LOUISIANA AIRPORT CONSTRUCTION AND DEVELOPMENT PRIORITY PROGRAM FISCAL YEAR 2017-2018

Upload: others

Post on 26-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

LOUISIANA

AIRPORT CONSTRUCTION AND DEVELOPMENT

PRIORITY PROGRAM

FISCAL YEAR 2017-2018

Page 2: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital
Page 3: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2017-2018

Air Carrier Capital Outlay

1 LAFAYETTE REGIONAL AIRPORT Taxiway F Safety Improvements - Phase II $0.00 $2,410,000.00 $20,000.00 $2,430,000.00

2 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Terminal Construction Project - Phase IV $26,110,927.00 $5,981,457.00 $5,222,185.00 $37,314,569.00

3 LAFAYETTE REGIONAL AIRPORT Taxiway F Safety Improvements - Phase III $0.00 $567,764.00 $247,000.00 $814,764.00

4 SHREVEPORT REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase IV $0.00 $1,000,000.00 $0.00 $1,000,000.00

5 LAKE CHARLES REGIONAL AIRPORT Wildlife Hazard Mitigation - Perimeter Fencing Phase

IV

$0.00 $1,000,000.00 $0.00 $1,000,000.00

6 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Runway 14/32 - Phase II $0.00 $80,600.00 $0.00 $80,600.00

7 ALEXANDRIA INTERNATIONAL AIRPORT Airfield Electrical Rehabilitation (NAVAIDS

Relocation)

$0.00 $300,000.00 $0.00 $300,000.00

8 BATON ROUGE METROPOLITAN AIRPORT South Ramp Rehabilitation $0.00 $2,250,000.00 $0.00 $2,250,000.00

9 SHREVEPORT REGIONAL AIRPORT Runway 14/32 Pavement Preservation (Design &

Construction)

$0.00 $1,450,000.00 $0.00 $1,450,000.00

10 MONROE REGIONAL AIRPORT Rehabilitate Runway 4/22 Blast Pads $450,000.00 $50,000.00 $0.00 $500,000.00

11 ALEXANDRIA INTERNATIONAL AIRPORT Airfield Wildlife Mitigation $0.00 $415,000.00 $0.00 $415,000.00

12 BATON ROUGE METROPOLITAN AIRPORT South Ramp Connector Taxiway $829,800.00 $92,200.00 $0.00 $922,000.00

Friday, March 24, 2017 Page 1 of 8Air Carrier Capital Outlay

Page 4: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2017-2018

Air Carrier Capital Outlay

13 SHREVEPORT REGIONAL AIRPORT Runway 06 and Taxiway C Extension & Road

Relocation (Design)

$396,000.00 $44,000.00 $0.00 $440,000.00

14 LAKE CHARLES REGIONAL AIRPORT Wildlife Mitigation - Sanitary Sewer Connection $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

15 SHREVEPORT REGIONAL AIRPORT Security Improvements - Phase II $765,000.00 $85,000.00 $0.00 $850,000.00

16 SHREVEPORT REGIONAL AIRPORT Master Plan Update - Phase II $135,000.00 $15,000.00 $0.00 $150,000.00

17 SHREVEPORT REGIONAL AIRPORT ATC Relocation & Concourse Modernization -

Environmental/Feasibility

$360,000.00 $40,000.00 $0.00 $400,000.00

18 BATON ROUGE METROPOLITAN AIRPORT ARFF/Security Road $1,207,800.00 $134,200.00 $0.00 $1,342,000.00

19 ALEXANDRIA INTERNATIONAL AIRPORT Mill & Overlay South End of Runway 18/36 & Rehab

Runway 36 Safety Area

$1,585,275.00 $576,142.00 $0.00 $2,161,417.00

20 BATON ROUGE METROPOLITAN AIRPORT Runway 13-31 RSA/RPZ Improvements (EA/BCA) $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

21 LAFAYETTE REGIONAL AIRPORT Terminal (Hangar Demolition) $1,519,905.00 $168,878.00 $0.00 $1,688,783.00

22 LAFAYETTE REGIONAL AIRPORT Noise Mitigation - Easements (Phase II) $1,763,973.00 $195,997.00 $0.00 $1,959,970.00

23 LAFAYETTE REGIONAL AIRPORT Terminal Design - Phase I $1,024,594.00 $113,844.00 $0.00 $1,138,438.00

24 MONROE REGIONAL AIRPORT Runway 14/32 Extension - Phase I $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

Friday, March 24, 2017 Page 2 of 8Air Carrier Capital Outlay

Page 5: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2017-2018

Air Carrier Capital Outlay

25 LAKE CHARLES REGIONAL AIRPORT Bury Utility Lines - Phase I $0.00 $311,479.00 $0.00 $311,479.00

26 ALEXANDRIA INTERNATIONAL AIRPORT Part 150 Noise Mitigation Program $850,941.00 $94,549.00 $0.00 $945,490.00

$17,767,221.00 $5,489,185.00 $63,775,621.00Air Carrier Capital Outlay Totals $40,519,215.00

Friday, March 24, 2017 Page 3 of 8Air Carrier Capital Outlay

Page 6: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital
Page 7: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2017-2018

General Aviation Capital Outlay

1 GEORGE R. CARR MEMORIAL AIRPORT Obstruction Clearing North RSA - Phase II $0.00 $260,000.00 $0.00 $260,000.00

2 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Phase II $250,000.00 $27,778.00 $0.00 $277,778.00

3 CHENNAULT INTERNATIONAL AIRPORT Airfield Lighting Rehabilitation - Phase II $0.00 $1,000,000.00 $503,000.00 $1,503,000.00

4 ST JOHN THE BAPTIST PARISH AIRPORT Taxiway and Drainage Improvements - Phase II

(Construction)

$0.00 $820,000.00 $20,000.00 $840,000.00

5 MARKSVILLE MUNICIPAL AIRPORT Runway 22 Obstruction removal $0.00 $100,000.00 $0.00 $100,000.00

6 SHREVEPORT DOWNTOWN AIRPORT Runway 5/23 and Taxiway E Modification

Extension/Shift - Environmental & Design

$150,000.00 $265,000.00 $0.00 $415,000.00

7 ALLEN PARISH AIRPORT Obstruction Removal - Phase I (Environmental &

Mitigation Credits)

$0.00 $520,000.00 $0.00 $520,000.00

8 NEW ORLEANS LAKEFRONT AIRPORT Drainage Repairs Phase I $0.00 $500,000.00 $0.00 $500,000.00

9 DE QUINCY INDUSTRIAL AIRPARK Obstruction Removal $0.00 $200,000.00 $0.00 $200,000.00

10 SHREVEPORT DOWNTOWN AIRPORT Northwest Ramp Rehabilitation (Design &

Construction)

$0.00 $400,000.00 $0.00 $400,000.00

11 CHENNAULT INTERNATIONAL AIRPORT Reconstruct Blast Pad for Runway 33 $0.00 $60,000.00 $540,000.00 $600,000.00

12 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase II (Construction) $0.00 $1,000,000.00 $0.00 $1,000,000.00

Friday, March 24, 2017 Page 4 of 8General Aviation Capital Outlay

Page 8: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2017-2018

General Aviation Capital Outlay

13 SOUTHLAND FIELD Fuel Farm Rehabilitation - Phase II $0.00 $205,000.00 $20,000.00 $225,000.00

14 ST LANDRY PARISH-AHART FIELD Taxiway Rehabilitation $0.00 $541,594.00 $0.00 $541,594.00

15 MOREHOUSE MEMORIAL AIRPORT Obstruction Removal (Runway 16 and 34 Approach) $405,000.00 $45,000.00 $0.00 $450,000.00

16 JENNINGS AIRPORT Rehabilitate Runway 13/31 - Phase II (Construction) $855,000.00 $95,000.00 $0.00 $950,000.00

17 ACADIANA REGIONAL AIRPORT Taxiway A Improvements - Phase II (Construction) $504,000.00 $56,000.00 $0.00 $560,000.00

18 ESLER REGIONAL AIRPORT Rehabilitate Runway 9/27 (Design) $140,490.00 $15,610.00 $0.00 $156,100.00

19 ST TAMMANY REGIONAL AIRPORT Airfield Lighting and NAVAIDS Improvements - Phase

II (Construction)

$706,719.00 $78,524.00 $0.00 $785,243.00

20 SLIDELL AIRPORT Apron Expansion - Phase I $450,000.00 $50,000.00 $0.00 $500,000.00

21 LE GROS MEMORIAL AIRPORT Terminal Apron Overlay - Phase II (Construction) $360,000.00 $40,000.00 $0.00 $400,000.00

22 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Terminal Building Improvements $0.00 $70,850.00 $637,650.00 $708,500.00

23 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Taxiway Lighting - Phase II (Construction) $712,800.00 $79,200.00 $0.00 $792,000.00

24 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Construct T-Hangar Taxilane - Phase II (Construction) $295,110.00 $32,790.00 $0.00 $327,900.00

Friday, March 24, 2017 Page 5 of 8General Aviation Capital Outlay

Page 9: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2017-2018

General Aviation Capital Outlay

25 C.E. (RUSTY) WILLIAMS AIRPORT Design Runway Rehabilitation $0.00 $10,000.00 $90,000.00 $100,000.00

26 LOUISIANA REGIONAL AIRPORT Runway and Taxiway Overlay - Phase I (Design) $141,345.00 $15,705.00 $0.00 $157,050.00

27 MINDEN AIRPORT Construct Parallel Taxiway (South End) $1,025,100.00 $113,900.00 $0.00 $1,139,000.00

28 JENNINGS AIRPORT Construct 10 Unit T-hangar & Apron $0.00 $383,000.00 $600,000.00 $983,000.00

29 GEORGE R. CARR MEMORIAL AIRPORT Construct Parallel Taxiway - Phase II $1,881,000.00 $209,000.00 $0.00 $2,090,000.00

30 MARKSVILLE MUNICIPAL AIRPORT Runway Reconstruction - Phase III (Construction) $1,917,000.00 $213,000.00 $0.00 $2,130,000.00

31 CONCORDIA PARISH AIRPORT Rehabilitate Runway $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

32 FALSE RIVER REGIONAL AIRPORT Runway and Taxiway Mill and Overlay - Phase I

(Design)

$252,000.00 $28,000.00 $0.00 $280,000.00

33 SOUTHLAND FIELD Rehabilitate Parallel Taxiway $150,000.00 $16,667.00 $0.00 $166,667.00

34 ALLEN PARISH AIRPORT Rehabilitate Airfield Pavement $449,849.00 $49,983.00 $0.00 $499,832.00

35 SOUTHLAND FIELD Rehabilitate Apron $150,000.00 $16,667.00 $0.00 $166,667.00

36 RUSTON REGIONAL AIRPORT Construct Runway Extension - Phase I (Design) $247,500.00 $27,500.00 $0.00 $275,000.00

37 BEAUREGARD REGIONAL AIRPORT Rehabilitate Apron - Phase I (Design) $45,900.00 $5,100.00 $0.00 $51,000.00

Friday, March 24, 2017 Page 6 of 8General Aviation Capital Outlay

Page 10: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2017-2018

General Aviation Capital Outlay

38 HAMMOND NORTHSHORE REGIONAL AIRPORT

Master Plan Update $184,500.00 $20,500.00 $20,000.00 $225,000.00

39 VICKSBURG-TALLULAH REGIONAL AIRPORTRehabilitate Taxiway $184,500.00 $20,500.00 $0.00 $205,000.00

40 C.E. (RUSTY) WILLIAMS AIRPORT Fuel Facility Phase II (Construction) $0.00 $50,000.00 $450,000.00 $500,000.00

41 DE QUINCY INDUSTRIAL AIRPARK Perimeter Fencing - Phase I $41,085.00 $4,565.00 $0.00 $45,650.00

42 KELLY-DUMAS Construct Three Box Hangars $315,000.00 $35,000.00 $0.00 $350,000.00

43 WINNSBORO MUNICIPAL AIRPORT Rehabilitate Airside Access Road $112,500.00 $12,500.00 $0.00 $125,000.00

44 VICKSBURG-TALLULAH REGIONAL AIRPORTRehabilitate Access Road $90,000.00 $10,000.00 $0.00 $100,000.00

45 JONESVILLE MUNICIPAL AIRPORT Rehabilitate Aprons - Phase I $36,900.00 $4,100.00 $0.00 $41,000.00

$7,858,033.00 $2,880,650.00 $24,141,981.00General Aviation Capital Outlay Totals $13,403,298.00

Friday, March 24, 2017 Page 7 of 8General Aviation Capital Outlay

Page 11: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local/Other Total Funds

Airport Construction and Development Priority Program 2017-2018

General Aviation Capital Outlay

Total AC / GA Funded $ 25,625,254

NAVAIDS Program

GA Maintenance Reimbursement Program

$ 955,806

$ 300,000

$ 28,200,0002017-2018 PROGRAM TOTAL

AC Maintenance Reimbursement Program $ 700,000

Obstruction Removal Program $ 618,940

Friday, March 24, 2017 Page 8 of 8General Aviation Capital Outlay

Page 12: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital
Page 13: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

Air Carrier Capital Outlay

1 ALEXANDRIA INTERNATIONAL AIRPORT

Mill & Overlay South End of Runway 18/36 & Rehab Runway 36 Safety Area

$0 $848,583 $0 $848,583

2 ALEXANDRIA INTERNATIONAL AIRPORT

Emergency Access Road Improvement $4,132,332 $459,148 $0 $4,591,480

3 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Terminal Construction Project - Phase V $2,080,000 $3,277,333 $416,000 $5,773,333

4 LAKE CHARLES REGIONAL AIRPORT Bury Utility Lines - Phase II $0 $818,521 $20,000 $838,521

5 SHREVEPORT REGIONAL AIRPORT Airfield Lighting Rehabilitation - Phase V $0 $1,000,000 $0 $1,000,000

6 SHREVEPORT REGIONAL AIRPORT Airfield Drainage Rehabilitation - Phase IV $0 $2,000,000 $0 $2,000,000

7 SHREVEPORT REGIONAL AIRPORT Runway 06 and Taxiway C Extension & Road Relocation (Construction)

$11,160,000 $1,240,000 $0 $12,400,000

8 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure -Airside - Phase I (Construction) $2,904,706 $322,745 $0 $3,227,451

9 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure - Airside - Phase II (Construction) $2,904,706 $322,745 $0 $3,227,451

10 LAFAYETTE REGIONAL AIRPORT Terminal Construction - Phase I (Building) $1,500,000 $3,166,667 $2,090,950 $6,757,617

11 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure - Design - Phase II $2,000,000 $222,222 $3,467,465 $5,689,687

12 LAKE CHARLES REGIONAL AIRPORT Safety Area Drainage Rehabilitation $0 $150,000 $0 $150,000

13 MONROE REGIONAL AIRPORT Rehabilitate Runway 4/22 $0 $813,000 $0 $813,000

14 MONROE REGIONAL AIRPORT Rehabilitate Airfield Lighting - Phase I $0 $2,100,000 $0 $2,100,000

15 ALEXANDRIA INTERNATIONAL AIRPORT

Emergency Response Vehicle $0 $162,500 $162,500 $325,000

Friday, March 24, 2017 Page 1 of 12Air Carrier Capital Outlay

Page 14: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

Air Carrier Capital Outlay

16 LAKE CHARLES REGIONAL AIRPORT Obstruction Removal - Transitional $0 $350,000 $0 $350,000

17 BATON ROUGE METROPOLITAN AIRPORT

Northwest GA Taxilane Lighting $0 $750,000 $0 $750,000

18 LAKE CHARLES REGIONAL AIRPORT South Apron Expansion - Phase I (Design) $0 $150,000 $0 $150,000

19 LAKE CHARLES REGIONAL AIRPORT Wildlife Mitigation - Drainage Improvements $3,979,800 $442,200 $0 $4,422,000

20 LAKE CHARLES REGIONAL AIRPORT ATCT Study $0 $250,000 $0 $250,000

21 ALEXANDRIA INTERNATIONAL AIRPORT

Airfield Emergency Access Point Rehab $0 $95,000 $0 $95,000

22 ALEXANDRIA INTERNATIONAL AIRPORT

Airport Access Rehabilitation $0 $543,062 $543,062 $1,086,124

23 ALEXANDRIA INTERNATIONAL AIRPORT

North Airport Emergency Access $6,165,000 $685,000 $0 $6,850,000

24 ALEXANDRIA INTERNATIONAL AIRPORT

ARFF Bunker Gear $0 $75,000 $0 $75,000

25 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase I $5,800,000 $3,644,444 $0 $9,444,444

$23,888,170 $6,699,977 $73,214,691Air Carrier Capital Outlay Totals $42,626,544

Friday, March 24, 2017 Page 2 of 12Air Carrier Capital Outlay

Page 15: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital
Page 16: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

1 NEW ORLEANS LAKEFRONT AIRPORT Pavement and Lighting Rehab - Hot Spot 2 $183,573 $20,397 $0 $203,970

2 NEW ORLEANS LAKEFRONT AIRPORT Pavement and Lighting Rehab - Hot Spot 1 $340,344 $37,816 $0 $378,160

3 EUNICE AIRPORT Obstruction Removal (Approach and RSA) - Phase II $0 $119,000 $0 $119,000

4 ST LANDRY PARISH-AHART FIELD Obstruction Removal (Runway 18-36) - Phase II $0 $333,000 $0 $333,000

5 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Obstruction Removal - Runway 18 Approach Phase II (Construction)

$150,000 $16,667 $0 $166,667

6 ST TAMMANY REGIONAL AIRPORT Mitigate Obstructions Phase V - Relocate Airport Access Road (Construction)

$0 $1,000,000 $0 $1,000,000

7 GEORGE R. CARR MEMORIAL AIRPORT Obstruction Removal North End - Land Acquisition Phase II

$0 $700,000 $0 $700,000

8 ALLEN PARISH AIRPORT Obstruction Removal - Phase II (Mitigation of Obstructions)

$0 $400,000 $0 $400,000

9 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Phase III (Construction) $2,844,000 $316,000 $0 $3,160,000

10 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase II (Design) $315,000 $35,000 $0 $350,000

11 THIBODAUX MUNICIPAL AIRPORT Obstruction Removal (Runway 8 and 26 Approach) - Phase II

$101,914 $11,324 $0 $113,238

12 EUNICE AIRPORT Land Acquistion for Obstruction Removal $0 $300,000 $0 $300,000

13 FRANKLINTON AIRPORT Obstruction Removal - Phase II $0 $75,000 $0 $75,000

14 SHREVEPORT DOWNTOWN AIRPORT Runway 5/23 and Taxiway E Modification Extension/Shift - Construction (Phase I)

$2,520,000 $280,000 $0 $2,800,000

15 COLUMBIA AIRPORT Obstruction Removal - Phase I $0 $100,000 $0 $100,000

Friday, March 24, 2017 Page 3 of 12General Aviation Capital Outlay

Page 17: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

16 LE MAIRE MEMORIAL AIRPORT Obstruction Removal - Phase II $0 $150,000 $0 $150,000

17 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 9/27 $0 $210,000 $0 $210,000

18 SLIDELL AIRPORT Runway 18 Threshold Recovery - Phase I (Survey and Design)

$150,000 $16,667 $0 $166,667

19 LOUISIANA REGIONAL AIRPORT Hangar Development - Phase I $0 $956,050 $20,000 $976,050

20 WELSH AIRPORT Obstruction Removal - Phase I $0 $105,000 $0 $105,000

21 ESLER REGIONAL AIRPORT Rehabilitate Runway 9/27 (Construction) $1,659,510 $184,390 $0 $1,843,900

22 CHENNAULT INTERNATIONAL AIRPORT Airfield Lighting Rehabilitation - Phase III $0 $600,000 $0 $600,000

23 JENNINGS AIRPORT Construct Runway 8-26 Exit Taxiway $0 $410,000 $20,000 $430,000

24 SHREVEPORT DOWNTOWN AIRPORT Security Fencing Upgrades $0 $120,000 $0 $120,000

25 FALSE RIVER REGIONAL AIRPORT Overlay Runway and Taxiway - Phase II (Construction) $2,028,375 $225,375 $0 $2,253,750

26 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Drainage - Phase II (Design) $0 $50,000 $0 $50,000

27 HOUMA-TERREBONNE AIRPORT Runway 18-36 Drainage Improvements - Phase I (Design)

$0 $300,000 $0 $300,000

28 RUSTON REGIONAL AIRPORT Obstruction Removal - Phase II $0 $250,000 $0 $250,000

29 LEESVILLE AIRPORT RSA Improvements South - Phase II (Construction) $567,000 $63,000 $0 $630,000

30 LE GROS MEMORIAL AIRPORT Rehabilitate Airfield Drainage Phase II - Design $0 $56,000 $0 $56,000

31 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway Lighting Rehabilitation $0 $300,000 $0 $300,000

Friday, March 24, 2017 Page 4 of 12General Aviation Capital Outlay

Page 18: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

32 ST TAMMANY REGIONAL AIRPORT Runway Rehabilitation - Phase II (Construction) $189,000 $21,000 $0 $210,000

33 HOUMA-TERREBONNE AIRPORT Taxiway B South Pavement Rehabilitation $0 $350,000 $0 $350,000

34 HAMMOND NORTHSHORE REGIONAL AIRPORT

Terminal Apron Rehabilitation $0 $360,000 $0 $360,000

35 SHREVEPORT DOWNTOWN AIRPORT Taxiway L and T-Hangar Ramps - Phase I (Environmental & Design)

$0 $250,000 $0 $250,000

36 SHREVEPORT DOWNTOWN AIRPORT Construct Taxiway S - Phase I (Environmental & Design) $0 $75,000 $0 $75,000

37 HARRY P. WILLIAMS MEMORIAL AIRPORT

Rehabilitate Pump Station - Phase II $0 $100,000 $0 $100,000

38 BEAUREGARD REGIONAL AIRPORT Rehabilitate Apron - Phase II (Construction) $495,000 $55,000 $0 $550,000

39 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Main Hangar $0 $275,000 $50,000 $325,000

40 SLIDELL AIRPORT Taxilane Widening and Overlay $0 $190,000 $0 $190,000

41 CONCORDIA PARISH AIRPORT Construct 5-Box Hangars $0 $365,000 $25,000 $390,000

42 C.E. (RUSTY) WILLIAMS AIRPORT Construct Runway Rehabilitation $0 $350,000 $100,000 $450,000

43 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Terminal Design $0 $150,000 $50,000 $200,000

44 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway A Realignment - Phase I (Design) $112,500 $12,500 $0 $125,000

45 HOUMA-TERREBONNE AIRPORT North Apron Expansion $1,890,000 $210,000 $0 $2,100,000

46 MINDEN AIRPORT Construct Parallel Taxiway (North End) $2,880,000 $320,000 $0 $3,200,000

Friday, March 24, 2017 Page 5 of 12General Aviation Capital Outlay

Page 19: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

47 SHREVEPORT DOWNTOWN AIRPORT Construct North Side Access Road - Phase I (Design) $0 $100,000 $0 $100,000

48 TENSAS PARISH AIRPORT Lighting Rehabilitation (Phase II - Construction) $0 $500,000 $0 $500,000

49 RUSTON REGIONAL AIRPORT Rehabilitate Runway & Taxiways $0 $500,000 $0 $500,000

50 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Aprons, Taxilanes and & T-Hangar Areas (Phase I - Design)

$47,700 $5,300 $0 $53,000

51 ACADIANA REGIONAL AIRPORT Seaway Lighting Rehabilitation - Phase I (Design) $0 $45,000 $0 $45,000

52 ST JOHN THE BAPTIST PARISH AIRPORT

Runway 17 Threshold Recovery/Runway Widening/Runway Overlay - Phase I (Design)

$160,560 $17,840 $0 $178,400

53 DE QUINCY INDUSTRIAL AIRPARK Perimeter Fencing - Phase II $648,900 $72,100 $0 $721,000

54 EUNICE AIRPORT Rehabilitate Lighting System $0 $100,000 $0 $100,000

55 HOUMA-TERREBONNE AIRPORT Taxiway F - Phase I (Design) $315,000 $35,000 $0 $350,000

56 ESLER REGIONAL AIRPORT Rehabilitate Taxiways (Design) $0 $39,700 $0 $39,700

57 ACADIANA REGIONAL AIRPORT Construct Blast Pad $0 $350,000 $0 $350,000

58 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Lighting on Runway 17/35 $0 $100,000 $0 $100,000

59 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Approach Lighting - Phase I (Land Acquisition) $0 $140,000 $0 $140,000

60 EUNICE AIRPORT Apron Rehabilitation - Phase I (Design) $45,000 $5,000 $0 $50,000

61 FALSE RIVER REGIONAL AIRPORT RPZ Drainage Improvements $438,300 $48,700 $0 $487,000

62 JENNINGS AIRPORT Construct Entrance Taxiway - Runway 13 $0 $285,000 $10,000 $295,000

Friday, March 24, 2017 Page 6 of 12General Aviation Capital Outlay

Page 20: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

63 LEESVILLE AIRPORT Rehabilitate Runway $0 $350,673 $0 $350,673

64 COLUMBIA AIRPORT Runway Rehabilitation $0 $165,000 $0 $165,000

65 BEAUREGARD REGIONAL AIRPORT Drainage Study $0 $120,000 $0 $120,000

66 ST JOHN THE BAPTIST PARISH AIRPORT

Obstruction Mitigation - Runway 17 Phase I (Environmental/Design)

$0 $250,000 $0 $250,000

67 MINDEN AIRPORT Rehabilitate Runway 1/19 (Design) $0 $85,000 $0 $85,000

68 ESLER REGIONAL AIRPORT Drainage Rehabilitation of Safety Areas and Midfield $0 $361,777 $0 $361,777

69 GEORGE R. CARR MEMORIAL AIRPORT Localized Runway Repairs $0 $120,000 $0 $120,000

70 BEAUREGARD REGIONAL AIRPORT Rehabilitate Taxiway Pavement - Sealcoat and Marking $0 $200,000 $0 $200,000

71 HARRY P. WILLIAMS MEMORIAL AIRPORT

Dredge and Stabilize Seaway - Phase I (Design) $0 $100,000 $0 $100,000

72 BUNKIE MUNICIPAL AIRPORT Airfield Lighting and Navaid Rehabilitation $0 $265,411 $0 $265,411

73 CHENNAULT INTERNATIONAL AIRPORT Install SSALR Approach Lighting System $0 $1,000,000 $0 $1,000,000

74 HART AIRPORT Reconstruct Runway Phase IIB (Construction) $0 $200,000 $0 $200,000

75 HART AIRPORT Runway Reconstruction Phase IIA $0 $950,000 $0 $950,000

76 TENSAS PARISH AIRPORT Rehabilitate Runway $0 $200,000 $0 $200,000

77 FELICIANA AIRPARK Rehabilitate Runway $0 $356,800 $0 $356,800

78 CONCORDIA PARISH AIRPORT Obstruction Removal $0 $100,000 $0 $100,000

Friday, March 24, 2017 Page 7 of 12General Aviation Capital Outlay

Page 21: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

79 NEW ORLEANS LAKEFRONT AIRPORT ARFF Quick Response Vehicle $0 $300,000 $0 $300,000

80 NATCHITOCHES REGIONAL AIRPORT Mill & Overlay Runway 7/25 $0 $900,000 $0 $900,000

81 SOUTHLAND FIELD Rehabilitate Taxiway B & T-hangar Apron $166,500 $18,500 $0 $185,000

82 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase I (Design) $43,133 $4,793 $0 $47,926

83 JENNINGS AIRPORT Relocate Wind Cone and Construct Segmented Circle $0 $85,200 $0 $85,200

84 ST TAMMANY REGIONAL AIRPORT Extend Runway 18/36 - Phase I (Environmental) $183,600 $20,400 $0 $204,000

85 ACADIANA REGIONAL AIRPORT ARFF Station Relocation - Phase I (Design) $288,000 $32,000 $0 $320,000

86 HARRY P. WILLIAMS MEMORIAL AIRPORT

Upgrade Perimeter Fence and Security System $0 $100,000 $0 $100,000

87 NATCHITOCHES REGIONAL AIRPORT Install New Perimeter Fence and Repair Existing Fence $360,000 $40,000 $0 $400,000

88 FALSE RIVER REGIONAL AIRPORT ODALS/REILS Upgrades $0 $150,000 $0 $150,000

89 ALLEN PARISH AIRPORT Construct Taxilane/Apron for T-Hangar Access $0 $500,000 $0 $500,000

90 FALSE RIVER REGIONAL AIRPORT NAVAID Improvements $0 $650,000 $0 $650,000

91 LE GROS MEMORIAL AIRPORT Security Fencing and Gates $0 $242,000 $0 $242,000

92 FELICIANA AIRPARK Construct Taxiway and Apron $0 $274,665 $0 $274,665

93 BUNKIE MUNICIPAL AIRPORT Security Fencing Rehabilitation $0 $82,900 $0 $82,900

94 ACADIANA REGIONAL AIRPORT Runway Sweeper $0 $300,000 $0 $300,000

Friday, March 24, 2017 Page 8 of 12General Aviation Capital Outlay

Page 22: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

95 ACADIANA REGIONAL AIRPORT AGIS Survey $0 $150,000 $0 $150,000

96 NATCHITOCHES REGIONAL AIRPORT Agricultural Apron - Phase I $0 $325,000 $0 $325,000

97 RED RIVER PARISH AIRPORT Construct East Airfield Perimeter Fence Replacement $0 $350,000 $0 $350,000

98 DELHI MUNICIPAL AIRPORT Runway Rehabilitation $0 $150,000 $0 $150,000

99 VICKSBURG-TALLULAH REGIONAL AIRPORT

Runway Extension (Feasibility Study) $0 $39,670 $0 $39,670

100 VICKSBURG-TALLULAH REGIONAL AIRPORT

Design to Construct Hangar $0 $85,000 $0 $85,000

101 UNION PARISH AIRPORT Action Plan $0 $75,000 $0 $75,000

102 MINDEN AIRPORT Design/Construct Perimeter Fencing $0 $200,000 $0 $200,000

103 TENSAS PARISH AIRPORT Apron Expansion - Phase I $0 $55,000 $0 $55,000

104 ST JOHN THE BAPTIST PARISH AIRPORT

Wildlife Assessment $0 $50,000 $0 $50,000

105 LE GROS MEMORIAL AIRPORT Construct 5 Unit Hangars $0 $400,000 $0 $400,000

106 ESLER REGIONAL AIRPORT Small Scale Airport Master Plan $0 $150,000 $0 $150,000

107 LE MAIRE MEMORIAL AIRPORT Runway Overlay - Phase I (Design) $0 $70,000 $0 $70,000

108 VIVIAN AIRPORT Replace Existing Terminal/Hangar $0 $625,000 $0 $625,000

109 PINEVILLE MUNICIPAL AIRPORT Obstruction Mitigation and Waterfront Improvements $0 $179,291 $0 $179,291

110 DE QUINCY INDUSTRIAL AIRPARK Hangar Rehabilitation $0 $300,000 $0 $300,000

Friday, March 24, 2017 Page 9 of 12General Aviation Capital Outlay

Page 23: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

111 THIBODAUX MUNICIPAL AIRPORT Perimeter Fencing $510,000 $56,667 $0 $566,667

112 HOMER MUNICIPAL AIRPORT Design Runway Safety Area Improvements $0 $105,000 $0 $105,000

113 MARKSVILLE MUNICIPAL AIRPORT Agriculture Apron Improvements - Phase I (Design) $0 $38,500 $0 $38,500

114 HART AIRPORT Design Apron Overlay $0 $45,000 $0 $45,000

115 SCOTT AIRPORT Rehabilitate Runway Lighting - Phase I $0 $40,000 $0 $40,000

116 MINDEN AIRPORT Airfield Lighting Rehabilitation - Phase I (Design) $0 $80,000 $0 $80,000

117 BUNKIE MUNICIPAL AIRPORT Small Scale Masterplan Update $0 $50,000 $0 $50,000

118 FRANKLINTON AIRPORT Perimeter Fencing - Phase I $0 $135,000 $0 $135,000

119 SPRINGHILL AIRPORT Construct Perimeter Fencing $382,500 $42,500 $0 $425,000

120 WELSH AIRPORT Runway Rehabilitation $0 $180,000 $0 $180,000

121 HART AIRPORT Runway Extension - Phase I (Design) $0 $160,000 $0 $160,000

122 PINEVILLE MUNICIPAL AIRPORT Terminal Building Improvements $0 $476,572 $0 $476,572

123 PINEVILLE MUNICIPAL AIRPORT Small Scope Master Plan - Phase II $0 $56,000 $0 $56,000

124 ARCADIA-BIENVILLE AIRPORT Construct Agriculture Apron, Taxilane, and Entrance Road

$0 $600,000 $0 $600,000

125 SCOTT AIRPORT Rehabilitate Runway Lighting - Phase II $0 $300,000 $0 $300,000

126 HART AIRPORT Design & Construct Perimeter Fencing $0 $350,000 $0 $350,000

Friday, March 24, 2017 Page 10 of 12General Aviation Capital Outlay

Page 24: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

127 PINEVILLE MUNICIPAL AIRPORT Automobile Parking Lot Expansion $0 $125,802 $0 $125,802

128 HOMER MUNICIPAL AIRPORT Airport Master Plan $0 $173,250 $0 $173,250

129 MARKSVILLE MUNICIPAL AIRPORT Small Scale Master Plan Update $0 $150,000 $0 $150,000

130 ST LANDRY PARISH-AHART FIELD Runway 6-24 Rehabilitation $373,824 $41,536 $0 $415,360

131 DAVID G. JOYCE AIRPORT Design Apron Rehabilitation $0 $40,000 $0 $40,000

132 FRANKLINTON AIRPORT Update Airport Layout Plan $0 $100,000 $0 $100,000

133 HART AIRPORT Action Plan/ALP Update $0 $125,000 $0 $125,000

134 RED RIVER PARISH AIRPORT Action Plan/ALP Update $0 $125,000 $0 $125,000

135 ACADIANA REGIONAL AIRPORT Taxiway B Improvements (East) $2,250,000 $250,000 $0 $2,500,000

136 WINNSBORO MUNICIPAL AIRPORT AGIS Survey $21,900 $8,500 $0 $85,000

137 LIVINGSTON REGIONAL AIRPORT Environmental Assessment $0 $300,000 $0 $300,000

138 DAVID G. JOYCE AIRPORT Apron Rehabilitation - Phase I (Construction of South End)

$0 $460,000 $0 $460,000

139 OLLA AIRPORT Perimeter Fencing $0 $400,000 $0 $400,000

140 ARCADIA-BIENVILLE AIRPORT Construct Perimeter Fencing $0 $500,000 $0 $500,000

141 ARCADIA-BIENVILLE AIRPORT Design Agriculture Apron, Taxilane, and Entrance Road $0 $85,000 $0 $85,000

142 SPRINGHILL AIRPORT Construct 6-Unit T-Hangar $0 $350,000 $0 $350,000

Friday, March 24, 2017 Page 11 of 12General Aviation Capital Outlay

Page 25: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Match Local Other Total Funds

Airport Construction and Development Priority Program 2018-2019

General Aviation Capital Outlay

143 ARCADIA-BIENVILLE AIRPORT Action Plan/ALP $0 $125,000 $0 $125,000

144 ARCADIA-BIENVILLE AIRPORT Design Terminal and Fuel Farm $0 $90,000 $0 $90,000

145 OLLA AIRPORT Rehabilitation of Beacon and Windsock $0 $55,000 $0 $55,000

146 DAVID G. JOYCE AIRPORT Rehabilitate Airfield Lighting $0 $325,000 $0 $325,000

$31,441,233 $275,000 $54,431,966General Aviation Capital Outlay Totals $22,661,133

Friday, March 24, 2017 Page 12 of 12General Aviation Capital Outlay

Page 26: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital
Page 27: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

1 BATON ROUGE METROPOLITAN AIRPORT

Reconstruct Runway 4R/22L & Taxiway E - Phase II (Design & Construction)

$0.00 $2,980,000.00 $20,000.00 $3,000,000.00

2 SHREVEPORT REGIONAL AIRPORT WHA Mitigation Drainage Project $2,400,000.00 $266,667.00 $0.00 $2,666,667.00

3 ALEXANDRIA INTERNATIONAL AIRPORT Airfield Electrical Rehabilitation - Phase V $0.00 $1,200,000.00 $0.00 $1,200,000.00

4 ALEXANDRIA INTERNATIONAL AIRPORT Property Acq. for Obstruction Removal to Approaches for Runway 14 & 18 - Phase II

$0.00 $70,729.00 $0.00 $70,729.00

5 BATON ROUGE METROPOLITAN AIRPORT

Airfield Perimeter Security Improvements $2,187,243.00 $243,027.00 $0.00 $2,430,270.00

6 BATON ROUGE METROPOLITAN AIRPORT

Construct EMAS Replacement $5,000,000.00 $555,556.00 $0.00 $5,555,556.00

7 ALEXANDRIA INTERNATIONAL AIRPORT Wildlife Hazard Removal - Phase V $0.00 $396,574.00 $0.00 $396,574.00

8 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Terminal Construction Project - Phase VI $2,080,000.00 $3,277,333.00 $416,000.00 $5,773,333.00

9 LAFAYETTE REGIONAL AIRPORT Obstruction Removal $0.00 $100,000.00 $0.00 $100,000.00

10 BATON ROUGE METROPOLITAN AIRPORT

North General Aviation Development - Phase II $0.00 $2,980,000.00 $20,000.00 $3,000,000.00

11 BATON ROUGE METROPOLITAN AIRPORT

North General Aviation Development - Phase III $2,160,000.00 $3,220,000.00 $20,000.00 $5,400,000.00

12 LAFAYETTE REGIONAL AIRPORT Taxiway F Improvements - Phase IV (Northend) $0.00 $1,180,000.00 $20,000.00 $1,200,000.00

Friday, March 24, 2017 Page 1 of 62Air Carrier Capital Outlay

Page 28: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

13 ALEXANDRIA INTERNATIONAL AIRPORT Install Emergency Generators for Navigational Aids $0.00 $300,000.00 $0.00 $300,000.00

14 SHREVEPORT REGIONAL AIRPORT Improve Runway 32 RPZ $0.00 $500,000.00 $0.00 $500,000.00

15 BATON ROUGE METROPOLITAN AIRPORT

GA Runway 4R/22L Reconstruction Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

16 BATON ROUGE METROPOLITAN AIRPORT

Reconstruct Runway 4R/22L & Taxiway E - Phase III $0.00 $2,980,000.00 $20,000.00 $3,000,000.00

17 BATON ROUGE METROPOLITAN AIRPORT

Reconstruct Runway 4R/22L & Taxiway E - Phase IV $0.00 $1,480,000.00 $20,000.00 $1,500,000.00

18 BATON ROUGE METROPOLITAN AIRPORT

GA Runway 4R/22L Reconstruction Phase III $0.00 $3,000,000.00 $0.00 $3,000,000.00

19 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase IV $0.00 $1,480,000.00 $0.00 $1,480,000.00

20 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase III $0.00 $1,480,000.00 $0.00 $1,480,000.00

21 LAKE CHARLES REGIONAL AIRPORT Bury Utility Lines - Phase III (Construction) $0.00 $1,000,000.00 $20,000.00 $1,020,000.00

22 ALEXANDRIA INTERNATIONAL AIRPORT Wildlife Mitigation Approach to Runway 18 $0.00 $225,000.00 $0.00 $225,000.00

23 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase V $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

24 LAFAYETTE REGIONAL AIRPORT Rehabilitate North General Aviation Apron - Phase V of V $0.00 $3,000,000.00 $0.00 $3,000,000.00

Friday, March 24, 2017 Page 2 of 62Air Carrier Capital Outlay

Page 29: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

25 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase VII $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

26 LAFAYETTE REGIONAL AIRPORT Rehabilitate North General Aviation Apron - IV of V $0.00 $3,000,000.00 $0.00 $3,000,000.00

27 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase VI $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

28 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase III $5,788,580.00 $643,176.00 $0.00 $6,431,756.00

29 BATON ROUGE METROPOLITAN AIRPORT

Wildlife Hazard Mitigation - Phase IV $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

30 MONROE REGIONAL AIRPORT Airfield Drainage Rehabilitation - Phase II (Construction) $0.00 $800,000.00 $0.00 $800,000.00

31 BATON ROUGE METROPOLITAN AIRPORT

Air Carrier Apron Rehabilitation - Phase II $1,977,943.00 $219,771.00 $0.00 $2,197,714.00

32 BATON ROUGE METROPOLITAN AIRPORT

North General Aviation Development - Phase I $0.00 $2,980,000.00 $20,000.00 $3,000,000.00

33 BATON ROUGE METROPOLITAN AIRPORT

GA Runway to Taxiway Conversion - Phase II $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

34 LAKE CHARLES REGIONAL AIRPORT South Apron Expansion - Phase II of III (Construction) $0.00 $2,250,000.00 $0.00 $2,250,000.00

35 LAKE CHARLES REGIONAL AIRPORT South Apron Expansion - Phase III $0.00 $1,750,000.00 $0.00 $1,750,000.00

36 SHREVEPORT REGIONAL AIRPORT Widen & Extend Taxiways E & K - Construction $2,880,000.00 $320,000.00 $0.00 $3,200,000.00

Friday, March 24, 2017 Page 3 of 62Air Carrier Capital Outlay

Page 30: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

37 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Runway 14/32 & 18/36 Safety Areas - Phase II $270,000.00 $30,000.00 $0.00 $300,000.00

38 MONROE REGIONAL AIRPORT Runway 14/32 Extension - Phase II $1,300,000.00 $3,014,444.00 $0.00 $4,314,444.00

39 ALEXANDRIA INTERNATIONAL AIRPORT North Ramp Rehabilitation- Phase II $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

40 SHREVEPORT REGIONAL AIRPORT Airfield Drainage Rehabilitation - Construction $0.00 $2,000,000.00 $0.00 $2,000,000.00

41 SHREVEPORT REGIONAL AIRPORT Widen & Extend Taxiways E & K - Design $0.00 $250,000.00 $0.00 $250,000.00

42 LAKE CHARLES REGIONAL AIRPORT Construct ATCT Phase I - (Tower & Cab) $0.00 $1,750,000.00 $0.00 $1,750,000.00

43 ALEXANDRIA INTERNATIONAL AIRPORT Taxiway B Rehabilitation - Construction for Phase II $360,000.00 $40,000.00 $0.00 $400,000.00

44 LAFAYETTE REGIONAL AIRPORT Terminal Infrastructure - Building $6,000,000.00 $3,066,667.00 $0.00 $9,066,667.00

45 MONROE REGIONAL AIRPORT Replace Airfield Sign Panels $0.00 $40,000.00 $0.00 $40,000.00

46 MONROE REGIONAL AIRPORT Replace Airfield Regulators $0.00 $60,000.00 $0.00 $60,000.00

47 LAKE CHARLES REGIONAL AIRPORT Airfield Signage Rehabilitation $0.00 $500,000.00 $0.00 $500,000.00

48 BATON ROUGE METROPOLITAN AIRPORT

Airfield Drainage Improvements - Phase II Construction $5,519,500.00 $613,278.00 $0.00 $6,132,778.00

Friday, March 24, 2017 Page 4 of 62Air Carrier Capital Outlay

Page 31: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

49 ALEXANDRIA INTERNATIONAL AIRPORT Thermoplast Hold Lines and Markings - Phase II $0.00 $400,000.00 $0.00 $400,000.00

50 BATON ROUGE METROPOLITAN AIRPORT

Taxiway F Reconstruction and Extension - Phase IV $5,415,000.00 $601,667.00 $0.00 $6,016,667.00

51 LAKE CHARLES REGIONAL AIRPORT Construct Perimeter Road - Phase II (Construction) $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

52 LAKE CHARLES REGIONAL AIRPORT Construct Perimeter Road - Phase III (Construction) $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

53 LAKE CHARLES REGIONAL AIRPORT Runway 5/23 Rehabilitation $0.00 $1,884,000.00 $0.00 $1,884,000.00

54 MONROE REGIONAL AIRPORT Improve Perimeter Road - Phase II $450,000.00 $50,000.00 $0.00 $500,000.00

55 MONROE REGIONAL AIRPORT Rehabilitate Runway 04/22 Markings $0.00 $308,730.00 $0.00 $308,730.00

56 MONROE REGIONAL AIRPORT Rehabilitate Taxiway A $81,000.00 $19,000.00 $0.00 $100,000.00

57 MONROE REGIONAL AIRPORT Wildlife Hazard Mitigation $337,500.00 $37,500.00 $0.00 $375,000.00

58 MONROE REGIONAL AIRPORT Rehabilitate Runway 14/32 Markings $0.00 $308,730.00 $0.00 $308,730.00

59 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Rehabilitate Taxiways E, S, & F $3,431,250.00 $381,250.00 $762,500.00 $4,575,000.00

60 BATON ROUGE METROPOLITAN AIRPORT

GA Runway to Taxiway Conversion - Phase I $4,680,000.00 $520,000.00 $0.00 $5,200,000.00

Friday, March 24, 2017 Page 5 of 62Air Carrier Capital Outlay

Page 32: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

61 BATON ROUGE METROPOLITAN AIRPORT

Taxiway F Reconstruction and Extension - Phase III $7,999,000.00 $888,778.00 $0.00 $8,887,778.00

62 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Apron Expansion $4,750,000.00 $527,778.00 $0.00 $5,277,778.00

63 LAKE CHARLES REGIONAL AIRPORT North Apron Expansion for Development - Phase I (Construction)

$0.00 $1,500,000.00 $0.00 $1,500,000.00

64 LAKE CHARLES REGIONAL AIRPORT Construct Middle Ramp $0.00 $701,000.00 $0.00 $701,000.00

65 MONROE REGIONAL AIRPORT Improve Security Fence $0.00 $400,000.00 $0.00 $400,000.00

66 NEW ORLEANS LOUIS ARMSTRONG INTERNATIONAL AIRPORT

Rehabilitate Runway 1/19 $1,571,808.00 $174,645.00 $349,291.00 $2,095,744.00

67 LAFAYETTE REGIONAL AIRPORT Rehabilitate Perimeter Fence $3,550,000.00 $222,222.00 $0.00 $3,772,222.00

68 ALEXANDRIA INTERNATIONAL AIRPORT Runway Rubber Removal and Striping $630,000.00 $70,000.00 $0.00 $700,000.00

69 ALEXANDRIA INTERNATIONAL AIRPORT Master Drainage Rehabilitation - Phase II $346,500.00 $653,500.00 $0.00 $1,000,000.00

70 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Runway 14/32 & 18/36 Safety Areas - Phase I $808,775.00 $89,864.00 $0.00 $898,639.00

71 MONROE REGIONAL AIRPORT Upgrade Airfield Lighting Controls $180,000.00 $20,000.00 $0.00 $200,000.00

72 BATON ROUGE METROPOLITAN AIRPORT

ARFF PH II (AIP) $511,936.00 $56,882.00 $0.00 $568,818.00

Friday, March 24, 2017 Page 6 of 62Air Carrier Capital Outlay

Page 33: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

73 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitation of Runway 32 and Taxiway A Safety Area $0.00 $160,000.00 $0.00 $160,000.00

74 BATON ROUGE METROPOLITAN AIRPORT

Runway 4L Drainage & Perimeter Road Improvements $4,200,000.00 $466,667.00 $0.00 $4,666,667.00

75 ALEXANDRIA INTERNATIONAL AIRPORT Install LED Runway Lighting $0.00 $750,000.00 $0.00 $750,000.00

76 ALEXANDRIA INTERNATIONAL AIRPORT Master Drainage Rehabilitation - Phase I $699,275.00 $77,697.00 $0.00 $776,972.00

77 ALEXANDRIA INTERNATIONAL AIRPORT Install LED Taxiway Sign Fixtures $0.00 $375,000.00 $0.00 $375,000.00

78 MONROE REGIONAL AIRPORT Thermoplastic Markings $498,150.00 $55,350.00 $0.00 $553,500.00

79 ALEXANDRIA INTERNATIONAL AIRPORT Master Drainage Rehabilitation - Phase III $900,000.00 $100,000.00 $0.00 $1,000,000.00

80 ALEXANDRIA INTERNATIONAL AIRPORT South Ramp Rehabilitation $0.00 $750,000.00 $0.00 $750,000.00

81 LAFAYETTE REGIONAL AIRPORT Taxiway Hotel Re-configuration $1,260,000.00 $140,000.00 $0.00 $1,400,000.00

82 LAFAYETTE REGIONAL AIRPORT Taxiway Delta Removal $382,500.00 $42,500.00 $0.00 $425,000.00

83 ALEXANDRIA INTERNATIONAL AIRPORT North Apron Rehabilitation - Joint Seal and Spall Repair $382,500.00 $42,500.00 $0.00 $425,000.00

84 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate FBO Apron - Phase II (Construction) $1,537,957.00 $170,884.00 $1,634,544.00 $3,343,385.00

Friday, March 24, 2017 Page 7 of 62Air Carrier Capital Outlay

Page 34: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

85 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitation of Taxiway E & Terminal Ramp - Phase I $495,000.00 $55,000.00 $0.00 $550,000.00

86 ALEXANDRIA INTERNATIONAL AIRPORT GA Apron Rehabilitation $0.00 $110,000.00 $990,000.00 $1,100,000.00

87 LAFAYETTE REGIONAL AIRPORT Taxiway Kilo Removal $495,000.00 $55,000.00 $0.00 $550,000.00

88 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road - Design $475,000.00 $52,778.00 $0.00 $527,778.00

89 LAFAYETTE REGIONAL AIRPORT Straighten Taxiway Bravo $2,403,000.00 $267,000.00 $0.00 $2,670,000.00

90 ALEXANDRIA INTERNATIONAL AIRPORT Southeast Apron Expansion $0.00 $8,000,000.00 $0.00 $8,000,000.00

91 ALEXANDRIA INTERNATIONAL AIRPORT Midfield Apron (S) New Construction North Ramp $0.00 $34,000,000.00 $0.00 $34,000,000.00

92 ALEXANDRIA INTERNATIONAL AIRPORT Midfield Apron (N) New Construction North Ramp $0.00 $22,600,000.00 $0.00 $22,600,000.00

93 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Overrun Area Runway 18/36 $190,000.00 $21,111.00 $0.00 $211,111.00

94 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate Taxiway "F" $1,092,500.00 $121,389.00 $0.00 $1,213,889.00

95 BATON ROUGE METROPOLITAN AIRPORT

Airport Police Vehicle $0.00 $20,000.00 $0.00 $20,000.00

96 LAKE CHARLES REGIONAL AIRPORT Terminal Loading Bridge $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

Friday, March 24, 2017 Page 8 of 62Air Carrier Capital Outlay

Page 35: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

97 MONROE REGIONAL AIRPORT Upgrade Windcone to LED $0.00 $38,000.00 $0.00 $38,000.00

98 ALEXANDRIA INTERNATIONAL AIRPORT Emergency Access Road Improvements - Phase II $900,000.00 $100,000.00 $0.00 $1,000,000.00

99 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase X $0.00 $1,500,000.00 $0.00 $1,500,000.00

100 SHREVEPORT REGIONAL AIRPORT F.A.R. Part 150 Land Acquisition $3,000,000.00 $333,333.00 $0.00 $3,333,333.00

101 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XV $0.00 $1,100,000.00 $0.00 $1,100,000.00

102 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XIV $0.00 $1,500,000.00 $0.00 $1,500,000.00

103 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XIII $0.00 $1,500,000.00 $0.00 $1,500,000.00

104 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XI $0.00 $1,500,000.00 $0.00 $1,500,000.00

105 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase IX $0.00 $1,500,000.00 $0.00 $1,500,000.00

106 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase VIII $0.00 $1,500,000.00 $0.00 $1,500,000.00

107 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase VII $0.00 $1,500,000.00 $0.00 $1,500,000.00

108 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

Friday, March 24, 2017 Page 9 of 62Air Carrier Capital Outlay

Page 36: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

109 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase IV $5,800,000.00 $3,644,444.00 $0.00 $9,444,444.00

110 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase III $5,800,000.00 $3,644,444.00 $0.00 $9,444,444.00

111 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase II $5,800,000.00 $3,644,444.00 $0.00 $9,444,444.00

112 BATON ROUGE METROPOLITAN AIRPORT

Relocate South Portion of Plank Road - Phase XII $0.00 $1,500,000.00 $0.00 $1,500,000.00

113 MONROE REGIONAL AIRPORT Rehabilitate Maintenance Facility $0.00 $350,000.00 $0.00 $350,000.00

114 BATON ROUGE METROPOLITAN AIRPORT

Emergency Drainage - Phase II Construction $6,359,300.00 $706,589.00 $0.00 $7,065,889.00

115 MONROE REGIONAL AIRPORT Construct General Aviation Hangars and Parking $0.00 $1,150,000.00 $0.00 $1,150,000.00

116 MONROE REGIONAL AIRPORT General Aviation Hangar Rehabilitation $0.00 $865,000.00 $0.00 $865,000.00

117 MONROE REGIONAL AIRPORT General Aviation Hangars $0.00 $700,000.00 $0.00 $700,000.00

118 BATON ROUGE METROPOLITAN AIRPORT

Taxiway F Reconstruction and Extension - Phase V $2,660,000.00 $295,556.00 $0.00 $2,955,556.00

119 ALEXANDRIA INTERNATIONAL AIRPORT Extend Runway 14/32 - Phase II $0.00 $765,000.00 $14,535,000.00 $15,300,000.00

120 ALEXANDRIA INTERNATIONAL AIRPORT Runway Blast Pads $0.00 $5,400,000.00 $0.00 $5,400,000.00

Friday, March 24, 2017 Page 10 of 62Air Carrier Capital Outlay

Page 37: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

121 ALEXANDRIA INTERNATIONAL AIRPORT Runway 18 Extension: Environmental Assessment $0.00 $500,000.00 $0.00 $500,000.00

122 MONROE REGIONAL AIRPORT Relocate Taxiway D Holding Position $0.00 $31,980.00 $0.00 $31,980.00

123 MONROE REGIONAL AIRPORT Rehabilitate Entrance Road $360,000.00 $40,000.00 $0.00 $400,000.00

124 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road $4,750,000.00 $527,778.00 $0.00 $5,277,778.00

125 MONROE REGIONAL AIRPORT Rehabilitate General Aviation South Access Road $0.00 $950,000.00 $0.00 $950,000.00

126 MONROE REGIONAL AIRPORT Rehabilitate General Aviation North Access Road $0.00 $900,000.00 $0.00 $900,000.00

127 LAKE CHARLES REGIONAL AIRPORT Airport Entrance Improvements $0.00 $1,319,000.00 $0.00 $1,319,000.00

128 ALEXANDRIA INTERNATIONAL AIRPORT Extend Taxiway A $0.00 $5,850,000.00 $5,850,000.00 $11,700,000.00

129 LAKE CHARLES REGIONAL AIRPORT Airport Entrance Improvements $0.00 $1,319,000.00 $0.00 $1,319,000.00

130 LAKE CHARLES REGIONAL AIRPORT Construct Perimeter Road - Phase I (Design) $0.00 $200,000.00 $0.00 $200,000.00

131 SHREVEPORT REGIONAL AIRPORT Construct West End AOA Perimeter Road - Phase II (Construction)

$0.00 $2,200,000.00 $0.00 $2,200,000.00

132 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar & Delushe (100K S.F.) $0.00 $22,000,000.00 $0.00 $22,000,000.00

Friday, March 24, 2017 Page 11 of 62Air Carrier Capital Outlay

Page 38: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

133 MONROE REGIONAL AIRPORT Acquire ARFF Vehicle $0.00 $775,000.00 $0.00 $775,000.00

134 LAKE CHARLES REGIONAL AIRPORT Acquire Runway Sweeper $0.00 $200,000.00 $0.00 $200,000.00

135 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

136 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase VIII $0.00 $500,000.00 $0.00 $500,000.00

137 MONROE REGIONAL AIRPORT Cargo Facility and Apron $675,000.00 $75,000.00 $0.00 $750,000.00

138 MONROE REGIONAL AIRPORT Storm Water Management Plan $0.00 $55,000.00 $0.00 $55,000.00

139 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

140 MONROE REGIONAL AIRPORT Improve Perimeter Road - Phase I $720,000.00 $80,000.00 $0.00 $800,000.00

141 MONROE REGIONAL AIRPORT Geographic Information System $270,000.00 $30,000.00 $0.00 $300,000.00

142 BATON ROUGE METROPOLITAN AIRPORT

North GA Terminal Facility $0.00 $2,980,000.00 $20,000.00 $3,000,000.00

143 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert $9,900,000.00 $1,100,000.00 $0.00 $11,000,000.00

144 MONROE REGIONAL AIRPORT Improve T-Hangar Access Road $405,000.00 $45,000.00 $0.00 $450,000.00

Friday, March 24, 2017 Page 12 of 62Air Carrier Capital Outlay

Page 39: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

145 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase VII $0.00 $1,500,000.00 $0.00 $1,500,000.00

146 MONROE REGIONAL AIRPORT Acquire Runway Sweeper $0.00 $225,000.00 $0.00 $225,000.00

147 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

148 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

149 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

150 SHREVEPORT REGIONAL AIRPORT East AOA Perimeter Road - Design & Environmental $0.00 $500,000.00 $0.00 $500,000.00

151 ALEXANDRIA INTERNATIONAL AIRPORT ILS Upgrade $1,900,000.00 $211,111.00 $0.00 $2,111,111.00

152 ALEXANDRIA INTERNATIONAL AIRPORT FAA Radar Facility Relocation $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

153 ALEXANDRIA INTERNATIONAL AIRPORT Install CAT 1 Approach - Runway 18/36 (Equipment Lighting)

$0.00 $2,500,000.00 $0.00 $2,500,000.00

154 ALEXANDRIA INTERNATIONAL AIRPORT Runway 18 Extension - Construction Phase I $1,765,275.00 $2,446,142.00 $5,000,000.00 $9,211,417.00

155 ALEXANDRIA INTERNATIONAL AIRPORT Runway 18 Extension - Construction Phase II $1,765,275.00 $3,700,688.00 $4,540,913.00 $10,006,876.00

156 ALEXANDRIA INTERNATIONAL AIRPORT Rehabilitate North Ramp, Runway 18 and Hot Pad $0.00 $0.00 $1,500,000.00 $1,500,000.00

Friday, March 24, 2017 Page 13 of 62Air Carrier Capital Outlay

Page 40: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

157 ALEXANDRIA INTERNATIONAL AIRPORT North Ramp Rehabilitation - Phase III $8,550,000.00 $950,000.00 $0.00 $9,500,000.00

158 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert $9,000,000.00 $1,000,000.00 $0.00 $10,000,000.00

159 ALEXANDRIA INTERNATIONAL AIRPORT Construct Holding Bay at Runway 36 End $1,900,000.00 $211,111.00 $0.00 $2,111,111.00

160 MONROE REGIONAL AIRPORT Electronic Airport Layout Plan $0.00 $400,000.00 $0.00 $400,000.00

161 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar - Two $0.00 $19,200,000.00 $0.00 $19,200,000.00

162 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar - Three $0.00 $19,200,000.00 $0.00 $19,200,000.00

163 ALEXANDRIA INTERNATIONAL AIRPORT 10 Unit T-hangar $0.00 $700,000.00 $0.00 $700,000.00

164 ALEXANDRIA INTERNATIONAL AIRPORT Runway 14 Parallel Taxiway Westside $0.00 $43,000,000.00 $0.00 $43,000,000.00

165 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road - Phase II (Construction) $7,125,000.00 $791,667.00 $0.00 $7,916,667.00

166 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road - Phase I (Design) $475,000.00 $52,778.00 $0.00 $527,778.00

167 BATON ROUGE METROPOLITAN AIRPORT

Construct Hangar $5,400,000.00 $600,000.00 $0.00 $6,000,000.00

168 ALEXANDRIA INTERNATIONAL AIRPORT Property Acquisition for Industrial Park Development $0.00 $204,000.00 $0.00 $204,000.00

Friday, March 24, 2017 Page 14 of 62Air Carrier Capital Outlay

Page 41: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

169 BATON ROUGE METROPOLITAN AIRPORT

South Entergy Pole Relocation $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

170 ALEXANDRIA INTERNATIONAL AIRPORT GIS Development - Phase II $0.00 $500,000.00 $0.00 $500,000.00

171 ALEXANDRIA INTERNATIONAL AIRPORT Westside Infrastructure Improvements (Electrical, Water, Sewer, Drainage and Access)

$0.00 $83,000,000.00 $0.00 $83,000,000.00

172 ALEXANDRIA INTERNATIONAL AIRPORT Relocate Fuel Farm - Phase IV (Demolition of Old Fuel Farm)

$665,000.00 $73,889.00 $0.00 $738,889.00

173 ALEXANDRIA INTERNATIONAL AIRPORT Master Plan Update $900,000.00 $100,000.00 $0.00 $1,000,000.00

174 BATON ROUGE METROPOLITAN AIRPORT

Hangar No.1 - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

175 BATON ROUGE METROPOLITAN AIRPORT

Hangar No.1 - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

176 BATON ROUGE METROPOLITAN AIRPORT

Hangar No.1 - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

177 BATON ROUGE METROPOLITAN AIRPORT

West Box Culvert - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

178 ALEXANDRIA INTERNATIONAL AIRPORT Large Southeast Apron Hangar - One $0.00 $19,200,000.00 $0.00 $19,200,000.00

179 ALEXANDRIA INTERNATIONAL AIRPORT Southeast Apron N Two Large Hangars (100K S.F.) $0.00 $18,000,000.00 $0.00 $18,000,000.00

180 MONROE REGIONAL AIRPORT Acquire Mass Casualty Vehicle $0.00 $550,000.00 $0.00 $550,000.00

Friday, March 24, 2017 Page 15 of 62Air Carrier Capital Outlay

Page 42: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

181 MONROE REGIONAL AIRPORT Upgrade Taxiway Lighting, Signs, and REILS to LED $2,340,000.00 $260,000.00 $0.00 $2,600,000.00

182 BATON ROUGE METROPOLITAN AIRPORT

RW 4R/22L Reconstruction - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

183 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

184 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

185 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase VII $0.00 $1,000,000.00 $0.00 $1,000,000.00

186 BATON ROUGE METROPOLITAN AIRPORT

Hangar No. 1 - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

187 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

188 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Phase 3 - Cold Storage - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

189 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Phase 3 - Cold Storage - Phase IV $0.00 $500,000.00 $0.00 $500,000.00

190 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

191 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

192 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Phase 3 - Cold Storage - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

Friday, March 24, 2017 Page 16 of 62Air Carrier Capital Outlay

Page 43: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

193 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase X $0.00 $1,500,000.00 $0.00 $1,500,000.00

194 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase IX $0.00 $1,500,000.00 $0.00 $1,500,000.00

195 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase VIII $0.00 $1,500,000.00 $0.00 $1,500,000.00

196 BATON ROUGE METROPOLITAN AIRPORT

North Airpark Development - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

197 BATON ROUGE METROPOLITAN AIRPORT

Property South of Blount Road - Phase III $0.00 $1,099,450.00 $0.00 $1,099,450.00

198 BATON ROUGE METROPOLITAN AIRPORT

Property South of Blount Road - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

199 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

200 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

201 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

202 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase V $0.00 $500,000.00 $0.00 $500,000.00

203 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase III $0.00 $1,500,000.00 $0.00 $1,500,000.00

204 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase II $0.00 $1,500,000.00 $0.00 $1,500,000.00

Friday, March 24, 2017 Page 17 of 62Air Carrier Capital Outlay

Page 44: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

205 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase VI $0.00 $1,500,000.00 $0.00 $1,500,000.00

206 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase IV $0.00 $1,500,000.00 $0.00 $1,500,000.00

207 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase V $0.00 $1,500,000.00 $0.00 $1,500,000.00

208 BATON ROUGE METROPOLITAN AIRPORT

Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase III

$0.00 $1,000,000.00 $0.00 $1,000,000.00

209 BATON ROUGE METROPOLITAN AIRPORT

Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase II

$0.00 $1,500,000.00 $0.00 $1,500,000.00

210 BATON ROUGE METROPOLITAN AIRPORT

Northwest Box Culvert - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

211 MONROE REGIONAL AIRPORT Design Precision Approach for Runway 14/32 Extension $270,000.00 $30,000.00 $0.00 $300,000.00

212 MONROE REGIONAL AIRPORT Rehabilitate Perimeter Road - Phase II (Construction) $169,321.00 $18,813.00 $0.00 $188,134.00

213 BATON ROUGE METROPOLITAN AIRPORT

Install USGS Survey Monuments Around Airport $0.00 $50,000.00 $0.00 $50,000.00

214 BATON ROUGE METROPOLITAN AIRPORT

Property East Side of Plank Road - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

215 BATON ROUGE METROPOLITAN AIRPORT

Property South of Blount Road - Phase I $0.00 $1,500,000.00 $0.00 $1,500,000.00

216 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements - Phase I $0.00 $0.00 $0.00 $0.00

Friday, March 24, 2017 Page 18 of 62Air Carrier Capital Outlay

Page 45: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022Air Carrier Capital Outlay

217 BATON ROUGE METROPOLITAN AIRPORT

Green Building Initiative (Lighting, Mechanical Energy Management System) - Phase I

$0.00 $1,500,000.00 $0.00 $1,500,000.00

218 BATON ROUGE METROPOLITAN AIRPORT

Air Cargo Access Road Improvements $8,100,000.00 $900,000.00 $0.00 $9,000,000.00

$494,613,194.00 $35,758,248.00$747,572,530.00Air Carrier Capital Outlay Totals $217,201,088.00

Friday, March 24, 2017 Page 19 of 62Air Carrier Capital Outlay

Page 46: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital
Page 47: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

1 EUNICE AIRPORT RSA Obstruction Removal $0.00 $300,000.00 $0.00 $300,000.00

2 MINDEN AIRPORT Obstruction Removal Phase V $0.00 $50,000.00 $0.00 $50,000.00

3 LOUISIANA REGIONAL AIRPORT Obstruction Removal - Phase II $0.00 $150,000.00 $0.00 $150,000.00

4 SLIDELL AIRPORT Obstruction Removal East Transition - Phase II $0.00 $250,400.00 $0.00 $250,400.00

5 LOUISIANA REGIONAL AIRPORT Obstruction Removal - Phase I (SW Transitional) $0.00 $80,000.00 $0.00 $80,000.00

6 ST TAMMANY REGIONAL AIRPORT Obstruction Mitigation - Phase VI $0.00 $143,440.00 $0.00 $143,440.00

7 ST TAMMANY REGIONAL AIRPORT Mitigate Obstructions Phase V - Relocate Airport Access Road (Design)

$0.00 $175,500.00 $0.00 $175,500.00

8 MINDEN AIRPORT Remove Transitional Surface Obstructions $0.00 $150,000.00 $0.00 $150,000.00

9 SLIDELL AIRPORT Land Acquisition West Side $0.00 $375,000.00 $0.00 $375,000.00

10 SLIDELL AIRPORT Obstruction Removal West Side Transition Surface (30 Acres)

$0.00 $258,500.00 $0.00 $258,500.00

11 SLIDELL AIRPORT Runway 18 Threshold Recovery - Phase II (Obstruction Mitigation)

$3,600,000.00 $400,000.00 $0.00 $4,000,000.00

12 SLIDELL AIRPORT Runway 18 Threshold Recovery - Phase III (Construction) $180,000.00 $20,000.00 $0.00 $200,000.00

Friday, March 24, 2017 Page 20 of 62General Aviation Capital Outlay

Page 48: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

13 LOUISIANA REGIONAL AIRPORT Hangar Development - Phase II $0.00 $780,000.00 $20,000.00 $800,000.00

14 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitation of Drainage - Phase III (Construction) $3,600,000.00 $400,000.00 $0.00 $4,000,000.00

15 ACADIANA REGIONAL AIRPORT Obstruction Removal $0.00 $200,000.00 $0.00 $200,000.00

16 ACADIANA REGIONAL AIRPORT Acquisition of ARFF Vehicle $0.00 $600,000.00 $0.00 $600,000.00

17 HAMMOND NORTHSHORE REGIONAL AIRPORT

Property Acquisition for Runway 18 Approach $902,000.00 $100,222.00 $0.00 $1,002,222.00

18 JENNINGS AIRPORT Land Acquisition for Runway 13 Approach Protection $0.00 $257,000.00 $0.00 $257,000.00

19 ESLER REGIONAL AIRPORT Obstruction Removal - Phase I $0.00 $21,000.00 $0.00 $21,000.00

20 HOUMA-TERREBONNE AIRPORT Runway 18-36 Drainage Improvements - Phase II (Construction)

$0.00 $1,000,000.00 $0.00 $1,000,000.00

21 JENNINGS AIRPORT Land Acquisition OFZ North of Runway 8-26 $0.00 $294,000.00 $0.00 $294,000.00

22 SHREVEPORT DOWNTOWN AIRPORT Free Entry $0.00 $0.00 $0.00 $0.00

23 CHENNAULT INTERNATIONAL AIRPORT Purchase ARFF Vehicle $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

24 FALSE RIVER REGIONAL AIRPORT Obstruction Removal - Runway 18 Approach $0.00 $250,000.00 $0.00 $250,000.00

Friday, March 24, 2017 Page 21 of 62General Aviation Capital Outlay

Page 49: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

25 SHREVEPORT DOWNTOWN AIRPORT Construct Taxiway S - Phase II (Construction) $0.00 $300,000.00 $0.00 $300,000.00

26 NATCHITOCHES REGIONAL AIRPORT Obstruction Removal $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

27 SLIDELL AIRPORT Purchase of Avigation Easement for East Transition Surface

$0.00 $67,500.00 $0.00 $67,500.00

28 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway A - Phase II (Construction) $270,000.00 $30,000.00 $0.00 $300,000.00

29 ST TAMMANY REGIONAL AIRPORT Mitigate Obstructions - East Trees $0.00 $101,000.00 $0.00 $101,000.00

30 GEORGE R. CARR MEMORIAL AIRPORT Land Acquisition - Northwest Runway 18 $0.00 $350,000.00 $0.00 $350,000.00

31 SLIDELL AIRPORT Rehabilitate Fuel System $0.00 $450,000.00 $50,000.00 $500,000.00

32 LEESVILLE AIRPORT Obstruction Removal - RSA East $0.00 $25,000.00 $0.00 $25,000.00

33 LE MAIRE MEMORIAL AIRPORT Obstruction Removal - Phase III $0.00 $100,000.00 $0.00 $100,000.00

34 KELLY-DUMAS Tree Removal $0.00 $50,000.00 $0.00 $50,000.00

35 BEAUREGARD REGIONAL AIRPORT Obstruction Removal $0.00 $50,000.00 $0.00 $50,000.00

36 SLIDELL AIRPORT Obstruction Mitigation (Runway 36 RPZ) $0.00 $101,400.00 $0.00 $101,400.00

Friday, March 24, 2017 Page 22 of 62General Aviation Capital Outlay

Page 50: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

37 HOUMA-TERREBONNE AIRPORT Improve 18/36 Runway Safety Area - Phase II $0.00 $750,000.00 $0.00 $750,000.00

38 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Runway 18R/36L - Preliminary Study $0.00 $100,000.00 $0.00 $100,000.00

39 HOUMA-TERREBONNE AIRPORT Improve 18/36 Runway Safety Area - Phase III (Construction)

$0.00 $1,000,000.00 $0.00 $1,000,000.00

40 JONESBORO AIRPORT Obstruction Removal - Phase I (Runway 18/36 Approach) $0.00 $200,000.00 $0.00 $200,000.00

41 VIVIAN AIRPORT Runway 09 Obstruction Removal - Phase I (Survey) $0.00 $100,000.00 $0.00 $100,000.00

42 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate East Apron $67,500.00 $7,500.00 $0.00 $75,000.00

43 LOUISIANA REGIONAL AIRPORT Runway & Taxiway Overlay - Phase II (Construction) $2,346,750.00 $260,750.00 $0.00 $2,607,500.00

44 RUSTON REGIONAL AIRPORT Construct Taxilanes and T- Hangars - Phase II (Construction)

$270,000.00 $30,000.00 $0.00 $300,000.00

45 NEW ORLEANS LAKEFRONT AIRPORT Main Apron Rehabilitation $3,600,000.00 $400,000.00 $0.00 $4,000,000.00

46 NATCHITOCHES REGIONAL AIRPORT Bury Powerlines Runway 7 $0.00 $575,000.00 $0.00 $575,000.00

47 HOUMA-TERREBONNE AIRPORT Taxiway A Extension - Phase II (Construction) $1,800,000.00 $200,000.00 $0.00 $2,000,000.00

48 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Terminal Construction $0.00 $1,000,000.00 $1,000,000.00 $2,000,000.00

Friday, March 24, 2017 Page 23 of 62General Aviation Capital Outlay

Page 51: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

49 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway A Realignment - Phase II (Construction) $1,673,325.00 $185,925.00 $0.00 $1,859,250.00

50 CONCORDIA PARISH AIRPORT Obstruction Relocation $0.00 $500,000.00 $0.00 $500,000.00

51 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Runway & Partial Taxiway (Phase II - Construction)

$1,064,700.00 $118,300.00 $0.00 $1,183,000.00

52 ACADIANA REGIONAL AIRPORT GA Taxiway Rehabilitation - Phase II (Construction) $1,170,000.00 $380,000.00 $0.00 $1,550,000.00

53 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Taxiway A - Phase I (Design) $22,500.00 $2,500.00 $0.00 $25,000.00

54 ACADIANA REGIONAL AIRPORT GA Taxiway Improvements Phase III $1,530,000.00 $170,000.00 $0.00 $1,700,000.00

55 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Aprons, Taxilanes and & T-Hangar Areas (Phase II - Construction)

$890,550.00 $98,950.00 $0.00 $989,500.00

56 TENSAS PARISH AIRPORT Obstruction Removal (Phase III) $0.00 $125,000.00 $0.00 $125,000.00

57 ACADIANA REGIONAL AIRPORT Heavy Jet Apron Rehabilitation - Phase II of III (Construction)

$4,500,000.00 $500,000.00 $0.00 $5,000,000.00

58 ACADIANA REGIONAL AIRPORT Heavy Jet Apron Rehabilitation - Phase III of III (Construction)

$5,580,000.00 $620,000.00 $0.00 $6,200,000.00

59 LOUISIANA REGIONAL AIRPORT Land Acquisition North (T-Hangar Development) $0.00 $200,000.00 $20,000.00 $220,000.00

60 SLIDELL AIRPORT North Apron Crack Seal $67,680.00 $7,520.00 $0.00 $75,200.00

Friday, March 24, 2017 Page 24 of 62General Aviation Capital Outlay

Page 52: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

61 WELSH AIRPORT Obstruction Removal - Phase II $0.00 $185,000.00 $0.00 $185,000.00

62 ACADIANA REGIONAL AIRPORT Seaway Lighting Rehabilitation - Phase II (Construction) $0.00 $450,000.00 $0.00 $450,000.00

63 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Airfield Lighting/Signs $0.00 $380,000.00 $0.00 $380,000.00

64 HOUMA-TERREBONNE AIRPORT Taxiway F - Phase II (Construction) $2,925,000.00 $325,000.00 $0.00 $3,250,000.00

65 SHREVEPORT DOWNTOWN AIRPORT Design New Taxiway Edge Lighting $0.00 $86,000.00 $0.00 $86,000.00

66 HOUMA-TERREBONNE AIRPORT Construct Partial Parallel Taxiway - Phase III (Construction) $900,000.00 $100,000.00 $0.00 $1,000,000.00

67 ESLER REGIONAL AIRPORT Runway 14/32 Rehabilitation (Design) $0.00 $52,400.00 $0.00 $52,400.00

68 HOUMA-TERREBONNE AIRPORT Construct Partial Parallel Taxiway - Phase IV (Construction) $900,000.00 $100,000.00 $0.00 $1,000,000.00

69 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Airfield Drainage - Phase III (Construction) $0.00 $225,000.00 $0.00 $225,000.00

70 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Runway 17/35 Thresholds - Phase II (Construction)

$270,000.00 $30,000.00 $0.00 $300,000.00

71 EUNICE AIRPORT Apron Rehabilitation - Phase II (Construction) $450,000.00 $50,000.00 $0.00 $500,000.00

72 C.E. (RUSTY) WILLIAMS AIRPORT Obstruction Removal (Approach to Runway 18/36) $0.00 $50,000.00 $0.00 $50,000.00

Friday, March 24, 2017 Page 25 of 62General Aviation Capital Outlay

Page 53: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

73 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Approach Lighting - Phase II (Engineering & Construction) $0.00 $245,000.00 $0.00 $245,000.00

74 SLIDELL AIRPORT Extend Runway 18/36 and Parallel Taxiway - Phase I (Design and EA)

$250,650.00 $27,850.00 $0.00 $278,500.00

75 HOUMA-TERREBONNE AIRPORT Improve 18/36 Runway Safety Area - Phase I $0.00 $750,000.00 $0.00 $750,000.00

76 C.E. (RUSTY) WILLIAMS AIRPORT Design/Construct Apron Overlay $0.00 $500,000.00 $0.00 $500,000.00

77 SLIDELL AIRPORT Extend Runway 18/36 and Parallel Taxiway - Phase II (Construction)

$1,595,160.00 $177,240.00 $0.00 $1,772,400.00

78 LE GROS MEMORIAL AIRPORT Rehabilitate Airfield Drainage Phase II - Construction $579,600.00 $64,400.00 $0.00 $644,000.00

79 BEAUREGARD REGIONAL AIRPORT Drainage Rehabilitation - Phase II $0.00 $650,000.00 $0.00 $650,000.00

80 HAMMOND NORTHSHORE REGIONAL AIRPORT

Drainage Improvements Phase IV $0.00 $550,000.00 $0.00 $550,000.00

81 NEW ORLEANS LAKEFRONT AIRPORT Construct Helipad $0.00 $800,000.00 $0.00 $800,000.00

82 HOUMA-TERREBONNE AIRPORT Runway and Taxiway Marking $0.00 $750,000.00 $0.00 $750,000.00

83 ST JOHN THE BAPTIST PARISH AIRPORT Obstruction Mitigation - Runway 17 - Phase II (Construction)

$0.00 $700,000.00 $0.00 $700,000.00

84 SHREVEPORT DOWNTOWN AIRPORT Construct Northwest Ramp Rehabilitation $0.00 $400,000.00 $0.00 $400,000.00

Friday, March 24, 2017 Page 26 of 62General Aviation Capital Outlay

Page 54: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

85 HARRY P. WILLIAMS MEMORIAL AIRPORT Dredge and Stabilize Seaway - Phase II (Construction) $742,500.00 $82,500.00 $0.00 $825,000.00

86 SLIDELL AIRPORT Apron Expansion - Phase II $675,000.00 $75,000.00 $0.00 $750,000.00

87 RUSTON REGIONAL AIRPORT Construct Runway Extension - Phase III (Construction) $3,330,000.00 $370,000.00 $0.00 $3,700,000.00

88 DE QUINCY INDUSTRIAL AIRPARK Rehabilitate Runway - Phase II (Construction) $1,890,000.00 $210,000.00 $0.00 $2,100,000.00

89 RUSTON REGIONAL AIRPORT Construct Runway Extension - Phase II (Construction) $2,430,000.00 $270,000.00 $0.00 $2,700,000.00

90 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Runway Pavement Strengthening - Phase II (Construction) $0.00 $4,450,000.00 $0.00 $4,450,000.00

91 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Taxiway Pavement Strengthening - Phase II (Construction) $3,600,000.00 $400,000.00 $0.00 $4,000,000.00

92 JENNINGS AIRPORT North Apron Development - Phase II (Construction) $680,400.00 $75,600.00 $0.00 $756,000.00

93 HAMMOND NORTHSHORE REGIONAL AIRPORT

Construct 5 Hangars $0.00 $500,000.00 $0.00 $500,000.00

94 SOUTHLAND FIELD Clear Airspace - Phase II (Land Acquisition/Easements) $346,500.00 $38,500.00 $0.00 $385,000.00

95 VICKSBURG-TALLULAH REGIONAL AIRPORT

Taxiway Lighting - Phase II $0.00 $275,000.00 $0.00 $275,000.00

96 RUSTON REGIONAL AIRPORT Construct Apron Expansion - Phase III $990,000.00 $110,000.00 $0.00 $1,100,000.00

Friday, March 24, 2017 Page 27 of 62General Aviation Capital Outlay

Page 55: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

97 RUSTON REGIONAL AIRPORT Construct Apron Expansion - Phase II (Construction) $675,000.00 $75,000.00 $0.00 $750,000.00

98 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase II (Construction) $345,150.00 $38,350.00 $0.00 $383,500.00

99 NEW ORLEANS LAKEFRONT AIRPORT Extend Runway 18L/36R $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

100 CONCORDIA PARISH AIRPORT Rehabilitate Southwest Apron - Phase II $475,000.00 $52,778.00 $0.00 $527,778.00

101 LOUISIANA REGIONAL AIRPORT Land Acquisition for MALSAR $0.00 $365,000.00 $0.00 $365,000.00

102 MOREHOUSE MEMORIAL AIRPORT Rehabilitate Runway - Phase II $570,000.00 $63,333.00 $0.00 $633,333.00

103 ST JOHN THE BAPTIST PARISH AIRPORT Drainage Improvements - Phase I $0.00 $78,000.00 $10,000.00 $88,000.00

104 SHREVEPORT DOWNTOWN AIRPORT Construct 10-Unit T-Hangar $0.00 $500,000.00 $0.00 $500,000.00

105 LEESVILLE AIRPORT Extend Runway 18/36 - Phase II (Construction) $1,080,000.00 $120,000.00 $0.00 $1,200,000.00

106 JENNINGS AIRPORT 8-Unit T-Hangars $0.00 $262,500.00 $262,500.00 $525,000.00

107 HOUMA-TERREBONNE AIRPORT Taxiway A Extension - Phase I (Design) $450,000.00 $50,000.00 $0.00 $500,000.00

108 GEORGE R. CARR MEMORIAL AIRPORT Design Parallel Taxiway - Phase II and III $154,299.00 $17,144.00 $0.00 $171,443.00

Friday, March 24, 2017 Page 28 of 62General Aviation Capital Outlay

Page 56: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

109 ACADIANA REGIONAL AIRPORT ARFF Station Relocation - Phase II (Construction) $2,988,000.00 $332,000.00 $0.00 $3,320,000.00

110 HOUMA-TERREBONNE AIRPORT West Apron Fill $0.00 $1,000,000.00 $0.00 $1,000,000.00

111 HAMMOND NORTHSHORE REGIONAL AIRPORT

Runway 13/31 Obstruction Removal $0.00 $100,000.00 $0.00 $100,000.00

112 LOUISIANA REGIONAL AIRPORT Midfield Apron Expansion - Phase II (Construction) $0.00 $540,000.00 $0.00 $540,000.00

113 VIVIAN AIRPORT Construct Teacup Taxiways $990,000.00 $110,000.00 $0.00 $1,100,000.00

114 ABBEVILLE CHRIS CRUSTA MEMORIAL AIRPORT

Rehabilitate Runway & Partial Taxiway (Phase I - Design) $55,800.00 $6,200.00 $0.00 $62,000.00

115 GEORGE R. CARR MEMORIAL AIRPORT Construct Parallel Taxiway - Phase III $990,000.00 $110,000.00 $0.00 $1,100,000.00

116 LOUISIANA REGIONAL AIRPORT South Apron Expansion - Phase III (Design/Construction) $0.00 $750,000.00 $0.00 $750,000.00

117 GEORGE R. CARR MEMORIAL AIRPORT Design Parallel Taxiway - Phase III $171,000.00 $19,000.00 $0.00 $190,000.00

118 LEESVILLE AIRPORT Construct Parallel Taxiway - Phase II $1,296,000.00 $144,000.00 $0.00 $1,440,000.00

119 FALSE RIVER REGIONAL AIRPORT 7 Row T-Hangars $0.00 $430,000.00 $20,000.00 $450,000.00

120 ACADIANA REGIONAL AIRPORT GA Taxiway Rehabilitation - Phase I (Design) $0.00 $100,000.00 $0.00 $100,000.00

Friday, March 24, 2017 Page 29 of 62General Aviation Capital Outlay

Page 57: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

121 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

T-Hangars $0.00 $500,000.00 $300,000.00 $800,000.00

122 ST TAMMANY REGIONAL AIRPORT Apron Extension - Phase II (Construction) $0.00 $1,149,591.00 $0.00 $1,149,591.00

123 ALLEN PARISH AIRPORT Install Perimeter Fence - Phase II (Construction) $0.00 $550,000.00 $0.00 $550,000.00

124 HOMER MUNICIPAL AIRPORT Rehabilitate Runway - Phase III $1,016,325.00 $112,925.00 $0.00 $1,129,250.00

125 ACADIANA REGIONAL AIRPORT Peimeter/Emergency Access Road - Phase II (Construction)

$675,000.00 $75,000.00 $0.00 $750,000.00

126 VICKSBURG-TALLULAH REGIONAL AIRPORT

Runway Extension - Phase I $378,000.00 $42,000.00 $0.00 $420,000.00

127 ST JOHN THE BAPTIST PARISH AIRPORT Runway Rehabilitation - Preliminary Evaluation $0.00 $75,000.00 $0.00 $75,000.00

128 LOUISIANA REGIONAL AIRPORT MALSAR Installation (Design and Construction) $0.00 $630,000.00 $0.00 $630,000.00

129 VICKSBURG-TALLULAH REGIONAL AIRPORT

Runway Extension - Phase II $5,355,000.00 $595,000.00 $0.00 $5,950,000.00

130 CONCORDIA PARISH AIRPORT Runway Extension - Phase I $123,750.00 $13,750.00 $0.00 $137,500.00

131 ACADIANA REGIONAL AIRPORT Heavy Jet Apron Rehabilitation - Phase I (Design) $810,000.00 $90,000.00 $0.00 $900,000.00

132 NEW ORLEANS LAKEFRONT AIRPORT Construct Perimeter Road (around Runway 27 ) with AOA Fence Relocation

$187,105.00 $20,789.00 $0.00 $207,894.00

Friday, March 24, 2017 Page 30 of 62General Aviation Capital Outlay

Page 58: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

133 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway Connector A3 Rehab $0.00 $410,000.00 $0.00 $410,000.00

134 NEW ORLEANS LAKEFRONT AIRPORT Reconstruct North Seawall - Phase I $5,700,000.00 $633,333.00 $0.00 $6,333,333.00

135 BYERLEY AIRPORT Obstruction Removal Phase III $0.00 $250,000.00 $0.00 $250,000.00

136 NEW ORLEANS LAKEFRONT AIRPORT Reconstruct West Seawall - Phase I $4,750,000.00 $527,778.00 $0.00 $5,277,778.00

137 CONCORDIA PARISH AIRPORT Taxiway Extension - Phase I $56,250.00 $6,250.00 $0.00 $62,500.00

138 SHREVEPORT DOWNTOWN AIRPORT Runway 5/23 Extension/Shift- Construction Phase II $13,500,000.00 $1,500,000.00 $0.00 $15,000,000.00

139 ST LANDRY PARISH-AHART FIELD Runway 18-36 Lighting Rehabilitation $360,000.00 $40,000.00 $0.00 $400,000.00

140 RUSTON REGIONAL AIRPORT Construct Taxilanes and T Hangars - Phase III (Construction)

$0.00 $400,000.00 $0.00 $400,000.00

141 PINEVILLE MUNICIPAL AIRPORT Construct Hangars $0.00 $332,850.00 $0.00 $332,850.00

142 ST JOHN THE BAPTIST PARISH AIRPORT Construct South Aircraft Parking Apron $427,282.00 $47,476.00 $0.00 $474,758.00

143 ST JOHN THE BAPTIST PARISH AIRPORT Runway 17 Threshold Recovery/Runway Widening/Runway Overlay - Phase II (Construction)

$2,393,135.00 $265,904.00 $0.00 $2,659,039.00

144 EUNICE AIRPORT New Aircraft Hangars - Phase II (Construction) $900,000.00 $100,000.00 $0.00 $1,000,000.00

Friday, March 24, 2017 Page 31 of 62General Aviation Capital Outlay

Page 59: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

145 JENNINGS AIRPORT Rehabilitate Runway 8/26 $292,500.00 $32,500.00 $0.00 $325,000.00

146 HARRY P. WILLIAMS MEMORIAL AIRPORT Runway Safety Area Improvements $150,000.00 $16,667.00 $0.00 $166,667.00

147 HARRY P. WILLIAMS MEMORIAL AIRPORT Rehab Public Heliport $0.00 $40,000.00 $0.00 $40,000.00

148 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Taxiway and Apron Seal Coat $121,500.00 $13,500.00 $0.00 $135,000.00

149 TENSAS PARISH AIRPORT Fuel Farm $0.00 $100,000.00 $20,000.00 $120,000.00

150 HART AIRPORT Construct T-Hangars $0.00 $280,000.00 $20,000.00 $300,000.00

151 WELSH AIRPORT Rehabilitate Airfield Lighting - Phase II (Construction) $0.00 $475,000.00 $0.00 $475,000.00

152 C.E. (RUSTY) WILLIAMS AIRPORT Design/Construct T-Hangars $0.00 $0.00 $800,000.00 $800,000.00

153 ESLER REGIONAL AIRPORT Perimeter Drainage Rehabilitation (Design) $0.00 $100,000.00 $0.00 $100,000.00

154 CHENNAULT INTERNATIONAL AIRPORT Apron Rehab - PCI Upgrade $285,000.00 $31,667.00 $0.00 $316,667.00

155 HARRY P. WILLIAMS MEMORIAL AIRPORT Runway Rehabilitation $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

156 NATCHITOCHES REGIONAL AIRPORT Construct 10-Unit T-Hangar & Box Hangar $0.00 $650,000.00 $0.00 $650,000.00

Friday, March 24, 2017 Page 32 of 62General Aviation Capital Outlay

Page 60: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

157 ACADIANA REGIONAL AIRPORT Runway 17/35 Extension - Phase I (Design) $0.00 $500,000.00 $0.00 $500,000.00

158 HARRY P. WILLIAMS MEMORIAL AIRPORT Rehabilitate North Apron - Phase I (Design) $0.00 $35,000.00 $0.00 $35,000.00

159 SOUTHLAND FIELD Rehabilitate 15/33 $225,000.00 $25,000.00 $0.00 $250,000.00

160 LOUISIANA REGIONAL AIRPORT North T-Hangar Development - Phase II (Apron) $0.00 $877,000.00 $0.00 $877,000.00

161 C.E. (RUSTY) WILLIAMS AIRPORT Design/Construct Airfield Lighting System Improvements and New Electrical Vault

$0.00 $500,000.00 $500,000.00 $1,000,000.00

162 LOUISIANA REGIONAL AIRPORT North T-Hangar Development - Phase III (Hangars) $0.00 $860,000.00 $20,000.00 $880,000.00

163 HAMMOND NORTHSHORE REGIONAL AIRPORT

Rehab MITL $243,000.00 $27,000.00 $0.00 $270,000.00

164 FALSE RIVER REGIONAL AIRPORT Land Acquisition of 10 acres +/- for Preservation/Expansion with Perimeter Fencing

$0.00 $750,000.00 $0.00 $750,000.00

165 SLIDELL AIRPORT LED Lighting Conversion $570,000.00 $63,333.00 $0.00 $633,333.00

166 ESLER REGIONAL AIRPORT Rehabilitate Runway 14/32 (Construction) $492,840.00 $54,760.00 $0.00 $547,600.00

167 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway E Improvements $0.00 $445,000.00 $0.00 $445,000.00

168 HAMMOND NORTHSHORE REGIONAL AIRPORT

Taxiway E Improvements - Phase I (Design) $0.00 $75,000.00 $0.00 $75,000.00

Friday, March 24, 2017 Page 33 of 62General Aviation Capital Outlay

Page 61: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

169 LOUISIANA REGIONAL AIRPORT North T-Hangar Development - Phase I (Environmental) $0.00 $100,000.00 $0.00 $100,000.00

170 SHREVEPORT DOWNTOWN AIRPORT Construct Seaplane Lane & Taxiway $4,500,000.00 $500,000.00 $0.00 $5,000,000.00

171 SHREVEPORT DOWNTOWN AIRPORT Design Sea Lane and Sea Taxiway $0.00 $150,000.00 $0.00 $150,000.00

172 LOUISIANA REGIONAL AIRPORT Land Acquisition for RPZ Expansion $0.00 $900,000.00 $0.00 $900,000.00

173 JOHN H.HOOKS JR. MEMORIAL Construct Hangar Access Taxiway Phase II $540,000.00 $60,000.00 $0.00 $600,000.00

174 ST JOHN THE BAPTIST PARISH AIRPORT East Side Levee Relocation - Phase I (Environmental) $241,200.00 $26,800.00 $0.00 $268,000.00

175 BEAUREGARD REGIONAL AIRPORT Rehabilitate Runway 18/36 $210,000.00 $23,333.00 $0.00 $233,333.00

176 NEW ORLEANS LAKEFRONT AIRPORT Runway 36L/18R Extension $18,000,000.00 $2,000,000.00 $0.00 $20,000,000.00

177 LE MAIRE MEMORIAL AIRPORT Runway Overlay - Phase II (Construction) $0.00 $740,595.00 $0.00 $740,595.00

178 C.E. (RUSTY) WILLIAMS AIRPORT Access Road and Parking $0.00 $100,000.00 $0.00 $100,000.00

179 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension - Phase III (Construction) $1,728,000.00 $192,000.00 $0.00 $1,920,000.00

180 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension - Phase II (Environmental) $162,000.00 $0.00 $0.00 $162,000.00

Friday, March 24, 2017 Page 34 of 62General Aviation Capital Outlay

Page 62: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

181 ST JOHN THE BAPTIST PARISH AIRPORT Taxiway Relocation and Widening - Phase II $855,000.00 $95,000.00 $0.00 $950,000.00

182 ST JOHN THE BAPTIST PARISH AIRPORT Taxiway Relocation and Widening - Phase I $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

183 ST JOHN THE BAPTIST PARISH AIRPORT East Side Levee Relocation - Phase II (Design/Construction)

$2,700,000.00 $300,000.00 $0.00 $3,000,000.00

184 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Taxiway A $2,115,000.00 $235,000.00 $0.00 $2,350,000.00

185 BUNKIE MUNICIPAL AIRPORT Runway Rehabilitation $0.00 $400,000.00 $0.00 $400,000.00

186 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Access Road - Phase II $0.00 $400,000.00 $0.00 $400,000.00

187 NEW ORLEANS LAKEFRONT AIRPORT Construct New East Apron $3,600,000.00 $400,000.00 $0.00 $4,000,000.00

188 C.E. (RUSTY) WILLIAMS AIRPORT Seal Coat Runway and Taxiways $0.00 $150,000.00 $0.00 $150,000.00

189 DE QUINCY INDUSTRIAL AIRPARK Rehabilitate Runway - Phase I (Design) $74,250.00 $8,250.00 $0.00 $82,500.00

190 SPRINGHILL AIRPORT Acquire Hangar $0.00 $85,000.00 $85,000.00 $170,000.00

191 HART AIRPORT Construct T-Hangar $0.00 $300,000.00 $36,000.00 $336,000.00

192 MARKSVILLE MUNICIPAL AIRPORT Agriculture Apron Improvements - Phase II (Construction) $0.00 $520,000.00 $0.00 $520,000.00

Friday, March 24, 2017 Page 35 of 62General Aviation Capital Outlay

Page 63: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

193 C.E. (RUSTY) WILLIAMS AIRPORT Corporate Hangar $0.00 $2,000,000.00 $0.00 $2,000,000.00

194 NEW ORLEANS LAKEFRONT AIRPORT Rehabilitate Flood Wall $18,000,000.00 $2,000,000.00 $0.00 $20,000,000.00

195 PINEVILLE MUNICIPAL AIRPORT Mill & Overlay Aircraft Apron $0.00 $565,141.00 $0.00 $565,141.00

196 ST JOHN THE BAPTIST PARISH AIRPORT Airport Security/Wildlife Fence $540,000.00 $60,000.00 $0.00 $600,000.00

197 BEAUREGARD REGIONAL AIRPORT Rehabilitate Runway 14/32 $210,000.00 $23,333.00 $0.00 $233,333.00

198 JENNINGS AIRPORT Install Taxiway Lighting $429,300.00 $47,700.00 $0.00 $477,000.00

199 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Taxiway Pavement Strengthening - Phase I (Design) $270,000.00 $30,000.00 $0.00 $300,000.00

200 JONESVILLE MUNICIPAL AIRPORT Rehabilitate Aprons - Phase II $332,500.00 $36,944.00 $0.00 $369,444.00

201 JENNINGS AIRPORT North Apron Development - Phase I (Design) $0.00 $70,000.00 $0.00 $70,000.00

202 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Runway Pavement Strengthening - Phase I (Design) $0.00 $350,000.00 $0.00 $350,000.00

203 SOUTHLAND FIELD Clear Airspace - Phase 1 (Environmental) $99,000.00 $11,000.00 $0.00 $110,000.00

204 JENNINGS AIRPORT Approach Lights for Runway 8/26 (ODALS) $242,105.00 $26,901.00 $0.00 $269,006.00

Friday, March 24, 2017 Page 36 of 62General Aviation Capital Outlay

Page 64: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

205 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Runway LED Upgrades $0.00 $50,000.00 $0.00 $50,000.00

206 ESLER REGIONAL AIRPORT GA Apron Strengthening and Expansion $150,000.00 $200,000.00 $0.00 $350,000.00

207 JONESBORO AIRPORT Parallel Taxiway - Phase II (Construction) $405,000.00 $45,000.00 $0.00 $450,000.00

208 CONCORDIA PARISH AIRPORT Relocate Signage/Markings $0.00 $25,000.00 $0.00 $25,000.00

209 VICKSBURG-TALLULAH REGIONAL AIRPORT

Taxiway Lighting - Phase I $0.00 $35,000.00 $0.00 $35,000.00

210 NATCHITOCHES REGIONAL AIRPORT Repair Hangar Taxilanes $0.00 $125,000.00 $0.00 $125,000.00

211 DE QUINCY INDUSTRIAL AIRPARK Overlay Taxiway and South Apron $562,500.00 $62,500.00 $0.00 $625,000.00

212 JENA AIRPORT Fuel Farm Installation $0.00 $65,000.00 $20,000.00 $85,000.00

213 NATCHITOCHES REGIONAL AIRPORT Construct Partial Parallel Taxiway $405,000.00 $45,000.00 $0.00 $450,000.00

214 NEW ORLEANS LAKEFRONT AIRPORT Construct Parallel Taxiway $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

215 CHENNAULT INTERNATIONAL AIRPORT Perimeter Fence Rehabilitation $0.00 $400,000.00 $0.00 $400,000.00

216 ST JOHN THE BAPTIST PARISH AIRPORT Construct Aircraft Parking Apron $1,475,000.00 $913,889.00 $66,168.00 $2,455,057.00

Friday, March 24, 2017 Page 37 of 62General Aviation Capital Outlay

Page 65: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

217 FRANKLINTON AIRPORT Perimeter Fencing Phase II $0.00 $300,000.00 $0.00 $300,000.00

218 ALLEN PARISH AIRPORT Widen Runway 18/36 $2,070,000.00 $230,000.00 $0.00 $2,300,000.00

219 KELLY-DUMAS Instrument Approach Survey $0.00 $85,000.00 $0.00 $85,000.00

220 RUSTON REGIONAL AIRPORT Rehabilitate Runway - Phase I $153,000.00 $17,000.00 $0.00 $170,000.00

221 ST JOHN THE BAPTIST PARISH AIRPORT T-Hangar Access Taxiway $0.00 $250,000.00 $0.00 $250,000.00

222 LEESVILLE AIRPORT Airfield Lighting Improvements $0.00 $250,000.00 $0.00 $250,000.00

223 BEAUREGARD REGIONAL AIRPORT Runway 18/36 Approach Lighting Improvements $855,117.00 $95,013.00 $0.00 $950,130.00

224 ST JOHN THE BAPTIST PARISH AIRPORT Apron Lighting $0.00 $75,000.00 $0.00 $75,000.00

225 LEESVILLE AIRPORT Extend Runway 18/36 - Phase I (Design) $108,000.00 $12,000.00 $0.00 $120,000.00

226 RUSTON REGIONAL AIRPORT Construct SSALR $0.00 $800,000.00 $0.00 $800,000.00

227 JONESBORO AIRPORT Fuel Farm $0.00 $110,000.00 $20,000.00 $130,000.00

228 MOREHOUSE MEMORIAL AIRPORT Apron Rehabilitation $292,500.00 $32,500.00 $0.00 $325,000.00

Friday, March 24, 2017 Page 38 of 62General Aviation Capital Outlay

Page 66: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

229 CONCORDIA PARISH AIRPORT Rehabilitate Southwest Apron - Phase I $71,250.00 $7,917.00 $0.00 $79,167.00

230 FALSE RIVER REGIONAL AIRPORT Perimeter Fencing of Runway 18 RPZ (5.0 acres) and Grading with Access Dr.

$279,000.00 $31,000.00 $0.00 $310,000.00

231 LE GROS MEMORIAL AIRPORT Parallel Taxiway for Runway 4-22 $2,047,500.00 $227,500.00 $0.00 $2,275,000.00

232 LEESVILLE AIRPORT Construct Parallel Taxiway - Phase I $0.00 $160,000.00 $0.00 $160,000.00

233 NATCHITOCHES REGIONAL AIRPORT Relocate Road Around Localizer $0.00 $750,000.00 $0.00 $750,000.00

234 ST TAMMANY REGIONAL AIRPORT Parallel Taxiway $3,316,590.00 $368,510.00 $0.00 $3,685,100.00

235 ESLER REGIONAL AIRPORT Rehabilitate Taxiways (Construction) $350,661.00 $38,962.00 $0.00 $389,623.00

236 NATCHITOCHES REGIONAL AIRPORT Complete Parallel Taxiway B $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

237 ACADIANA REGIONAL AIRPORT Construct Hangar $0.00 $350,000.00 $0.00 $350,000.00

238 GEORGE R. CARR MEMORIAL AIRPORT Runway 18-36 and Parking Apron Pavement Improvement $1,980,000.00 $220,000.00 $0.00 $2,200,000.00

239 NATCHITOCHES REGIONAL AIRPORT Construct Hammer Head for Runway 7 $0.00 $350,000.00 $0.00 $350,000.00

240 THIBODAUX MUNICIPAL AIRPORT Drainage Rehabilitation - Phase II (Construction) $643,500.00 $71,500.00 $0.00 $715,000.00

Friday, March 24, 2017 Page 39 of 62General Aviation Capital Outlay

Page 67: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

241 FELICIANA AIRPARK Install Runway Lighting $0.00 $186,000.00 $0.00 $186,000.00

242 MINDEN AIRPORT Construct Apron Expansion, Connector Taxiway, and Access Road Extension

$0.00 $0.00 $0.00 $0.00

243 FELICIANA AIRPARK Extend Runway 15/33 $0.00 $136,000.00 $0.00 $136,000.00

244 FALSE RIVER REGIONAL AIRPORT Taxiway Lighting to Terminal Area and T-Hangar Area $0.00 $50,000.00 $0.00 $50,000.00

245 ST JOHN THE BAPTIST PARISH AIRPORT GA Hangar Phase II $0.00 $0.00 $523,000.00 $523,000.00

246 MINDEN AIRPORT Design/Construct Apron Expansion Phase II, Connector Taxiway, and Access Road Extension

$1,800,000.00 $200,000.00 $0.00 $2,000,000.00

247 ST TAMMANY REGIONAL AIRPORT Apron Extension - Phase I (Design) $0.00 $146,000.00 $0.00 $146,000.00

248 TENSAS PARISH AIRPORT Environmental Assessment for Runway Extension $0.00 $175,000.00 $0.00 $175,000.00

249 TENSAS PARISH AIRPORT Design Runway Extension $0.00 $150,000.00 $0.00 $150,000.00

250 ST JOHN THE BAPTIST PARISH AIRPORT GA Hangar Phase III $0.00 $0.00 $536,000.00 $536,000.00

251 ALLEN PARISH AIRPORT Rehabilitate North Apron Drainage $0.00 $480,000.00 $0.00 $480,000.00

252 NATCHITOCHES REGIONAL AIRPORT Replace AWOS III P/T $0.00 $200,000.00 $0.00 $200,000.00

Friday, March 24, 2017 Page 40 of 62General Aviation Capital Outlay

Page 68: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

253 HART AIRPORT Runway Extension - Phase II (Road Relocation) $0.00 $800,000.00 $0.00 $800,000.00

254 CHENNAULT INTERNATIONAL AIRPORT Taxiway Delta Realignment $2,700,000.00 $300,000.00 $0.00 $3,000,000.00

255 CONCORDIA PARISH AIRPORT Construct T-Hangar Taxilane $0.00 $500,000.00 $0.00 $500,000.00

256 HART AIRPORT Runway Extension - Phase III (Extend Runway) $0.00 $800,000.00 $0.00 $800,000.00

257 LE GROS MEMORIAL AIRPORT LPV Survey $61,750.00 $6,861.00 $0.00 $68,611.00

258 ST JOHN THE BAPTIST PARISH AIRPORT T-Hangar Development - Phase I $0.00 $580,800.00 $913,100.00 $1,493,900.00

259 HARRY P. WILLIAMS MEMORIAL AIRPORT Rehabilitate Segmented Circle $0.00 $7,500.00 $0.00 $7,500.00

260 GEORGE R. CARR MEMORIAL AIRPORT Install Additional Fencing $0.00 $390,000.00 $0.00 $390,000.00

261 HART AIRPORT Design Parallel Taxiway $0.00 $200,000.00 $0.00 $200,000.00

262 NEW ORLEANS LAKEFRONT AIRPORT Expand ARFF Building $1,350,000.00 $150,000.00 $0.00 $1,500,000.00

263 PINEVILLE MUNICIPAL AIRPORT Construct South Apron Extension $0.00 $265,352.00 $0.00 $265,352.00

264 ALLEN PARISH AIRPORT Install Perimeter Fence - Phase I $0.00 $22,500.00 $0.00 $22,500.00

Friday, March 24, 2017 Page 41 of 62General Aviation Capital Outlay

Page 69: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

265 ACADIANA REGIONAL AIRPORT Perimeter/Emergency Access Road - Phase I (Design) $288,000.00 $32,000.00 $0.00 $320,000.00

266 RUSTON REGIONAL AIRPORT Design Runway & Taxiways Rehabilitation $0.00 $50,000.00 $0.00 $50,000.00

267 HART AIRPORT Construct Parallel Taxiway $0.00 $2,000,000.00 $0.00 $2,000,000.00

268 FRANKLINTON AIRPORT Hangar Taxilane - Phase II (Construction) $0.00 $300,000.00 $0.00 $300,000.00

269 LEESVILLE AIRPORT Install Perimeter Fence $360,000.00 $40,000.00 $0.00 $400,000.00

270 ST TAMMANY REGIONAL AIRPORT Perimeter Fence $0.00 $531,400.00 $0.00 $531,400.00

271 CONCORDIA PARISH AIRPORT Runway Extension - Preliminary $60,750.00 $6,750.00 $0.00 $67,500.00

272 VICKSBURG-TALLULAH REGIONAL AIRPORT

Rehabilitate Apron $120,000.00 $13,333.00 $0.00 $133,333.00

273 DE QUINCY INDUSTRIAL AIRPARK Apron Expansion $1,719,068.00 $191,008.00 $0.00 $1,910,076.00

274 C.E. (RUSTY) WILLIAMS AIRPORT Construct Runway Overlay $0.00 $0.00 $750,000.00 $750,000.00

275 JENA AIRPORT Apron Rehabilitation - Phase III $0.00 $280,000.00 $0.00 $280,000.00

276 ALLEN PARISH AIRPORT Installation of Approach Lights $0.00 $750,000.00 $0.00 $750,000.00

Friday, March 24, 2017 Page 42 of 62General Aviation Capital Outlay

Page 70: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

277 MOREHOUSE MEMORIAL AIRPORT Rehabilitate Runway - Phase I $57,000.00 $6,333.00 $0.00 $63,333.00

278 ST TAMMANY REGIONAL AIRPORT Beacon Relocation $0.00 $66,950.00 $0.00 $66,950.00

279 RED RIVER PARISH AIRPORT Construct New Apron, Connecting Taxiway, and Taxilanes $0.00 $2,200,000.00 $0.00 $2,200,000.00

280 HOMER MUNICIPAL AIRPORT Apron Rehabilitation Phase II $0.00 $175,000.00 $0.00 $175,000.00

281 COLUMBIA AIRPORT Construct New Runway - Phase I $0.00 $350,000.00 $0.00 $350,000.00

282 BUNKIE MUNICIPAL AIRPORT Perimeter Fencing $0.00 $267,400.00 $0.00 $267,400.00

283 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Master Plan Update $225,000.00 $25,000.00 $0.00 $250,000.00

284 COLUMBIA AIRPORT Construct Runway - Preliminary $0.00 $175,000.00 $0.00 $175,000.00

285 ST LANDRY PARISH-AHART FIELD T-Hangars $246,600.00 $27,400.00 $0.00 $274,000.00

286 NATCHITOCHES REGIONAL AIRPORT Construct Agricultural Ramp & Wash Rack $0.00 $325,000.00 $0.00 $325,000.00

287 RUSTON REGIONAL AIRPORT Construct Taxilanes and T Hangars - Phase I (Design) $0.00 $75,000.00 $0.00 $75,000.00

288 ST JOHN THE BAPTIST PARISH AIRPORT New Terminal Building and Apron $0.00 $2,800,000.00 $0.00 $2,800,000.00

Friday, March 24, 2017 Page 43 of 62General Aviation Capital Outlay

Page 71: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

289 ST JOHN THE BAPTIST PARISH AIRPORT GA Hangar $0.00 $700,000.00 $0.00 $700,000.00

290 LE GROS MEMORIAL AIRPORT Installation of Runway 13-31 Lighting $0.00 $383,600.00 $0.00 $383,600.00

291 EUNICE AIRPORT New Aircraft Hangars - Phase I (Design) $90,000.00 $10,000.00 $0.00 $100,000.00

292 LEESVILLE AIRPORT GA Development Area - Taxilanes and Drainage $0.00 $217,100.00 $0.00 $217,100.00

293 UNION PARISH AIRPORT Parallel Taxiway Extension - Phase II $1,125,000.00 $125,000.00 $0.00 $1,250,000.00

294 THIBODAUX MUNICIPAL AIRPORT Airport Terminal $0.00 $1,000,000.00 $0.00 $1,000,000.00

295 CONCORDIA PARISH AIRPORT Taxiway Extension - Preliminary $60,750.00 $6,750.00 $0.00 $67,500.00

296 CHENNAULT INTERNATIONAL AIRPORT Land Aquisition - Phase I $0.00 $900,000.00 $0.00 $900,000.00

297 CHENNAULT INTERNATIONAL AIRPORT Land Acquistion Adjacent to Taxiway G $9,025,000.00 $1,002,778.00 $0.00 $10,027,778.00

298 BEAUREGARD REGIONAL AIRPORT Construct T-Hangar Taxilanes $1,352,502.00 $150,278.00 $0.00 $1,502,780.00

299 NATCHITOCHES REGIONAL AIRPORT Construct Taxilanes for T-Hangars $450,000.00 $50,000.00 $0.00 $500,000.00

300 CHENNAULT INTERNATIONAL AIRPORT Perimeter Road Rehabilitation $0.00 $750,000.00 $0.00 $750,000.00

Friday, March 24, 2017 Page 44 of 62General Aviation Capital Outlay

Page 72: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

301 PINEVILLE MUNICIPAL AIRPORT East Access Road and Site Improvements $0.00 $200,000.00 $0.00 $200,000.00

302 COLUMBIA AIRPORT Construct Apron and Taxiway Stub - Phase I $0.00 $60,000.00 $0.00 $60,000.00

303 VIVIAN AIRPORT Construct Apron - Phase I Design $0.00 $60,000.00 $0.00 $60,000.00

304 COLUMBIA AIRPORT Construct AG Apron $0.00 $231,000.00 $0.00 $231,000.00

305 FALSE RIVER REGIONAL AIRPORT Hangars - 5 Box $0.00 $1,500,000.00 $0.00 $1,500,000.00

306 RUSTON REGIONAL AIRPORT Construct Hangar Taxiways - Phase II $1,170,000.00 $130,000.00 $0.00 $1,300,000.00

307 JOHN H.HOOKS JR. MEMORIAL Design & Environmental for Runway & Taxiway Extension $152,000.00 $16,889.00 $0.00 $168,889.00

308 KELLY-DUMAS Construct Parallel Taxiway - Phase III $2,280,000.00 $120,000.00 $0.00 $2,400,000.00

309 ALLEN PARISH AIRPORT Construct Hangars $0.00 $750,000.00 $0.00 $750,000.00

310 TENSAS PARISH AIRPORT Apron Expansion - Phase II $0.00 $450,000.00 $0.00 $450,000.00

311 RED RIVER PARISH AIRPORT Construct Parallel Taxiway $1,100,000.00 $122,222.00 $0.00 $1,222,222.00

312 NATCHITOCHES REGIONAL AIRPORT Acquire Land for Runway 25 Runway Protection Zone $94,500.00 $10,500.00 $0.00 $105,000.00

Friday, March 24, 2017 Page 45 of 62General Aviation Capital Outlay

Page 73: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

313 THIBODAUX MUNICIPAL AIRPORT Midfield Connector Taxiway $216,900.00 $24,100.00 $0.00 $241,000.00

314 SPRINGHILL AIRPORT Design Taxilanes for T-Hangar Development Area $67,500.00 $7,500.00 $0.00 $75,000.00

315 COLUMBIA AIRPORT Perimeter Fencing $0.00 $356,200.00 $0.00 $356,200.00

316 ESLER REGIONAL AIRPORT Perimeter Drainage Rehabilitation (Construction) $450,000.00 $50,000.00 $0.00 $500,000.00

317 VIVIAN AIRPORT AGIS Survey for New Runway/Extension $0.00 $80,000.00 $0.00 $80,000.00

318 ESLER REGIONAL AIRPORT Access Road and Security Checkpoints $1,080,000.00 $120,000.00 $0.00 $1,200,000.00

319 ST TAMMANY REGIONAL AIRPORT Small Scale Master Plan Update $150,000.00 $16,667.00 $0.00 $166,667.00

320 VIVIAN AIRPORT Land Acquisition for New Runway 9/27 $0.00 $350,000.00 $0.00 $350,000.00

321 GEORGE R. CARR MEMORIAL AIRPORT Hangar $0.00 $700,000.00 $0.00 $700,000.00

322 VIVIAN AIRPORT Site Preparation for New Runway 9/27 $2,227,500.00 $522,500.00 $0.00 $2,750,000.00

323 ESLER REGIONAL AIRPORT Construct T-Hangars $0.00 $373,258.00 $0.00 $373,258.00

324 KELLY-DUMAS Construct Apron (Phase III) $720,000.00 $80,000.00 $0.00 $800,000.00

Friday, March 24, 2017 Page 46 of 62General Aviation Capital Outlay

Page 74: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

325 TENSAS PARISH AIRPORT Perimeter Fencing Phase I $0.00 $250,000.00 $0.00 $250,000.00

326 ST TAMMANY REGIONAL AIRPORT 10 Unit T-Hangar Complex $0.00 $600,000.00 $0.00 $600,000.00

327 ESLER REGIONAL AIRPORT Rehabilitate Security Fencing & Gates $0.00 $108,977.00 $0.00 $108,977.00

328 GEORGE R. CARR MEMORIAL AIRPORT Apron Expansion $720,000.00 $80,000.00 $500,000.00 $1,300,000.00

329 VICKSBURG-TALLULAH REGIONAL AIRPORT

Construct T-Hangar Taxiway - Phase II $270,000.00 $30,000.00 $0.00 $300,000.00

330 ST TAMMANY REGIONAL AIRPORT Box Hangar $0.00 $600,000.00 $0.00 $600,000.00

331 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Fuel System Rehabilitation $0.00 $200,000.00 $0.00 $200,000.00

332 BUNKIE MUNICIPAL AIRPORT Agricultural Operations Apron $0.00 $304,800.00 $0.00 $304,800.00

333 FALSE RIVER REGIONAL AIRPORT Construction of Corporate Hangar $114,000.00 $12,667.00 $30,000.00 $156,667.00

334 LE GROS MEMORIAL AIRPORT New Terminal Building $0.00 $350,000.00 $0.00 $350,000.00

335 JONESBORO AIRPORT Design to Construct Agriculture Apron $51,319.00 $5,702.00 $0.00 $57,021.00

336 LEESVILLE AIRPORT Construct 6 T-Hangars $0.00 $350,000.00 $0.00 $350,000.00

Friday, March 24, 2017 Page 47 of 62General Aviation Capital Outlay

Page 75: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

337 COLUMBIA AIRPORT Install AWOS $0.00 $230,100.00 $0.00 $230,100.00

338 VIVIAN AIRPORT Construct New Runway 9/27 $1,822,500.00 $427,500.00 $0.00 $2,250,000.00

339 LE GROS MEMORIAL AIRPORT Construct Aviation Fuel System $0.00 $194,000.00 $0.00 $194,000.00

340 UNION PARISH AIRPORT Design Runway Extension $180,000.00 $20,000.00 $0.00 $200,000.00

341 TENSAS PARISH AIRPORT Acquire and Install AWOS $0.00 $200,000.00 $0.00 $200,000.00

342 JONESBORO AIRPORT Parallel Taxiway - Phase I (Design) $72,000.00 $8,000.00 $0.00 $80,000.00

343 BEAUREGARD REGIONAL AIRPORT RPZ Land Acquisition for Runway 18/36 And Obstruction Removal

$900,000.00 $100,000.00 $0.00 $1,000,000.00

344 MARKSVILLE MUNICIPAL AIRPORT Runway 4/22 Extension - Phase I (Design) $130,500.00 $14,500.00 $0.00 $145,000.00

345 JOHN H.HOOKS JR. MEMORIAL New East Apron - Phase II $475,000.00 $52,778.00 $0.00 $527,778.00

346 MOREHOUSE MEMORIAL AIRPORT 1000 Foot Runway Extension $1,000,000.00 $111,111.00 $0.00 $1,111,111.00

347 FRANKLINTON AIRPORT Hangar Taxilane - Phase I (Design) $0.00 $50,000.00 $0.00 $50,000.00

348 JOHN H.HOOKS JR. MEMORIAL New East Apron - Phase I $95,000.00 $10,556.00 $0.00 $105,556.00

Friday, March 24, 2017 Page 48 of 62General Aviation Capital Outlay

Page 76: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

349 BUNKIE MUNICIPAL AIRPORT Airport Terminal Building $0.00 $34,000.00 $0.00 $34,000.00

350 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Access Road - Phase I $0.00 $50,000.00 $0.00 $50,000.00

351 RED RIVER PARISH AIRPORT Design & Construct Fuel System $0.00 $225,000.00 $0.00 $225,000.00

352 RED RIVER PARISH AIRPORT Design & Construct Hangars for New Apron $0.00 $350,000.00 $0.00 $350,000.00

353 ARCADIA-BIENVILLE AIRPORT Design Hangar $0.00 $120,000.00 $0.00 $120,000.00

354 SOUTH LAFOURCHE LEONARD MILLER, JR. AIRPORT

Security Cameras $0.00 $60,000.00 $0.00 $60,000.00

355 THIBODAUX MUNICIPAL AIRPORT Renovate Terminal/FBO Hangar $0.00 $137,515.00 $0.00 $137,515.00

356 LE MAIRE MEMORIAL AIRPORT Apron Rehabilitation $0.00 $350,000.00 $0.00 $350,000.00

357 HARRY P. WILLIAMS MEMORIAL AIRPORT Update ALP/Convert to eALP $90,000.00 $10,000.00 $0.00 $100,000.00

358 FALSE RIVER REGIONAL AIRPORT Bury Powerlines - Runway 36 Approach $0.00 $250,000.00 $0.00 $250,000.00

359 LEESVILLE AIRPORT Access Road Rehabilitation $0.00 $75,000.00 $0.00 $75,000.00

360 VIVIAN AIRPORT Construct Box Hangars $0.00 $600,000.00 $0.00 $600,000.00

Friday, March 24, 2017 Page 49 of 62General Aviation Capital Outlay

Page 77: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

361 VIVIAN AIRPORT Environmental Assessment to Construct New Runway 9/27 $0.00 $150,000.00 $0.00 $150,000.00

362 ALLEN PARISH AIRPORT Construct T-Hangars $0.00 $300,000.00 $0.00 $300,000.00

363 VICKSBURG-TALLULAH REGIONAL AIRPORT

Construct T-hangars - Phase II $0.00 $0.00 $400,000.00 $400,000.00

364 BUNKIE MUNICIPAL AIRPORT Land Acquistion $0.00 $200,000.00 $0.00 $200,000.00

365 KELLY-DUMAS Design to Construct Apron (Phase II) $0.00 $40,000.00 $0.00 $40,000.00

366 HOMER MUNICIPAL AIRPORT Construct Runway Safety Area Improvements $0.00 $831,600.00 $0.00 $831,600.00

367 FELICIANA AIRPARK Temporary Runway Lighting $0.00 $51,600.00 $0.00 $51,600.00

368 HOMER MUNICIPAL AIRPORT Construct Perimeter Fence $0.00 $330,028.00 $0.00 $330,028.00

369 BUNKIE MUNICIPAL AIRPORT Airport Access Drive $0.00 $128,400.00 $0.00 $128,400.00

370 CONCORDIA PARISH AIRPORT Acquistion of Land $0.00 $100,000.00 $0.00 $100,000.00

371 JONESBORO AIRPORT Construct Hangars $0.00 $292,000.00 $8,000.00 $300,000.00

372 HOMER MUNICIPAL AIRPORT Construct Parallel Taxiway $0.00 $836,063.00 $0.00 $836,063.00

Friday, March 24, 2017 Page 50 of 62General Aviation Capital Outlay

Page 78: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

373 HOMER MUNICIPAL AIRPORT Design Parallel Taxiway $0.00 $51,188.00 $0.00 $51,188.00

374 BEAUREGARD REGIONAL AIRPORT Airport Layout Plan Update $0.00 $60,000.00 $0.00 $60,000.00

375 DAVID G. JOYCE AIRPORT Rehabilitate Apron - North Section $0.00 $250,000.00 $0.00 $250,000.00

376 HART AIRPORT Construct Apron Overlay $0.00 $165,000.00 $0.00 $165,000.00

377 JONESBORO AIRPORT Construct Hangars $0.00 $292,000.00 $8,000.00 $300,000.00

378 LIVINGSTON REGIONAL AIRPORT Construct Runway - Phase II $0.00 $1,000,000.00 $0.00 $1,000,000.00

379 RED RIVER PARISH AIRPORT Design Parallel Taxiway $180,000.00 $20,000.00 $0.00 $200,000.00

380 KELLY-DUMAS Install AWOS $0.00 $200,000.00 $0.00 $200,000.00

381 RED RIVER PARISH AIRPORT Design New Apron $54,000.00 $6,000.00 $0.00 $60,000.00

382 JOHN H.HOOKS JR. MEMORIAL Construct Hangar AccessTaxiway Phase I $58,500.00 $6,500.00 $0.00 $65,000.00

383 LE MAIRE MEMORIAL AIRPORT T-Hangar Complex $0.00 $400,000.00 $0.00 $400,000.00

384 THIBODAUX MUNICIPAL AIRPORT Resurface Terminal Building Parking Lot $150,000.00 $16,667.00 $0.00 $166,667.00

Friday, March 24, 2017 Page 51 of 62General Aviation Capital Outlay

Page 79: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

385 MOREHOUSE MEMORIAL AIRPORT Construct Hangars $315,000.00 $35,000.00 $0.00 $350,000.00

386 ST LANDRY PARISH-AHART FIELD Perimeter Fencing - Phase III (Construction) $345,150.00 $38,350.00 $0.00 $383,500.00

387 KELLY-DUMAS Construct Hangar $0.00 $280,000.00 $0.00 $280,000.00

388 MINDEN AIRPORT Rehabilitate Runway 1/19 (Construction) $810,000.00 $90,000.00 $0.00 $900,000.00

389 COLUMBIA AIRPORT Fuel Farm $0.00 $100,000.00 $0.00 $100,000.00

390 COLUMBIA AIRPORT Mitigate Wastewater Treatment Facility $0.00 $187,200.00 $0.00 $187,200.00

391 ST JOHN THE BAPTIST PARISH AIRPORT Construct 4-Unit Hangar Building $0.00 $307,700.00 $0.00 $307,700.00

392 COLUMBIA AIRPORT Property Acquisition $0.00 $370,000.00 $0.00 $370,000.00

393 LE MAIRE MEMORIAL AIRPORT Runway Extension $0.00 $250,000.00 $0.00 $250,000.00

394 TENSAS PARISH AIRPORT New T-Hangars $0.00 $500,000.00 $0.00 $500,000.00

395 TENSAS PARISH AIRPORT Terminal Building $0.00 $100,000.00 $0.00 $100,000.00

396 WELSH AIRPORT Rehabilitate Airfield Lighting - Phase I (Design) $0.00 $80,000.00 $0.00 $80,000.00

Friday, March 24, 2017 Page 52 of 62General Aviation Capital Outlay

Page 80: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

397 COLUMBIA AIRPORT Relocate Airport Access Road and Auto Parking - Phase II $0.00 $200,000.00 $0.00 $200,000.00

398 COLUMBIA AIRPORT Relocate Airport Access Road - Phase I $0.00 $40,000.00 $0.00 $40,000.00

399 TENSAS PARISH AIRPORT Land Acquisition (Phase II) $0.00 $350,000.00 $0.00 $350,000.00

400 JONESBORO AIRPORT Construct Agriculture Apron $450,000.00 $50,000.00 $0.00 $500,000.00

401 CONCORDIA PARISH AIRPORT Security Lighting for Main and T-Hangar Ramps $142,500.00 $15,833.00 $0.00 $158,333.00

402 UNION PARISH AIRPORT Land Acquisition for Taxilanes/Hangar Development $0.00 $150,000.00 $0.00 $150,000.00

403 NATCHITOCHES REGIONAL AIRPORT Wildlife Hazard Study $0.00 $75,000.00 $0.00 $75,000.00

404 GEORGE R. CARR MEMORIAL AIRPORT Ramp Overlay $0.00 $380,000.00 $0.00 $380,000.00

405 LE MAIRE MEMORIAL AIRPORT Ramp Expansion $0.00 $400,000.00 $0.00 $400,000.00

406 TENSAS PARISH AIRPORT Construct Access Road $0.00 $700,000.00 $0.00 $700,000.00

407 ST JOHN THE BAPTIST PARISH AIRPORT East Airfield Interior Access Road $0.00 $500,000.00 $0.00 $500,000.00

408 JOHN H.HOOKS JR. MEMORIAL Terminal Building - Phase I $95,000.00 $10,556.00 $0.00 $105,556.00

Friday, March 24, 2017 Page 53 of 62General Aviation Capital Outlay

Page 81: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

409 JOHN H.HOOKS JR. MEMORIAL New Fuel Farm $0.00 $50,000.00 $0.00 $50,000.00

410 CONCORDIA PARISH AIRPORT Construct T-Hangars $0.00 $425,000.00 $0.00 $425,000.00

411 JOHN H.HOOKS JR. MEMORIAL Terminal Building - Phase II $475,000.00 $52,778.00 $0.00 $527,778.00

412 MINDEN AIRPORT Airfield Lighting Rehabilitation (Construction) $0.00 $1,000,000.00 $0.00 $1,000,000.00

413 ARCADIA-BIENVILLE AIRPORT Construct Parallel Taxiway $0.00 $1,500,000.00 $0.00 $1,500,000.00

414 ARCADIA-BIENVILLE AIRPORT Design Parallel Taxiway $0.00 $100,000.00 $0.00 $100,000.00

415 KELLY-DUMAS Rehabilitate Access Road $150,000.00 $350,000.00 $0.00 $500,000.00

416 SPRINGHILL AIRPORT Construct Taxilanes for T-Hangar Development Area $675,000.00 $75,000.00 $0.00 $750,000.00

417 DAVID G. JOYCE AIRPORT Design Parallel Taxiway $0.00 $58,000.00 $0.00 $58,000.00

418 LE MAIRE MEMORIAL AIRPORT Perimeter Fence $0.00 $168,000.00 $0.00 $168,000.00

419 LIVINGSTON REGIONAL AIRPORT Construct Runway - Phase III $0.00 $1,000,000.00 $0.00 $1,000,000.00

420 PINEVILLE MUNICIPAL AIRPORT Relocate Hangars Behind Building Restriction Line $0.00 $752,512.00 $0.00 $752,512.00

Friday, March 24, 2017 Page 54 of 62General Aviation Capital Outlay

Page 82: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

421 GEORGE R. CARR MEMORIAL AIRPORT Construct Perimeter Road $855,000.00 $95,000.00 $0.00 $950,000.00

422 DAVID G. JOYCE AIRPORT Construct Parallel Taxiway - Apron to Midfield $0.00 $471,000.00 $0.00 $471,000.00

423 GEORGE R. CARR MEMORIAL AIRPORT Pave Auto Parking Lot $135,000.00 $15,000.00 $0.00 $150,000.00

424 ST TAMMANY REGIONAL AIRPORT Runway 18/36 Extension - Phase III (Construction) $2,713,842.00 $301,538.00 $0.00 $3,015,380.00

425 EUNICE AIRPORT Taxiway Extension (South) with Associated Lighting and Signage

$540,000.00 $60,000.00 $0.00 $600,000.00

426 ESLER REGIONAL AIRPORT Drainage Study $0.00 $22,200.00 $0.00 $22,200.00

427 TENSAS PARISH AIRPORT Parking Lot $0.00 $65,000.00 $0.00 $65,000.00

428 NATCHITOCHES REGIONAL AIRPORT Rehabilitation of Parallel Taxiway Lighting $0.00 $650,000.00 $0.00 $650,000.00

429 UNION PARISH AIRPORT Parallel Taxiway Extension - Phase I $135,000.00 $15,000.00 $0.00 $150,000.00

430 ARCADIA-BIENVILLE AIRPORT Perimeter Fencing - Phase I $0.00 $70,000.00 $0.00 $70,000.00

431 UNION PARISH AIRPORT Runway Extension $950,000.00 $105,556.00 $0.00 $1,055,556.00

432 DELHI MUNICIPAL AIRPORT Perimeter Fencing - Phase I $0.00 $40,000.00 $0.00 $40,000.00

Friday, March 24, 2017 Page 55 of 62General Aviation Capital Outlay

Page 83: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

433 ST TAMMANY REGIONAL AIRPORT Runway 18/36 Extension - Phase IV (Widening and Overlay)

$1,140,000.00 $126,667.00 $0.00 $1,266,667.00

434 RUSTON REGIONAL AIRPORT RehabilitateTaxiway - Phase II $135,000.00 $15,000.00 $0.00 $150,000.00

435 BYERLEY AIRPORT Rehabilitate Airfield Lighting $405,000.00 $45,000.00 $0.00 $450,000.00

436 EUNICE AIRPORT Relocate Perimeter Fence on East Property Line $54,000.00 $6,000.00 $0.00 $60,000.00

437 DE QUINCY INDUSTRIAL AIRPARK Construct Six T-Hangars with Taxilane $397,100.00 $44,122.00 $0.00 $441,222.00

438 RED RIVER PARISH AIRPORT Construct Terminal Building $400,000.00 $44,444.00 $0.00 $444,444.00

439 HOMER MUNICIPAL AIRPORT Construct Hangars $0.00 $272,816.00 $0.00 $272,816.00

440 ST LANDRY PARISH-AHART FIELD Apron Rehabilitation $0.00 $75,000.00 $0.00 $75,000.00

441 TENSAS PARISH AIRPORT Land Acquisition (Phase I) $0.00 $250,000.00 $0.00 $250,000.00

442 FRANKLINTON AIRPORT Land Acquisition $0.00 $100,000.00 $0.00 $100,000.00

443 BYERLEY AIRPORT Apron Rehabilitation $463,500.00 $51,500.00 $0.00 $515,000.00

444 HAMMOND NORTHSHORE REGIONAL AIRPORT

Runway 13/31 LPV Survey $0.00 $48,000.00 $0.00 $48,000.00

Friday, March 24, 2017 Page 56 of 62General Aviation Capital Outlay

Page 84: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

445 MARKSVILLE MUNICIPAL AIRPORT LPV Obstruction Survey $0.00 $60,000.00 $0.00 $60,000.00

446 DAVID G. JOYCE AIRPORT Construct Agricultural Apron $0.00 $267,000.00 $0.00 $267,000.00

447 NATCHITOCHES REGIONAL AIRPORT Runway 17/25 Extension- Phase I $0.00 $175,000.00 $0.00 $175,000.00

448 EUNICE AIRPORT Construct Ag Loading Area with Access Road $284,202.00 $31,578.00 $0.00 $315,780.00

449 DELHI MUNICIPAL AIRPORT Perimeter Fencing - Phase II $0.00 $50,000.00 $0.00 $50,000.00

450 SPRINGHILL AIRPORT Design/Construct 6 Unit T-Hangar $0.00 $350,000.00 $0.00 $350,000.00

451 DELHI MUNICIPAL AIRPORT Perimeter Fence - Phase III $0.00 $330,000.00 $0.00 $330,000.00

452 CONCORDIA PARISH AIRPORT Runway Extension - Phase II $787,500.00 $87,500.00 $0.00 $875,000.00

453 BEAUREGARD REGIONAL AIRPORT Drainage Rehabilitation - Phase III $0.00 $650,000.00 $0.00 $650,000.00

454 LE MAIRE MEMORIAL AIRPORT Land Acquisition $0.00 $150,000.00 $0.00 $150,000.00

455 WELSH AIRPORT Airfield Perimeter Fencing $0.00 $250,000.00 $0.00 $250,000.00

456 DAVID G. JOYCE AIRPORT Construct 4-Unit T-Hangar $0.00 $0.00 $442,000.00 $442,000.00

Friday, March 24, 2017 Page 57 of 62General Aviation Capital Outlay

Page 85: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

457 UNION PARISH AIRPORT Construct Taxiway Configuration Design $481,500.00 $53,500.00 $0.00 $535,000.00

458 UNION PARISH AIRPORT Design & Construct New Taxilanes $0.00 $500,000.00 $0.00 $500,000.00

459 JONESVILLE MUNICIPAL AIRPORT Hangar Replacement $360,000.00 $40,000.00 $0.00 $400,000.00

460 ARCADIA-BIENVILLE AIRPORT Construct Terminal $0.00 $300,000.00 $0.00 $300,000.00

461 NATCHITOCHES REGIONAL AIRPORT Rehabilitate Taxiway B $270,000.00 $30,000.00 $0.00 $300,000.00

462 KELLY-DUMAS Environmental Assessment to Construct Taxiway and Apron - Phase I

$67,500.00 $7,500.00 $0.00 $75,000.00

463 JENA AIRPORT Land Acquisition $0.00 $200,000.00 $0.00 $200,000.00

464 FRANKLINTON AIRPORT Airport Terminal $0.00 $32,000.00 $8,000.00 $40,000.00

465 LIVINGSTON REGIONAL AIRPORT Construct Runway - Phase I $0.00 $1,000,000.00 $0.00 $1,000,000.00

466 JENA AIRPORT Taxiway Lighting - Phase II $0.00 $250,000.00 $0.00 $250,000.00

467 ACADIANA REGIONAL AIRPORT Taxiway B Improvements - West $666,000.00 $74,000.00 $0.00 $740,000.00

468 UNION PARISH AIRPORT Construct Hangars $0.00 $650,000.00 $0.00 $650,000.00

Friday, March 24, 2017 Page 58 of 62General Aviation Capital Outlay

Page 86: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

469 COLUMBIA AIRPORT Terminal Building $0.00 $50,000.00 $0.00 $50,000.00

470 ST TAMMANY REGIONAL AIRPORT Extend Runway 18/36 - Phase II (Design) $229,500.00 $25,500.00 $0.00 $255,000.00

471 JONESVILLE MUNICIPAL AIRPORT Airport Layout Plan $67,500.00 $7,500.00 $0.00 $75,000.00

472 VIVIAN AIRPORT Site Selection from Previous ALP Update $112,500.00 $12,500.00 $0.00 $125,000.00

473 ARCADIA-BIENVILLE AIRPORT Construct Fuel Farm $0.00 $250,000.00 $0.00 $250,000.00

474 ST LANDRY PARISH-AHART FIELD Install Localizer Runway 18 $225,000.00 $25,000.00 $0.00 $250,000.00

475 WELSH AIRPORT T-Hangar $0.00 $400,000.00 $0.00 $400,000.00

476 DELHI MUNICIPAL AIRPORT Land Acquisition $0.00 $95,000.00 $0.00 $95,000.00

477 CONCORDIA PARISH AIRPORT Taxiway Extension - Phase II $787,500.00 $87,500.00 $0.00 $875,000.00

478 NATCHITOCHES REGIONAL AIRPORT Upgrade Localizer $0.00 $450,000.00 $0.00 $450,000.00

479 C.E. (RUSTY) WILLIAMS AIRPORT Taxiway Lighting System $0.00 $400,000.00 $0.00 $400,000.00

480 VICKSBURG-TALLULAH REGIONAL AIRPORT

Land Acquisition $697,500.00 $77,500.00 $0.00 $775,000.00

Friday, March 24, 2017 Page 59 of 62General Aviation Capital Outlay

Page 87: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

481 LEESVILLE AIRPORT AWOS/ASOS $180,000.00 $20,000.00 $0.00 $200,000.00

482 VIVIAN AIRPORT Construct Apron - Phase II Construction $575,000.00 $63,889.00 $0.00 $638,889.00

483 COLUMBIA AIRPORT Survey Approaches $0.00 $75,000.00 $0.00 $75,000.00

484 WINNSBORO MUNICIPAL AIRPORT Construct Entrance Drive, Gating & Erosion Control Measures for New Airport Site

$360,000.00 $40,000.00 $0.00 $400,000.00

485 WELSH AIRPORT Airport Layout Plan (ALP) $0.00 $80,000.00 $0.00 $80,000.00

486 DELHI MUNICIPAL AIRPORT Fuel Farm $0.00 $100,000.00 $0.00 $100,000.00

487 DELHI MUNICIPAL AIRPORT Update Airport Layout Plan (ALP) $0.00 $40,000.00 $0.00 $40,000.00

488 BYERLEY AIRPORT Fuel Farm $0.00 $50,000.00 $0.00 $50,000.00

489 WINNSBORO MUNICIPAL AIRPORT Site Selection & EA for new Airport $270,000.00 $30,000.00 $0.00 $300,000.00

490 WINNSBORO MUNICIPAL AIRPORT Master Planning for New Airport $270,000.00 $30,000.00 $0.00 $300,000.00

491 BYERLEY AIRPORT Construct New Shade Ports $450,000.00 $50,000.00 $0.00 $500,000.00

492 ARCADIA-BIENVILLE AIRPORT Construct Hangars $0.00 $500,000.00 $0.00 $500,000.00

Friday, March 24, 2017 Page 60 of 62General Aviation Capital Outlay

Page 88: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

493 CONCORDIA PARISH AIRPORT Construct Taxilane $0.00 $375,000.00 $0.00 $375,000.00

494 CONCORDIA PARISH AIRPORT Construct Segmented Circle $0.00 $30,000.00 $0.00 $30,000.00

495 JENA AIRPORT Taxiway Lighting $0.00 $25,000.00 $0.00 $25,000.00

496 NATCHITOCHES REGIONAL AIRPORT Relocate Fairgrounds Road Project - Phase I $0.00 $125,000.00 $0.00 $125,000.00

497 COLUMBIA AIRPORT Construct Access Taxilane $0.00 $290,400.00 $0.00 $290,400.00

498 RUSTON REGIONAL AIRPORT Taxiway Lighting $617,500.00 $68,611.00 $0.00 $686,111.00

499 PINEVILLE MUNICIPAL AIRPORT Airport Terminal $0.00 $25,000.00 $8,000.00 $33,000.00

500 JENA AIRPORT Taxiway A Extension - North - Phase III (Construction) $0.00 $400,000.00 $0.00 $400,000.00

501 JENA AIRPORT Taxiway A Extension - South - Phase II (Construction) $0.00 $1,275,000.00 $0.00 $1,275,000.00

502 KELLY-DUMAS Construct Parallel Taxiway - Phase II $0.00 $175,000.00 $0.00 $175,000.00

503 JENA AIRPORT Taxiway A Extension - Phase I $0.00 $18,000.00 $0.00 $180,000.00

504 JENA AIRPORT T-hangar Apron $0.00 $75,000.00 $0.00 $75,000.00

Friday, March 24, 2017 Page 61 of 62General Aviation Capital Outlay

Page 89: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Item Airport Project Description

Federal

Funds State Funds Local Other Total Funds

Airport Construction and Development Priority Program Unfunded 2019-2022General Aviation Capital Outlay

505 DAVID G. JOYCE AIRPORT Construct Parallel Taxiway - Midfield to Runway 09 $0.00 $508,000.00 $0.00 $508,000.00

506 COLUMBIA AIRPORT Construct New Runway - Phase II $0.00 $750,000.00 $0.00 $750,000.00

507 COLUMBIA AIRPORT Obstruction Removal-Phase II $0.00 $200,000.00 $0.00 $200,000.00

508 COLUMBIA AIRPORT Land Acquistion $0.00 $370,000.00 $0.00 $370,000.00

509 JENA AIRPORT Construct 4 T-hangars $0.00 $225,000.00 $0.00 $225,000.00

510 COLUMBIA AIRPORT Access Gate and Terminal Area Fencing $0.00 $50,000.00 $0.00 $50,000.00

$138,434,994.00 $7,395,768.00$392,589,919.00General Aviation Capital Outlay Totals $246,597,157.00

Friday, March 24, 2017 Page 62 of 62General Aviation Capital Outlay

Page 90: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital
Page 91: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

PROJECTS  TO  BE  CANCELLED  

 

Listed  below  are  projects  in  the  Airport  Construction  and  Development  Priority  Program  for  the  Fiscal  Years  indicated.  These  projects  are  either  idle  or  outdated,  and  their  scopes  of  work  are  no  longer  valid.  Therefore,  we  recommend  approval  of  the  sponsor’s  request  to  withdraw  the  following  projects  from  the  Airport  Construction  and  Development  Priority  Program.  

 

Fiscal  Year  2013-­‐2014  Funded  List  

General  Aviation  28GA   Delhi  Municipal  –  Obstruction  Removal;  $55,000    Air  Carrier  28AC   Shreveport  Regional  –  Rehabilitate  Runway  24  PAPI;  $100,000      

Fiscal  Year  2014-­‐2015  Funded  List  General  Aviation  22GA   David  G.  Joyce  –  Obstruction  Removal;  $100,000    Air  Carrier  21AC   New  Orleans  Louis  Armstrong  International  –  Rehabilitate  Taxiway  E;  $35,417  23  AC   Lake  Charles  Regional  –  Design  of  Wildlife  Mitigation  Projects;  $25,000      

Fiscal  Year  2015-­‐2016  Funded  List  General  Aviation  35GA   Louisiana  Regional  –  Drainage  Rehabilitation  –  Phase  I  (Design);  $10,000        General  Aviation  Cancelled  Projects:    $165,000    Air  Carrier  Cancelled  Projects:    $160,417    

Total  Cancelled  Projects:    $325,417  

Page 92: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Additional Comments to the Airport Construction and Development Priority Program Funded 2017-2018,

Unfunded Program 2018-2019, and Unfunded Program 2019-2022. The actual project cost, on a project by project basis, may be below or above the estimate. However, the total amount approved for the Airport Construction and Development Priority Program, for fiscal year 2017-2018, will not be exceeded. In accordance with Act 451, 1989 regular Session, paragraph 803 (B), which states “…if governing authority of an airport authority, district, parish or of any local unit of government obtains ninety percent or more funding for an airport, or for an airport project, from federal sources or from sources other than state funds, the legislature shall give priority to funding the remaining amount necessary for the airport or for the airport project, even if the project is not on the priority list of projects.” The available funds will be distributed in the following order: 1) Projects in the FY 2017-2018 Airport Construction and Development Priority Program are funded directly from the Transportation Trust Fund that is allocated in FY 2017-2018 to the Airport Construction and Development Priority Program. 2) Any other project or eligible enhancements to previously approved projects which receives 90% funding from any source, other than another State source, but which has not been processed and prioritized and is not in either the FY 2017-2018 funded or the FY 2018-2019 and 2019-2022 unfunded portion of the Airport Construction and Development Priority Program. 3) The General Aviation and Reliever Airports Maintenance Grant Program shall be funded in accordance with the conditions specified in Chapter 8 of Title 2 of the Louisiana Revised Statues. 4) In the event that additional funds become available, through special appropriations, underruns, project cancellations, or otherwise, certain unfunded, state only projects required for safety or infrastructure preservation at airports not eligible for Federal Aviation Administration (FAA) Airport Improvement Program (AIP) funding may be moved from the Unfunded FY 2018-2019 or Unfunded FY 2019-2022 Airport Construction and Development Priority Program to the FY 2017-2018 Airport Construction and Development Priority Program (funded list). 5) Aviation Trust Funds will not be used as a match for projects funded with Passenger Facility Charges (PFC) as PFCs can be approved by the FAA at 100% of the project cost.

Page 93: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital
Page 94: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

GLOSSARY

AC (Air Carrier): Airports or aircraft providing service to fare paying passengers Apron: Parking area for aircraft ALP: Airport Layout Plan ARFF (Aircraft Rescue & Firefighting): Trucks and equipment for fighting aircraft fires ATC (Air Traffic Control): A service operated by appropriate authority to promote the safe, orderly, and expeditious flow of air traffic. ATCT (Air Traffic Control Tower): Air traffic control facility located on airport responsible for controlling local airport traffic. ASOS (Automated Surface Observation System): Automated system that transmits weather data to aircraft AWOS (Automated Weather Observation System): Automated system that transmits weather data to aircraft Blast Pad: Concrete extension at the end of a runway to prevent erosion caused by jet blast CAT (Category): Category of instrument landing system based on visibility requirements. Construct: Build a new system DME (Distance Measuring Equipment): A transponder-based radio navigation technology that measures distance by timing the propagation delay of radio signals DNL (Average Day/Night Noise Level): Noise levels measured in the vicinity of an airport EA: Environmental Assessment EDS (Explosive Detection System): Electronic equipment for screening luggage EMAS (Engineered Mechanical Arresting System): An area at the end of a runway paved with special, soft concrete to stop aircraft in an emergency FBO (Fixed Base Operator): A commercial operator of aviation services on an airport that provides fuel, maintenance, aircraft rental, etc. GA (General Aviation): All aviation except air carriers and military GIS: Geographic Information Systems GLS (GNSS Landing System) GNSS (Global Navigation Satellite System) Grooving: Longitudinal grooves cut into runways to promote drainage and prevent hydroplaning

Page 95: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

Holding Bay: Paved pull-off area for temporary aircraft parking near the runway end ILS (Instrument Landing System): Ground based instrument approach system that provides precision guidance to an aircraft approaching and landing on a runway. Incursion Device: Detects aircraft or vehicles that go onto a runway without approval Joints: Space between concrete slabs LLWAS: Low Level Wind shear Alert System LNAV: Lateral navigation instrument approach procedure LNAV/VNAV: Lateral Navigation/Vertical Navigation instrument approach procedure Localizer: The component of an instrument landing system that provides course guidance to the runway centerline. LOI: (Letter of Intent) The FAA’s intent to obligate AIP discretionary and entitlement funds from future budgetary authority in an amount not greater than the Federal Government’s share of allowable costs for that project. LPV: Localizer performance with vertical guidance instrument approach procedure MALSR (Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights): Lighting system used to align landing aircraft with the runway Marking: Numbers, letters, and symbols painted on runways and taxiways Master Plan: A plan for airport growth during a 20-25 year period MIRL (Medium Intensity Runway Lights): Lights that mark the edge of a runway MITL (Medium Intensity Taxiway Lights): Lights that mark the edge of a taxiway Noise Compatibility: FAA program to assist homeowners near airports Obstruction Removal: A planned program to remove obstructions (trees, buildings, ditches, etc) from an RPZ or safety areas Overlay: A layer of asphalt placed on top of an existing asphalt surface Overrun: Area beyond the end of a runway used for aircraft unable to stop on the runway PAPI (Precision Approach Path Indicator): A visual landing aid that provides landing information by the use of colored lights Parallel Taxiway: A taxiway paralleling a runway Passenger Loading Bridge: Enclosed movable hallway connecting a passenger aircraft to the terminal PCI: Pavement Condition Index

Page 96: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

PCC: Portland Concrete Cement RAIL (Runway Alignment Indicator Lights): Sequence flashing lights used as part of an approach lighting system Ramp: Parking area for aircraft Reconstruct: Rebuild an existing system Rehabilitate: Major repairs to an existing system REIL (Runway End Identifier Lights): Flashing lights that identify the runway end Rejuvenator: An additive that replaces lost oils in asphalt RPZ (Runway Protection Zone): Area which must be free of vertical obstacles Runway: A strip of concrete, asphalt, or turf used for the landing and takeoff of aircraft Safety Area: Land immediately adjacent to runways and taxiways Sealcoat: Protective surface applied to asphalt pavements (sometimes called a slurry seal) Seaway: Landing area for seaplanes or amphibious airplanes Segmented Circle: A system of visual indicators designed to provide traffic pattern information to aircraft Sound Mitigation: FAA program to assist homeowners near airports SSALR (Simplified Short Approach Light System with RAIL): Lighting system used to align landing aircraft with the runway Striping: White or yellow lines painted on runways and taxiways Stub Taxiway: Small taxiway connecting a runway to a parallel taxiway, apron or ramp Taxilane: Small taxiway leading to hangars Taxiway: Strip of concrete, asphalt, or turf used to move aircraft to and from the runway Terminal: Building used by pilots and passengers for creature comfort and flight planning. Also adjacent aircraft parking T-hangar: Hangars shaped like a “T” designed for storing airplanes tail to tail Tie Down: A ring set in an apron for anchoring small aircraft UAS: Unmanned Aerial Systems UHF (Ultra High Frequency): Radio signals primarily used by military aircraft Vault: Building that houses electrical equipment for an airport

Page 97: LOUISIANA -  · Item Airport Project Description Federal Funds State Match Local/Other Total Funds Airport Construction and Development Priority Program 2017-2018 Air Carrier Capital

WHA: Wildlife Hazard Assessment Wind Cone: Device for detecting and displaying wind direction (also called wind sock) Wind Tee: Device for detecting and displaying wind direction