mahi hydro power plant summer industrial training presentaion
TRANSCRIPT
1
GOVT. ENGINEERING COLLEGE,BANSWARA
A Presentation On Mahi Hydel Power House
PRESENTED TODepartment of Mechanical Engg.
PRESENTED BYAbhimanyu Singh Bhati13EGBME300B.Tech. IV Yr. VII Sem.
About Mahi Hydro Power Project
Development of the multistate Mahi Bajaj Sager Project started with laying of the foundation stone in 1960. The project is named after national leader Shri Jamnala Bajaj. Major construction activities started in 1972 and the PH-I was dedicated by Chief Minister Haridev Joshi in Feb 1983
Feature of Mahi – I Power House
Name of the Powerhouse Mahi - Power House I
Year Commissioned 1986
Total Installed Capacity (MW) Sum of IC of all turbines
2 X 25 MW
Type of Turbines Francis
Speed (rpm) 150
Number of Penstocks 2
Size of Penstocks 4.2m dia
Full Reservoir Level (m) 281.5
Components of Hydroelectric Power Plants
DAM RESERVOIR CONTROL
GATE PENSTOCK TURBINE GENERATOR
TRANSFORMER SWITCH YARD
How a Hydroelectric Power System Works
Francis Turbine
Top View Of Francis Turbine
SERVO MOTER PISTON
SHAFT
Guide vane servomotor
Parts Of Generator
STATOR ROTOR
Top View Of Generator
DC EXCITER
RUNNER
STATOR
DC Exciter
Power Transformer
For Safety
CIRCUIT BREAKER CO2 GAS CYLINDER