LOCAL IMPROVEMENT DISTRICT OVERVIEW

January 2018

• Waterfront Seattle Overview• Design

• Operations & Management

• Schedule

• Budget

• LID Timeline and Legislative Process

• Waterfront Seattle Local Improvement District• Economic Value from Parks

• What is an LID?

• How Special Benefit Works

• Feasibility Study

• LID formation process

AGENDA

2

3

4

WATERFRONT SEATTLE PROGRAM

5

6

MARKETFRONT

Source: Barbie Hull, courtesy of Pike Place Market PDA

7

8

SEAWALL AND PROMENADE

9

URBAN HABITAT

10

GREAT PUBLIC SPACES

11

EAST-WEST CONNECTIONS

12

MOBILITY AND ACCESS

13

ACTIVE RECREATION

PIKE AND PINE STREETS

• Pike and Pine streets, between First Avenue and Melrose Avenue

• Pedestrian and streetscape improvements

• Budget: $20 million (all costs including design, construction, City costs)

• Funding Source: Waterfront Local Improvement District, partner projects

14

PIKE AND PINE STREETSExisting

15

PIKE AND PINE STREETSProposed

16

OPERATIONS AND MANAGEMENT

17

Maintenance approach

• Baseline: City departments

• Enhanced: Parks/Friends agreement

Programming and activation

Budget

• Seattle Parks District: $3.5M/year for Parks staff

• Friends of Waterfront Seattle: anticipated $1M+/year

18

19

20

CONSTRUCTION SCHEDULE

OVERALL WATERFRONT INVESTMENTS (INCLUDING UTILITIES AND SEAWALL)

21

22

WATERFRONT SEATTLE FUNDING

• Waterfront Seattle Overview• Design

• Operations & Management

• Schedule

• Budget

• LID Timeline and Legislative Process

• Waterfront Seattle Local Improvement District• Economic Value from Parks

• What is an LID?

• How Special Benefit Works

• Feasibility Study

• LID formation process

AGENDA

23

24

PROJECT PUBLIC BENEFITS

25

“PROXIMATE PRINCIPLE”

26

CASE STUDY:HUDSON RIVER PARK (NYC)

Park represents 20% of increased property value

27

CASE STUDY:MILLENIUM PARK (CHICAGO)

$1.4B of direct spending generated in park vicinity

• Doubles near streetscape improvements

28

15%

7%

48%

22%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Improved Not Improved

Year 1 Year 2

INCREASE IN LOCAL BUSINESS SALES

29

CLOSER TO HOME…

30

CASE STUDY:WATERFRONT REDEVELOPMENT(VANCOUVER, BC)

Stanley Park and Coal Harbour responsible for as much as 16% of new property value (<6 blocks)

31

CASE STUDY:TOM MCCALL WATERFRONT PARK(PORTLAND)

Quality of life improves

32

THIS WILL HAPPEN HERE, TOO

Source: Downtown Seattle Association

33

HR&A VISITATION STUDY

950,000 net new visitors: $65-100 million annual direct spending

34

LID PROCESS

• Funding tool by which property owners financially contribute to a project that will increase the value of their property

• Used to fund public projects in State of Washington

• Governed by specific state and local laws (including special benefit study)

35

LOCAL IMPROVEMENT DISTRICT

36

SPECIAL BENEFIT

• Special benefit: Estimated increase in a property’s fair market value as a result of public improvements.

• Special benefit study: Conducted by an independent appraisal firm to determine the LID boundary and the difference between the fair market value of each property before and immediately after the improvement.

• Assessment: Portion of the special benefit each property owner will pay. Cannot exceed the amount of the special benefit.

• Assessment ratio: Portion of the special benefit each property will pay. Same ratio will apply to all assessed properties. (Determined by City Council)

37

TERMINOLOGY

• Total assessments not more than special benefits

• Total assessments not more than total cost

• Assessments are roughly proportionate to each other

38

LEGAL PROTECTIONS AND GUIDELINES

• Initial estimate of overall range of total special benefit to determine feasibility

• Does not include parcel-by-parcel analysis and is not used to determine assessments.

• Total estimated range in study area: $300-420 million

39

FEASIBILITY STUDY

40

A

B C D

E

LID ANALYSIS AREAS

41

SPECIAL BENEFIT STUDY AREA

42

LID FORMATION PROCESS