TSX.V - CBS www.bardventures.com Lone Pine Molybdenum Project

Upload: hoangduong

Post on 30-Aug-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

TSX.V - CBSw w w. b a r d v e n t u r e s . c o m

Lone Pine

Molybdenum Project

• Forward Looking Statement

• Certain information regarding the Company contained herein may constitute forward- looking

statements within the meaning of applicable securities laws. Forward-looking statements may

include estimates, plans, expectations, opinions, forecasts, projections, guidance or other

statements that are not statements of fact. Although the Company believes that the

expectations reflected in such forward-looking statements are reasonable, it can give no

assurance that such expectations will prove to have been correct. The Company cautions that

actual performance will be affected by a number of factors, many of which are beyond the

Company’s control, and that future events and results may vary substantially from what the

Company currently foresees. Discussion of the various factors that may affect future results is

contained in the Company’s Annual Report which is available at www.sedar.com.

• The Company’s forward-looking statements are expressly qualified in their entirety by this

cautionary statements.

• *This presentation has been reviewed by Mr. R. Kemp, P. Geo., a qualified person as that term is

defined in NI 43-101.

Property Location Map

Lone PineProperty

Claim Location

• Highway 16

15km Houston

50km to Smithers

• Pacific Northern Gas

10.75” dia. pipeline

• 500 kV transmission

line and hydro

substation

• CN Rail link to coastal

ports of Kitimat and

Prince Rupert

Exploration History

• 1979-1983 Noranda Exploration Ltd.

– Evaluated for VMS potential east of Mineral Hill

• 1985 Daffrey Resources

– Assess precious metal potential of Quartz Breccia

and Alaskite Zones

– 12 percussion drill holes

2006-2007 Bard Exploration

• August 2006:

Bard Options Lone Pine Property from Daniel and

William Merkley of Houston, BC

• 2007: 41.25km of gridding

– 3D Induced Polarization Survey

Magnetic Survey

• Jan-Feb 2007: 7NQ Drill Holes = 2836.4m

• Sept-Dec 2007: 16 NQ Drill Holes = 5383.1m

Bard 2008 Exploration Program

• Jan-April 2008: 16 NQ Drill Holes = 8957.2m

• July-Oct 2008: 16 NQ Drill Holes = 8957.2m

– Alaskite Zone: 40 Drill Holes = 21,295.2m

– Qtz Breccia Zone: 7 Drill Holes = 3456.3m

– Granby Zone: 4 Drill Holes = 952.6m

– Other: 4 Drill Holes = 1308.1m

• Total combined Drilling 2007-2008

55 Drill Holes = 27,012.2m

Mineral Hill Zone

Coarse grained Quartz Feldspar Porphyry

Fine to medium grained alaskite intrusive or leucogranite

Hornfels and altered volcanics

Massive fine grained volcanics

Massive grey diorite

Tuffs (grey)

Pinkish magnetic monzonitic dyke

Tuffs (brown)

Quartz BrecciaZone

AlaskiteZone

GranbyZone

Mineral Hill ZonePercussion hole M14

0.03% MoS2 / 85.4m

Alaskite ZoneDrill Section

Mineral Resource Summary

MEASURED + INDICATED

Cut-off

% Mo

Tonnes ≥

Cutoff

(000's)

Mo%In-situ lbs

Mo (000's)

0.02 151,536 0.069 232,071

0.03 140,417 0.073 225,193

0.04 110,340 0.083 201,733

0.05 84,869 0.094 176,628

0.06 66,454 0.106 154,890

0.07 54,702 0.114 137,758

0.08 47,583 0.120 125,858

0.09 41,556 0.126 115,132

0.10 34,975 0.131 101,310

INFERRED

Cutoff

% Mo

Tonnes ≥

Cutoff

(000's)

Mo%In-situ lbs

Mo (000's)

0.02 27,827 0.084 51,532

0.03 27,555 0.085 51,636

0.04 25,840 0.088 50,131

0.05 22,839 0.094 47,331

0.06 18,295 0.104 41,947

0.07 15,238 0.111 37,290

0.08 13,092 0.117 33,769

0.09 11,800 0.121 31,477

0.10 10,186 0.125 28,070

Ronald G Simpson P.Geo

(GeoSim Services Inc.)

0.02% Mo Gradeshell Domain View

Looking NE

Alaskite / Mo Grade Shell

Looking NW

Block Model Grade Distribution

Bard 2009 – Mo in Soils

BD-07-01

BD-07-03

Bard 2009 – Cu in Soils

BD-07-01

BD-07-03

Bard 2009 – Ag in Soils

BD-07-01

BD-07-03

IP Resistivity – 50m Depth

BD-07-01

BD-07-03

IP Chargeabilty – 50m Depth

BD-07-01

BD-07-03

Bard 2009-10 Exploration Programs

• Compilation of available historic data

• Mapping and soil geochemical survey (480 samples)

covering 12.1 grid line kilometers overlying quartz

feldspar granite intrusive.

• Historical showings located and sampled.

• Nov- Dec 2009: 9 NQ Drill Holes = 2495.0m

(BD-09-49 to BD-09-57)

• Feb - Mar 2010: 9 NQ Drill Holes = 3427.1m

(BD-10-58 to BD-10-66)

2007-2010 Bard Drill Hole locations

Lone Pine Preliminary Pit Design

Lone Pine Preliminary Pit Design

Lone Pine Preliminary Pit Design

Lone Pine Preliminary Pit Design

Lone Pine Preliminary Pit Design

Lone Pine Preliminary Pit Design

Lone Pine Preliminary Pit Design

Lone Pine Preliminary Pit Design

Lone Pine Preliminary Pit Design

Sensitivity of Project Economics to

Molybdenum Prices at Various Discount Rates

This preliminary assessment is preliminary in nature. It includes inferred mineral resources that are considered too speculative

geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves.

There is no certainty that this preliminary assessment will be realized.

Bard 2009-10 Exploration Program

Coarse grained Quartz Feldspar Porphyry

Fine to medium grained alaskite intrusive or leucogranite

Hornfels and altered volcanics

Massive fine grained volcanics

Massive grey diorite

Tuffs (grey)

Pinkish magnetic monzonitic dyke

Tuffs (brown)

BD-07-01

BD-07-03

open open

NEW AREA OF MOLYBDENUMMINERALIZATION

Bard 2010 Drilling

Coarse grained Quartz Feldspar Porphyry

Fine to medium grained alaskite intrusive or leucogranite

Hornfels and altered volcanics

open open

NEW AREA OF MOLYBDENUMMINERALIZATION

61 Zone

Quartz Breccia Zone

Quartz Breccia Zone Results

Corporate Structure

• Directors and Management

Eugene Beukman President

Jim Miller-Tait Director

Robert Pryde Director

John B. Malysa Director

Emmet McGrath Director

Rick Kemp Vice President, Exploration

Debra Watkins Corporate Secretary

Corporate Office: Suite 800 – 1199 West Hastings St.

Vancouver, BC V6E 3T5