m arket maintenance activity

13
1 Market Maintenance Activity

Upload: gerodi

Post on 31-Jan-2016

31 views

Category:

Documents


0 download

DESCRIPTION

M arket Maintenance Activity. Texas Market Link ( PRP Phase 1). IT Update – Texas Market Link (Portal Replacement Project Phase 1). Status: Texas Market Link (TML) was launched in parallel on May 3 rd Issues to report: As of June 1 there are no significant issues. Market usage: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: M arket Maintenance Activity

1

Market Maintenance Activity

Page 2: M arket Maintenance Activity

2

Texas Market Link(PRP Phase 1)

Page 3: M arket Maintenance Activity

3

IT Update – Texas Market Link(Portal Replacement Project Phase 1)

• Status:– Texas Market Link (TML) was launched in parallel on May 3rd – Issues to report:

• As of June 1 there are no significant issues.– Market usage:

• As of June 1 TML is handling 15-25% of the daily “portal” traffic• Being accessed by 60+ Market Participants (30REP, 30QSE)

• Next Steps:– Planned Outage:

• Working with Client Relations to determine timing of planned outage of Top-Tier Portal to surface any Market issues prior to end of parallel.

– De-commissioning TopTier Portal (https://portal.ercot.com)• TML and Top-Tier Portal platforms planned for parallel until July 1, 2004

to allow for transition period of market users and interfaces.• Client Relations will send notice to Market advising of decommissioning

of https://portal.ercot.com. The planned dates of service are:– May 3-July 1: https://tml.ercot.com and https://portal.ercot.com– 1 day TBD: planned outage of https://portal.ercot.com– July1-forward: https://tml.ercot.com

Page 4: M arket Maintenance Activity

4

Thank You

Page 5: M arket Maintenance Activity

5

Retail Market Guide

Changes/Updates Procedures

Brief overview in support of RMGR-2004_006

Page 6: M arket Maintenance Activity

6

Retail Market Guide

• RMS approved changes/updates to Retail Market Guide will be made quarterly

– 1st quarter ending March 31st

– 2nd quarter ending June 30th

– 3rd quarter ending September 30th – 4th quarter ending December 31st

• Retail Market Guide website updated to include link to Retail Market Guide Change Control Form for downloading

Page 7: M arket Maintenance Activity

7

Retail Market Guide

Location of Retail Market Guide Change Control Form http://www.ercot.com/Participants/Committees/rms_comm.htm

Page 8: M arket Maintenance Activity

8

Retail Market Guide

• Email address established for submission of changes/updates ([email protected])

• ERCOT staff will monitor change/update requests to the RMG

• Submitted change requests to the RMG will be presented to RMS for review and possible action

• Approved changes will be incorporated into the RMG as a redlined version until TAC and the ERCOT Board have approved the RMG at the end of the quarter

Page 9: M arket Maintenance Activity

9

Retail Market Guide

• Updates to the RMG may occur outside the normal quarterly update process in the event of a PUCT directed market change. These updates will also require RMS, TAC and ERCOT Board approval, respectively

• Retail Market Guide Change Control Form has also been revised to include a change control manager monitoring section

Page 10: M arket Maintenance Activity

10

Retail Market Guide Change Control Form

Page 11: M arket Maintenance Activity

11

Retail Market Guide Change Control Log

Page 12: M arket Maintenance Activity

12

RMGR – 2004_006

Review for approval by RMS

Page 13: M arket Maintenance Activity

13

Thank You