M560, New Gate Processing FacilitiesConley Terminal

Pre-Proposal BriefingOctober 23, 2018

1

Page 2: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Briefing Agenda

1. M560 RFQ Scope, Submission Requirements & Schedule

2. Selection Evaluation Criteria

3. Conley Terminal Overview

4. Q & A

2

Page 3: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

M560, New Gate Processing Facilities Conley TerminalScope of Work

Terminal Gate Planning & Design Berth 14-17 & Lobster Cove Bulkheads Evaluation Final Design & Bid Documents Engineering Cost Estimates Construction Phase Services & Resident Engineering

3

Page 4: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

M560, New Gate Processing Facilities Conley TerminalRFQ Process

• SUPPLEMENTAL INFORMATION PACKAGE – AVAILABLE ON 10/10/18

• PRE-PROPOSAL BRIEFING, 10/23/18• DEADLINE FOR SUBMISSION OF WRITTEN QUESTIONS, 11/2/2018 AT

NOON• OFFICIAL ANSWERS PUBLISHED (ESTIMATED), 11/9/2018 AT NOON• SUBMISSION DUE DATE, 11/29/2018 AT NOON

4

Page 5: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

M560, New Gate Processing Facilities RFQ submissions requirements

5

Submission must includes• Cover Letter• Confirmation that the Consultant has the ability

to obtain requisite insurance coverage• Litigation & Legal Proceedings• Registration of the Board of

Directors for the Prime & Every Sub-Consultants

Submission due at NOON, 11/29/18

Page 6: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

M560, New Gate Processing Facilities Conley TerminalEvaluation criteria

6

• Current Level of Experience & Knowledge of the team in designing terminal gates in semi-automatic terminals

• Experience of the team in container terminal’s IT infrastructure design, integration & installation• Geographic location & availability of the Project Manager, REs, and other key personnel• Experience & expertise of sub-consultants• Demonstrated experience in BIM modeling, Lean Planning & Lean Construction• Demonstrated ability to perform work with minimal disruption to terminal operations• Familiarity with MGL, including filed sub-bid experience• Cost management & scheduling capabilities• DBE and affirmative action efforts – PLEASE INDICATE THE PROPOSED % OF DBE PARTICIPATION• Current level of work with the Authority, and past performance • Experience with sustainable design and resiliency• Project understanding & technical approach

Page 7: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

M560, New Gate Processing Facilities

CONLEY TERMINAL OVERVIEW

7

Page 8: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

• $4.6B economic impact• 50,000 total jobs (7,000 direct jobs)• Federal tax revenues of $203M• State & local tax revenues of $136M• 1,600 NE businesses use the port

EastBoston

Charlestown

SouthBoston

Chelsea

Everett

MassportProperty

Other Public(USCG & BRA)

Private PortFacilities

The Port Compared

to Boston’s Largest

Employers

8Port Ownership

The Port of Boston is vital to the regional economy

Page 9: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Conley Terminal is New England’s only full-service container terminal

Global access for the area’s businesses and industry as well as its 14 million consumers

Weekly Service to/from Asia, North Europe, and Latin America

Shipping Lines: MSC, Ocean Alliance, THE Alliance

1/3 of New England bound cargo moves through Conley

Efficient connectivity to interstate highway system Center of international commerce Top Imports: Seafood, Furniture, Beverages & Spirits, Plastics Top Exports: Paper, Logs & Lumber, Scrap Metal, Seafood Import To Export Ratio = 1.4:1 A diverse collection of companies use Conley Terminal to import and export their

products Top Customers: IFP (Kraft), America Chung Nam, Schnitzer Steel, Christmas

Tree Shops, BJs Wholesale Club, Ogo Fibers, Ocean Spray, Jordan’s Furniture

9

Page 10: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Rotation: Yokohama, Qingdao, Ningbo, Shanghai, Pusan, (Panama Canal)New York, Boston, Norfolk, (Cape of Good Hope) Singapore, Cai Mep, Hong Kong

Ocean Alliance Asia-US East Coast Service: COSCO, Evergreen, CMA CGM, OOCL, APL10

Page 11: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Mediterranean Shipping Company (MSC)N. Europe-US East Coast Service

Rotation: Antwerp, Bremerhaven, Rotterdam, Boston, New York, Philadelphia, Cristobal

11

Page 12: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Rotation: Qingdao, Ningbo, Shanghai, Pusan, (Panama Canal),New York, Boston, Wilmington NC, Savannah, (Panama Canal), Pusan, Qingdao

THE Alliance Asia-US East Coast ServiceHapag Lloyd/K Line/MOL/NYK/Yang Ming 12

Page 13: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

1.9 million metric tons of products and materials are shipped through Conley Terminal annually

13

Imports1,060,637 Metric Tons

Exports838,897 Metric Tons

Source: WISER Trade, 2017

Recycled Fibers66%

Scrap Metal16%

Logs & Lumber9%

Raw Hides And Skins4%

Plastics Incl Waste3%

Other2% Recycled Fibers

66%

Scrap Metal16%

Logs & Lumber9%

Raw Hides And Skins4%

Plastics Incl Waste

3%

Other2%

Page 14: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Conley Terminal set its fourth consecutive record for volume in FY18 14

180,000

190,000

200,000

210,000

220,000

230,000

240,000

250,000

260,000

270,000

280,000

290,000

FY 14 FY 15 FY 16 FY 17 FY18

TEUs

Page 15: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Strong Relationship with the ILA: 30% Increase in Productivity since 2013 contract

0

5

10

15

20

25

30

35

Before Contract After Contract

Con

tain

ers

per h

our

15

Page 16: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

May 23: The Seaspan Elbe, a 10,000 TEU ship, called Conley Terminal –this is the largest ship to ever call Conley Terminal 16

Page 17: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Boston Harbor Dredging Project17

Maintenance Dredging of Inner Harbor Completed December 2017

CAD Cell Completed in 2017

Area of Federal ChannelRequiring Improvement Dredging• Existing Elev: -40 MLLW• Proposed Elev: -47 MLLW

Funding Source

Federal $220 million

State $75 million

Massport $55 million

Total ≈ $350 million

Page 18: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Conley Terminal 18

Existing Conley Terminal Logan International Airport

Page 19: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Existing Terminal($103M with $42M FASTLANE Grant)

New Berth 10 With 3 New Cranes

Dedicated Freight Corridor ($75M) opened in September 2017

Conley Terminal Revitalization & Modernization 19

Page 20: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

Conley Terminal Master Plan 20

Page 21: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

FASTLANE Grant Projects: ModernizingExisting Conley Terminal

21

Page 22: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

M560, New Gate processing Facilities CONLEY TERMINAL

22

Conley Existing Operation• Terminal Circulation• Existing Gate Processing Operation• Existing Gate Processing

Technology• Entry TWIC Verification• CBP Screening

Page 23: M560, New Gate Processing Facilities Conley Terminal Pre ... · Pre-Proposal Briefing October 23, 2018 1. Briefing Agenda 1. ... • Experience with sustainable design and resiliency

23M560, New Gate processing Facilities CONLEY TERMINALPROJECT SCHEDULE

• Commence planning/concept design – Early 2019• Complete construction – Late 2021