magnetic manipulator team 125

11
Chad Perkins Marley Rutkowski John Olennikov Ben Younce Project Advisor: Robert J. Albright Industrial Advisor: Andy McConnell Client: Mark Utlaut Magnetic Manipulator Team 125

Upload: azure

Post on 22-Feb-2016

75 views

Category:

Documents


0 download

DESCRIPTION

Magnetic Manipulator Team 125. Chad Perkins Marley Rutkowski John Olennikov Ben Younce Project Advisor: Robert J. Albright Industrial Advisor: Andy McConnell Client: Mark Utlaut. Magnetic Levitation Small neodymium magnet suspended a minimum of 2 inches from solenoid - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Magnetic Manipulator Team 125

Chad PerkinsMarley RutkowskiJohn OlennikovBen YounceProject Advisor: Robert J. AlbrightIndustrial Advisor: Andy McConnellClient: Mark Utlaut

Magnetic Manipulator

Team 125

Page 2: Magnetic Manipulator Team 125

*Project Overview*Magnetic Levitation*Small neodymium magnet

suspended a minimum of 2 inches from solenoid

*Secondary Objective*Movement Control*1st Vertical*2nd Horizontal

Page 3: Magnetic Manipulator Team 125

Completed Milestones Since November Program Review

*Fri 22 Nov*Create initial plan for prototype build

*Fri 6 Dec*Finalize prototype plans*Determine lead time for any technician

help.*All parts purchased or ordered

*Fri 17 Jan*Begin programming for Arduino

*Milestones

Page 4: Magnetic Manipulator Team 125

Completed Milestones Since November Program Review

*Fri 24 Jan*Begin prototype build

*Fri 31 Jan*Prototype build 50% complete

*Fri 7 Feb*Begin testing/debugging of prototype

*Milestones

Page 5: Magnetic Manipulator Team 125

Missed Milestones Since November Program Review

*Fri 7 Feb*Prototype build 100% complete*Begin testing/debugging of prototype

*Milestones

Page 6: Magnetic Manipulator Team 125

Upcoming Milestones

*Fri 21 Feb*Have at least 1 dimensional movement

working *Fri 28 Feb*Comprehensive Exams

*Fri 07 Mar*Complete Final Report Document initial

write*Fri 21 Mar*Complete Final Report, first complete draft

(ver. 0.9)

* Milestones

Page 7: Magnetic Manipulator Team 125

Demo

Page 8: Magnetic Manipulator Team 125

*Minor Complications

*Overloading the power supply*Reduce Voltage from source*Current Max = 6-A, to defeat gravity

*Precise adjustments for negative feedback*Hall sensor output range from 0-5 V truncated to 2.5 -5 V, then expanded back to 0-5 V

*Get a reasonably sized heat sink!!

Page 9: Magnetic Manipulator Team 125

*Questions?

Page 10: Magnetic Manipulator Team 125

*Summary

*Overall Team 125 is on track!*Milestones

*Oregon snow caused some “slipping”*Tele-comuting/ task delegation

*Minor complication solutions being implemented!

Page 11: Magnetic Manipulator Team 125

Thank You