E-rate Discounted Telecommunication and Network Projects Monthly Progress Report BFAT Committee August 2002 8-15-02 Los Angeles Unified School District Submitted by James Alther Director of Strategic Planning Information Technology Division ITD ITD

Upload: others

Post on 27-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

E-rate Discounted Telecommunication and Network Projects Monthly Progress Report

BFAT CommitteeAugust 2002

8-15-02

Los Angeles Unified School District

Submitted by James Alther

Director of Strategic Planning

Information Technology Division

ITDITD

Page 2: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

ProjectsInstall Telephone Equipment Page 3Install Local Area Data Networks Page 4Install E-rate Funded LANs Page 5 to 11Complete Full Network Integration Page 12 Provide Maintenance and Support Page 13

AttachmentsSBC Cabinet Replacement SchedulesLAN Progress by Board Member and Site

2

Outline

Page 3: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

3

Project cost - $10.7 million with E-rate funding discounts covering $ 6. 9 million of the cost.

Vendor: Avaya

Project Start Date: July 31, 2002

Description of the Project:

Purchase and installation of new phone switches and phones in offices at 131 school sites.

Purchase and installation of Uninterruptible Power Supplies (UPS) to protect phone switches at 512 school sites from damage caused by power outages and surges.

Project – Install Telephone Equipment at 131 Schools

Page 4: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

Total Traditional

K-12 Schools

eligible for E-rate

Total LAN Contracts in

place or under

construction

Basic Connectivity to all classrooms

0% - In design 1-50% 51-75% 76%

Plus

662 604* 67* 39* 34* 59* 480**

Construction Percentages

Progress to Date - All Local Area Networks: 8-5-02

* Includes BB Bond, Grant/Van Nuys E-rate, other LANs being installed using other funding sources, and E-rate years 2, 3, and 4. Some schools may have funding from more than one source and have E-rate funding for more than one year.

** Network is functioning, all sites have not have passed test and acceptance, and the vendors continue to correct deficiencies.

4

Project: Install Local Area Data Networks at all K-12 Schools.

Page 5: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

Vendor Total # of Schools

Project Closed

0% 1-25% 26-50% 51-75%

76% Plus

Network Complete*

Passed T & A

All Documents Submitted

IBM 126 0 0 0 0 0 126 126 126**

SBCI 194 0 0 0 0 0 194 115 0

SBCII 101 1 18 18 25 16 23 23 0

Vector Yr3 29 0 0 0 0 0 29 29 29

Verizon 26 25 1 0 0 0 0 0 0

Vector Yr4 63 26 4 4 6 10 13 13 0

TOTAL 539 52 23 22 31 26 385 306 154

Status At A Glance -Yr3 & Yr4 - Created From Data Dated: 8-5-02

Construction Percentages

5

* Deficiencies, that do not impact the network, need to be corrected

** IBM completed the contract on July 9th, 2002

Project: Install Local Area Data Networks at Schools Receiving E-rate Discounts

Page 6: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

SBC estimates that all 194 schools will be completed and the contract closed by mid November. Current progress indicates that SBC is two weeks behind on their new schedules.

Cabinet Replacement

506 out of 748 cabinets replaced

113 of the 194 schools have cabinets replaced, 81 sites remaining

46 sites submitted for close out and SBC states are complete

All deficiencies cleared

All required documentation complete

SBC - Progress E-rate Year 2000 – 194 Sites

6

Page 7: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

Progress is improving. SBC states 63 school sites will be completed by 9/30/02. District staff

believes 63 will be functioning. However some sites will still have deficiencies and documentation to be submitted after 9/30/02.

23 of the 63 are tested and accepted. 13 of these have final documentation submitted.

An extension was filed for the 38 sites that have Wareforce Inc. related deficiencies. SBC has committed to have as many as possible of these sites functioning by September 30. Legal issues will delay closing out these sites.

93 of the 101 sites have active construction.

SBC - E-rate Year 2000 Extended – 101 Sites

7

Page 8: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

District Project Management staff continue to:Request a more accurate scheduleWork to ensure Digital High School deadlines are metWork to complete as many schools as possible by September 30Meet almost daily with SBC to resolve issuesMeet weekly with SBC and Local District Facilities Directors and their

Project Managers.

Megan Klee, CIO, and District staff continue to meet with high level management from SBC weekly.

Extended SBC sites – District Actions

8

Page 9: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

Package One - 37 school sites, must be completed by 9/30/0237 schools under construction as of 8/5/02 13 schools fully functioning and tested and accepted

Package Two - 44 school sites, must be completed by 9/30/03Beginning site surveys at 26 sitesIn the planning stage for classroom switch rollouts.

Vector – Progress E-rate Year 2001:

9

Page 10: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

36 School Sites Funded, must be completed by 9/30/03Preparing surveys for 26 sites Canoga Park High School 40% complete – target date for

completion is 9/02/02Construction to begin at

Mark Twain Middle and Valerio Elementary Schools before 8/30/02

In the planning stage to install classroom switches at 10 sites.

Verizon – Progress E-rate Year 2001

10

Page 11: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

Project Description: 342 schools to receive switches for classrooms with one data drop.

Progress:

316 schools have received switches.

For schools where SBC is completing LAN installation, SBC will install switches in all classrooms instead of media converters.

173 schools scheduled to receive switches in District D, E, F, and G are scheduled to be completed by 9/30/02, one year ahead of contract deadline date.

AMI – Progress E-rate Year 2001

11

Page 12: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

Project Description: 480 functioning sitesIntegrate all site networks and connect to the router and T1.Configure the router, switches, and servers.Install and configure the operating system that allows for end-to-end

interoperability.Connect all classrooms, instructional areas, labs, library, and offices the same

integrated network. Address all equipment.Install, connect, configure, and address classroom computers.

Progress: 89 school sites complete (see summary spreadsheet: End-to-End column)221 school sites have teams completing the above tasks 170 schools still need to be scheduled

Project: Fully Integrate LANs and Connect all Classroom Computers.

12

Page 13: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

Progress: Complete

Contract length – May 14, 2002 to June 30, 2002

IBM provided 4212 man hours for:

Helpdesk support

Solving thousands of maintenance and support issues for all E-rate eligible local area network equipment and cabling.

Total cost: $ 749, 140 with E-rate funding $ 674,226 of the cost.

Project: Provide Maintenance and Support for LANs at 513 sites Funded by Year 2001 E-rate.

13

Page 14: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

SBC Cabinet Replacements

Page 15: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

School Site Local Area Network Status

The attached spreadsheet provides the following information:

Local District, Board Member, School Site

Status of the Network as of August 5, 2002

Internet Access

Yes means connectivity to all classrooms

No means no contract in place to network all classrooms. However, the school has Internet connectivity to some locations.

Progress means contract in place to network classrooms, limited Internet access in some locations.

Complete end to end – meets all requirements outline on slide 12.

Stu/Comp Ratio – Student to computer ratio – District goal 6 to 1

Date District tested and accepted the network as meeting contract requirements

Y4 Clrm Switch indicates date school received additional switch to allow for more than one computer in a classroom to be connected to the Internet.

Page 16: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 1 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

E C. Young 3rd St (THIRD STREET ELEM) Y3 E-rate - 82% complete progress 6.95E C. Young ALLESANDRO ELEMENTARY BB S & T 99% complete: add Y3 functioning yes 3.85 7/18/02 7/16/2002D C. Young BANCROFT (HUBERT HOWE) MIDDLE Y3 E-rate - 72% complete progress 15.77F C. Young BERENDO MIDDLE Y3 E-rate functioning - needs T & A yes 3.49E C. Young BLEND (FRANCES) SPECIAL ED. CE Y3 E-rate - 1% complete progress 42.00B C. Young BURBANK BOULEVARD ELEM BB S & T and Y3 E-rate complete yes 7/14/2002 5.16 1/9/2001 12/21/01 5/6/2002E C. Young BURROUGHS (JOHN) MIDDLE Y3 E-rate - 70% complete progress 12.69F C. Young CAHUENGA ELEMENTARY Y3 E-rate functioning - needs T & A yes 7.94B C. Young CARLSON (BERENECE) HOME HOSPIT Y3 E-rate functioning - passed T & A (see Wilson) yes 10.63E C. Young CHEREMOYA AVENUE ELEMENTARY Y3 E-rate - 19% complete progress 4.35E C. Young CLIFFORD STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 7/16/2002 7.00 11/09/01 7/16/2002C C. Young COLDWATER CANYON AVE ELem Grant/Van Nuys E-rate Y2 complete yes 5/27/2002 5.25 9/28/2001B C. Young COLFAX AVENUE ELEMENTARY Y3 E-rate complete yes 5.94 02/01/02 5/22/2002B C. Young EARHART (AMELIA) CONTINUATION Y3 E-rate complete yes 5/22/2002 8.08 07/11/01 5/3/2002C C. Young ERWIN STREET ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 3/11/2002 21.70 09/28/01B C. Young FAIR AVENUE ELEMENTARY BB S & T and Y3 E-rate complete yes 6/17/2002 6.01 5/8/2001 10/4/01 5/21/2002D C. Young FAIRFAX SENIOR HIGH Y3 E-rate - 68% complete progress 6.17B C. Young FENTON CHARTER BB S & T complete yes 2.06 6/30/2000B C. Young FRANCIS (JOHN H.) POLYTECHNIC Y3 E-rate complete yes 2.70 03/08/02 5/17/2002E C. Young FRANKLIN AVENUE ELEMENTARY BB S & T, Y2 E-rate 99% complete: Y3 E-rate complete yes 12.61 1/14/02 7/12/2002E C. Young GARDNER STREET ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 6.67 4/3/2000 7/8/02C C. Young GRANT (ULYSSES S.) SENIOR HIGH BB S & T and G/VNs Y2 E-rate complete yes 4.07 6/18/2002 11/01/01E C. Young GRANT ELEMENTARY Y3 E-rate - 70% complete progress 8.64D C. Young HANCOCK PARK ELEMENTARY Y3 E-rate - 64% complete progress 22.39E C. Young HOBART BOULEVARD ELEMENTARY BB S & T and Y2 E-rate 98%: Y3 E-rate complete yes 5.94 11/5/01E C. Young HOLLYWOOD SENIOR HIGH Y3 E-rate - 95% complete - E-rate functioning yes 1.98 7/9/2002F C. Young HOOVER STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.43 01/25/02E C. Young IVANHOE ELEMENTARY Y3 E-rate functioning - passed T & A yes 13.62 12/18/01 7/12/2002C C. Young Kindergarden Learning Acad (Van Nuys PRI) completed in 1998 - backbone copper Y4 E-rate upgrade yes 0.00 12/1/1998E C. Young KING (THOMAS STARR) MIDDLE Y3 E-rate functioning - needs T & A yes 5.67 7/12/2002C C. Young KITTRIDGE STREET ELEMENTARY BB S & T and G/VNs Y2 E-rate - complete yes 3.44B C. Young LANKERSHIM ELEMENTARY Y3 E-rate complete yes 5/16/2002 7.07 02/28/02D C. Young LAUREL ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.93 7/28/02E C. Young LE CONTE (JOSEPH) MIDDLE Y3 E-rate - 13% complete progress 5.31B C. Young LEWIS (ROBERT H.) CONTINUATION Y3 E-rate complete yes 1.95 03/01/02F C. Young LOGAN STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 11.62C C. Young LONDON (JACK) CONTINUATION BB S & T and G/VNs Y2 E-rate - complete yes 6/19/2002 3.14 6/18/2002 10/24/01E C. Young LOS ANGELES ELEMENTARY Y3 E-rate functioning - needs T & A yes 9.32E C. Young LOS ANGELES SENIOR HIGH BB S & T and E-rate functioning - passed T & A yes 2.76 1/17/2001 02/15/02

Page 17: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 2 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

E C. Young LOS FELIZ ELEMENTARY Y3 E-rate functioning - passed T & A yes 7/15/2002 11.15 6/17/02 7/9/2002B C. Young LOWMAN (CHARLES LEROY) SPECIAL Grant/Van Nuys E-rate Y2 complete yes 5.14 07/24/01C C. Young MADISON (JAMES) MIDDLE Grant/Van Nuys E-rate Y2 complete yes 4.24 10/19/01E C. Young MARSHALL (JOHN) SENIOR HIGH BB S & T complete: add Y3 functioning - need T&A and punchlist items completed yes 6/12/2002 2.48 3/27/2001 7/12/2002E C. Young MAYBERRY STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 12.19 05/17/01D C. Young MELROSE AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.33 7/28/02E C. Young MICHELTORENA STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.83 12/18/01 7/12/2002C C. Young MONLUX (JOHN B.) ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 13.88 08/22/01B C. Young NORTH HOLLYWOOD SENIOR HIGH Y3 E-rate complete yes 2.59 07/11/01 5/6/2002F C. Young POLITI (LEO) ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.05E C. Young RAMONA ELEMENTARY Y3 E-rate functioning - passed T & A yes 8.83 3/29/01B C. Young REED (WALTER) MIDDLE BB S & T, Y2 E-rate and: Y3 E-rate complete yes 7.47 12/21/01 5/23/2002B C. Young RIO VISTA ELEMENTARY Y3 E-rate complete yes 5.09 03/27/02 5/22/2002D C. Young ROSEWOOD AVENUE ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 3.09 5/27/1999 7/22/02E C. Young SANTA MONICA BOULEVARD ELEM Y3 E-rate - 25% complete progress 4.40B C. Young SATICOY ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 5/22/2002 6.31 08/22/01E C. Young SELMA AVENUE ELEMENTARY Y3 E-rate - 73% complete progress 10.63B C. Young STRATHERN STREET ELEMENTARY Y3 E-rate complete yes 6.04 02/13/02 5/20/2002E C. Young VALLEY VIEW ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.75 7/29/02D C. Young VAN NESS AVENUE ELEMENTARY Y3 E-rate - 46% complete progress 3.60B C. Young VICTORY BOULEVARD ELEMENTARY Y3 E-rate complete yes 4.37 03/12/02 5/21/2002D C. Young VINE STREET ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 4.81 4/4/2000 7/02/02 7/2/2002D C. Young WEST HOLLYWOOD ELEMENTARY Y3 E-rate - 64% complete progress 2.83D C. Young WEST HOLLYWOOD OPPORTUNITY Y3 E-rate - 28% complete progress 0.00D C. Young WHITMAN CONTINUATION HS Y3 E-rate - 70% complete progress 6.93E C. Young WILTON PLACE ELEMENTARY Y3 E-rate - 13% complete progress 5.90D C. Young WONDERLAND AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.26 7/29/02H D. Tokofsky 1STt ST (FIRST STREET ELEMENTARY) Y3 E-rate functioning - passed T & A yes 7/10/2002 6.69 05/03/01 6/10/2002H D. Tokofsky 4th ST (FOURTH ST ELEM) Y3 E-rate functioning - passed T & A yes 7/16/2002 7.60 11/05/01 6/17/2002F D. Tokofsky ALBION STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 4/2/2002 4.83 05/21/01E D. Tokofsky ALDAMA ELEMENTARY Y3 E-rate functioning - passed T & A yes 5/1/2002 5.03 06/12/01E D. Tokofsky ANNANDALE ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.25 7/21/01 7/23/2002E D. Tokofsky ARAGON AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 2/18/2002 5.06 5/18/01B D. Tokofsky ARMINTA STREET ELEMENTARY Y3 E-rate complete yes 4.38 02/07/02 5/20/2002E D. Tokofsky ARROYO SECO ALTERNATIVE Y3 E-rate functioning - passed T & A yes 5/21/2002 3.54 04/30/01 7/23/2002E D. Tokofsky ATWATER AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 1/30/2002 4.84 05/17/01 7/16/2002B D. Tokofsky BEACHY AVENUE ELEMENTARY BB S & T, Y2 E-rate 94%: Y3 E-rate complete yes 3.84 12/12/01H D. Tokofsky BELVEDERE ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.56 6/13/2002H D. Tokofsky BELVEDERE MIDDLE Y3 E-rate functioning - needs T & A yes 6.26 6/10/2002

Page 18: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 3 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

H D. Tokofsky BOYLE HEIGHTS CONT (Roosevelt) BB S & T complete: add Y3 passed T & A yes 4.63 7/18/2001 2/26/02 6/10/2002F D. Tokofsky BRAVO (FRANCISCO) MEDICAL MAGN Y3 E-rate functioning - needs T & A yes 4.14B D. Tokofsky BROADOUS (HILLERY T.) ELEMENTA Y3 E-rate complete yes 3.98 03/19/02 5/10/2002H D. Tokofsky BROOKLYN AVENUE ELEM Y3 E-rate functioning - needs T & A yes 7.03 6/13/2002E D. Tokofsky BUCHANAN STREET ELEM Y3 E-rate functioning - passed T & A yes 4.51 11/05/01 7/23/2002E D. Tokofsky BURBANK (LUTHER) MIDDLE Y3 E-rate functioning - needs T & A yes 8.03 7/18/2002E D. Tokofsky BUSHNELL WAY ELEMENTARY BB S & T, Y2 E-rate 94% complete: Y3 E-rate complete yes 5.52 1/29/02 7/23/2002B D. Tokofsky BYRD (RICHARD E.) MIDDLE Y3 E-rate complete yes 2.06 1/23/02 5/15/2002E D. Tokofsky CALIFORNIA ACADEMY FOR LIBERAL need to go to bid no 3.00B D. Tokofsky CAMELLIA AVENUE ELEMENTARY Y3 E-rate complete yes 4.56 01/31/02 5/21/2002F D. Tokofsky CITY TERRACE ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.34 06/21/01E D. Tokofsky DAHLIA HEIGHTS ELEMENTARY Y3 E-rate functioning - passed T & A yes 13.41 05/20/01 7/23/2002E D. Tokofsky DELEVAN DRIVE ELEMENTARY Y3 E-rate functioning - passed T & A yes 9.98 9/14/01 7/23/2002B D. Tokofsky DYER STREET ELEMENTARY Y3 E-rate complete yes 4.41 02/25/02 4/25/2002E D. Tokofsky EAGLE ROCK ELEMENTARY Y3 E-rate functioning - passed T & A yes 10.52 12/18/01 7/16/2002E D. Tokofsky EAGLE ROCK JUNIOR-SENIOR HIGH BB S & T and Y2 E-rate complete: Y3 passed T&A yes 5.20 4/18/2000H D. Tokofsky EASTMAN AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.81 01/10/02 6/19/2002B D. Tokofsky EL DORADO AVENUE ELEMENTARY Y3 E-rate complete yes 4.91 01/24/02 5/3/2002F D. Tokofsky EL SERENO ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.16 11/05/01F D. Tokofsky EL SERENO MIDDLE Y3 E-rate functioning - needs T & A yes 6.25H D. Tokofsky EVERGREEN AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 8.45 12/18/01 6/10/2002B D. Tokofsky EVERGREEN CONTINUATION Y3 E-rate complete yes 3.75 08/06/01 4/25/2002F D. Tokofsky FARMDALE ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.83 12/18/01B D. Tokofsky FERNANGELES ELEMENTARY BB S & T and Y3 E-rate complete yes 3.60 11/2/2001 1/22/02 4/29/2002E D. Tokofsky FLETCHER DRIVE ELEMENTARY Y3 E-rate functioning - passed T & A yes 1/21/2002 8.93 5/17/01 7/16/2002H D. Tokofsky FORD BOULEVARD ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.85 12/20/01 6/17/2002E D. Tokofsky FRANKLIN (BENJAMIN) SENIOR HIG BB S & T 99% complete: add Y3 needs T&A yes 2.64 7/12/2002H D. Tokofsky GARFIELD (JAMES A.) SENIOR HIG Y3 E-rate functioning - needs T & A yes 3.96 6/19/2002E D. Tokofsky GARVANZA ELEMENTARY Y3 E-rate functioning - passed T & A yes 9.99 1/4/02 7/23/2002F D. Tokofsky GATES STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 16.59 05/19/01E D. Tokofsky GLASSELL PARK ELEMENTARY BB S & T and Y2 E-rate complete: Y3 E-rate complete yes 3.38 4/6/2000 1/14/02 7/16/2002E D. Tokofsky GLENFELIZ BOULEVARD ELEM Y3 E-rate functioning - passed T & A yes 11.61 12/18/01 7/16/2002B D. Tokofsky GRIDLEY STREET ELEMENTARY BB S & T and Y3 E-rate complete yes 7/16/2002 5.55 8/17/2000 08/21/01 4/22/2002F D. Tokofsky GRIFFIN AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 14.22 1/4/02H D. Tokofsky GRIFFITH (DAVID WARK) MIDDLE Y3 E-rate functioning - needs T & A yes 7.94 6/17/2002B D. Tokofsky HADDON AVENUE ELEMENTARY Y3 E-rate complete yes 5.01 08/27/01 5/10/2002H D. Tokofsky HAMASAKI (MORRIS K) ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.37 7/21/02 6/13/2002H D. Tokofsky HAMMEL STREET ELEMENTARY BB S & T, Y2 E-rate 94% complete: Y3 E-rate complete yes 7.31 12/18/01 6/13/2002B D. Tokofsky HARDING STREET ELEMENTARY Y3 E-rate complete yes 5/16/2002 5.38 08/17/01 4/30/2002

Page 19: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 4 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

F D. Tokofsky HARRISON STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.37 10/18/01E D. Tokofsky HIGHLAND PARK CONTINUATION BB S & T complete: add Y3 functioning, needs T&A and punchlist yes 4.00F D. Tokofsky HILLSIDE ELEMENTARY Y3 E-rate functioning - passed T & A yes 7/16/2002 3.87 05/23/01H D. Tokofsky HUMPHREYS AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 4.07 6/19/2002F D. Tokofsky HUNTINGTON DRIVE ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.98E D. Tokofsky IRVING (WASHINGTON) MIDDLE Y3 E-rate functioning - needs T & A yes 5.28 7/16/2002H D. Tokofsky LANE (ROBERT HILL) ELEMENTARY BB S & T and Y2 E-rate complete: Y3 E-rate complete yes 3.12 7/7/2000 01/16/02 6/13/2002F D. Tokofsky LATONA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 12.27 04/28/01F D. Tokofsky LINCOLN (ABRAHAM) SENIOR HIGH Y3 E-rate functioning - passed T & A yes 6/18/2002 3.54 12/18/01F D. Tokofsky LORETO STREET ELEMENTARY BB S & T, Y2 E-rate 94% complete: Y3 E-rate complete yes 4.95H D. Tokofsky MALABAR STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 6/11/2002 7.17 05/31/01 6/13/2002H D. Tokofsky MARIANNA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.97 12/18/01 6/13/2002B D. Tokofsky MISSION CONTINUATION Y3 E-rate complete yes 2.46 06/08/01 5/8/2002B D. Tokofsky MONTAGUE STREET ELEMENTARY Y3 E-rate complete yes 5.65 03/21/02 5/14/2002B D. Tokofsky MONTARA AVENUE ELEMENTARY Y3 E-rate complete yes 4.12 01/17/02E D. Tokofsky MONTE VISTA STREET ELEMENTARY BB S & T 99%: add. Y3 E-rate complete yes 7/16/2002 6.85 11/5/01 7/18/2002H D. Tokofsky MONTEREY CONTINUATION BB S & T compl E-rate network functioning, passed T&A yes 3.94 11/16/2000 11/05/01 6/19/2002B D. Tokofsky MORNINGSIDE ELEMENTARY Y3 E-rate complete yes 9.55 01/11/02 5/3/2002E D. Tokofsky MOUNT WASHINGTON ELEMENTARY Y3 E-rate functioning - needs T & A yes 6.38 7/18/2002F D. Tokofsky MULTNOMAH STREET ELEM Y3 E-rate functioning - needs T & A yes 7.17F D. Tokofsky MURCHISON STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.05F D. Tokofsky NIGHTINGALE (FLORENCE) MIDDLE Y3 E-rate functioning - needs T & A yes 5.32B D. Tokofsky O'MELVENY ELEMENTARY Y3 E-rate complete yes 3.15 03/18/02 5/10/2002B D. Tokofsky OSCEOLA STREET ELEMENTARY Y3 E-rate complete yes 4.57 02/15/02 5/3/2002B D. Tokofsky OXNARD STREET ELEMENTARY Y3 E-rate complete yes 8.45 02/22/02 5/21/2002B D. Tokofsky PACOIMA ELEMENTARY BB S & T and Y3 E-rate complete yes 7/1/2002 6.56 9/13/2000 2/28/02 4/26/2002B D. Tokofsky PACOIMA MIDDLE Y3 E-rate complete yes 6.31 04/08/02 5/14/2002H D. Tokofsky PEREZ (ALPHONSO B.) SPECIAL ED Y3 E-rate functioning - needs T & A yes 3.14 6/13/2002F D. Tokofsky PUEBLO DE LOS ANGELES CONTINUA Y3 E-rate functioning - needs T & A yes 3.11H D. Tokofsky RAMONA OPPORTUNITY HIGH (ALT.) Y3 E-rate functioning - passed T & A yes 2.10 03/29/01 6/17/2002E D. Tokofsky ROCKDALE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.30 09/04/01H D. Tokofsky ROOSEVELT (THEODORE) S H BB S & T complete: add Y3 functioning - need T&A yes 2.98 7/18/2001 6/10/2002B D. Tokofsky ROSCOE ELEMENTARY Y3 E-rate complete yes 6.29 02/26/02H D. Tokofsky ROWAN AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 4.03 6/17/2002B D. Tokofsky SAN FERNANDO ELEMENTARY Y3 E-rate complete yes 4.89 03/07/02 5/7/2002B D. Tokofsky SAN FERNANDO MIDDLE BB S & T 99% and Y3 E-rate complete yes 5.40 3/22/02 5/7/2002B D. Tokofsky SAN FERNANDO SENIOR HIGH Y3 E-rate complete yes 3.08 07/11/01 5/10/2002A D. Tokofsky SAN JOSE STREET ELEMENTARY Y3 E-rate complete yes 9.91 02/08/02 5/21/2002E D. Tokofsky SAN PASCUAL AVENUE ELEM Y3 E-rate functioning - needs T & A yes 11.19 7/23/2002

Page 20: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 5 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

B D. Tokofsky SHARP AVENUE ELEMENTARY Y3 E-rate complete yes 4.11 03/18/02 5/13/2002F D. Tokofsky SIERRA PARK ELEMENTARY Y3 E-rate functioning - needs T & A yes 7.70F D. Tokofsky SIERRA VISTA ELEMENTARY Y3 E-rate functioning - passed T & A yes 13.28 05/24/01B D. Tokofsky SUN VALLEY MIDDLE Y3 E-rate complete yes 16.67 02/25/02 5/7/2002B D. Tokofsky SYLMAR SENIOR HIGH Y3 E-rate complete yes 4.16 03/18/02 4/29/2002B D. Tokofsky TELFAIR AVENUE ELEMENTARY Y3 E-rate complete yes 6.90 03/26/02 5/10/2002E D. Tokofsky TOLAND WAY ELEMENTARY Y3 E-rate functioning - passed T & A yes 12.48 06/05/01 7/18/2002B D. Tokofsky TOLUCA LAKE ELEMENTARY Y3 E-rate complete yes 4.33 01/25/02 5/22/2002B D. Tokofsky VAUGHN ELEMENTRY Charter complete yes 3.58 1/1/2000B D. Tokofsky VENA AVENUE ELEMENTARY Y3 E-rate complete yes 6.94 03/08/02 5/13/2002F D. Tokofsky WILSON (WOODROW) SENIOR HIGH Y3 E-rate functioning - needs T & A yes 6.00E D. Tokofsky YORKDALE ELEMENTARY Y3 E-rate functioning - passed T & A yes 13.96 05/23/01 7/23/2002E G.Hudley-Hayes 24th Street Elementary Y3 E-rate - 19% complete progress 4.21G G.Hudley-Hayes 32nd St (THIRTY-SECOND ST. USC PERF) BB S & T complete: add Y3 functioning yes 3.26 8/9/2000 2/27/02G G.Hudley-Hayes 42nd ST (FORTY-SECOND ST ELEM) Y3 E-rate - 68% complete progress 13.42H G.Hudley-Hayes 49th ST (FORTY-NINTH ST ELEM) Y3 E-rate functioning - needs T & A yes 5.58 6/10/2002G G.Hudley-Hayes 52nd ST (FIFTY-SECOND ST ELEM) Y3 E-rate functioning - passed T & A yes 8.03 12/18/01G G.Hudley-Hayes 54th St (FIFTY-FOURTH ST ELEM) Y3 E-rate - 73% complete progress 3.36G G.Hudley-Hayes 59th St (FIFTY-NINTH ST ELEM) Y3 E-rate - 66% complete progress 7.19I G.Hudley-Hayes 61st ST (SIXTY-FIRST ST) Y3 E-rate - 79% complete progress 12.32 6/30/2002I G.Hudley-Hayes 66th ST (SIXT(Y-SIXTH ST) Y3 E-rate - 86% complete progress 4.73 6/30/2002I G.Hudley-Hayes 68th ST (SIXTY-EIGHTH ST) Y3 E-rate - 65% complete progress 4.69 6/27/2002G G.Hudley-Hayes 6th Ave (SIXTH AVE ELEM) Y3 E-rate - 69% complete progress 6.27G G.Hudley-Hayes 74th ST (SEVENTY-FOURTH ST ELEM) Y3 E-rate - 76% complete progress 6.23I G.Hudley-Hayes 75th ST (SEVENTY-FIFTH ST) Y3 E-rate - 20% complete progress 10.23 6/27/2002E G.Hudley-Hayes ALTA LOMA ELEMENTARY Y3 E-rate - 57% complete progress 4.22G G.Hudley-Hayes ANGELES MESA ELEMENTARY Y3 E-rate - 64% complete progress 24.40E G.Hudley-Hayes ARLINGTON HEIGHTS ELEM BB S & T and E-rate functioning - passed T & A yes 10.00 4/19/2001 7/25/02G G.Hudley-Hayes AUDUBON MIDDLE Y3 E-rate - 61% complete progress 13.09G G.Hudley-Hayes BALDWIN HILLS ELEM Y3 E-rate - 70% complete progress 8.01I G.Hudley-Hayes BETHUNE (MARY MCLEOD) MIDDLE BB S & T and YE-rate functioning - passed T & A yes 5.97 7/11/2001 7/25/02G G.Hudley-Hayes BRADLEY (Tom) ELEM BB S & T awarded: Y3 E-rate - 67%complete progress 7.65G G.Hudley-Hayes BRIGHT (BIRDIELEE V) ELEMENTAR Y3 E-rate functioning - passed T & A yes 8.13 05/24/01G G.Hudley-Hayes BUDLONG AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 7.39D G.Hudley-Hayes CARTHAY CENTER ELEMENTARY funded Y4 E-rate - Verizon - in design progress 8.28H G.Hudley-Hayes CARVER (GEORGE WASHINGTON) MID Y3 E-rate functioning - needs T & A yes 3.25 6/10/2002D G.Hudley-Hayes CHARNOCK ROAD ELEMENTARY BB S & T and Y2 E-rate complete - Y4 E-rate - upgrades yes 4/28/2002 4.05 2/9/2001 5/9/01G G.Hudley-Hayes CIENEGA ELEMENTARY Y3 E-rate - 24% complete progress 5.29G G.Hudley-Hayes COLISEUM STREET ELEMENTARY BB S & T and Y2 E-rate and E-rate functioning - passed T & A yes 5.22 8/20/1999 7/25/02

Page 21: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 6 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

D G.Hudley-Hayes COMMUNITY SCHOOL (MAGNET) BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.97G G.Hudley-Hayes CRENSHAW SENIOR HIGH Y3 E-rate - 95% complete - E-rate functioning yes 5.11G G.Hudley-Hayes DORSEY (SUSAN MILLER) SENIOR H BB S & T and Y2 E-rate complete: Y3 E-rate 63% complete yes 3.92 7/11/2001G G.Hudley-Hayes FOSHAY LEARNING CENTER (K-12) Y3 E-rate functioning - needs T & A yes 3.33I G.Hudley-Hayes FREMONT (JOHN C.) SENIOR HIGH Y3 E-rate - 95% complete - E-rate functioning yes 6.47 6/13/2002D G.Hudley-Hayes GRAND VIEW BOULEVARD ELEM Y4 E-rate - 45% complete progress 7.56G G.Hudley-Hayes HARTE (BRET) PREPATORY INTERME Y3 E-rate complete yes 9.32 06/25/01G G.Hudley-Hayes HILLCREST DRIVE ELEMENTARY Y3 E-rate - 88% complete progress 4.09I G.Hudley-Hayes HOPE (JOHN) CONTINUATION Y3 E-rate - 95% complete - functioning needs T&A yes 4.38 6/13/2002G G.Hudley-Hayes HYDE PARK BLVD. ELEMENTARY Y3 E-rate - 59% complete progress 3.73G G.Hudley-Hayes KING (MARTIN LUTHER, JR) ELEME BB S & T complete: add Y3 functioning - need T&A yes 6/4/2002 4.26 3/7/2000H G.Hudley-Hayes LA ACAD MS (JEFFERSON NEW M.S.) BB S & T: add Y3 functioning - need T&A complete yes 3/14/2002 5.49 10/12/2001 6/10/2002G G.Hudley-Hayes LA SALLE AVENUE ELEMENTARY Y3 E-rate complete yes 7/17/2002 6.67 06/29/01D G.Hudley-Hayes LOS ANGELES CENTER FOR ENRICHE BB S & T Waiting for Local Dist FD and PM to put out to bid no 6.16H G.Hudley-Hayes MAIN STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.94 6/10/2002I G.Hudley-Hayes MANCHESTER AVENUE ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 7/9/2002 4.19 11/8/2000 7/3/02G G.Hudley-Hayes MANHATTAN PLACE ELEMENTARY Y3 E-rate complete yes 6/4/2002 5.99 05/17/01G G.Hudley-Hayes MANN (HORACE) JUNIOR HIGH Y3 E-rate - 15% complete progress 8.60G G.Hudley-Hayes MANUAL ARTS SENIOR HIGH BB S & T complete: add Y3 functioning - need T&A and punchlist items completed yes 2.44 10/6/2000G G.Hudley-Hayes MARLTON (DEAF) Y3 E-rate - 40% complete progress 4.00D G.Hudley-Hayes MARVIN ELEMENTARY Y4 E-rate - 65% complete progress 5.11D G.Hudley-Hayes MCBRIDE (JAMES J.) SPECIAL ED. Y4 E-rate - 80% complete progress 17.30I G.Hudley-Hayes MCKINLEY AVENUE ELEMENTARY BB S and T complete - Y3 Erate - 74% complete yes 18.00 5/29/2001 6/24/2002G G.Hudley-Hayes MENLO AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.28G G.Hudley-Hayes MID CITY ALTERNATIVE Y3 E-rate - 3% complete progress 6.25I G.Hudley-Hayes MILLER (LOREN) ELEMENTARY Y3 E-rate - 36% complete progress 9.79E G.Hudley-Hayes MOUNT VERNON MIDDLE BB S & T 99% and YE-rate functioning - passed T & A yes 7/1/2002 4.04 7/2/02G G.Hudley-Hayes MUIR (JOHN) MIDDLE Y3 E-rate functioning - passed T & A yes 5.06 12/18/01G G.Hudley-Hayes NORMANDIE AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.33 9/17/01G G.Hudley-Hayes Owens Opportunity unknown 4.60D G.Hudley-Hayes PALMS ELEMENTARY BB S & T complete - Y4 E-rate yes 7.90 4/19/2001E G.Hudley-Hayes PIO PICO ELEMENTARY Y3 E-rate - 24% complete progress 7.00E G.Hudley-Hayes QUEEN ANNE PLACE ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 4.04 6/30/2000 8/5/02G G.Hudley-Hayes RAYMOND AVENUE ELEMENTARY Y3 E-rate complete yes 11.36 06/28/01G G.Hudley-Hayes SALVIN (SOPHIA T.) SPECIAL ED. Y3 E-rate functioning - needs T & A yes 10.08D G.Hudley-Hayes SATURN STREET ELEMENTARY Y4 E-rate - 10% complete progress 4.13D G.Hudley-Hayes SHENANDOAH STREET ELEMENTARY BB S & T complete yes 6.99 2/9/2001I G.Hudley-Hayes SOUTH PARK ELEMENTARY Y3 E-rate - 70% complete progress 5.94 7/1/2002G G.Hudley-Hayes VERMONT AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.64 11/05/01

Page 22: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 7 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

G G.Hudley-Hayes VIEW PARK CONT BB S & T and Y3 E-rate complete yes 1.91 7/11/2001G G.Hudley-Hayes VIEW PARK PREP (Charter) No network no 23.79G G.Hudley-Hayes VIRGINIA ROAD ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 5.15 7/11/2001 07/05/02G G.Hudley-Hayes WEEMES (LENICIA B.) ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.58 12/11/01G G.Hudley-Hayes WESTERN AVENUE ELEMENTARY Y3 E-rate - 43% complete progress 5.32E G.Hudley-Hayes WIDNEY (JOSEPH POMEROY) HIGH Y3 E-rate - 43% complete progress 4.72E G.Hudley-Hayes WILSHIRE CREST ELEMENTARY Y3 E-rate - 61% complete progress 5.58D G.Hudley-Hayes WINDSOR HILLS MATH SCI ELEM. BB S & T and Y2 E-rate complete - Y4 E-rate - upgrades yes 6/5/2002 5.58 4/13/2000G G.Hudley-Hayes YOUNG (Crenshaw) CONTINUATION Y3 E-rate - 95% complete - E-rate functioning yes 1.79I G.Hudley-Hayes Youth Opportunities Unlimited unknown 16.81 6/28/2002F J. Huizar 10TH St (TENTH STREET ELEMENTARY) Y3 E-rate functioning - passed T & A yes 5.47 05/09/01H J. Huizar 20TH ST (TWENTIETH STREET ELEMENTARY) Y3 E-rate functioning - passed T & A yes 4.81 12/18/01 5/29/2002H J. Huizar 28th ST (TWENTY-EIGHTH ST ELEM) Y3 E-rate functioning - passed T & A yes 7/1/2002 5.95 08/29/01 5/28/2002H J. Huizar 2nd ST (SECOND ST ELEM) Y3 E-rate functioning - passed T & A yes 3/18/2002 10.16 09/13/01 6/10/2002F J. Huizar 9th St (NINTH STREET ELEM) Y3 E-rate functioning - passed T & A yes 4/2/2002 4.29 10/04/01H J. Huizar ADAMS (JOHN) MIDDLE Y3 E-rate functioning - passed T & A yes 4.86 04/06/01 5/28/2002F J. Huizar ALEXANDRIA AVENUE ELEM BB S & T complete: add Y3 functioning yes 3/14/2002 3.37 2/8/2001 6/5/02F J. Huizar ANN STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.41 05/08/01J J. Huizar BELL #3 NEW PRIMARY CENTER Complete - New Construction yes 2.86 7/1/2002J J. Huizar BELL SENIOR HIGH BB S & T complete: add Y3 functioning - passed T&A yes 4.06 7/11/2001 6/12/02F J. Huizar BELLEVUE AVENUE PRIMARY network complete when school opened yes 20.38 1/1/2000F J. Huizar BELMONT SENIOR HIGH BB S & T complete:Y3 passed T & A yes 2.29 11/16/2000 12/18/01H J. Huizar BREED STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.70 07/12/01 6/10/2002H J. Huizar BRIDGE STREET ELEMENTARY BB S & T and Y2 E-rate 94%: Y3 E-rate complete yes 6.49 10/18/01 6/10/2002J J. Huizar BRYSON AVENUE ELEMENTARY BB S & T complete: add Y3 passed T & A, yes 6/4/2002 5.40 11/8/2000 11/05/01F J. Huizar CAMINO NUEVO CHARTER ACADEMY need to go to bid no 7.36F J. Huizar CASTELAR STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 8.10 5/17/01F J. Huizar CENTRAL CONT no 2.99F J. Huizar City of Angels Indep Study unknown 7.85F J. Huizar COMMONWEALTH AVE ELEM Y3 E-rate functioning - passed T & A yes 4/15/2002 3.84 06/12/01J J. Huizar CORONA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.39 01/08/02E J. Huizar DAYTON HEIGHTS ELEMENTARY Y3 E-rate functioning - passed T & A yes 11.61 06/06/01 7/12/2002H J. Huizar DENA (CHRISTOPHER) ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.66 11/09/01 6/10/2002E J. Huizar DORRIS PLACE ELEMENTARY Y3 E-rate functioning - passed T & A yes 9.13 12/11/01 7/23/2002F J. Huizar DOWNTOWN BUSINESS HIGH BB S & T and Y2 E-rate complete passed: Y3 passed T&A yes 2.42 6/30/2000 1/8/02J J. Huizar ELIZABETH LEARNING CENTER K-12 Y3 E-rate functioning - needs T & A yes 3.22F J. Huizar ELYSIAN HEIGHTS ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.26 11/05/01F J. Huizar ESPERANZA ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.49H J. Huizar EUCLID AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 5.72 11/28/01 6/10/2002

Page 23: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 8 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

J J. Huizar FISHBURN AVENUE ELEMENTARY BB S & T and Y2 E-rate complete: add Y3 needs T & A yes 7/1/2002 4.11 5/29/2001J J. Huizar FLORENCE AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.74J J. Huizar GAGE (HENRY T.) MIDDLE BB S & T complete: add Y3 functioning - need T&A yes 5.69 3/27/2001I J. Huizar GRAHAM ELEMENTARY Y3 E-rate - 14% complete progress 3.91F J. Huizar GRATTS (EVELYN THURMAN) ELEM Y3 E-rate functioning - needs T & A yes 3.61J J. Huizar HELIOTROPE AVENUE ELEMENTARY BB S & T and Y2 E-rate complete: add Y3 passed T &a need to pass T&A & punchlist yes 3.98 11/8/2000 1/14/02H J. Huizar HOLLENBECK MIDDLE Y3 E-rate functioning - needs T & A yes 3.27 6/10/2002J J. Huizar HUGHES (TERESA) ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.08 1/1/2000 5/19/01J J. Huizar HUNTINGTON PARK SENIOR HIGH BB S & T, Y2 E-rate complete: Y3 E-rate functioning - needs T & A yes 3.38 1/31/2002F J. Huizar INDEPENDENCE ELEm (new SG Elem) BB S & T 1% complete: add Y3 functioning - need T&A yes 3.41 1/1/2000F J. Huizar LAFAYETTE PRI (BELMONT/HWD #2) New Consc. School opened 10/01 network not complete - no electronics no 12.46G J. Huizar LANTERMAN (FRANK D.) (TMR) Y3 E-rate functioning - passed T & A yes 2.56 06/13/01J J. Huizar LIBERTY BOULEVARD ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.13 11/05/01J J. Huizar LILLIAN STREET ELEMENTARY Y3 E-rate - 42% complete progress 7.94 6/24/2002E J. Huizar LOCKWOOD AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 8.03 7/12/2002J J. Huizar LOMA VISTA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.52 12/11/01H J. Huizar LORENA STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.01 04/30/01 6/10/2002G J. Huizar MAGNOLIA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 3.89 02/14/02F J. Huizar MCALISTER HIGH (OPPOR Y3 multiple sites all complete yes 5.76H J. Huizar METROPOLITAN CONTINUATION Y3 E-rate functioning - passed T & A yes 4.03 11/05/01 6/10/2002J J. Huizar MIDDLETON STREET ELEM BB S & T and Y2 E-rate complete: add Y3 functioning, need to pass T&A & punchlist yes 7.13 11/8/2000J J. Huizar MILES AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.53F J. Huizar NEWMARK (HARRIS) CONT (Belmont) BB S & T and Y3 E-rate complete yes 3/20/2002 2.48 11/16/2000 6/14/01J J. Huizar NIMITZ (CHESTER W.) MIDDLE Y3 E-rate functioning - passed T & A yes 7.03 07/12/01G J. Huizar NORWOOD STREET ELEMENTARY BB S & T and Y2 E-rate 94%: Y3 E-rate complete yes 3.71 11/5/01J J. Huizar NUEVA VISTA ELEM (BEL?) Y3 E-rate functioning - needs T & A yes 5.26J J. Huizar ODYSSEY CONTINUATION Y3 E-rate functioning - passed T & A yes 1.89 05/26/01J J. Huizar PACIFIC BOULEVARD SPECIAL ED. Y3 E-rate functioning - needs T & A yes 5.11J J. Huizar PARK AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.23 12/18/01F J. Huizar PLASENCIA (BETTY) ELEMENTARY BB S & T: Y3 E-rate complete yes 6/2/2002 3.91 2/8/2001 10/17/01F J. Huizar ROSEMONT AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 4.40J J. Huizar SAN ANTONIO CONT (HP) BB S & T complete: add Y3 functioning, needs T&A yes 3.20 1/31/2002J J. Huizar SAN ANTONIO ELEMENTARY Y3 E-rate functioning - passed T & A yes 4/5/2002 3.64 1/1/2001 5/20/01J J. Huizar SAN GABRIEL AVENUE ELEMENTARY BB S & T complete: add Y3 passed T & A yes 6.95 12/15/2000 5/28/02J J. Huizar SAN MIGUEL ELEMENTARY Y3 E-rate functioning - needs T & A yes 2.40H J. Huizar SAN PEDRO STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.26 8/24/2002 12/18/01 5/28/2002H J. Huizar SHERIDAN STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 6.80 11/05/01 6/10/2002F J. Huizar SOLANO AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.84 05/29/01H J. Huizar SOTO STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 16.93 05/09/01 6/10/2002

Page 24: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 9 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

J J. Huizar SOUTH GATE MIDDLE BB S & T 75% complete -E-rate functioning, passed T&A yes 4.38 12/18/01J J. Huizar SOUTH GATE SENIOR HIGH BB S & T and Y2 E-rate complete: add Y3 functioning, need to pass T&A yes 4.19 7/12/2000J J. Huizar STANFORD AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 6.42J J. Huizar STATE STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 5.93H J. Huizar STEVENSON (ROBERT LOUIS) MS BB S & T and Y2 E-rate complete: add Y3 functioning, need to pass T&A yes 5.52 8/14/2000 6/14/2002H J. Huizar SUNRISE ELEMENTARY BB S & T complete: Y3 passed T & A yes 3/5/2002 6.23 3/28/2001 12/11/01 6/10/2002F J. Huizar TRI-C COMMUNITY DAY unknown 0.00J J. Huizar TWEEDY ELEMENTARY Y3 E-rate functioning - needs T & A yes 1/31/2002 3.71F J. Huizar UNION AVENUE ELEMENTARY BB S & T complete: add Y3 functioning - need T&A yes 3/28/2002 4.27 12/22/1999H J. Huizar UTAH STREET ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.76 6/10/2002J J. Huizar VERNON CITY ELEMENTARY Y3 E-rate functioning - needs T & A yes 3.76J J. Huizar VICTORIA AVENUE ELEMENTARY Y3 E-rate functioning - passed T & A yes 7/25/2002 9.28 07/27/01F J. Huizar VIRGIL MIDDLE BB S & T: Y3 passed T&A yes 6.90 6/6/2001 12/18/01J J. Huizar WALNUT PARK ELEMENTARY Y3 E-rate functioning - passed T & A yes 7/10/2002 4.10 12/11/01F J. Huizar WHITE HOUSE PRIMARY CENTER Y3 E-rate functioning - passed T & A yes 4.99 06/11/01C J. Huizar WOODLAND HILLS ELEMENTARY BB S & T waiting for Local Dist F & PM to put out to bid progress 7.04J J. Huizar WOODLAWN AVENUE ELEMENTARY BB S & T 92% complete and Y3 E-rate functioning needs T &A deficiencies yes 6.17A J. Korenstein ADDAMS (JANE) CONT (Kennedy) BB S & T and Y3 E-rate complete yes 2/18/2002 1.87 1/17/2002 6/22/01 5/17/2002C J. Korenstein ALISO HIGH (CONT.) Y3 E-rate complete yes 2.68 07/17/01C J. Korenstein ANATOLA AVENUE ELEMENTARY Y3 E-rate complete yes 8.18 2/15/02A J. Korenstein ANDASOL AVENUE ELEMENTARY BB S & T complete yes 6.03 3/13/2002B J. Korenstein APPERSON STREET ELEMENTARY Y3 E-rate complete yes 7.46 2/4/02 5/17/2002A J. Korenstein BALBOA GIFTED/HIGH ABILITY MAG BB S & T 49% complete yes 4.36C J. Korenstein BASSETT STREET ELEMENTARY BB S & T and Y3 E-rate complete yes 5/22/2002 3.94 6/9/1999 1/16/02C J. Korenstein BERTRAND AVENUE ELEMENTARY Y3 E-rate complete yes 6.34 03/11/02C J. Korenstein BIRMINGHAM SENIOR HIGH Y3 E-rate complete yes 4.90 04/01/02C J. Korenstein BLYTHE STREET ELEMENTARY Y3 E-rate complete yes 7/7/2002 9.40 05/27/01B J. Korenstein BRAINARD AVENUE ELEMENTARY Y3 E-rate complete yes 6.55 02/11/02 5/13/2002A J. Korenstein BURTON STREET ELEMENTARY BB S & T and Y3 E-rate complete yes 3/17/2002 4.17 4/24/2001 1/3/02 5/23/2002C J. Korenstein CALAHAN STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 9.60C J. Korenstein CANTARA STREET ELEMENTARY Y3 E-rate complete yes 7.37 01/23/02B J. Korenstein CANTERBURY AVENUE ELEMENTARY Y3 E-rate complete yes 7.43 12/17/01 5/15/2002B J. Korenstein CARPENTER AVENUE ELEMENTARY Y3 E-rate complete yes 3.81 02/27/02C J. Korenstein CHANDLER ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 7.36 08/22/01A J. Korenstein CHASE STREET ELEMENTARY Y3 E-rate complete yes 6.03 2/5/02 5/23/2002C J. Korenstein CLEVELAND (GROVER) HIGH BB S & T and Y3 E-rate complete yes 5.38 3/1/2002 3/22/02C J. Korenstein COHASSET STREET ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 7/18/2002 12.12 09/04/01A J. Korenstein DANUBE AVENUE ELEMENTARY Y3 E-rate complete yes 9.69 08/07/01 5/20/2002A J. Korenstein DEARBORN STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 11.31

Page 25: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 10 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

C J. Korenstein DIXIE CANYON AVENUE ELEM Grant/Van Nuys E-rate Y2 complete yes 3/11/2002 6.14 08/22/01A J. Korenstein DOUGLAS (W GRANADA CONT) BB S & T yes 2.53 3/22/2002A J. Korenstein EINSTEIN (ALBERT) CONTINUATION Y3 E-rate complete yes 5.69 02/20/02 5/24/2002A J. Korenstein EL ORO WAY ELEMENTARY Y3 E-rate complete yes 7.09 11/26/01 5/20/2002C J. Korenstein EMELITA STREET ELEMENTARY Y3 E-rate complete yes 7.86 03/21/02C J. Korenstein ENCINO ELEMENTARY Y3 E-rate complete yes 7.10 03/01/02A J. Korenstein FROST (ROBERT) MIDDLE Y3 E-rate functioning - passed T & A yes 5.25 12/12/01C J. Korenstein FULTON (ROBERT) MIDDLE Grant/Van Nuys E-rate Y2 complete yes 5/2/2002 6.74 10/19/01C J. Korenstein GARDEN GROVE ELEMENTARY Y3 E-rate complete yes 4.71 01/09/02C J. Korenstein GAULT STREET ELEMENTARY Y3 E-rate complete yes 6/4/2002 18.32 02/28/02A J. Korenstein GLEDHILL STREET ELEMENTARY BB S & T and Y3 E-rate complete yes 5/20/2002 6.62 11/14/2000 12/7/01 5/22/2002F J. Korenstein GLEN ALTA ELEMENTARY Y3 E-rate functioning - passed T & A yes 4.87 05/11/01B J. Korenstein GLENWOOD ELEMENTARY BB S & T and Y3 E-rate complete yes 2/14/2002 5.63 2/15/2001 7/31/01 5/6/2002A J. Korenstein GRANADA ELEMENTARY funded Y4 E-rate - Verizon - in design progress 10.96A J. Korenstein GRANADA HILLS SENIOR HIGH BB S & T complete yes 4.46 3/22/2002C J. Korenstein GREY (ZANE) CONTINUATION (Reseda) BB S & T and Y3 E-rate complete yes 4.83 5/9/2001 8/3/01A J. Korenstein HASKELL ELEMENTARY Y3 E-rate complete yes 4.93 12/9/01 5/17/2002C J. Korenstein HAZELTINE AVENUE ELEM Grant/Van Nuys E-rate Y2 complete yes 6/13/2002 5.67 9/28/2001A J. Korenstein HENRY (PATRICK) MIDDLE funded Y4 E-rate - Verizon - in design progress 8.04B J. Korenstein HERRICK AVENUE ELEMENTARY Y3 E-rate complete yes 6/10/2002 5.52 07/23/01 4/29/2002A J. Korenstein HOLMES (OLIVER WENDELL) MIDDLE Y3 E-rate complete yes 6.41 03/25/02 5/22/2002B J. Korenstein HUBBARD STREET ELEMENTARY Y3 E-rate complete yes 6/10/2002 6.44 08/17/01 4/30/2002C J. Korenstein INDEPENDENCE CONTINUATION Y3 E-rate complete yes 4.58 01/09/02A J. Korenstein KENNEDY (JOHN F.) HIGH BB S & T and Y3 E-rate complete yes 5.12 1/17/2002 7/17/01 5/17/2002H J. Korenstein KENNEDY (ROBERT F.) ELEMENTARY Y3 E-rate functioning - passed T & A yes 7.87 12/18/01 6/17/2002C J. Korenstein KESTER AVENUE ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 6.64 11/01/01A J. Korenstein KNOLLWOOD ELEMENTARY Y3 E-rate complete yes 5.55 02/06/02 5/20/2002C J. Korenstein LANAI ROAD ELEMENTARY Y3 E-rate complete yes 5.96 01/10/02A J. Korenstein LANGDON AVENUE ELEMENTARY Y3 E-rate complete yes 12.21 01/28/02A J. Korenstein LASSEN ELEMENTARY Y3 E-rate complete yes 11.23 02/02/02 5/22/2002C J. Korenstein LEICHMAN (DIANE S.) SPECIAL ED Y3 E-rate complete yes 2.12 07/17/01C J. Korenstein LEMAY STREET ELEMENTARY Y3 E-rate complete yes 3.99 03/14/02A J. Korenstein LIGGETT STREET ELEMENTARY Y3 E-rate complete yes 3.62 12/13/01C J. Korenstein LOKRANTZ (SVEN) SPECIAL ED. CE Y3 E-rate complete yes 5.22 1/22/02C J. Korenstein LORNE STREET ELEMENTARY BB S & T, Y2 E-rate and: Y3 E-rate complete yes 6.46 11/12/1999 7/30/01C J. Korenstein LULL (FRED E.) SPECIAL ED. CEN Y3 E-rate complete yes 2.85 08/20/01B J. Korenstein MACLAY (CHARLES) MIDDLE Y3 E-rate complete yes 5.21 03/21/02 5/10/2002B J. Korenstein MACLAY Primary Center Y3 E-rate complete yes 5.29 1/1/2000 08/14/01A J. Korenstein MAYALL STREET ELEMENTARY Y3 E-rate complete yes 5.13 01/10/02 5/21/2002

Page 26: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 11 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

C J. Korenstein MELVIN AVENUE ELEMENTARY Y3 E-rate complete yes 14.92 2/7/02C J. Korenstein MILLER (JOAQUIN) SH SP ED Y3 E-rate complete yes 2.02 07/06/01C J. Korenstein MILLIKAN (ROBERT A.) MIDDLE Grant/Van Nuys E-rate Y2 complete yes 9.43 09/28/01A J. Korenstein MONROE (JAMES) HIGH Y3 E-rate complete yes 3.62 02/21/02 5/24/2002B J. Korenstein MOUNT GLEASON MIDDLE Y3 E-rate complete yes 7.06 03/07/02 5/16/2002B J. Korenstein MOUNT LUKENS CONT BB S & T and Y3 E-rate complete yes 4/15/2002 4.21 3/13/2002 6/22/01B J. Korenstein MOUNTAIN VIEW ELEMENTARY BB S & T 99% and Y3 E-rate complete yes 9.58 8/9/01 4/29/2002C J. Korenstein MULHOLLAND (WILLIAM) MIDDLE BB S & T and Y3 E-rate complete yes 3.57 5/23/2001 2/14/02C J. Korenstein NESTLE AVENUE ELEMENTARY Y3 E-rate complete yes 13.00 01/18/02C J. Korenstein NEWCASTLE ELEM BB S & T and Y3 E-rate complete yes 6/18/2002 3.71 1/1/2001 1/28/02A J. Korenstein NOBLE AVENUE ELEMENTARY BB S & T and Y3 E-rate complete yes 4.00 8/2/01C J. Korenstein NORTHRIDGE MIDDLE Y3 E-rate complete yes 6.37 03/26/02B J. Korenstein OLIVE VISTA MIDDLE Y3 E-rate complete yes 5.30 1/15/02 4/25/2002A J. Korenstein PARTHENIA STREET ELEMENTARY Y3 E-rate complete yes 4.89 12/13/01 5/24/2002B J. Korenstein PINEWOOD AVENUE ELEMENTARY Y3 E-rate complete yes 6.25 02/26/02 5/20/2002B J. Korenstein PLAINVIEW AVENUE ELEM Y3 E-rate complete yes 6.60 02/28/02 5/15/2002A J. Korenstein PLUMMER ELEMENTARY Y3 E-rate complete yes 3.06 03/22/02A J. Korenstein PORTER (GEORGE K.) MIDDLE BB S & T and Y3 E-rate complete yes 19.94 7/26/2001 12/27/01 5/21/2002A J. Korenstein PRIM ACADFOR SUCCESS SCH (Monroe Primary Center) completed - new construction yes 4.66 9/1/1999A J. Korenstein RANCHITO AVENUE ELEMENTARY Y3 E-rate complete yes 6.24 12/12/01 5/23/2002C J. Korenstein RESEDA ELEMENTARY Y3 E-rate complete yes 9.35 01/09/02C J. Korenstein RESEDA SENIOR HIGH BB S & T and Y2 E-rate complete yes 5.83 5/9/2001 1/15/02C J. Korenstein RIVERSIDE DRIVE ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 9.85 07/23/01C J. Korenstein ROGERS (WILL) CONTINUATION Grant/Van Nuys E-rate Y2 complete yes 7/26/2002 3.64 07/16/01A J. Korenstein SEPULVEDA (FRANCISCO) MIDDLE Y3 E-rate complete yes 6.32 04/03/02 5/24/2002C J. Korenstein SHERMAN OAKS CTR. FOR ENRICHED Y3 E-rate complete yes 7.28 04/08/02C J. Korenstein SHERMAN OAKS ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 1/24/2002 9.41 08/22/01C J. Korenstein SHIRLEY AVENUE ELEMENTARY Y3 E-rate complete yes 7.51 01/30/02C J. Korenstein STAGG STREET ELEMENTARY Y3 E-rate complete yes 6.14 02/22/02B J. Korenstein STONEHURST AVENUE ELEMENTARY Y3 E-rate complete yes 4.07 02/12/02 4/11/2002B J. Korenstein SUNLAND ELEMENTARY Y3 E-rate complete yes 8.85 01/29/02 5/16/2002B J. Korenstein SYLMAR ELEMENTARY BB S & T 88% and Y3 E-rate complete yes 3.96 3/11/02 4/22/2002C J. Korenstein SYLVAN PARK ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 7/9/2002 6.06 07/25/01C J. Korenstein TARZANA ELEMENTARY Y3 E-rate complete yes 10.02 03/04/02A J. Korenstein TULSA STREET ELEMENTARY funded Y4 E-rate - Verizon - in design progress 4.98C J. Korenstein VALERIO NEW PRIMARY CENTER completed 3 years ago - copper backbone- Y4 E-rate - upgrade yes 4.69 12/1/1998C J. Korenstein VALERIO STREET ELEMENTARY BB S & T, Y2 E-rate and G/VN E-rate completed yes 6/4/2002 3.74 12/20/2000C J. Korenstein VALLEY ALTERNATIVE Y3 E-rate complete yes 9.80 12/14/01A J. Korenstein VAN GOGH STREET ELEMENTARY Y3 E-rate complete yes 4.74 8/6/01 5/20/2002

Page 27: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 12 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

C J. Korenstein VAN NUYS ELEMENTARY Grant/Van Nuys E-rate Y2 complete yes 3/11/2002 2.45 10/15/01C J. Korenstein VAN NUYS MIDDLE Grant/Van Nuys E-rate Y2 complete yes 6.28 09/28/01C J. Korenstein VAN NUYS SENIOR HIGH Grant/Van Nuys E-rate Y2 complete yes 3.26 02/05/02C J. Korenstein VANALDEN AVENUE ELEMENTARY Y4 E-rate functioning, needs T & A yes 7.20B J. Korenstein VERDUGO HILLS SENIOR HIGH BB S & T and Y3 E-rate complete yes 3/21/2002 4.42 3/13/2002 01/22/02 4/30/2002B J. Korenstein VINEDALE ELEMENTARY Y3 E-rate complete yes 6.29 02/22/02 5/15/2002A J. Korenstein VINTAGE STREET Magnet ELEM BB S & T and Y2 E-rate complete yes 4.52 12/20/2000C J. Korenstein WEST VALLEY SPECIAL ED. CENTER Y3 E-rate complete yes 2.79 12/13/01D M. Canter 98th St (NINETY-EIGHTH ST) Y4 E-rate - 40% complete progress 5.36A M. Canter AGGELER (WILLIAM TELL) OPPORTU BB S & T Waiting for Local Dist FD and PM to put out to bid no 0.22A M. Canter BECKFORD AVENUE ELEMENTARY BB S & T out to bid no 8.97D M. Canter BEETHOVEN STREET ELEMENTARY funded Y4 E-rate - Verizon - in design progress 22.18D M. Canter BELLAGIO ROAD NEWCOMER CENTER Y3 E-rate functioning - passed T & A yes 4/28/2002 5.89 06/12/01D M. Canter BRADDOCK DRIVE ELEMENTARY Y4 E-rate - 60% complete progress 9.05D M. Canter BRENTWOOD SCIENCE BB S & T complete yes 5.65 5/14/2001D M. Canter BROADWAY ELEMENTARY Y4 E-rate - 80% complete progress 3.45D M. Canter BROCKTON AVENUE ELEMENTARY funded Y4 E-rate - 30 % complete progress 16.53A M. Canter CALABASH STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 7.95C M. Canter CALVERT STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 8.40D M. Canter CANFIELD AVENUE ELEMENTARY funded Y4 E-rate - Verizon - in design progress 7.45A M. Canter CANOGA PARK ELEMENTARY Y4 E-rate functioning - passed T & A yes 5.90 6/30/02 6/30/2002A M. Canter CANOGA PARK SENIOR HIGH Y4 E-rate - 5% complete progress 4.33D M. Canter CANYON ELEMENTARY BB S & T bid, needs to be awarded LDFD Responsible no 4.94A M. Canter CAPISTRANO AVENUE ELEMENTARY funded Y4 E-rate - Verizon - in design progress 8.44D M. Canter CASTLE HEIGHTS ELEMENTARY BB S & T bid LDFD responsible no 8.82A M. Canter CASTLEBAY LANE ELEMENTARY BB S & T 70% complete progress 8.09A M. Canter CHATSWORTH PARK ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 10.55A M. Canter CHATSWORTH SENIOR HIGH BB S & T complete yes 4.14 3/13/2002D M. Canter CHEVIOT HILLS CONT (Hami) BB S & T complete yes 5.36 3/29/2001D M. Canter CLOVER AVENUE ELEMENTARY BB S & T 40% complete progress 6.03D M. Canter COEUR D'ALENE AVENUE ELEM BB S & T complete yes 4.12 12/4/2000A M. Canter COLUMBUS (CHRISTOPHER) MIDDLE BB S & T and Y2 E-rate complete - Y4 E-rate - upgrades yes 6.43 6/15/2001D M. Canter COWAN AVENUE ELEMENTARY BB S & T out to bid no 9.06D M. Canter CRESCENT HEIGHTS BLD ELE Y4 E-rate - in construction progress 4.11A M. Canter DARBY AVENUE ELEMENTARY BB S & T 70% complete progress 8.98D M. Canter DEL REY CONT (Westchester) BB S & T complete yes 2.21 9/4/2001A M. Canter EL CAMINO REAL SENIOR HIGH BB S & T, Y2 E-rate complete yes 4.38 11/9/2001D M. Canter EMERSON (RALPH WALDO) MIDDLE Y3 E-rate functioning - passed T & A yes 5.12 5/22/02D M. Canter FAIRBURN AVENUE ELEM BB S & T Waiting for Local Dist FD and PM to put out to bid no 5.31

Page 28: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 13 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

C M. Canter FULLBRIGHT AVENUE ELEMENTARY Y4 E-rate functioning needs T & A yes 20.16A M. Canter GERMAIN STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 10.85A M. Canter HALE (GEORGE ELLERY) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 10.74D M. Canter HAMILTON (ALEXANDER) SENIOR HI BB S & T complete yes 4.27 3/29/2001A M. Canter HAMLIN STREET ELEMENTARY funded Y4 E-rate - Verizon - in design progress 7.52A M. Canter HART STREET ELEMENTARY Y4 E-rate - 95 % complete yes 5.18K M. Canter HAWAIIAN AVENUE ELEMENTARY BB S & T under construction - 98% Complete progress 5.04A M. Canter HAYNES ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 3.62D M. Canter INDIAN SPRINGS CONT (UNI HS) BB S & T complete yes 5/16/2002 1.88 7/27/1999A M. Canter JUSTICE STREET ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 6.56D M. Canter KENTER ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 7.25D M. Canter KENTWOOD ELEMENTARY BB S & T bid LDFD responsible no 5.76A M. Canter LAWRENCE (ERNEST) MIDDLE funded Y4 E-rate - Verizon - in design yes 11.19A M. Canter LEONIS (MIGUEL) CONT (El Camino) BB S & T and Y2 E-rate complete yes 4.17 11/9/2001A M. Canter LIMERICK AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 7.84 6/27/02 6/27/2002A M. Canter LOCKHURST DRIVE ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 3.24D M. Canter LOYOLA VILLAGE ELEMENTARY BB S & T complete yes 12.15 7/11/2000D M. Canter MAR VISTA ELEMENTARY BB S & T and Y2 E-rate complete yes 5.18 5/4/1999D M. Canter MARINA DEL REY MIDDLE Y4 E-rate - 50% complete progress 6.59D M. Canter MARK TWAIN MIDDLE funded Y4 E-rate - Verizon - in design progress 9.35D M. Canter MARQUEZ CHARTER SCHOOL ELEM BB S & T bid, not awarded LDFD and PM responsible yes 4.17C M. Canter NAPA STREET ELEMENTARY Y3 E-rate complete yes 5/22/2002 4.13 07/05/01A M. Canter NEVADA AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 11.70 6/28/02 6/28/2002A M. Canter NOBEL (ALFRED BERNHARD) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 11.01D M. Canter OPEN Magnet - Center for Individual (Osage) ITD installed when school open yes 2.18 01/28/99D M. Canter OVERLAND AVENUE ELEMENTARY BB S & T bid LDFD responsible no 5.29A M. Canter OWENSMOUTH CONT (Canoga Park) to be completed with Canoga Park HS progress 4.07D M. Canter PACIFIC PALISADES ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 3.61D M. Canter PALISADES CHARTER SH BB S & T complete yes 5.75 7/13/2001D M. Canter PALMS MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 9.03C M. Canter PARKMAN (FRANCIS) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 7.28D M. Canter PASEO DEL REY NATURAL SCIENCE MAG BB S & T Waiting for Local Dist FD and PM to put out to bid no 5.92D M. Canter PHOENIX CONT (Venice) BB S & T 90% complete progress 2.06D M. Canter PLAYA DEL REY ELEMENTARY Y4 E-rate - 60% complete progress 4.61A M. Canter POMELO DRIVE ELEMENTARY BB S & T complete yes 9.24 6/13/2000C M. Canter PORTOLA(GASPER) M S Y3 E-rate complete yes 10.81 03/11/02D M. Canter REVERE MIDDLE BB S & T complete yes 5.42 8/30/2001D M. Canter RICHLAND AVENUE ELEMENTARY BB S & T complete - Y4 E-rate beginning construction yes 5.61 4/17/2002D M. Canter ROSCOMARE ROAD ELEMENTARY BB S & T bid LDFD responsible no 5.83

Page 29: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 14 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

C M. Canter SERRANIA AVENUE ELEMENTARY BB S & T and Y2 E-rate complete yes 5.09 6/15/2001D M. Canter SHORT AVENUE ELEMENTARY BB S & T contract awarded waiting start date also Y4 E-rate Verizon progress 3.79D M. Canter STERRY (NORA) ELEMENTARY Y4 E-rate - 45% complete progress 4.03D M. Canter STONER AVENUE ELEMENTARY Y4 E-rate - 60% complete progress 5.73A M. Canter STONEY POINT CONTINUATION BB S & T complete yes 2.32 3/13/2002A M. Canter SUNNY BRAE AVENUE ELEMENTARY Y4 E-rate functioning, needs T & A yes 9.14A M. Canter SUPERIOR STREET ELEMENTARY funded Y4 E-rate - Verizon - in design progress 5.77C M. Canter SUTTER (JOHN A.) MIDDLE Y3 E-rate complete yes 5.87 03/27/02C M. Canter TAFT (WILLIAM HOWARD) SENIOR H BB S & T bid LDFD responsible no 4.39D M. Canter TEMESCAL CANYON HIGH (CONT) SCHOOL BB S & T complete yes 3.41 7/13/2001C M. Canter THOREAU (HENRY DAVID) CONT(Taft) BB S & T bid LDFD responsible no 3.75D M. Canter TOPANGA ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.38A M. Canter TOPEKA DRIVE ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 5.48D M. Canter UNIVERSITY SENIOR HIGH BB S & T and Y2 E-rate complete yes 5/13/2002 4.11 7/27/1999D M. Canter VENICE SENIOR HIGH BB S & T 90% complete progress 4.97D M. Canter WALGROVE AVENUE ELEMENTARY Y4 E-rate - 70% complete progress 11.69D M. Canter WARNER AVENUE ELEMENTARY BB S & T bid LDFD responsible no 10.55D M. Canter WEBSTER (DANIEL) MIDDLE Y4 E-rate - 50% complete progress 10.88A M. Canter WELBY WAY ELEMENTARY BB S & T out to bid progress 6.84D M. Canter WESTCHESTER SENIOR HIGH BB S & T and Y2 E-rate complete yes 3.34 9/4/2001D M. Canter WESTMINSTER AVENUE ELEMENTARY Y4 E-rate - 85% complete progress 3.64D M. Canter WESTPORT HEIGHTS ELEMENTARY funded Y4 E-rate Verizon progress 14.67D M. Canter WESTSIDE LEADERSHIP (ALT.) funded Y4 E-rate Verizon progress 6.52D M. Canter WESTWOOD ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.72C M. Canter WILBUR AVENUE ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 8.77C M. Canter WINNETKA AVENUE ELEMENTARY Y3 E-rate complete yes 8.56 03/11/02A M. Canter WOODLAKE AVENUE ELEMENTARY BB S & T 32% complete progress 13.76D M. Canter WRIGHT (ORVILLE) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 21.12I M. Lansing 107TH ST (ONE HUNDRED SEVENTH STREET EL) Y3 E-rate - 62% complete progress 7.96 6/24/2002I M. Lansing 109THh St (ONE HUNDRED NINTH STREET EL) Y3 E-rate - 59% complete progress 6.07 6/24/2002I M. Lansing 112TH ST (ONE HUNDRED TWELFTH STREET) ELE Y3 E-rate - 79% complete progress 5.16 6/24/2002I M. Lansing 116TH ST (ONE HUNDRED SIXTEENTH ST EL) Y3 E-rate - 86% complete progress 6.15 6/24/2002I M. Lansing 118TH ST (ONE HUNDRED EIGHTEENTH STREET) BB S & T and E-rate functioning - passed T & A yes 3/20/2002 6.33 8/24/2000 7/17/02 6/10/2002I M. Lansing 122ND St (ONE HUNDRED TWENTY-SECOND STREET) Y3 E-rate - 83% complete progress 5.03 6/24/2002K M. Lansing 135TH ST (ONE HUNDRED THIRTY-FIFTH STREET) Y3 E-rate complete yes 3/18/2002 5.97 06/28/01K M. Lansing 153RD ST (ONE HUNDRED FIFTY-THIRD ST) Y3 E-rate complete yes 6/13/2002 6.50 06/11/01K M. Lansing 156TH ST (ONE HUNDRED FIFTY-SIXTH ST EL) Y3 E-rate complete yes 5.86 05/20/01K M. Lansing 15TH ST (FIFTEENTH ST ELEMENTARY) Y4 E-rate functioning - passed T & A yes 4.31 5/21/02 5/21/2002K M. Lansing 186TH St (ONE HUNDRED EIGHT-SIXTH ST EL) Y3 E-rate complete yes 5/20/2002 13.16 05/26/01

Page 30: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 15 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

K M. Lansing 232nd PL (TWO HUNDRED THIRTY-SECOND PL) Y4 E-rate Vector - in design progress 8.38K M. Lansing 7th ST (SEVENTH ST ELEM) BB S & T Waiting for Local Dist FD and PM to put out to bid no 6.34I M. Lansing 92nd ST (NINETY-SECOND ST ELEM) Y3 E-rate - 73% complete progress 7.33 6/24/2002I M. Lansing 93rd ST (NINETY-THIRD ST ELEM) Y3 E-rate - 64% complete progress 7.36 6/24/2002G M. Lansing 95th ST (NINETY-FIFTH ST ELEM) Y3 E-rate complete yes 7/17/2002 4.40 06/25/01I M. Lansing 96th ST (NINETY-SIXTH ST ELEM) Y3 E-rate - 70% complete progress 5.19 6/24/2002I M. Lansing 99th ST (NINETY-NINTH ST ELEM) Y3 E-rate functioning - passed T & A yes 11.14 7/25/02 6/11/2002H M. Lansing ACCELERATED CHARTER SCHOOL 11 rooms existing - BB S & T yes 3.97K M. Lansing AMBLER AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 24.80K M. Lansing AMESTOY ELEMENTARY Y3 E-rate complete yes 4.69 05/29/01K M. Lansing ANGEL'S GATE (CONT.) (San Pedro) BB S & T complete yes 3.22 12/22/2000K M. Lansing ANNALEE AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 11.67H M. Lansing ARCO IRIS PRIMARY CENTER Y3 E-rate functioning - passed T & A yes 3.41 06/06/01 6/10/2002H M. Lansing ASCOT AVENUE ELEMENTARY BB S & T and Y2 E-rate complete: Y3 passed T&A yes 4/14/2002 4.43 3/1/2000 6/10/2002K M. Lansing AVALON CONTINUATION BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.83K M. Lansing AVALON GARDENS ELEMENTARY BB S & T and Y2 E-rate and: Y3 E-rate complete yes 4/15/2002 3.08 8/31/1999 6/21/01K M. Lansing BANDINI STREET ELEMENTARY Y4 E-rate Vector - in design progress 3.12K M. Lansing BANNEKER (BENJAMIN) SPECIAL ED Y3 E-rate complete yes 5.95 05/31/01K M. Lansing BANNING (PHINEAS) SENIOR HIGH BB S & T 0% -contract awarded waiting for start date Y4 E-rate progress 2.99I M. Lansing BARRETT (CHARLES W.) ELMENTARY Y3 E-rate functioning - passed T & A progress 9.44 8/1/02 6/11/2002K M. Lansing BARTON HILL ELEMENTARY Y4 E-rate functioning needs T & A yes 6.11K M. Lansing BONITA STREET ELEMENTARY Y4 E-rate Vector - in design progress 15.21K M. Lansing BROAD AVENUE ELEMENTARY BB S & T complete yes 1/29/2002 4.92 6/21/2001K M. Lansing BROADACRES AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 4.82K M. Lansing CABRILLO AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 11.56 5/24/02 5/24/2002K M. Lansing CARNEGIE (ANDREW) MIDDLE Y4 E-rate Vector - in design progress 15.28K M. Lansing CAROLDALE LEARNING CENTER Y4 E-rate Vector - in design progress 8.19K M. Lansing CARSON SENIOR HIGH BB S & T 78% complete yes 3.81K M. Lansing CARSON STREET ELEMENTARY Y4 E-rate functioning - passed T & A yes 7.60 6/6/02 6/6/2002K M. Lansing CATSKILL AVENUE ELEMENTARY BB S & T and Y2 E-rate complete yes 8.14 3/7/2001G M. Lansing CENTURY PARK ELEMENTARY BB S & T and Y3 E-rate complete yes 8.47 5/19/2000 5/17/01K M. Lansing CHAPMAN ELEMENTARY Y3 E-rate complete yes 6/4/2002 9.31 05/27/01G M. Lansing CIMARRON AVENUE ELEM Y3 E-rate complete yes 8.29 06/20/01G M. Lansing CLAY (HENRY) MIDDLE Y3 E-rate complete yes 9.27 06/28/01I M. Lansing COMPTON AVENUE ELEMENTARY Y3 E-rate - 77% complete progress 4.22K M. Lansing COOPER (JAMES FENIMORE) OPPORT BB S & T Waiting for Local Dist FD and PM to put out to bid no 2.64K M. Lansing CRESTWOOD STREET ELEM BB S & T Waiting for Local Dist FD and PM to put out to bid no 5.74K M. Lansing CURTISS (GLENN HAMMOND) MIDDLE BB S & T Waiting for Local Dist FD and PM to put out to bid no 7.77K M. Lansing DANA (RICHARD HENRY) MIDDLE BB S & T and Y2 E-rate complete yes 5.93 8/16/2000

Page 31: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 16 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

K M. Lansing DEL AMO ELEMENTARY Y4 E-rate Vector - in design progress 7.08K M. Lansing DENKER AVENUE ELEMENTARY Y3 E-rate complete yes 2/14/2002 7.99 05/26/01K M. Lansing DODSON M S BB S & T advertised to bid LDFD and PM responsible progress 13.81K M. Lansing DOLORES STREET ELEMENTARY Y4 E-rate Vector - in design progress 8.70K M. Lansing DOMINGUEZ ELEMENTARY BB S & T and Y2 E-rate complete yes 7.44 3/7/2001I M. Lansing DREW (CHARLES) MIDDLE Y3 E-rate - 35% complete progress 5.42 6/24/2002K M. Lansing EAGLE TREE CONT (Carson) BB S & T 78% complete progress 2.33I M. Lansing EDISON (THOMAS A.) MIDDLE Y3 E-rate - 83% complete progress 5.28 6/24/2002G M. Lansing ELLINGTON (DUKE) CONT. (Wash) BB S & T and Y3 E-rate complete yes 8.71 5/24/2000 6/14/01K M. Lansing ESHELMAN AVENUE ELEMENTARY Y4 E-rate functioning - passed T & A yes 7.85 04/29/02 4/29/2002I M. Lansing FIGUEROA STREET ELEMENTARY Y3 E-rate - 23% complete progress 5.12K M. Lansing FLEMING (ALEXANDER) MIDDLE Y4 E-rate Vector - in design progress 9.64I M. Lansing FLOURNOY (LOVELIA P.) ELEMENTA Y3 E-rate - 89%complete progress 8.82 6/24/2002K M. Lansing FRIES AVENUE ELEMENTARY BB S & T and Y2 E-rate complete yes 7/8/2002 3.67 11/21/2000K M. Lansing GARDENA ELEMENTARY Y3 E-rate complete yes 5/16/2002 5.28 05/16/01K M. Lansing GARDENA SENIOR HIGH BB S & T 98% complete -Mod under construction: Y3 E-rate complete yes 5.61 6/29/01I M. Lansing GOMPERS (SAMUEL) MIDDLE Y3 E-rate - 77% complete progress 7.96 6/24/2002I M. Lansing GRAPE STREET ELEMENTARY Y3 E-rate functioning - passed T & A yes 17.98 7/30/02I M. Lansing GRIFFITH JOYNER (102nd) Y3 E-rate - 67% complete progress 4.48K M. Lansing GULF AVENUE ELEMENTARY Y4 E-rate - 95% complete yes 10.63K M. Lansing HALLDALE ELEMENTARY Y4 E-rate Vector - in design progress 10.92K M. Lansing HARBOR CITY ELEMENTARY Y4 E-rate functioning - passed T & A yes 5.03 04/26/02 4/26/2002J M. Lansing HOLMES AVENUE ELEMENTARY Y3 E-rate - 75% complete progress 5.88H M. Lansing HOOPER AVENUE ELEMENTARY BB S & T and Y2 E-rate complete: add Y3 passed T &A yes 4/4/2002 5.06 10/17/2000 11/5/01 6/10/2002H M. Lansing JEFFERSON (THOMAS) S H BB S & T and Y2 E-rate complete: add Y3 functioning, need to pass T&A yes 3.25 1/31/2001 5/29/2002H M. Lansing JOHNSON (DOROTHY V.) OPPORT Y3 E-rate functioning - needs T & A yes 2.49 5/29/2002I M. Lansing JORDAN (DAVID STARR) SENIOR HI BB S & T and E-rate functioning - passed T & A yes 9.27 6/22/2001 5/23/02 6/13/2002I M. Lansing KING/DREW MEDICAL MAGNET HIGH BB S & T and E-rate functioning - passed T & A yes 4.77 7/17/02K M. Lansing LEAPWOOD AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 4.89K M. Lansing LELAND STREET ELEMENTARY Y4 E-rate Vector - in design progress 5.65I M. Lansing LOCKE (ALAIN LEROY) SENIOR HIG Y3 E-rate functioning - passed T & A yes 7.95 7/29/02 6/24/2002K M. Lansing LOMITA MATH/SCIENCE MAGNET BB S & T Waiting for Local Dist FD and PM to put out to bid no 4.90I M. Lansing MARKHAM (EDWIN) MIDDLE BB S & T and E-rate functioning - passed T & A yes 9.35 8/22/2001 7/16/02 6/10/2002K M. Lansing MEYLER STREET ELEMENTARY Y4 E-rate functioning, needs T & A yes 8.74G M. Lansing MIDDLE COLLEGE HIGH (ALT.) Y3 E-rate complete yes 2.69 06/25/01I M. Lansing MIRAMONTE ELEMENTARY Y3 E-rate - 44% complete progress 3.46 6/24/2002K M. Lansing MONETA CONTINUATION BB S & T 98% complete - Y3 E-rate complete yes 3.35 5/26/01K M. Lansing NARBONNE (NATHANIEL) SENIOR HI BB S & T and Y2 E-rate complete yes 5.23 12/4/2001H M. Lansing NEVIN AVENUE ELEMENTARY BB S & T and Y2 E-rate 95% com: Y3 E-rate complete yes 4.80 7/25/02 5/29/2002

Page 32: Los Angeles Unified School District · Los Angeles Unified School District ... SBC states 63 school sites will be completed by 9/30/02. District staff believes 63 will be functioning

LAN Progress8/8/200212:53 PM 17 J. Alther 213 241 1800

Local

DistBoard

Member School Site LAN status as August 5, 2002

Internet Access

all rooms

Complete end to end

(Magic)

Stu/Comp Ratio

Date BB LAN

Tested Accepted

Date Erate LAN

Tested & Accepted

Y4 Clrm Switch install

K M. Lansing NORMONT ELEMENTARY Y4 E-rate functioning - passed T & A yes 2.75 6/12/02 6/12/2002K M. Lansing PARK WESTERN PLACE ELEMENTARY Y4 E-rate Vector - in design progress 1.33I M. Lansing PARMELEE AVENUE ELEMENTARY Y3 E-rate - 31% complete progress 5.09 6/28/2002K M. Lansing PATTON (GEORGE S.) CONT (Narbonne) BB S & T complete yes 4.67 12/4/2001K M. Lansing PEARY (ROBERT E.) MIDDLE Y3 E-rate complete yes 11.36 06/07/01K M. Lansing POINT FERMIN ELEMENTARY Y4 E-rate Vector - in design progress 6.77K M. Lansing PRESIDENT AVENUE ELEMENTARY Y4 E-rate Vector - in design progress 11.92K M. Lansing PURCHE AVENUE ELEMENTARY Y3 E-rate complete yes 8.95 06/11/01I M. Lansing RITTER ELEMENTARY BB S & T and E-rate functioning - passed T & A yes 6/4/2002 5.87 11/21/2000 7/28/02 6/10/2002I M. Lansing RODIA (SIMON) CONTINUATION BB S & T complete Y3 E-rate functioning yes 2.85 6/23/2001I M. Lansing RUSSELL ELEMENTARY Y3 E-rate - 35% complete progress 7.52 6/24/2002K M. Lansing SAN PEDRO SENIOR HIGH BB S & T and Y2 E-rate complete yes 4/22/2002 8.13K M. Lansing SELLERY (C. MORLEY) SPECIAL ED Y3 E-rate complete yes 2.93 05/19/01K M. Lansing SOUTH SHORES/CSUDH VISUAL & PE BB S & T complete: E-rate functioning: add Y3 passed T &At yes 3.96 8/24/2000 3/1/02K M. Lansing TAPER AVENUE ELEMENTARY BB S & T Waiting for Local Dist FD and PM to put out to bid no 8.35K M. Lansing TOWNE AVENUE ELEMENTARY Y4 E-rate functioning, needs T & A yes 6.28I M. Lansing TRUTH (SOJOURNER) CONT Y3 E-rate functioning - passed T & A yes 5.90 7/29/02 6/30/2002K M. Lansing VAN DEENE AVENUE ELEM Y4 E-rate functioning - passed T & A yes 11.95 6/7/02 6/7/2002H M. Lansing WADSWORTH AVENUE ELEMENTARY Y3 E-rate functioning - needs T & A yes 6.28 6/10/2002G M. Lansing WASHINGTON (GEORGE) PREP HS BB S & T and Y2 E-rate and: Y3 E-rate complete yes 2.81 5/24/2000 6/14/02I M. Lansing WEIGAND AVENUE ELEMENTARY Y3 E-rate - 76% complete progress 2.95 6/30/2002G M. Lansing WEST ATHENS ELEMENTARY BB S & T and Y2 E-rate and: Y3 E-rate complete yes 4.59 7/12/2000 5/22/01K M. Lansing WHITE (STEPHEN M.) MIDDLE BB S & T complete - Y4 E-rate upgrades yes 6.39 3/8/2001K M. Lansing WHITE POINT ELEMENTARY BB S & T awarded waiting start no 4.53K M. Lansing WILLENBERG (ERNEST P.) SPECIAL Y4 E-rate - 85% complete yes 3.88K M. Lansing WILMINGTON MIDDLE Y4 E-rate - 95% complete yes 7.17K M. Lansing WILMINGTON PARK ELEMENTARY Y4 E-rate Vector - in design progress 18.37G M. Lansing WOODCREST ELEMENTARY Y3 E-rate complete yes 8.16 06/26/01