SmallModularReactors(SMRs)• Clean,consistentenergytoreplaceretiringplants• Lessthan300Mwe output• Modularity• MassProductionCapabilities• Manydesignsincludemorepassivesafetyfeatures• UndergroundSiting• LWRsandnon-LWRs
2Source:SRSCommunityResourceOrganization
RegulatoryHurdles
• Safety– AccidentScenarioAnalysis– MechanisticSourceTerms– EmergencyPlanningZone
• Siting• Staffing
– ControlRoom– Security
• Design-BasisConsiderations– ModuleLicensing– ApplicationProcess
Source:NRC
4
AccidentScenarioAnalysis
• Currentregulationsposeacceptancecriteriaforspecificpossibleaccidents
• NotallpossibleaccidentswillapplytoallSMRdesigns
• DesignBasisandBeyondDesignBasisAccidents(DBA&BDBA)
• ProbabilisticRiskAssessment(PRA)
5
Recommendations:1. ApplicantsdevelopextensivePRAbeforesubmissiontobase
safetyanalyseson2. NRCusetechnology-neutralthresholdbasedonPRAtodetermine
DBAsandBDBAs
Source:B&W
EmergencyPlanningZone(EPZ)
• CurrentRegulationis10mileexposureand50mileingestionradius
• Plant-based
• Scalable
Source:NRC
6Recommendation:NRCuseoff-sitedosebasisforEPZ
ControlRoomStaffing
• Currentregulationsscalablewithpowerunits
• Differenttasksandlevelsofautomationperdesign
• Nooperationalexperiencefortheseadvanceddesigns
• Impossibletomakeuniformstandards
Source:DukeEnergy
7
Recommendation:NRCwillreviewcase-by-casehumanfactorsengineeringplanandreviewbasedonNUREG-0711objectives
Security Staffing
• Currentregulationssetminimumof10armedresponders• Newcriterionneeded• Plantcharacteristics
Source:CBSNews
8
Recommendation:NRCuse
1. Modules2. EntryPoints
Ascriteriaforregulatingsecuritystaffnumbers
ApplicationProcess• 10CFRPart50:individualconstructionandoperatinglicenses• 10CFRPart52:combinedconstructionandoperatinglicense(COL)
– Optional:EarlySitePermit(ESP)– Optional:DesignCertification(DC)
Pros Cons
Part50 NRC:MoreExperienced
Industry: Possibly slowertimeline
Industry:Could buildplant,butnotreceiveoperatinglicense
Part52 Industry: Possiblymorestreamlined
NRC:Nodesignhascompletedthisprocessbefore
Industry:Certaindesignchangesrequirefederalrulemaking
Recommendation:NRCusephasedDCApplicationinPart529
Summary of RecommendationsCategory Recommendations
AccidentSelection 1. Applicants developextensivePRA2. NRCusethresholdvalueinPRAforanalyzing DBAs and
BDBAs
Mechanistic SourceTerms IndustrycollaborationwithnationallabsEmergency PlanningZone NRCusedose-based criteriabasedonsevereDBAcalculation
forestablishingEPZ
Siting 1. NRCusecurrentregulationsapplied forprobable DBA2. NRCseekguidance forrevisionofseismicandgeological
acceptancecriteria
ControlRoomStaff NRCevaluatestaffoncase-by-casebasis; notscalable
SecurityStaff NRC regulate basedonnumber ofentrypointsandnumberofmodules
ModuleLicensing NRClicenseindividualmodule licenseswithlicenseappendix
ApplicationProcess ApplicantsusePart50orNRCuse phasedDCAprocess forPart52