Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Effects on existingdriveways and surrounding properties

Natural Environment No impact Mitigation of impact of the proposed retaining wall will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridge structure(s) will be required

Mitigation of impact of the proposed retaining wall and the widening of the bridgestructure(s) will be required

Cultural Environment No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

No impact Properties within the study area are not considered to be of cultural heritage value or interest

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 26: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

EVALUATION OF ALTERNATIVE SOLUTIONSAlternative 1 Do Nothing

Alternative 2 Alternative 3 Alternative 4 Alternative 5

Economic Environment Increase congestion and delay

Reduce delay and improves traffic safety

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Reduce congestion delay and increase safety of all road users

Implementation No impact Minimal construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaboration of other road authorities Major construction disturbance

Requires collaborationof other road authorities Major construction disturbance

Health Identified health related issues (ie noise and air quality) are not addressed

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunity for compliance with AODA requirements Improvements to air quality and noise reduction

Provides opportunityfor compliance with AODA requirements Improvements to air quality and noise reduction

Summary Not Preferred Preferred - Interim Not Preferred Not Preferred Preferred ndash Preliminary Technically Preferred

Most Preferred Moderately Preferred Somewhat Preferred Least Preferred

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 27: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

POTENTIAL PHASING

bullThe project is planned to be implemented in two phasesndashPhase 1 Interim Solution (an additional northbound right-turn lane)

ndashPhase 2 Ultimate Solution (Preferred Alternative Solution)

bullThe interim solution will be completed prior to the implementation of the preferred solution to address existing safety concerns

LegendRepresents the new movements being added at the intersection

The replacement of structures adjacent to the intersection of Albion Vaughan Road and King Street is anticipated to delay the implementation of the preferred alternative solution as the study area includes roads that are not within the Region of Peel jurisdiction

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 28: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

TECHNICALLY PREFERRED ALTERNATIVE SOLUTION

bullThe ultimate solution includes

bullAddition of a northbound through-right lane

bullConverting existing southbound exclusive right turn lane to southbound through-right lane

bullAddition of a westbound through-right Lane

bullConverting existing eastbound exclusive right turn lane to eastbound through-right lane

bullOpportunities for integration of sidewalks in all segments of the intersection as well as cycling facilities to tie into eventual active transportation facilities along the King Street corridor

Alternative 5 ndash Widening to Four Lanes has been selected as it best addresses the future traffic

needs of the intersection

LegendRepresents the new movements being added at the intersection

Represents road widening (limits are not to scale and are shown for visual representation only)

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 29: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

NEXT STEPSbullReview and confirm preferred alternative solution and assessment in light of comments received from the public and other stakeholders

bullDevelop preliminary designbullDocument Study in Project File Report (PFR)

Tareq MahmoodProject Manager Infrastructure Programming amp Studies Region of Peel10 Peel Centre Drive Suite B 4th FloorBrampton On L6T 4B9905-791-7800TareqMahmoodpeelregionca

Jaime Garcia PhD P Eng Consultant Project ManagerCIMA Canada Inc3027 Harvester RoadBurlington ON L7N 3G7289-288-0287JaimeGarciacimaca

Comment Deadline is January 5

2018

Thank you for your

participation

  • Slide Number 1
  • PURPOSE OF THE EVENT
  • CLASS EA PROCESS
  • PROBLEM STATEMENT
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • EXISTING CONDITIONS
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • FUTURE PROJECTED TRAFFIC CONDITIONS
  • ALTERNATIVE SOLUTIONS
  • Slide Number 14
  • Slide Number 15
  • ACTIVE TRANSPORTATION
  • EVALUATION CRITERIA
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • EVALUATION OF ALTERNATIVE SOLUTIONS
  • POTENTIAL PHASING
  • TECHNICALLY PREFERRED ALTERNATIVE SOLUTION
  • NEXT STEPS
    • TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

      Thank you Annette

      Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

      Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

      P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

      Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

      400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

      cimaca

      MEMO TO Toronto and Region Conservation for the Living City (TRCA)

      COPY TO Tareq Mahmood Regional Municipality of Peel

      FROM Jaime Garcia CIMA+

      DATE December 06 2018

      SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

      The present memorandum summarizes in the form of a table our response to comments

      provided by TRCA with respect of the content of the draft technical reports completed as part of

      the Schedule B Class Environmental Assessment

      As requested the following submission to TRCA will include this document in the form of a cover

      letter as well as the following documentation

      Hard copy of the final technical reports

      Two (2) copies of the draft Project File Report

      Digital copies of all reports and drawings in a PDF format

      Best Regards

      Jaime Garcia PEng PhD

      Senior Project Manager Transportation

      cc Tareq Mahmood Regional Municipality of Peel

      Page 2 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      1 Evaluation table contained

      too many TBD Clarify how

      evaluation was completed

      At the time of the TAC meeting a preliminary preferred

      solution was identified As agency comments were

      received and studies were completed a preferred

      solution was selected It should be noted that although

      other design alternatives were considered such as

      relocation of Albion-Vaughan Road to the west those

      were considered not feasible

      2 There is no space for

      widening and a retaining

      wall on the east side without

      impacting Cold Creek

      Widening to the west was considered as part of the

      evaluation of alternative process and it was

      immediately clear that the impacts to private property

      would be severe and permanent

      In the other hand the impacts to Cold Creek can be

      mitigated with the use of a MSERSS wall rather than

      the cast-in-place reinforced concrete retaining wall The

      advantage of using this type of structure includes

      Could lessen the required depth of earth excavation

      (shallow concrete levelling pad)

      Could mitigate interference with the flows in the

      meandering watercourse

      Could eliminate the need to restore the watercourse

      to the pre-construction condition

      Could eliminate potential conflicts with buried

      utilities and

      Accelerated construction schedule less duration for

      work at and below the normal water level in

      watercourse

      The pre-screening of these alternatives will be

      discussed in the Project File

      Page 3 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      3 Consider setting back the

      westbound traffic stop lines

      on King Street as an interim

      measure to address safety

      concerns or other less

      intrusive measures instead

      of the northbound RTL and

      retaining wall

      Transportation engineers with expertise in addressing

      safety issues played a key role in developing alternative

      solutions and interim measures A range of possible

      solutions was investigated and the interim measure

      proposed was recommended because it is the best

      solution in the circumstance Assessment of traffic

      operations and safety is complex Adjustments to

      location of stop bars as suggested by TRCA will not be

      sufficient to address the safety concern

      4 Impacts of each alternative

      on the meander belt of the

      watercourses was not

      assessed

      Although several alternatives were considered during

      the evaluation process aside of those requiring the

      relocation of the intersection to the west (which was

      considered unfeasible) all of them requires modification

      to the existing structures north or east of the

      intersection Potential effects of those modifications are

      currently included in the respective technical reports

      and we will be highlighted as part of the content of the

      File Report

      5 Bridge span widening is not

      proposed at any of the

      crossings which is

      inconsistent with the

      recommendations from the

      Fluvial Geomorphic

      Assessment

      No widenings are proposed The impact assessment

      with regard to the meander belt will be updated in the

      evaluation including a statement on why the

      recommendations are not being applied

      6 Assess impacts of the

      alternatives on stormwater

      quantity quality and water

      balance

      This will be reviewed by the stormwater engineer

      7 Provide an assessment of

      potential future issues

      requirements and costs

      associated with

      maintenance of the

      retaining wall

      This will be addressed in the Project File

      Page 4 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      8 The hydraulic model for

      Cold Creek needs to be

      integrated with the model

      for the Humber River to

      accurately assess the

      effects of the alternatives

      This will be reviewed by the stormwater engineer

      9 Prepare a table that shows

      the projected increases in

      water levels for multiple

      storm events for all of the

      alternatives and identify the

      impacts to properties

      This will be reviewed by the stormwater engineer

      10 Contact MNRF regarding

      SAR Tree removal in bat

      habitat may have mitigation

      requirements

      This has already been done

      11 TRCA does not support

      entry of dewatered water

      into the watercourse

      The proposed mitigation measures will be revised

      12 Re-evaluate the proximity of

      the proposed retaining wall

      to Cold Creek

      Please refer to Comment No 4 A complete set of

      preliminary design drawings will be provided for

      comments

      13 Compensation for loss of

      habitat will be required on

      all TRCA lands

      This will be examined and outlined in detail in the

      Project File and Natural Environment Report

      14 Replacement plantings are

      required for all native and

      non-native vegetation

      This will be noted in the Project File and Natural

      Environment Report following Regional Streetscaping

      toolbox

      15 The term lsquobridge wideningrsquo

      is used inappropriately

      Change to lsquobridge

      extensionrsquo

      Noted However please note that modifications to the

      structure will not change the span of the bridges

      Page 5 of 5

      Memorandum

      December 06 2018

      Albion-Vaughan Road and King Street Intersection Improvements

      TRCA comments Response

      16 Discuss the impacts of

      climate change in the

      Project File

      This is now a standard practice required by MOECC for

      all EArsquos It will be included in the Project File

      17 The condition of Structure

      3 is inconsistently

      reported Please clarify

      The referred comment was a misinterpretation of

      Structure 3 provided by the Township of King

      The referred structure in poor condition is located farther

      north of the intersection of King Street and outside of

      the study area

      18 Clarify is hydro poles or

      other utilities will be

      impacted or will require

      relocation

      Information regarding relocation of utilities will be

      included as part of preliminary design

      19 Final copies of reports are

      to be signed and stamped

      by qualified professionals

      Noted

      From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

      ATT00002jpg

      Hello Jaime

      I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

      Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

      Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

      1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

      2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

      3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

      Comment 3No further comment

      Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

      Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

      Staff understands that further information in relation to the remaining comments will be provided within

      the Draft PFR

      Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

      Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

      T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

      Toronto and Region Conservation Authority (TRCA) | trcaca

      From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

      Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

      JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

      T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

      `

      From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

      image002pngimage003jpgimage004png

      Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

      - What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

      letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      - Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

      From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

      Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

      From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

      From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

      This is very helpful Thanks

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

      Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

      middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

      Tel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

      From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

      Albion Vaughan Road and King Intersectionpptx

      Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

      middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

      Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

      While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

      Major Milestones of the Project Current Schedule

      Peel Region

      King St E

      King Rd

      York Region

      Caledon King Townline S

      image1png

      Project Limits Albion Vaughan Road andKing Street Intersection

      Scope Northbound right turn lane(interim)

      Municipal Class CEnvironmental Assessment Study

      On-going

      Completion date for EA Q3- 2018

      Detailed Design 2018 - 2019

      Utility Relocation 2019-2020

      Construction Commencement 2021

      Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

      From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

      middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

      o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

      middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

      (northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

      middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

      o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

      middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

      o Tareq M will contact you direct to discuss Best Regards

      Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

      CIMA+Partners in Excellence

      3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

      P Do you really need to print this email Lets protect the environment

      CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

      From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

      List of Technical Reportspdf

      Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

      10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      11 Natural

      Environment

      Assessment

      Natural

      Environment

      Assessment

      KingAlbion ndash Vaughan

      Intersection Natural

      Environmental Assessment

      November

      14th

      2017

      12 Hydraulics

      Drainage and

      SWM Report

      Rev 1

      February 7th

      2018

      13 Fluvial

      Geomorphology

      RevB-Fluvial

      Geomorphic

      Fluvial Geomorphic

      Assessment in support of

      the schedule B Municipal

      Class Environmental

      assessment

      October 19th

      2017

      14 Contaminated soil Peel -DRAFT

      Contaminated

      Soil Assessment

      Report

      Contamination Overview

      StudyExisting Conditions

      Report

      June 27th

      2017

      15 BuildCultural

      heritage

      Cultural and

      Built Heritage

      Assessment

      Report

      Cultural Heritage Screening

      Report Albion Vaughan

      Road and King Street

      Municipal Class EA town

      of Caledon Region of Peel

      Ontario

      March 31st

      2017

      16 Archaeological

      Features

      Stage 1

      Archaeological

      Assessment

      Final Report

      April 7th

      2017

      Stage 2

      Archaeological

      Assessment

      Final Report

      Albion Vaughan Road and

      King Street

      Intersection Part of Lot 7

      Concession

      8 Geographic Township of

      Albion

      County of Peel Part of Lots

      5 and 6

      Concession 11 Geographic

      Township

      of King County of York

      now Region

      of Peel and Region of York

      Ontario

      August 10th

      2017

      Albion Vaughan Road and King Street Intersection Improvements

      Municipal Class B Environmental Assessment Study

      List of Technical Reports

      Item Description Document

      name

      Report Date

      17 Air Quality Peel - King and

      Albion Vaughan

      EA - DRAFT Air

      Quality

      Assessment

      Schedule lsquoBrsquo Municipal

      Class Environmental

      Assessment ndash Albion

      Vaughn Road and King

      Street Town of Caledon

      Ontario

      October 18

      2017

      18 Hydrogeology Peel - DRAFT

      Hydrogeological

      Investigation

      Report

      Preliminary Schedule B

      Class Environmental

      Assessment Report

      October 17

      2017

      19 Transportation

      and Traffic Study

      Report

      Region of Peel

      King and Albion

      Vaughan

      Transportation

      Report_e02

      Schedule B Class EA Albion

      Vaughan Road and King

      Street Transportation and

      Traffic Study Report

      March 2017

      20 Geotechnical and

      Pavement

      Investigation

      DRT 2017Nov3

      Albion and King

      Foundations

      Draft Geotechnical and

      Pavement Investigation

      and Design Report

      November

      3rd

      2017

      21 Noise Impact

      Study

      DRAFT Rpt

      3Nov2017

      Albion Vaughan-

      King Noise

      Noise Impact Study November

      3rd

      2017

      Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

      RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

      Page 1 of 2

      2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 2 of 2

      Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

      Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

      1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

      Ministry of Tourism Culture and Sport

      Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

      Ministegravere du Tourisme de la Culture et du Sport

      Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

      RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

      cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

      Page 1 of 1

      1

      Jessica Dorgo

      From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

      Follow Up Flag Follow upFlag Status Flagged

      Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

      2

      Thank you

      JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

      From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

      Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

      • King_20181206
      • Caledon_20181206
      • TRCA_20171207
      • TRCA_20181206
      • TRCA_20190124
      • York_20180501
      • York_20180509
      • York_20180525
      • York_20180528
      • York_20181206
      • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
      • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 30: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

TRCA staff received the notice of Public Information Centre No 1 on November 21 2017 Please seeattached for staff response

Thank you Annette

Annette Lister Planner II Environmental Assessment Planning Planning and Development Toronto and Region Conservation Authority (4166616600 x5266 | alistertrcaonca

Office Location amp Courier Address 101 Exchange Avenue | Concord ON L4K 5R6 Mailing Address 5 Shoreham Drive | Toronto ON M3N 1S4

P Please consider the environment before printing this email PLEASE CONSIDER THE ENVIRONMENT BEFORE PRINTING STORING OR FORWARDING THIS MESSAGE

Toronto and Region Conservation Authority Confidentiality NoticeThe information contained in this communication including any attachments may be confidential is intended only for use of therecipient(s) named above and may be legally privileged If the reader of the message is not the intended recipient you are herebynotified that any dissemination distribution disclosure or copying of this communication is strictly prohibited If you have received thiscommunication in error please resend this communication to the sender and delete it permanently from your computer systemThank you

400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

cimaca

MEMO TO Toronto and Region Conservation for the Living City (TRCA)

COPY TO Tareq Mahmood Regional Municipality of Peel

FROM Jaime Garcia CIMA+

DATE December 06 2018

SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

The present memorandum summarizes in the form of a table our response to comments

provided by TRCA with respect of the content of the draft technical reports completed as part of

the Schedule B Class Environmental Assessment

As requested the following submission to TRCA will include this document in the form of a cover

letter as well as the following documentation

Hard copy of the final technical reports

Two (2) copies of the draft Project File Report

Digital copies of all reports and drawings in a PDF format

Best Regards

Jaime Garcia PEng PhD

Senior Project Manager Transportation

cc Tareq Mahmood Regional Municipality of Peel

Page 2 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

1 Evaluation table contained

too many TBD Clarify how

evaluation was completed

At the time of the TAC meeting a preliminary preferred

solution was identified As agency comments were

received and studies were completed a preferred

solution was selected It should be noted that although

other design alternatives were considered such as

relocation of Albion-Vaughan Road to the west those

were considered not feasible

2 There is no space for

widening and a retaining

wall on the east side without

impacting Cold Creek

Widening to the west was considered as part of the

evaluation of alternative process and it was

immediately clear that the impacts to private property

would be severe and permanent

In the other hand the impacts to Cold Creek can be

mitigated with the use of a MSERSS wall rather than

the cast-in-place reinforced concrete retaining wall The

advantage of using this type of structure includes

Could lessen the required depth of earth excavation

(shallow concrete levelling pad)

Could mitigate interference with the flows in the

meandering watercourse

Could eliminate the need to restore the watercourse

to the pre-construction condition

Could eliminate potential conflicts with buried

utilities and

Accelerated construction schedule less duration for

work at and below the normal water level in

watercourse

The pre-screening of these alternatives will be

discussed in the Project File

Page 3 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

3 Consider setting back the

westbound traffic stop lines

on King Street as an interim

measure to address safety

concerns or other less

intrusive measures instead

of the northbound RTL and

retaining wall

Transportation engineers with expertise in addressing

safety issues played a key role in developing alternative

solutions and interim measures A range of possible

solutions was investigated and the interim measure

proposed was recommended because it is the best

solution in the circumstance Assessment of traffic

operations and safety is complex Adjustments to

location of stop bars as suggested by TRCA will not be

sufficient to address the safety concern

4 Impacts of each alternative

on the meander belt of the

watercourses was not

assessed

Although several alternatives were considered during

the evaluation process aside of those requiring the

relocation of the intersection to the west (which was

considered unfeasible) all of them requires modification

to the existing structures north or east of the

intersection Potential effects of those modifications are

currently included in the respective technical reports

and we will be highlighted as part of the content of the

File Report

5 Bridge span widening is not

proposed at any of the

crossings which is

inconsistent with the

recommendations from the

Fluvial Geomorphic

Assessment

No widenings are proposed The impact assessment

with regard to the meander belt will be updated in the

evaluation including a statement on why the

recommendations are not being applied

6 Assess impacts of the

alternatives on stormwater

quantity quality and water

balance

This will be reviewed by the stormwater engineer

7 Provide an assessment of

potential future issues

requirements and costs

associated with

maintenance of the

retaining wall

This will be addressed in the Project File

Page 4 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

8 The hydraulic model for

Cold Creek needs to be

integrated with the model

for the Humber River to

accurately assess the

effects of the alternatives

This will be reviewed by the stormwater engineer

9 Prepare a table that shows

the projected increases in

water levels for multiple

storm events for all of the

alternatives and identify the

impacts to properties

This will be reviewed by the stormwater engineer

10 Contact MNRF regarding

SAR Tree removal in bat

habitat may have mitigation

requirements

This has already been done

11 TRCA does not support

entry of dewatered water

into the watercourse

The proposed mitigation measures will be revised

12 Re-evaluate the proximity of

the proposed retaining wall

to Cold Creek

Please refer to Comment No 4 A complete set of

preliminary design drawings will be provided for

comments

13 Compensation for loss of

habitat will be required on

all TRCA lands

This will be examined and outlined in detail in the

Project File and Natural Environment Report

14 Replacement plantings are

required for all native and

non-native vegetation

This will be noted in the Project File and Natural

Environment Report following Regional Streetscaping

toolbox

15 The term lsquobridge wideningrsquo

is used inappropriately

Change to lsquobridge

extensionrsquo

Noted However please note that modifications to the

structure will not change the span of the bridges

Page 5 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

16 Discuss the impacts of

climate change in the

Project File

This is now a standard practice required by MOECC for

all EArsquos It will be included in the Project File

17 The condition of Structure

3 is inconsistently

reported Please clarify

The referred comment was a misinterpretation of

Structure 3 provided by the Township of King

The referred structure in poor condition is located farther

north of the intersection of King Street and outside of

the study area

18 Clarify is hydro poles or

other utilities will be

impacted or will require

relocation

Information regarding relocation of utilities will be

included as part of preliminary design

19 Final copies of reports are

to be signed and stamped

by qualified professionals

Noted

From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

ATT00002jpg

Hello Jaime

I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

Comment 3No further comment

Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

Staff understands that further information in relation to the remaining comments will be provided within

the Draft PFR

Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trcaca

From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

`

From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

image002pngimage003jpgimage004png

Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

- What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

- Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 31: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

400ndash3027 Harvester Road Burlington ON L7N 3G7 T 289 288-0287 F 289 288-0285

cimaca

MEMO TO Toronto and Region Conservation for the Living City (TRCA)

COPY TO Tareq Mahmood Regional Municipality of Peel

FROM Jaime Garcia CIMA+

DATE December 06 2018

SUBJECT Albion-Vaughan Road and King Street Intersection Improvements

The present memorandum summarizes in the form of a table our response to comments

provided by TRCA with respect of the content of the draft technical reports completed as part of

the Schedule B Class Environmental Assessment

As requested the following submission to TRCA will include this document in the form of a cover

letter as well as the following documentation

Hard copy of the final technical reports

Two (2) copies of the draft Project File Report

Digital copies of all reports and drawings in a PDF format

Best Regards

Jaime Garcia PEng PhD

Senior Project Manager Transportation

cc Tareq Mahmood Regional Municipality of Peel

Page 2 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

1 Evaluation table contained

too many TBD Clarify how

evaluation was completed

At the time of the TAC meeting a preliminary preferred

solution was identified As agency comments were

received and studies were completed a preferred

solution was selected It should be noted that although

other design alternatives were considered such as

relocation of Albion-Vaughan Road to the west those

were considered not feasible

2 There is no space for

widening and a retaining

wall on the east side without

impacting Cold Creek

Widening to the west was considered as part of the

evaluation of alternative process and it was

immediately clear that the impacts to private property

would be severe and permanent

In the other hand the impacts to Cold Creek can be

mitigated with the use of a MSERSS wall rather than

the cast-in-place reinforced concrete retaining wall The

advantage of using this type of structure includes

Could lessen the required depth of earth excavation

(shallow concrete levelling pad)

Could mitigate interference with the flows in the

meandering watercourse

Could eliminate the need to restore the watercourse

to the pre-construction condition

Could eliminate potential conflicts with buried

utilities and

Accelerated construction schedule less duration for

work at and below the normal water level in

watercourse

The pre-screening of these alternatives will be

discussed in the Project File

Page 3 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

3 Consider setting back the

westbound traffic stop lines

on King Street as an interim

measure to address safety

concerns or other less

intrusive measures instead

of the northbound RTL and

retaining wall

Transportation engineers with expertise in addressing

safety issues played a key role in developing alternative

solutions and interim measures A range of possible

solutions was investigated and the interim measure

proposed was recommended because it is the best

solution in the circumstance Assessment of traffic

operations and safety is complex Adjustments to

location of stop bars as suggested by TRCA will not be

sufficient to address the safety concern

4 Impacts of each alternative

on the meander belt of the

watercourses was not

assessed

Although several alternatives were considered during

the evaluation process aside of those requiring the

relocation of the intersection to the west (which was

considered unfeasible) all of them requires modification

to the existing structures north or east of the

intersection Potential effects of those modifications are

currently included in the respective technical reports

and we will be highlighted as part of the content of the

File Report

5 Bridge span widening is not

proposed at any of the

crossings which is

inconsistent with the

recommendations from the

Fluvial Geomorphic

Assessment

No widenings are proposed The impact assessment

with regard to the meander belt will be updated in the

evaluation including a statement on why the

recommendations are not being applied

6 Assess impacts of the

alternatives on stormwater

quantity quality and water

balance

This will be reviewed by the stormwater engineer

7 Provide an assessment of

potential future issues

requirements and costs

associated with

maintenance of the

retaining wall

This will be addressed in the Project File

Page 4 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

8 The hydraulic model for

Cold Creek needs to be

integrated with the model

for the Humber River to

accurately assess the

effects of the alternatives

This will be reviewed by the stormwater engineer

9 Prepare a table that shows

the projected increases in

water levels for multiple

storm events for all of the

alternatives and identify the

impacts to properties

This will be reviewed by the stormwater engineer

10 Contact MNRF regarding

SAR Tree removal in bat

habitat may have mitigation

requirements

This has already been done

11 TRCA does not support

entry of dewatered water

into the watercourse

The proposed mitigation measures will be revised

12 Re-evaluate the proximity of

the proposed retaining wall

to Cold Creek

Please refer to Comment No 4 A complete set of

preliminary design drawings will be provided for

comments

13 Compensation for loss of

habitat will be required on

all TRCA lands

This will be examined and outlined in detail in the

Project File and Natural Environment Report

14 Replacement plantings are

required for all native and

non-native vegetation

This will be noted in the Project File and Natural

Environment Report following Regional Streetscaping

toolbox

15 The term lsquobridge wideningrsquo

is used inappropriately

Change to lsquobridge

extensionrsquo

Noted However please note that modifications to the

structure will not change the span of the bridges

Page 5 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

16 Discuss the impacts of

climate change in the

Project File

This is now a standard practice required by MOECC for

all EArsquos It will be included in the Project File

17 The condition of Structure

3 is inconsistently

reported Please clarify

The referred comment was a misinterpretation of

Structure 3 provided by the Township of King

The referred structure in poor condition is located farther

north of the intersection of King Street and outside of

the study area

18 Clarify is hydro poles or

other utilities will be

impacted or will require

relocation

Information regarding relocation of utilities will be

included as part of preliminary design

19 Final copies of reports are

to be signed and stamped

by qualified professionals

Noted

From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

ATT00002jpg

Hello Jaime

I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

Comment 3No further comment

Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

Staff understands that further information in relation to the remaining comments will be provided within

the Draft PFR

Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trcaca

From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

`

From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

image002pngimage003jpgimage004png

Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

- What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

- Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 32: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Page 2 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

1 Evaluation table contained

too many TBD Clarify how

evaluation was completed

At the time of the TAC meeting a preliminary preferred

solution was identified As agency comments were

received and studies were completed a preferred

solution was selected It should be noted that although

other design alternatives were considered such as

relocation of Albion-Vaughan Road to the west those

were considered not feasible

2 There is no space for

widening and a retaining

wall on the east side without

impacting Cold Creek

Widening to the west was considered as part of the

evaluation of alternative process and it was

immediately clear that the impacts to private property

would be severe and permanent

In the other hand the impacts to Cold Creek can be

mitigated with the use of a MSERSS wall rather than

the cast-in-place reinforced concrete retaining wall The

advantage of using this type of structure includes

Could lessen the required depth of earth excavation

(shallow concrete levelling pad)

Could mitigate interference with the flows in the

meandering watercourse

Could eliminate the need to restore the watercourse

to the pre-construction condition

Could eliminate potential conflicts with buried

utilities and

Accelerated construction schedule less duration for

work at and below the normal water level in

watercourse

The pre-screening of these alternatives will be

discussed in the Project File

Page 3 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

3 Consider setting back the

westbound traffic stop lines

on King Street as an interim

measure to address safety

concerns or other less

intrusive measures instead

of the northbound RTL and

retaining wall

Transportation engineers with expertise in addressing

safety issues played a key role in developing alternative

solutions and interim measures A range of possible

solutions was investigated and the interim measure

proposed was recommended because it is the best

solution in the circumstance Assessment of traffic

operations and safety is complex Adjustments to

location of stop bars as suggested by TRCA will not be

sufficient to address the safety concern

4 Impacts of each alternative

on the meander belt of the

watercourses was not

assessed

Although several alternatives were considered during

the evaluation process aside of those requiring the

relocation of the intersection to the west (which was

considered unfeasible) all of them requires modification

to the existing structures north or east of the

intersection Potential effects of those modifications are

currently included in the respective technical reports

and we will be highlighted as part of the content of the

File Report

5 Bridge span widening is not

proposed at any of the

crossings which is

inconsistent with the

recommendations from the

Fluvial Geomorphic

Assessment

No widenings are proposed The impact assessment

with regard to the meander belt will be updated in the

evaluation including a statement on why the

recommendations are not being applied

6 Assess impacts of the

alternatives on stormwater

quantity quality and water

balance

This will be reviewed by the stormwater engineer

7 Provide an assessment of

potential future issues

requirements and costs

associated with

maintenance of the

retaining wall

This will be addressed in the Project File

Page 4 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

8 The hydraulic model for

Cold Creek needs to be

integrated with the model

for the Humber River to

accurately assess the

effects of the alternatives

This will be reviewed by the stormwater engineer

9 Prepare a table that shows

the projected increases in

water levels for multiple

storm events for all of the

alternatives and identify the

impacts to properties

This will be reviewed by the stormwater engineer

10 Contact MNRF regarding

SAR Tree removal in bat

habitat may have mitigation

requirements

This has already been done

11 TRCA does not support

entry of dewatered water

into the watercourse

The proposed mitigation measures will be revised

12 Re-evaluate the proximity of

the proposed retaining wall

to Cold Creek

Please refer to Comment No 4 A complete set of

preliminary design drawings will be provided for

comments

13 Compensation for loss of

habitat will be required on

all TRCA lands

This will be examined and outlined in detail in the

Project File and Natural Environment Report

14 Replacement plantings are

required for all native and

non-native vegetation

This will be noted in the Project File and Natural

Environment Report following Regional Streetscaping

toolbox

15 The term lsquobridge wideningrsquo

is used inappropriately

Change to lsquobridge

extensionrsquo

Noted However please note that modifications to the

structure will not change the span of the bridges

Page 5 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

16 Discuss the impacts of

climate change in the

Project File

This is now a standard practice required by MOECC for

all EArsquos It will be included in the Project File

17 The condition of Structure

3 is inconsistently

reported Please clarify

The referred comment was a misinterpretation of

Structure 3 provided by the Township of King

The referred structure in poor condition is located farther

north of the intersection of King Street and outside of

the study area

18 Clarify is hydro poles or

other utilities will be

impacted or will require

relocation

Information regarding relocation of utilities will be

included as part of preliminary design

19 Final copies of reports are

to be signed and stamped

by qualified professionals

Noted

From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

ATT00002jpg

Hello Jaime

I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

Comment 3No further comment

Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

Staff understands that further information in relation to the remaining comments will be provided within

the Draft PFR

Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trcaca

From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

`

From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

image002pngimage003jpgimage004png

Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

- What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

- Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 33: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Page 3 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

3 Consider setting back the

westbound traffic stop lines

on King Street as an interim

measure to address safety

concerns or other less

intrusive measures instead

of the northbound RTL and

retaining wall

Transportation engineers with expertise in addressing

safety issues played a key role in developing alternative

solutions and interim measures A range of possible

solutions was investigated and the interim measure

proposed was recommended because it is the best

solution in the circumstance Assessment of traffic

operations and safety is complex Adjustments to

location of stop bars as suggested by TRCA will not be

sufficient to address the safety concern

4 Impacts of each alternative

on the meander belt of the

watercourses was not

assessed

Although several alternatives were considered during

the evaluation process aside of those requiring the

relocation of the intersection to the west (which was

considered unfeasible) all of them requires modification

to the existing structures north or east of the

intersection Potential effects of those modifications are

currently included in the respective technical reports

and we will be highlighted as part of the content of the

File Report

5 Bridge span widening is not

proposed at any of the

crossings which is

inconsistent with the

recommendations from the

Fluvial Geomorphic

Assessment

No widenings are proposed The impact assessment

with regard to the meander belt will be updated in the

evaluation including a statement on why the

recommendations are not being applied

6 Assess impacts of the

alternatives on stormwater

quantity quality and water

balance

This will be reviewed by the stormwater engineer

7 Provide an assessment of

potential future issues

requirements and costs

associated with

maintenance of the

retaining wall

This will be addressed in the Project File

Page 4 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

8 The hydraulic model for

Cold Creek needs to be

integrated with the model

for the Humber River to

accurately assess the

effects of the alternatives

This will be reviewed by the stormwater engineer

9 Prepare a table that shows

the projected increases in

water levels for multiple

storm events for all of the

alternatives and identify the

impacts to properties

This will be reviewed by the stormwater engineer

10 Contact MNRF regarding

SAR Tree removal in bat

habitat may have mitigation

requirements

This has already been done

11 TRCA does not support

entry of dewatered water

into the watercourse

The proposed mitigation measures will be revised

12 Re-evaluate the proximity of

the proposed retaining wall

to Cold Creek

Please refer to Comment No 4 A complete set of

preliminary design drawings will be provided for

comments

13 Compensation for loss of

habitat will be required on

all TRCA lands

This will be examined and outlined in detail in the

Project File and Natural Environment Report

14 Replacement plantings are

required for all native and

non-native vegetation

This will be noted in the Project File and Natural

Environment Report following Regional Streetscaping

toolbox

15 The term lsquobridge wideningrsquo

is used inappropriately

Change to lsquobridge

extensionrsquo

Noted However please note that modifications to the

structure will not change the span of the bridges

Page 5 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

16 Discuss the impacts of

climate change in the

Project File

This is now a standard practice required by MOECC for

all EArsquos It will be included in the Project File

17 The condition of Structure

3 is inconsistently

reported Please clarify

The referred comment was a misinterpretation of

Structure 3 provided by the Township of King

The referred structure in poor condition is located farther

north of the intersection of King Street and outside of

the study area

18 Clarify is hydro poles or

other utilities will be

impacted or will require

relocation

Information regarding relocation of utilities will be

included as part of preliminary design

19 Final copies of reports are

to be signed and stamped

by qualified professionals

Noted

From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

ATT00002jpg

Hello Jaime

I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

Comment 3No further comment

Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

Staff understands that further information in relation to the remaining comments will be provided within

the Draft PFR

Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trcaca

From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

`

From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

image002pngimage003jpgimage004png

Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

- What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

- Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 34: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Page 4 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

8 The hydraulic model for

Cold Creek needs to be

integrated with the model

for the Humber River to

accurately assess the

effects of the alternatives

This will be reviewed by the stormwater engineer

9 Prepare a table that shows

the projected increases in

water levels for multiple

storm events for all of the

alternatives and identify the

impacts to properties

This will be reviewed by the stormwater engineer

10 Contact MNRF regarding

SAR Tree removal in bat

habitat may have mitigation

requirements

This has already been done

11 TRCA does not support

entry of dewatered water

into the watercourse

The proposed mitigation measures will be revised

12 Re-evaluate the proximity of

the proposed retaining wall

to Cold Creek

Please refer to Comment No 4 A complete set of

preliminary design drawings will be provided for

comments

13 Compensation for loss of

habitat will be required on

all TRCA lands

This will be examined and outlined in detail in the

Project File and Natural Environment Report

14 Replacement plantings are

required for all native and

non-native vegetation

This will be noted in the Project File and Natural

Environment Report following Regional Streetscaping

toolbox

15 The term lsquobridge wideningrsquo

is used inappropriately

Change to lsquobridge

extensionrsquo

Noted However please note that modifications to the

structure will not change the span of the bridges

Page 5 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

16 Discuss the impacts of

climate change in the

Project File

This is now a standard practice required by MOECC for

all EArsquos It will be included in the Project File

17 The condition of Structure

3 is inconsistently

reported Please clarify

The referred comment was a misinterpretation of

Structure 3 provided by the Township of King

The referred structure in poor condition is located farther

north of the intersection of King Street and outside of

the study area

18 Clarify is hydro poles or

other utilities will be

impacted or will require

relocation

Information regarding relocation of utilities will be

included as part of preliminary design

19 Final copies of reports are

to be signed and stamped

by qualified professionals

Noted

From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

ATT00002jpg

Hello Jaime

I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

Comment 3No further comment

Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

Staff understands that further information in relation to the remaining comments will be provided within

the Draft PFR

Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trcaca

From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

`

From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

image002pngimage003jpgimage004png

Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

- What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

- Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 35: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Page 5 of 5

Memorandum

December 06 2018

Albion-Vaughan Road and King Street Intersection Improvements

TRCA comments Response

16 Discuss the impacts of

climate change in the

Project File

This is now a standard practice required by MOECC for

all EArsquos It will be included in the Project File

17 The condition of Structure

3 is inconsistently

reported Please clarify

The referred comment was a misinterpretation of

Structure 3 provided by the Township of King

The referred structure in poor condition is located farther

north of the intersection of King Street and outside of

the study area

18 Clarify is hydro poles or

other utilities will be

impacted or will require

relocation

Information regarding relocation of utilities will be

included as part of preliminary design

19 Final copies of reports are

to be signed and stamped

by qualified professionals

Noted

From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

ATT00002jpg

Hello Jaime

I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

Comment 3No further comment

Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

Staff understands that further information in relation to the remaining comments will be provided within

the Draft PFR

Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trcaca

From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

`

From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

image002pngimage003jpgimage004png

Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

- What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

- Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 36: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

From Annette ListerTo Jaime GarciaCc Mahmood Tareq Maria ParishSubject Re B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memoDate Thursday January 24 2019 114510 AMAttachments ATT00001jpg

ATT00002jpg

Hello Jaime

I understand that the Draft Project File Report and associated materials will be circulated for TRCA staffreview prior to posting Please allow at least 30 business days for our staff to review the draft report Ialso understand that you would like preliminary comments to the responses provided in the memo Asrequested please see below for our preliminary comments

Comment 1Staff will review the updated Evaluation of Design Alternatives Table in the Draft PFR when it is available

Comment 2Staff understands and appreciates that widening to the west was considered as part of the evaluation ofalternatives process At this point in time it is staff opinion that there appears to be three options toaddress impacts to Cold Creek on the southeast corner of the intersection Please consider all of theseoptions within the Draft PFR

1 Appropriately designed retaining wall at Cold Creek A retaining wall at this location will have toconsider all costs associated with design and implementation including but not limited to studies(eg environmental impact study including inventory and assessment of florafauna and EcologicalLand Classification (ELC) fluvial geomorphology study hydrogeology study geotechnical studyetc) as well as cost analysis of future maintenance requirements associated with the wall

2 Realignment of Cold Creek away from the road A watercourse realignment will have to considerall costs associated with design and implementation Please see the TRCA Channel ModificationDesign and Submission Requirements (2007) for studies required for watercourse realignmentsPlease note that this section of Cold Creek is located on TRCA property As such any workrelated to a watercourse realignment at this location may be completed by or in partnership withTRCA Restoration Projects staff

3 Acquisition or expropriation of private property located on the west side of the intersection toaccommodate widening to the west It is staff opinion that the costs associated with acquisition orexpropriation should be weighed against costs for required studies and other work associated witha retaining wall or watercourse realignment

Comment 3No further comment

Comment 4Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately evaluates the impact of the various alternatives on the meander belt

Comment 5Please ensure that the Evaluation of Design Alternatives Table in the Draft PFR is updated so that itaccurately characterizes the impact of the proposed alternatives on the meander belt even if no bridgespan widening is proposed

Staff understands that further information in relation to the remaining comments will be provided within

the Draft PFR

Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trcaca

From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

`

From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

image002pngimage003jpgimage004png

Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

- What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

- Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 37: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

the Draft PFR

Please do not hesitate to contact me if you have any further questions at this point Thank youAnnette

Annette Lister MASc PlannerEnvironmental Assessment Planning | Planning and Development

T 4166616600 ext 5266 E alistertrcaoncaA 101 Exchange Avenue Vaughan ON L4K 5R6

Toronto and Region Conservation Authority (TRCA) | trcaca

From Jaime Garcia ltJaimeGarciacimacagtTo Annette Lister ltalistertrcaoncagtCc Mahmood Tareq lttareqmahmoodpeelregioncagtDate 01092019 1157 AMSubject B000709 Region of Peel - King and Albion Vaughan EA - TRCA response memo

Hi Annette I am under the assumption that the attached document was delivered to you by mail lastDecember - If that it is the case please disregard this message If not please accept my apologies Please note that we are working with the Region toadequate address your comments as part of the completion of the Final Reports As indicatedin the attached document we will contact you again prior to the issue of the Project File to theMinistry Best Regards

JAIME GARCIA PEngPhDAssociate Partner Senior Project Manager Transportation - Traffic Engineering

T 289-288-0287 ext 6814 M 905 630-2730 F289-288-0285400ndash3027 Harvester Road Burlington ONenspL7N 3G7 CANADA

`

From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

image002pngimage003jpgimage004png

Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

- What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

- Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 38: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

From Mota SteveTo Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE PCC for Albion Vaughan Rd and King StDate Tuesday May 1 2018 104411 AMAttachments image001png

image002pngimage003jpgimage004png

Hi TareqThanks for your e-mail Richard Hui is no longer with York Region so if you can add me to the mailinglist that would be greatly appreciated Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing There are a few questionscomments that I have at this time Feel free to call me to discuss

- What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersection- Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need a

letter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

- Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

RegardsSteve Mota PEng | Program Manager ndash Transportation PlanningTransportation amp Infrastructure Planning Branch | Transportation Services ------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York| 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 905-830-4444 ext 75056 | SteveMotayorkca | wwwyorkca

From Mahmood Tareq [mailtotareqmahmoodpeelregionca] Sent Monday April 30 2018 1105 AMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject FW PCC for Albion Vaughan Rd and King St Hi Steve According to our project stakeholder registry Richard Hui and later Joshua Wang arethe contacts at the Region of York for Albion Vaughan Road and King Streetintersection EA study please see the following correspondence and the attached PICnotification that has been sent to York Region prior to PIC-1 Wersquove also provided acopy of the PIC boards to Joshua Wang on December 1st 2017 (PIC boards areenclosed herewith) Jaime Garica the Consultant project manager is ccrsquod on this email if you need anyfurther details about the preferred design alternative and impacts on York Regional

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 39: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Road Jaime Garcia can provide you the details Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent December 1 2017 121 PMTo Wang JoshuaSubject RE PCC for Albion Vaughan Rd and King St Hi Joshua The final display boards of PIC for Albion Vaughan Road and King Street Intersection are attached to theemail Please Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregioncaREGION OF PEEL Working with you

From Wang Joshua [mailtoJoshuaWangyorkca] Sent December 1 2017 1116 AMTo Mahmood TareqSubject PCC for Albion Vaughan Rd and King St Hi Tareq We received your Public Information Centre notice for intersection improvements at Albion VaughanRoad and King Street Unfortunately we cannot attend Would you send an electronic copy of the PIC material Thanks Joshua Wang PEng | Transportation Technologist Transportation amp Infrastructure PlanningTransportation Services------------------------------------------------------------------------------------------------------------------------The Regional Municipality of York | 17250 Yonge Street | Newmarket ON L3Y 6Z1 O 1-877-464-9675 ext 75146 | JoshuaWangyorkca | wwwyorkca

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 40: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

From Mota SteveTo Jaime Garcia Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Wednesday May 9 2018 111604 AMAttachments image001jpg

This is very helpful Thanks

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent Monday May 07 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 41: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 30458 PMAttachments image001jpg

Hi Steve In addition to my previous mail for next yearrsquos budget wersquore only looking to complete the detaileddesign and utility relocation Here is the cost breakdown for 2019 project scope EA Study - 260000Design cost ndash 98000Utility relocation - 150000Contingency ndash 50000 Approximately it will cost 300k to complete the above scope to share 50 of the cost pleasebudget between a range of 150k to 200k in 2019 capital program Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Mahmood Tareq Sent May 25 2018 248 PMTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 range

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 42: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

middot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies Transportation

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 43: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Tel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADA

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 44: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

From Mahmood TareqTo Mota SteveCc JaimeGarciacimaca Jessica DorgoSubject RE B000709 - Region of Peel - Albion Vaughan Rd and King St EADate Friday May 25 2018 25027 PMAttachments image001jpg

Albion Vaughan Road and King Intersectionpptx

Hi Steve Sorry for the delay response As Regional Shared the Albion Vaughan Road with York Region as aboundary road wersquore expecting the project cost to be shared 50 - 50 with York Region Irsquove been waiting for CIMA to complete the cost estimate includes detailed design Construction andCA of the project Irsquove just been informed that York Regionsrsquo budget deadline is sometime in Mayand if time will not permit to await for the final estimate from CIMA you could base your budget onthe following estimate Irsquove received the following preliminary estimate from CIMAInterim include southbound right turn lane extension and the new northbound right turn lane thecost adjustment is as below middot Item 1 Right Turn Lane $245000 cost is approximately correct

middot Item 2 4-way temporary signal $25000 is too low my estimate is $50000 to$75000 rangemiddot Item 3 4-way permanent signals $75000 is low my estimate is $125000middot Item 4 Utility relocations $150000 is probably is ok The southeast corner has bellrelocation And at least two hydro pole relocationmiddot Item 5 Property we are not sure if the property information is correct If it is correctthe southbound right turn lane requires 250sm property therefore the cost should be$38750middot Item 6 Sidewalk we assumed the sidewalk is for north leg west side We adjusted theunit price from $50m2 $75m2 Therefore the cost should be $18150middot Item 7 Trees assumed the tree is for Southbound right turn lane extension The costis ok for this one So for conclusion the summary is as belowmiddot EA Study $260000

Project cost $654000middot Design 15 (not 10) of Construction Cost $98000middot CA 8 (not 5) of construction cost $52000 - Sub-total $1064000

While the project estimate has not been finalized I propose to allow additional 200k forcontingency The estimated total project cost will be $ 12 million To share 50 of the cost pleasebudget 600k in York Regionrsquos capital program The project timeline for Interim solution

Major Milestones of the Project Current Schedule

Peel Region

King St E

King Rd

York Region

Caledon King Townline S

image1png

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 45: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Project Limits Albion Vaughan Road andKing Street Intersection

Scope Northbound right turn lane(interim)

Municipal Class CEnvironmental Assessment Study

On-going

Completion date for EA Q3- 2018

Detailed Design 2018 - 2019

Utility Relocation 2019-2020

Construction Commencement 2021

Thanks Tareq MahmoodPM Infrastructure Programmingand Studies TransportationTel 905-791-7800 X 7828Cell 905-872-6475

From Jaime Garcia [mailtoJaimeGarciacimaca] Sent May 7 2018 158 PMTo Mota Steve Mahmood TareqCc JaimeGarciacimaca Jessica DorgoSubject B000709 - Region of Peel - Albion Vaughan Rd and King St EA Hi Steve As per Tareq request we are providing you with a respond to your comments and questionsprovided last week

middot Please let me know what your schedule is for filing the EA and whether you can share thepreliminary design with York Region in advance of filing

o Filing of the Project Report is expected to be completed by AugustSeptember 2018An electronic copy of the preliminary design for the interim and the final preferredalternative will be provided by the Region of Peel in advance

middot What is the limit of Peel Regionrsquos jurisdiction related to the east leg of the intersectiono The east limits of the proposed improvements for the interim preferred alternative

(northbound right turn lane) is the bridge structure located east of the intersection(King Road Bridge)

middot Does the project extends into York Regionrsquos jurisdiction on King Road If so will you need aletter from York Region to include in the project file as it relates to the project within Yorkrsquosjurisdiction

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 46: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

o The limits of the final preferred design (widening the intersection to 4 lanes) mayextend east of the King Road Bridge The preliminary design drawings will identifythe exact extend of the road widening Please refer to the next question regarding apermit letter from the Region

middot Is this something that Peel is expecting to cost share with York Region If so we will need tobudget some money in our capital program

o Tareq M will contact you direct to discuss Best Regards

Jaime Garcia PEngPhDAssociate partnerSenior Project ManagerTraffic Engineering Transportation

CIMA+Partners in Excellence

3027 Harvester Road Suite 400Burlington Ontario L7N 3G7CANADATel 289-288-0287 ext 6814 Fax 289-288-0285Cell 905630-2730

P Do you really need to print this email Lets protect the environment

CONFIDENTIALITY WARNING This e-mail is confidential If you are not the intended recipient please notify the sender immediately and delete it in itsentirety

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 47: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

From Mahmood TareqTo Mota SteveCc Jaime GarciaSubject Albion-Vaughan Road and King Street Intersection Improvements EA StudyDate Thursday December 6 2018 30511 PMAttachments image001gif

List of Technical Reportspdf

Hello The Region has initiated a Schedule lsquoBrsquo Municipal Class Environmental Assessment (EA) forimprovements at the intersection of Albion Vaughan Road and King Street in Jan 2016 and PIC washeld on December 7th 2017 The limits of the study area are 300m back for each leg of theintersection The intersection is located on the boundary between The Town of Caledon Townshipof King York Region and the Region of Peel As a part of Albion Vaughan Road ndash King Street intersection improvements technical studies havebeen conducted by CIMA The consultant has submitted the technical reports in 2017 and due tostaff changes Irsquom not sure whether the attached technical reports have been circulated tostakeholders during the process As far I know the reports have been reviewed by TRCA and wersquoreworking on to address their comments As we plan to complete the EA project early next year (Q1-2019) and moving ahead with the plan Iwould like to ensure that the stakeholders are engaged to review the technical reports and theirinputs are properly embraced The technical reports can be accessed via the following link Please open the FTP link by using GoogleChrome and open the lsquoYork Regionrdquo folder and ldquoAlbion- Vaughan Rd and King Street Intersection EArdquo sub-folder to view and download technical reportshttpseftspeelregioncaID tmahmoodPw tmahmood I would appreciate if you kindly provide your feedback on these attached reports by no laterthan Tuesday January 8th 2019 Any questions please let me know Best regards Tareq MahmoodProject Manager Infrastructure Programming and StudiesTransportation Public Works Region of Peel

10 Peel Centre Dr Suite B 4th floorBrampton ON L6T 4B9Tel 905-791-7800 ext 7828Cell905-872-6475Email tareqmahmoodpeelregionca

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 48: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

11 Natural

Environment

Assessment

Natural

Environment

Assessment

KingAlbion ndash Vaughan

Intersection Natural

Environmental Assessment

November

14th

2017

12 Hydraulics

Drainage and

SWM Report

Rev 1

February 7th

2018

13 Fluvial

Geomorphology

RevB-Fluvial

Geomorphic

Fluvial Geomorphic

Assessment in support of

the schedule B Municipal

Class Environmental

assessment

October 19th

2017

14 Contaminated soil Peel -DRAFT

Contaminated

Soil Assessment

Report

Contamination Overview

StudyExisting Conditions

Report

June 27th

2017

15 BuildCultural

heritage

Cultural and

Built Heritage

Assessment

Report

Cultural Heritage Screening

Report Albion Vaughan

Road and King Street

Municipal Class EA town

of Caledon Region of Peel

Ontario

March 31st

2017

16 Archaeological

Features

Stage 1

Archaeological

Assessment

Final Report

April 7th

2017

Stage 2

Archaeological

Assessment

Final Report

Albion Vaughan Road and

King Street

Intersection Part of Lot 7

Concession

8 Geographic Township of

Albion

County of Peel Part of Lots

5 and 6

Concession 11 Geographic

Township

of King County of York

now Region

of Peel and Region of York

Ontario

August 10th

2017

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 49: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Albion Vaughan Road and King Street Intersection Improvements

Municipal Class B Environmental Assessment Study

List of Technical Reports

Item Description Document

name

Report Date

17 Air Quality Peel - King and

Albion Vaughan

EA - DRAFT Air

Quality

Assessment

Schedule lsquoBrsquo Municipal

Class Environmental

Assessment ndash Albion

Vaughn Road and King

Street Town of Caledon

Ontario

October 18

2017

18 Hydrogeology Peel - DRAFT

Hydrogeological

Investigation

Report

Preliminary Schedule B

Class Environmental

Assessment Report

October 17

2017

19 Transportation

and Traffic Study

Report

Region of Peel

King and Albion

Vaughan

Transportation

Report_e02

Schedule B Class EA Albion

Vaughan Road and King

Street Transportation and

Traffic Study Report

March 2017

20 Geotechnical and

Pavement

Investigation

DRT 2017Nov3

Albion and King

Foundations

Draft Geotechnical and

Pavement Investigation

and Design Report

November

3rd

2017

21 Noise Impact

Study

DRAFT Rpt

3Nov2017

Albion Vaughan-

King Noise

Noise Impact Study November

3rd

2017

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 50: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Jun 23 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon This office has reviewed the above-mentioned report which has been submitted to this ministry as acondition of licensing in accordance with Part VI of the Ontario Heritage Act RSO 1990 c 0181 Thisreview has been carried out in order to determine whether the licensed professional consultantarchaeologist has met the terms and conditions of their licence that the licensee assessed the propertyand documented archaeological resources using a process that accords with the 2011 Standards andGuidelines for Consultant Archaeologists set by the ministry and that the archaeological fieldwork andreport recommendations are consistent with the conservation protection and preservation of the culturalheritage of Ontario The report documents the assessmentmitigation of the study area as depicted in Map 5 of the above titledreport and recommends the following The Stage 1 archaeological assessment found the Project Area to exhibit potential for the recovery of intactarchaeological deposits Once a design plan for the proposed improvements to the Project Area iscomplete Stage 2 is required within the project limits prior to construction for all areas determined to retainarchaeological potential (see Map 5) This will include all sections within the proposed new ROW as well asstaging and storage areas required for construction The following methods are recommended for theStage 2 property survey 1) Areas of manicured lawn and overgrown areas that appear to be relatively undisturbed exhibitarchaeological potential for the recovery of archaeological remains Stage 2 test pit survey at an interval offive metres is recommended for these areas prior to ground disturbance activities Test pits should beapproximately 30 centimetres in diameter and excavated to subsoil If artifacts be recovered their locationshould be recorded with a GPS unit and test pit intervals reduced to 25 metres within 5 metres of thepositive test pit as well as a one-metre test unit if necessary

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Tel (416) 314-7691Email IanHemberontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Teacutel (416) 314-7691Email IanHemberontarioca

RE Review and Entry into the Ontario Public Register of Archaeological ReportsArchaeological Assessment Report Entitled Stage 1 Archaeological AssessmentAlbion Vaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Apr 7 2017 Filed with MTCS Toronto Office on Apr 272017 MTCS Project Information Form Number P1056-0083-2017 MTCS File Number0006551

Page 1 of 2

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 51: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

2) Areas of slope exhibit low potential for the recovery of archaeological remains No further assessment isrecommended for these areas and 3) Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Areas of previous disturbance exhibit low potential for the recovery of archaeological remains No furtherassessment is recommended for these areas Based on the information contained in the report the ministry is satisfied that the fieldwork and reporting forthe archaeological assessment are consistent with the ministrys 2011 Standards and Guidelines forConsultant Archaeologists and the terms and conditions for archaeological licences This report has beenentered into the Ontario Public Register of Archaeological Reports Please note that the ministry makes norepresentation or warranty as to the completeness accuracy or quality of reports in the register Should you require any further information regarding this matter please feel free to contact me Sincerely Ian Hember Archaeology Review Officer

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 2 of 2

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 52: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

Aug 17 2017 Jamie Lemon (P1056) Golder Associates Ltd 84 High Bowmanville ON L1C 3B4

Dear Mrs Lemon The above-mentioned report which has been submitted to this ministry as a condition of licensing inaccordance with Part VI of the Ontario Heritage Act RSO 1990 c 018 has been entered into the OntarioPublic Register of Archaeological Reports without technical review1 Please note that the ministry makes no representation or warranty as to the completeness accuracy orquality of reports in the register Should you require further information please do not hesitate to send your inquiry to ArchaeologyOntarioca

1In no way will the ministry be liable for any harm damages costs expenses losses claims or actions that may result (a) if the Report(s) or itsrecommendations are discovered to be inaccurate incomplete misleading or fraudulent or (b) from the issuance of this letter Further measuresmay need to be taken in the event that additional artifacts or archaeological sites are identified or the Report(s) is otherwise found to be inaccurateincomplete misleading or fraudulent

Ministry of Tourism Culture and Sport

Archaeology Programs UnitPrograms and Services BranchCulture Division401 Bay Street Suite 1700Toronto ON M7A 0A7Archaeologyontarioca

Ministegravere du Tourisme de la Culture et du Sport

Uniteacute des programmes darcheacuteologieDirection des programmes et des servicesDivision de culture401 rue Bay bureau 1700Toronto ON M7A 0A7Archaeologyontarioca

RE Entry into the Ontario Public Register of Archaeological Reports ArchaeologicalAssessment Report Entitled Stage 2 Archaeological Assessment AlbionVaughan Road and King Street Intersection Part of Lot 7 Concession 8Geographic Township of Albion County of Peel Part of Lots 5 and 6 Concession11 Geographic Township of King County of York now Region of Peel and Regionof York Ontario Dated Aug 10 2017 Filed with MTCS Toronto Office on NAMTCS Project Information Form Number P1056-0114-2017 MTCS File Number0006551

cc Archaeology Licensing OfficerJaime GarciaCIMA+Sargon SifoRegion of Peel

Page 1 of 1

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 53: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

1

Jessica Dorgo

From Sharon Lingertat ltSharonLingertattrcacagtSent Tuesday August 4 2020 1122 AMTo Jessica DorgoCc Jaime Garcia Albert Thomas Mahmood TareqSubject RE CFN 56053 Albion-Vaughan Road and King Street EA - Draft PFR - TRCA Comments

Follow Up Flag Follow upFlag Status Flagged

Hi Jessica Thank you for sending over the responses and SWM report Annettersquos last day at TRCA was this past Friday so please direct the final EA and supporting background reports to my attention once they are available for review Regards Sharon Lingertat BSc (Hons) MCIP RPP Senior Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 5717 C (437) 333-4183 E sharonlingertattrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

From Jessica Dorgo ltJessicaDorgocimacagt Sent Friday July 31 2020 1022 AM To Annette Lister ltAnnetteListertrcacagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Mahmood Tareq lttareqmahmoodpeelregioncagt Subject RE CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments Hi Annette Thank you for your comments on the Project File Report (PFR) for the Albion‐Vaughan Road and King Street EA A table outlining our responses to your comments is attached for your review A copy of the Stormwater Management Report and revised Section 9 (Commitments to Further Work) of the PFR are also attached We intend to file the EA the second week of August 2020 A copy of the final PFR and Notice of Study Completion will be provided to you at that time If you have any outstanding questions or concerns please feel free to contact us

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017
Page 54: Mahmood, Tareq Jaime Garcia...Project Manager, Infrastructure Programming and Studies Transportation, Public Works, Region of Peel 10 Peel Centre Dr., Suite B, 4th floor Brampton,

2

Thank you

JESSICA DORGO EIT EIT Transportation T 289-288-0287 ext 6819 F 289-288-0285 400ndash3027 Harvester Road Burlington ON L7N 3G7 CANADA

From Annette Lister ltAnnetteListertrcacagt Sent Friday July 17 2020 500 PM To Mahmood Tareq lttareqmahmoodpeelregioncagt Cc Jaime Garcia ltJaimeGarciacimacagt Sharon Lingertat ltSharonLingertattrcacagt Suzanne Bevan ltSuzanneBevantrcacagt Victoria Kramkowski ltVictoriaKramkowskitrcacagt Brandon Hester ltBrandonHestertrcacagt Alistair Jolly ltAlistairJollytrcacagt Albert Thomas ltAlbertThomastrcacagt Deanna Cheriton ltDeannaCheritontrcacagt Subject CFN 56053 Albion‐Vaughan Road and King Street EA ‐ Draft PFR ‐ TRCA Comments

Hello Tareq TRCA staff received the Draft Project File Report and appendices on June 5 2020 Please see the attached letter for TRCA staff comments Please ensure that comments are addressed and that we receive a copy of the Notice of Study Completion and Final Project File Report Should you have any questions please do not hesitate to contact me Thank you Annette Annette Lister MASc Planner Infrastructure Planning and Permits | Development and Engineering Services T (416) 661-6600 ext 6443 E annettelistertrcaca A 101 Exchange Avenue Vaughan ON L4K 5R6 | trcaca

  • King_20181206
  • Caledon_20181206
  • TRCA_20171207
  • TRCA_20181206
  • TRCA_20190124
  • York_20180501
  • York_20180509
  • York_20180525
  • York_20180528
  • York_20181206
  • ENTERED INTO REGISTER Archaeological Report for P1056-0083-2017
  • ENTERED INTO REGISTER Archaeological Report for P1056-0114-2017