lubbock outer routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12...
TRANSCRIPT
![Page 1: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/1.jpg)
Public MeetingFebruary 25th, 2014
LUBBOCK OUTER ROUTE
![Page 2: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/2.jpg)
Table of Contents
2
4-8
9-10
11-12
13-18
19
3
20
Project Background
2010 Feasibility Study – Approach
Route Study – Overview
Route Study – Stakeholder Group
Route Study – Preliminary Options
Route Study – Preliminary Evaluation Criteria
Route Study – Next Steps
11
22
33
44
55
66
77
21-22Questions and Open Comments88
![Page 3: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/3.jpg)
Project Background – Steps for Project Development
3
Feasibility Study (2010)
Route Study (2013-2014)
Environmental Study & Schematic Design
Detailed Design & ROW Acquisition
Utility Adjustments
Construction
We are here
![Page 4: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/4.jpg)
2010 Feasibility Study
4
Feasibility Study (2010)
Route Study (2013-2014)
Environmental Study & Schematic Design
Detailed Design & ROW Acquisition
Utility Adjustments
Construction
![Page 5: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/5.jpg)
2010 Feasibility Study – Approach
5
The study was undertaken using a stepwise interdisciplinary approach and “fatal flaw analysis” Evaluation of alternatives was based on:
– Traffic, access, and safety issues– Engineering issues– Social and economic conditions– Agricultural impacts– Rare, threatened, or endangered species– Cultural resources– Floodway/floodplains
![Page 6: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/6.jpg)
2010 Feasibility Study – Project Map
6
![Page 7: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/7.jpg)
2010 Feasibility Study – Conclusion and Recommendations
7
The preferred corridor was the Red Corridor Further evaluation of the Red and Blue Corridors at the
Route Study Level was recommended Elimination of the Green Corridor alternatives from further
evaluation was recommended The proposed Lubbock Outer Route was feasible as a 4-lane
divided highway in 2030 The proposed Lubbock Outer Route was marginally feasible
as a freeway in 2050
![Page 8: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/8.jpg)
2010 Feasibility Study – Conclusion and Recommendations
8
Preferred facility type was the interim 4-lane divided highway for the design year 2030 while preserving right-of-way needed for a future freeway
Four-Lane Divided Interim - 2030
FreewayFinal - 2050
![Page 9: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/9.jpg)
Route Study
9
Feasibility Study (2010)
Route Study (2013-2014)
Environmental Study & Schematic Design
Detailed Design & ROW Acquisition
Utility Adjustments
Construction
We are here
![Page 10: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/10.jpg)
Route Study – Overview
10
More detailed investigation to determine specific routes within the corridor(s)– Traffic– Safety– Socio-economic– Environmental– Engineering– Public Involvement
12-month study time frame (Summer 2013 to Summer 2014) Four stakeholder meetings Two public meetings
![Page 11: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/11.jpg)
Route Study – Stakeholder Group
11
Name OrganizationBrian Baker South Plains Community Action AssociationMark Heinrich Lubbock CountyPat Henderson Cooper ISDH. David Jones Lubbock Metropolitan Planning OrganizationMike Lamberson City of SlatonGeorge McMahan West Texas Home Builders AssociationDarrell Newsom City of WolfforthNick Olenik Lubbock CountyDrew Paxton City of LubbockMayor Glen Robertson City of LubbockStacy Smith Plains Cotton GrowersDr. David Vroonland Frenship ISDNeil Welch City of LubbockMayor Robert Olmsted Jr. City of Shallowater
![Page 12: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/12.jpg)
Route Study – Stakeholder Meetings
12
Kick-off Meeting – July 2013– History and Overview of the Study– Discuss Project Schedule
Second Meeting – October 2013– Identify Constraints and Features– Review Preliminary Options– Review Draft Evaluation Criteria– Determine Date and Location of Public Meeting
Third Meeting – January 2014– Review Revised Options for Public Meeting
![Page 13: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/13.jpg)
Route Study – Preliminary Options
13
![Page 14: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/14.jpg)
Route Study – Segment 1 Options
14
![Page 15: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/15.jpg)
Route Study – Segment 2 Options
15
![Page 16: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/16.jpg)
Route Study – Segment 3 Options
16
![Page 17: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/17.jpg)
Route Study – Segment 4 Options
17
![Page 18: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/18.jpg)
Route Study – Typical Sections
18
Initial Construction*: Four-lane Divided Highway (2030)
Ultimate Construction*: Freeway with Frontage Roads (2050)
*Draft for illustrative purposes only; subject to changebased on funding availability and actual site conditions
Two 12-foot travel lanes per direction
272-ft. Median
Two 12-foot travel lanes per direction
Two 12-foot travel lanes per direction
Existing lanes convert to frontage road
Existing lanes convert to frontage road
Two 12-foot travel lanes per direction
76-ft. Median
![Page 19: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/19.jpg)
Route Study – Evaluation Criteria
19
• Average Daily Traffic (2035)
• Population served (within 5 miles)
• Potential for reduction in crashes (2035)
• Potential impact to tax rolls (reduction in taxable value, based on 2012 data)
• Number of intersecting parcels• Potential residential displacements• Land use (acreage impacted by segment)
• Residential• Commercial• Agricultural• Other
• Floodplains• Additional impervious cover• Wetlands, Playa lakes & stream
crossings• Water wells• Wildlife habitat• Cemeteries• Historic structures, sites, and
resources• Parks• Potential archaeological resources• Potential hazmat sites• Prime farmland• Potential traffic noise receptors• Oil/gas wells & pipeline crossings
• Amount of existing pavement utilized• Total right-of-way required (acres)• Construction cost (2013 dollars)
• Interim• Ultimate
• Stream crossings• Number of bridges• Segment length
Safety
Socio-economic
Mobility/ Congestion
Public Input
• Input from stakeholders• Public Comments
Environmental Engineering
![Page 20: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/20.jpg)
We are here
Route Study – Schedule & Next Steps
20
Indicates public meeting
Stakeholder Group Kick-off & Study Introduction
June 2013
October 2013
January 2014
February 2014
April 2014
Summer 2014
Indicates stakeholder meeting
• Identify constraints and issues
• Review route options and evaluation criteria
• Review revised route options
• Review preliminary evaluation
• Introduce route study
• Present route options and receive input
• Review February meeting input
• Discuss funding strategies
• Review draft route study report
• Present study findings and receive public input
• Release final report with recommended route
![Page 21: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/21.jpg)
Questions…?
Written comments to be sent by March 7, 2014
Submit a comment card at the meeting today or send your comments by:– E-mail: [email protected]– Fax: (806) 748-4380– Mail: 135 Slaton Road, Lubbock, TX 79404-5201– Website: http://www.txdot.gov/inside-txdot/projects/studies/lubbock/outer-route.html
– Please provide your name and address at the sign-in table if you would like to be included on the project mailing list.
21
![Page 22: Lubbock Outer Routeftp.dot.state.tx.us/pub/txdot-info/lbb/outer_route/... · 2014-03-04 · 11-12 13-18 19 3 20 Project Background 2010 Feasibility Study – Approach Route Study](https://reader034.vdocuments.mx/reader034/viewer/2022050302/5f6b7871386b3e6b76732eaa/html5/thumbnails/22.jpg)
Open Comments
To present your comments related to the Lubbock Outer Route, please fill out a speaker card and return it at the sign-in table
22