m di ll b eesmordialloc bypass ees - amazon s3 · 2019. 3. 13. · • likely upgrade within 27.19m...

7
M di ll B EES Mor dialloc Bypass EES Presentation material re 321 Old Dandenong Road Andrew Prout – Engeny 13 March 2019

Upload: others

Post on 10-May-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M di ll B EESMordialloc Bypass EES - Amazon S3 · 2019. 3. 13. · • Likely upgrade within 27.19m easem ent to suit MW Likely upgrade to meet AustRoads / MW requirements

M di ll B EESMordialloc Bypass EESPresentation material re 321 Old Dandenong Road

Andrew Prout – Engeny13 March 2019

Page 2: M di ll B EESMordialloc Bypass EES - Amazon S3 · 2019. 3. 13. · • Likely upgrade within 27.19m easem ent to suit MW Likely upgrade to meet AustRoads / MW requirements

Locality PlanLocality Plan

Page 3: M di ll B EESMordialloc Bypass EES - Amazon S3 · 2019. 3. 13. · • Likely upgrade within 27.19m easem ent to suit MW Likely upgrade to meet AustRoads / MW requirements

IntroductionIntroduction

• See Engeny Report dated 13 February 2019g y p y• Previous report dated 14 /12/2018 was

superseded due to additional flow data received from Melbourne Water

Page 4: M di ll B EESMordialloc Bypass EES - Amazon S3 · 2019. 3. 13. · • Likely upgrade within 27.19m easem ent to suit MW Likely upgrade to meet AustRoads / MW requirements

Engeny 2019 Report ConclusionsEngeny 2019 Report Conclusions

Page 5: M di ll B EESMordialloc Bypass EES - Amazon S3 · 2019. 3. 13. · • Likely upgrade within 27.19m easem ent to suit MW Likely upgrade to meet AustRoads / MW requirements

Mordialloc Bypass land acquisition (green) and M lb W t 2719 id i d i Melbourne Water 27.19m wide main drain

easement (pink)

Page 6: M di ll B EESMordialloc Bypass EES - Amazon S3 · 2019. 3. 13. · • Likely upgrade within 27.19m easem ent to suit MW Likely upgrade to meet AustRoads / MW requirements

PhotographsPhotographs

• Redwood Gardens Channel and Culvert

Page 7: M di ll B EESMordialloc Bypass EES - Amazon S3 · 2019. 3. 13. · • Likely upgrade within 27.19m easem ent to suit MW Likely upgrade to meet AustRoads / MW requirements

PhotographsPhotographs• Centre Dandenong Road upstream channel and culvert

• Likely upgrade within 27.19m easement to suit MW Likely upgrade to meet AustRoads / MW requirements