Low Impact Development (LID)
LID Approaches
PreserveExisting
Vegetation
Restoring Roadside
Landscape
Minimizing Impervious
Area
MaintainSheet Flow,
Dispersionpatterns
MaintainInfiltrationPatterns
Retrofit existing
StormwaterFeatures
PorousMaterials
PRESERVE EXISTING VEGETATION
RETROFIT OR RESTORE USING A SOIL AMENDMENT
BEFORE
AFTER
VEGETATED SIDE SLOPE RETROFITTED WITH A SOIL AMENDMENT
BEFORE
AFTER
SLOPE RETROFITTED WITH A SOIL AMENDMENT
FLAT BOTTOM CHANNEL WITH A SOIL AMENDMENT ADDED
BEFORE
AFTER
RESHAPED CHANNEL AND INSTALLING SOIL AMENDMENT
Treatment Solution SelectionFor project with identified water
Issues and treatment goals
Incorporate LID techniques suchas soil amendments, impervious
surface reduction, preservingor restoring adjacent roadway landscaping
Submit hydraulic Design Deviation for other BMP
not listed in WaterQuality Guidance/Tech Bulletin with supporting
documentation
Select appropriatetreatment based on:
• BMP removal capabilities• Constructability• Cost and maintenance• Site constraints (steep Slopes, high groundwater, Bedrock, etc)
Go to StormwaterManagement Tech
Bulletin and attachedWater Quality Guidance
Sufficient LIDs Incorporated?
Water Quality SelectionComplete
YN
BMP selected from Recommended listFrom Water Quality
Guidance/Tech Bulletin?
N
Y
LIDs and/or EngineeredTreatment option used
To meet treatmentgoals
Sufficient design?
Y
Re-Submit deviation for for other BMP
not listed in WaterQuality Guidance/Tech Bulletin with supporting
documentationN
Design Guidance
StormwaterManagement
Tech Bulletin
(GE-09-02B)
LID GuidanceUnder
Development
LID Guidance
LID Types
SelectionProcess
Siteconsiderations
Operation andMaintenance
Site Constraints
SizingCriteria