lrgvdc – preparing for regional flood planning

18
LRGVDC – Preparing for Regional Flood Planning Credit: NWS - 2018 Floods : Los Fresnos, TX

Upload: others

Post on 25-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LRGVDC – Preparing for Regional Flood Planning

LRGVDC – Preparing for Regional Flood Planning

Credit: NWS - 2018 Floods: Los Fresnos, TX

Page 2: LRGVDC – Preparing for Regional Flood Planning

LRGV Federally Declared Disaster Declarations –Severe Storms & Flooding

DR NumberDisaster

Declared DateIndividual

Assistance $Public

Assistance $ Counties

4454 7/17/2019 $25,812,074.32 $0

Hidalgo, Cameron,

Willacy

4377 7/6/2018 $60,593,763.34 $0Hidalgo, Cameron

4272 6/11/2016 $140,400.36 $130,861.33 Hidalgo

4245 11/25/2015 $7,746,214.64 $4,558,538.89

Hidalgo, Cameron,

Willacy

4223 5/29/2015 $5,521,773.68 $6,377,522.34 Hidalgo

Page 3: LRGVDC – Preparing for Regional Flood Planning

LRGV Flooding is Regional Flooding

Page 4: LRGVDC – Preparing for Regional Flood Planning

Watersheds vs. Jurisdictions in the LRGV

Map Source: Cameron County

Page 5: LRGVDC – Preparing for Regional Flood Planning

About the Lower Rio Grande Valley Development Council (LRGVDC)

Page 6: LRGVDC – Preparing for Regional Flood Planning

A Regional Body for a Regional Problem

Page 7: LRGVDC – Preparing for Regional Flood Planning

Flood Infrastructure Fund – History

Page 8: LRGVDC – Preparing for Regional Flood Planning

Texas Water Development Board (TWDB) Flood Infrastructure Fund (FIF) Application – Cat 1

Page 9: LRGVDC – Preparing for Regional Flood Planning

The LRGVDC’s Regional Water Resource Advisory Committee (RWRAC)

January 30, 2019 @ LRGVDC

Page 10: LRGVDC – Preparing for Regional Flood Planning

RWRAC Composition = Regional Buy-in

Page 11: LRGVDC – Preparing for Regional Flood Planning

LRGV Watershed Coordinator

Page 12: LRGVDC – Preparing for Regional Flood Planning

LRGVDC’s Staff Capacity Increases with FIF

Page 13: LRGVDC – Preparing for Regional Flood Planning

Regional Flood Knowledgebase Management

Page 14: LRGVDC – Preparing for Regional Flood Planning

Collaborating with a Regional Network of Partners

Page 15: LRGVDC – Preparing for Regional Flood Planning

Subcontractor Oversight and Interlocals

Page 16: LRGVDC – Preparing for Regional Flood Planning

Why this Flood Study is Different –Capacity Building

Page 17: LRGVDC – Preparing for Regional Flood Planning

LRGVDC as Librarian for a “Living” Flood Model