Local Agency Construction Projects Authorized 03/01/2020 through 08/31/2020 DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 10 BRLS-5931(030) Alpine County Hot Springs Road (Bridge 31C0005) Over Hot Springs Creek Bridge Replacement 08/27/20 $4,303,750 $1,803,210 01 BPMP-5904(141) Humboldt County In Humboldt County On Mccann Road Over The Eel River. Bridge Preventive Maintenance 06/01/20 $215,570 $24,345 01 ER-40A0(020) Humboldt County ALDERPOINT ROAD PM 0.22 EO EMERGENCY OPENING 04/13/20 $31,689 $31,689 01 ER-40A0(026) Humboldt County BRICELAND THORNE ROAD PM 3.08 EMERGENCY OPENING 04/13/20 $23,594 $23,594 01 BRLO-5914(077) Lake County 0.6 Miles Southeast Of State Route 29 On Clayton Creek Road Over Whey Creek Bridge Replacement (Tc) 03/09/20 $3,135,000 $3,135,000 01 BRLO-5914(092) Lake County Cache Creek Bridge On Bartlett Springs Road Bridge Preventative Maintenance (Tc) 06/23/20 $1,776,500 $1,776,500 01 ACSTP-40A0(023) Lakeport IN THE CITY OF LAKEPORT, SOUTH MAIN STREET FROM 167 FEET NORTH OF MARTIN ST. INTERSECTION TO 80 FEET SOUTH OF ARMSTRONG ST. INTERSECTION EMERGENCY OPENING 08/21/20 $7,215 $0 01 ACSTP-40A0(025) Lakeport IN THE CITY OF LAKEPORT, CA HARTLEY STREET FROM 275 FEET NORTH OF ANASTASIA DR TO 310 FEET NORTH OF ANASTASIA DR EMERGENCY OPENING 08/06/20 $2,536 $0 02 BRLO-5907(033) Lassen County Near Doyle: Hackstaff Road (Bridges 07C0012 And 07C0081) Over Long Valley Creek, 0.4 And 0.6 Mi Ne Of Cr 361 Replace 2 Existing Bridges (Tc) 06/15/20 $15,598,102 $15,412,782 02 ACST-ER-39A7(001) Los Angeles County ON STATE ROUTE: 36. IN TRINITY COUNTY NEAR FOREST GLEN FROM 1.8 MILES WEST TO 0.3 MILE EAST OF GLEN CREEK ROAD MOVE SLIDE MATERIAL, REGRADE SLOPE, INCREASE CATCHMENT AREA, PLACE CABLE MESH NETTING, PLACE RSP, PROVIDE 24-7 TRAFFIC CONTROL AS NEEDED. 05/06/20 $2,200,000 $0 02 ATPL-5068(055) Redding Diestelhorst Bridge To Downtown Via Benton Dr., Riverside Dr., Center St., And Division St. Non- Motorized Bicycle And Pedestrian Pathways And Class Ii Bicycle Lanes, Sidewalks, Lighting, Flashing Beacons. (Tc) 06/23/20 $3,875,039 $504,000 02 BRLO-5068(032) Redding SHARON AVENUE (BRIDGE 06C0344) OVER ACID CANAL, 300 FEET N/W RUSSELL STREET BRIDGE REPLACEMENT (TC) 03/23/20 $1,928,506 $1,928,506 02 BRLS-5068(036) Redding EASTSIDE ROAD AT OLNEY CREEK BR.# 06C0335 BRIDGE REPLACEMENT 07/26/20 $4,377,000 $3,874,956 02 HSIPL-5068(054) Redding HARTNELL AVENUE BETWEEN CHURN CREEK ROAD AND VICTOR AVENUE BICYCLE AND PEDESTRIAN IMPROVEMENTS 03/13/20 $2,574,548 $2,070,730 02 ATPL-5906(130) Shasta County Old Oregon Trail And Shasta College Drive Install Bike Lanes & Improve Intersections For Non- Motorized Users (Tc) 04/08/20 $866,677 $572,000 03 BRLS-5912(085) Butte County Midway Rd @ Butte Creek 3.9 Miles South Of Nelson Rd. Bridge No. 12C0052 & 12C0053 Bridge Replacement 03/10/20 $54,392,500 $32,528,224 page 1 of 22

Upload: others

Post on 20-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

Local Agency Construction Projects Authorized 03/01/2020 through 08/31/2020 DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 10 BRLS-5931(030) Alpine County Hot Springs Road (Bridge 31C0005) Over Hot Springs Creek Bridge Replacement 08/27/20 $4,303,750 $1,803,210 01 BPMP-5904(141) Humboldt County In Humboldt County On Mccann Road Over The Eel River. Bridge Preventive Maintenance 06/01/20 $215,570 $24,345

01 ER-40A0(020) Humboldt County ALDERPOINT ROAD PM 0.22 EO EMERGENCY OPENING 04/13/20 $31,689 $31,689 01 ER-40A0(026) Humboldt County BRICELAND THORNE ROAD PM 3.08 EMERGENCY OPENING 04/13/20 $23,594 $23,594 01 BRLO-5914(077) Lake County 0.6 Miles Southeast Of State Route 29 On Clayton Creek Road Over Whey Creek Bridge

Replacement (Tc) 03/09/20 $3,135,000 $3,135,000

01 BRLO-5914(092) Lake County Cache Creek Bridge On Bartlett Springs Road Bridge Preventative Maintenance (Tc) 06/23/20 $1,776,500 $1,776,500 01 ACSTP-40A0(023) Lakeport IN THE CITY OF LAKEPORT, SOUTH MAIN STREET FROM 167 FEET NORTH OF MARTIN

ST. INTERSECTION TO 80 FEET SOUTH OF ARMSTRONG ST. INTERSECTION EMERGENCY OPENING

08/21/20 $7,215 $0

01 ACSTP-40A0(025) Lakeport IN THE CITY OF LAKEPORT, CA HARTLEY STREET FROM 275 FEET NORTH OF ANASTASIA DR TO 310 FEET NORTH OF ANASTASIA DR EMERGENCY OPENING

08/06/20 $2,536 $0

02 BRLO-5907(033) Lassen County Near Doyle: Hackstaff Road (Bridges 07C0012 And 07C0081) Over Long Valley Creek, 0.4 And 0.6 Mi Ne Of Cr 361 Replace 2 Existing Bridges (Tc)

06/15/20 $15,598,102 $15,412,782

02 ACST-ER-39A7(001) Los Angeles County ON STATE ROUTE: 36. IN TRINITY COUNTY NEAR FOREST GLEN FROM 1.8 MILES WEST TO 0.3 MILE EAST OF GLEN CREEK ROAD MOVE SLIDE MATERIAL, REGRADE SLOPE, INCREASE CATCHMENT AREA, PLACE CABLE MESH NETTING, PLACE RSP, PROVIDE 24-7 TRAFFIC CONTROL AS NEEDED.

05/06/20 $2,200,000 $0

02 ATPL-5068(055) Redding Diestelhorst Bridge To Downtown Via Benton Dr., Riverside Dr., Center St., And Division St. Non-Motorized Bicycle And Pedestrian Pathways And Class Ii Bicycle Lanes, Sidewalks, Lighting, Flashing Beacons. (Tc)

06/23/20 $3,875,039 $504,000

02 BRLO-5068(032) Redding SHARON AVENUE (BRIDGE 06C0344) OVER ACID CANAL, 300 FEET N/W RUSSELL STREET BRIDGE REPLACEMENT (TC)

03/23/20 $1,928,506 $1,928,506

02 BRLS-5068(036) Redding EASTSIDE ROAD AT OLNEY CREEK BR.# 06C0335 BRIDGE REPLACEMENT 07/26/20 $4,377,000 $3,874,956 02 HSIPL-5068(054) Redding HARTNELL AVENUE BETWEEN CHURN CREEK ROAD AND VICTOR AVENUE BICYCLE AND

PEDESTRIAN IMPROVEMENTS 03/13/20 $2,574,548 $2,070,730

02 ATPL-5906(130) Shasta County Old Oregon Trail And Shasta College Drive Install Bike Lanes & Improve Intersections For Non-Motorized Users (Tc)

04/08/20 $866,677 $572,000

03 BRLS-5912(085) Butte County Midway Rd @ Butte Creek 3.9 Miles South Of Nelson Rd. Bridge No. 12C0052 & 12C0053 Bridge Replacement

03/10/20 $54,392,500 $32,528,224

page 1 of 22

Page 2: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 03 HSIPL-5925(172) El Dorado County Multiple Locations Within The El Dorado County Portion Of The Tahoe Basin, Near South Lake

Tahoe. Includes Areas Along Lake Tahoe Blvd, Pioneer Trail, Black Bart, And View Circle Construct And/Or Reconstruct/Upgrade Metal Beam Cor - 10 Style Guardrail.

07/27/20 $610,544 $90,400

03 STPL-5925(177) El Dorado County At Silva Valley Pkwy From Harvard Way To Green Valley Road Silva Valley Bike Path Drainage Improvements (Tc)

05/12/20 $351,000 $351,000

03 LPPRPSB1-5288(046) Folsom In Folsom On White Rock Rd From Prairie City Rd To East Bidwell St. Construct 4 Lane Road With 8 Foot Shoulders. (Class 1 Trail To Be Built In Later Phase).

06/25/20 31,201,500 15,000,000

03 CML-5442(012) Loomis In Loomis: Taylor Road From Horseshoe Bar Road To King Road Construct New Bike Lanes And Sidewalks And Streetscape Improvements.

03/04/20 $807,306 $0

03 STPL-5442(013) Loomis Various Streets In The Loomis Downtown Core Area Asphalt Concrete Overlay 03/04/20 $925,422 $0 03 BRLO-5917(079) Nevada County Soda Springs Roads At South Yuba River Near Van Norden Lake Road; Br.# 17C0010 Bridge

Replacement - 2 Lanes (Tc) 07/23/20 $2,282,250 $438,750

03 HSIPL-5917(103) Nevada County Curves Along Greenhorn, Dog Bar, Red Dog, Rough & Ready Hwy, Wolf, Bitney Springs, Old Tunnel, Indian Springs, Mccourtney, Auburn, Lake Vera Purdon, Pleasant Valley Roads. Apply High Friction Surface Treatment (Tc).

03/10/20 $1,520,200 $1,520,200

03 CML-5919(128) Placer County Martis Valley Connecting Northstar Village Roundabout To The Southerly Border Of Army Corps Property Class 1 Multipurpose Trail

06/25/20 $3,746,224 $288,369

03 BRLO-5182(057) Roseville Oak Ridge Drive At Linda Creek Br#19C0180 Bridge Replacement (Tc) 03/16/20 $5,578,000 $1,075,000 03 CML-5002(192) Sacramento WOOLLEY WAY FROM ALBATROSS TO DW BABCOCK SCHOOL CONSTRUCT SIDEWALKS,

INSTALL A SIGNALIZED INTERSECTION WITH ACCESSIBILITY COMPLIANT CROSSWALK AT THE INTERSECTION OF ALBATROSS WAY AND EL CAMINO AVENUE, CURB RAMPS, AND OTHER ACCESS IMPROVEMENTS FOR STUDENTS WHO ATTEND DW BABCOCK SCHOOL.

06/17/20 $2,100,090 $995,700

03 HSIPL-5002(188) Sacramento HSIP CYCLE 7. THE FOUR INTERSECTIONS ARE AS FOLLOWS:

(1.) MARTIN LUTHER KING BOULEVARD AND FRUITRIDGE ROAD (2.) 65TH SREET EXPRESSWAY AND ELDER CREEK ROAD (3.) POWER INN ROAD AND ELDER CREEK RD (4.) MACK ROAD AND CENTER PARKWAY INSTALL MAST ARM TRAFFIC SIGNALS TO REPLACE TRAFFIC SIGNAL HEADS IN MEDIAN

03/25/20 $1,346,500 $1,346,500

03 ATPL-5924(243) Sacramento County 47Th Avenue Pedestrian And Bicycle Improvement Project. Along 47Th Ave Between 27Th St And Stockton Blvd. Construct Continuous Sidewalk And Bike Lanes Along The North And South Sides Of 47Th Ave

05/08/20 $5,924,087 $0

page 2 of 22

Page 3: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 03 BRLS-5924(155) Sacramento County Franklin Blvd At Lost Slough Br# 24C0155 Bridge Replacement 03/02/20 $11,716,001 $1,629,837 03 CML-5924(230) Sacramento County On Hazel Ave Between Central And Elm Avenues Construct Class Ii Bike Lane, Sidewalk Infill, A

Signalized Mid-Block Ped Crossing, And Transit Stop. 07/10/20 $2,501,927 $441,000

03 CML-5924(232) Sacramento County Northside Of Folsom Blvd. East And West Of Butterfield Way Adjacent To The Butterfield Lrt Station, And Along The Northside Of Cottage Way Between Fulton Ave. And Watt Ave. Sidewalk Infill

03/26/20 $2,237,000 $393,000

03 RPSTPL-5924(253) Sacramento County In Sacramento County, Hazel Avenue, From Sunset Ave. To Madison Ave. Widen From 4-6 Lanes, New Traffic Signals At Roediger Lane And Phoenix Avenue. Improve Existing And Projected Traffic Congestion; Enhance Pedestrian And Bicycle Mobility In The Corridor, Address Safety Concerns, And Improve The Aesthetics Of The Corridor.

06/09/20 $14,904,040 $0

03 HSIPL-5473(023) Truckee High Street At Veteran'S Hall, High Street At Jiboom Street, Brockway Road And Martis Street At Palisade Street Upgrade Guardrail

03/10/20 $455,708 $393,120

03 BRLO-5916(107) Yuba County Along Rices Crossing Road 0.04 Miles Southeast Of Marysville Road. Br.# 16C0087 Bridge Replacement (Tc)

05/15/20 $4,084,100 $419,000

03 STPL-5916(132) Yuba County Feather River Blvd., From Algodon Rd. To Ella Ave. Rehabilitate Roadway And Install Signage For A Class Iii Bicycle Route. (Tc)

08/17/20 $2,080,000 $0

04 HSIPL-5933(141) Alameda County Palomares Rd. Between Palo Verde Rd. And Highway 84 & Redwood Rd. Between Marciel Rd. And Camino Alta Mira In Castro Valley, Alameda County Pave Existing Shoulders And Provide Law Enforcement Pullouts Areas

05/05/20 $566,200 $376,200

04 STPL-5038(026) Antioch HILLCREST AVENUE (DAVISON DRIVE TO LONE TREE WAY), GENTRYTOWN DRIVE (JAMES DONLON BOULEVARD TO BUCHANAN ROAD), AND DELTA FAIR BOULEVARD (BUCHANAN ROAD TO SOMERSVILLE ROAD) PAVEMENT REHABILITATION

04/20/20 $3,352,945 $2,474,000

04 HSIPL-5376(015) Brisbane Guadalupe Canyon Parkway Between Brisbane City Limits And Bayshore Blvd Restripe Roadway, Class Ii Bike Lanes Markings And Signs, Install Flashing Led Warning Signs

03/26/20 $120,260 $108,234

04 CML-5171(023) Burlingame Along Broadway Corridor Remove And Replace Old Street Lighting With New Pedestrian Light Fixtures And Poles.

06/24/20 $865,106 $720,000

04 STPL-5171(024) Burlingame Braodway , Cadillac Way, Trousdale Dr, California Dr Ac Overlay 03/05/20 $1,561,990 $571,000 04 STPL-5318(031) Cupertino Cupertino: Bollinger Rd, Wolfe Rd, Prospect Rd, Mcclellan Rd And S Stelling Rd. Pavement

Maintenance Phase 2 03/17/20 $2,567,582 $769,000

04 ATPL-5196(040) Daly City On Junipero Serra Blvd, Eastmoor Ave, San Pablo Rd, E Market St, Guadalupe Canyon Parkway, Mission St And El Camino Real Install Bicycle And Pedestrian Enhancements (Tc)

07/02/20 $2,669,661 $2,019,000

page 3 of 22

Page 4: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 04 STPL-5438(018) East Palo Alto West Bayshore Rd, Scofield St, Runnymede St., Pulgas Ave, O.Connor St (Non-Participating),

Newbridge St, Cooley Ave Roadway Rehabilitation, Including: Base Repair, Crack Seal. Ac Overlay, Grinding, Adjust Utility Frames, Replace Pavement Markings And Traffic Signal Detection

03/05/20 $2,717,448 $832,000

04 STPL-5053(031) Livermore NORTH LIVERMORE AVE. FROM 1100 FEET SOUTH OF LAS POSITAS RD TO CHESTNUT ST: SOUTH LIVERMORE AVE. FROM EIGHTH ST TO CONCANNON BLVD. REPAIR, RESURFACING AND/OR REHABILITATE PAVEMENT

05/11/20 $2,121,307 $1,382,000

04 HSIPL-5927(119) Marin County Two Locations In Mrn Co. : 1. Paradise Drive At Mp 3.25 In Tiburon

2. Point Reyes-Petaluma Road At Mp 2.06 In Nicasio Install Guardrail System

04/30/20 $434,133 $386,100

04 STPL-5299(016) Millbrae Larkspur Dr From Crestview Dr To Helen Dr Pavement Rehab , Ada Ramp Upgrade 03/05/20 $938,729 $387,000 04 ACSTP-26E0(005) Napa County DAF 22: SILVERADO TRAIL BRIDGE AT TAPLIN ROAD (MPM 15.35) NAPA COUNTY

EARTHQUAKE REPAIR - SILVERADO TRAIL BRIDGE AT TAPLIN ROAD STRUCTURAL REPAIR: REPLACE DAMAGED STONE BARRIER WITH A NEW CONCRETE BARRIER WITH AN ARCHITECTURAL STONE VENEER

06/23/20 $0 $0

04 ACSTP-26E0(006) Napa County DAF 23: SILVERADO TRAIL BRIDGE AT MPM 26.5 NAPA COUNTY EARTHQUAKE REPAIR -SILVERADO TRAIL BRIDGE AT MPM 26.5STRUCTURAL REPAIR: REPLACE DAMAGED STONE BARRIER WITH CONCRETE BARRIER SLAB AND CONCRETE BARRIER WITH AN ARCHITECTURAL STONE VENEER

06/23/20 $0 $0

04 ER-26E0(005) Napa County DAF 22: SILVERADO TRAIL BRIDGE AT TAPLIN ROAD (MPM 15.35) NAPA COUNTY EARTHQUAKE REPAIR - SILVERADO TRAIL BRIDGE AT TAPLIN ROAD STRUCTURAL REPAIR: REPLACE DAMAGED STONE BARRIER WITH A NEW CONCRETE BARRIER WITH AN ARCHITECTURAL STONE VENEER

06/23/20 $110,000 $97,382

04 ER-26E0(006) Napa County DAF 23: SILVERADO TRAIL BRIDGE AT MPM 26.5 NAPA COUNTY EARTHQUAKE REPAIR -SILVERADO TRAIL BRIDGE AT MPM 26.5STRUCTURAL REPAIR: REPLACE DAMAGED STONE BARRIER WITH CONCRETE BARRIER SLAB AND CONCRETE BARRIER WITH AN ARCHITECTURAL STONE VENEER

06/23/20 $110,000 $97,382

page 4 of 22

Page 5: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 04 STPL-5361(030) Novato -Novato Blvd From San Marin Drive To City Limits:

- Redwood Blvd. From Rush Creek Place To San Marin Dr. And From San Marin Drive To Wood Hollow Dr., - Wilson Ave From Center Rd To City Limit Rehabilitate Pavement, Upgrade Pedestrian Facilities To Meet Current Accessibility Requirements, Including Striping For Class 2 And Class 3 Bicycle Facilities. Repairs Include Installing Scrub-Seal And Micro-Surface Treatment With Ancillary Work Including Isolated Failed Asphalt Grind/Replacement, Adjust Utility Frames And Grates, And Replacing Pavement Markings, Sings, And Traffic Signal Detection Devices.

03/11/20 $1,977,272 $1,117,000

04 ATPL-5012(144) Oakland IN OAKLAND ON 20TH ST. BETWEEN BROADWAY AND HARRISON ST. PEDESTRIAN IMPROVEMENT SIDEWALK WIDENING, BULB OUT PED CROSSWALK IMPROVE, BUFFERED CLASS 2 BIKE LANE NEW TRAFFIC SIGNAL STREET LIGHTS SIGNAGE AND MINOR LANDSCAPE. (TC)

07/26/20 7,815,823 4,157,000

04 HSIPL-5100(029) Palo Alto PAGE MILL ROAD (MILE MARKER 0-4.5) REHABILITATE ROADWAY SECTIONS ON PAGE MILL ROAD FROM MILEPOST MARKER 4.5 AT THE PALO ALTO CITY LIMITS TO THE LOS TRANCOS OPEN SPACE PRESERVE PARKING LOT AT MILEPOST 0. PROJECT WORK INCLUDED MILLING OF EXISTING ASPHALT, CRACK SEALING, REPLACEMENT AND INSTALLATION OF GUARDRAILS, ADJUSTING VALVES AND MANHOLES TO FINISHED GRADE AND PERMANENT STRIPING.

04/15/20 $2,332,834 $946,170

04 HSIPL-5127(034) Pittsburg 3 Intersections Of Stoneman Avenue (At Meadowbrook Avenue, Meadowbrook Circle, And Briarcliff Drive) Install Pedestrian Hawk Signals, Intersection Striping/Signage Improvements, And Two Variable Speed Signs (At Approaches To Stoneman Ave/Meadowbrook Ave).

07/07/20 $1,075,213 $880,000

04 BPMP-5101(029) Pleasanton CITY OF PLEASANTON: 5 BRIDGES, 33C0454, 33C0099, 33C0453, 33C0461, AND 33C0462. BRIDGE PREVENTIVE MAINTENANCE PROJECT

04/23/20 $7,877,130 $672,660

04 STPL-5101(031) Pleasanton Chabot Drive, Willow Road, Gilbraltar Drive, Hacienda Drive, Stoneridge Drive And Owens Drive Pavement Rehabilitation And Bike/Ped Improvements

03/19/20 $3,040,666 $1,095,000

04 ATPL-5137(049) Richmond The Yellow Brick Road In Richmond'S Iron Triangle Neighborhood Install Pedestrian And Bike Facilities And Traffic Calming Device (Tc)

07/31/20 $8,135,785 $6,209,000

04 STPL-5379(022) Rohnert Park State Farm Drive From Rohnert Park Expressway To Approximately 200Ft North Of Professional Center Drive Street Rehabilitation

03/26/20 $1,748,642 $1,035,000

04 STPL-5226(024) San Bruno San Antonio Ave Between Santa Inez To San Felipe Ave (Phase I) Street Rehabilitation (Phase I) 03/26/20 $1,455,388 $673,000

page 5 of 22

Page 6: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 04 STPL-5005(163) San Jose THE PROJECT LOCATIONS ARE: CHERRY AVENUE FROM ALMADEN EXPRESSWAY TO

BRANHAM LANE; FRUITDALE AVENUE FROM BASCOM AVENUE TO SOUTHWEST EXPRESSWAY; LEAN AVENUE FROM BFOSSOM HILL ROAD TO CHYNOWETH AVENUE; MERIDIAN AVENUE FROM CAMDEN AVENUE TO BLOSSOM HILL ROAD; NAGLEE AVENUE FROM FOREST AVENUE TO THE ALAMEDA; O'TOOLE AVENUE FROM MONTAGUE EXPRESSWAY TO BROKAW ROAD; PIEDMONT ROAD FROM LANDESS AVENUE TO PENITENCIA CREEK; PINE AVENUE FROM HICKS AVENUE TO BIRD AVENUE; SANTA TERESA BOULEVARD FROM BERNAL ROAD TO THE CITY LIMIT (3000 FEET SOUTH OF BAILEY AVENUE); AND ZANKER ROAD FROM BERING DRIVE/REMUDA LANE TO MONTAGUE EXPRESSWAY. . PROJECT WORK INCLUDES: ROAD REHABILITATION; RESTRIPING; BICYCLE IMPROVEMENTS; UPGRADING NON-COMPLIANT CURB RAMPS; AND UTILITY ADJUSTMENTS TO GRADE.

05/13/20 $23,471,782 $0

04 HSIPL-5041(046) San Leandro In San Leandro At The Intersection Of East 14 Th Street (Sr 185 ) And Joaquin Ave. Upgrade Traffic Signals, Install Ped. Signal Phasing, Improve Stripping, Signage And Curb Ramps

06/25/20 $341,900 $335,250

04 BRLO-5043(038) San Rafael SOUTHERN HEIGHTS BL. OVER HILLSIDE, JUNCTION MEYERS ROAD IN SAN RAFAEL BR. 27C0148 REPLACE EXISTING 1-LANE BRIDGE WITH NEW 1-LANE BRIDGE (TC)

05/27/20 $4,693,500 $4,510,000

04 STPL-5937(218) Santa Clara County Capitol Expressway Between Capitol Auto Mall Parkway To Mclaughlin Avenue Pavement Rehabilitation

04/20/20 $6,327,764 $5,000,000

04 STPL-5937(220) Santa Clara County On Mckean Road From Harry Road To Casa Loma Road Pavement Rehabilitation 04/15/20 $3,703,530 $2,302,000 04 CML-5098(012) Sausalito Gate 6 Road Intersection With State Hwy 101 On Ramp In Sausalito, Marin County. Signal

Modification 06/01/20 $832,316 $338,000

04 STPL-5920(167) Sonoma County River Road From Trenton-Healdsburg Road To Just West Of Smart Train Right Of Way. Rehabilitation Of Pavement And Striping For Bike Lanes.

03/11/20 $4,129,450 $3,264,000

04 HSIPL-5094(072) Vacaville IN VACAVILLE AT 2 INTERSECTIONS: 1) BROWNS VALLEY ROAD AT WATERFORD/CLARECASILE WAY AND 2) MARSHALL WAY AT SOUTHSIDE BIKEWAY. CONSTRUCT PEDESTRIAN CROSSING ENHANCEMENTS INCLUDING ADVANCE WARNING SIGNS AND RECTANGULAR RAPID FLASHING BEACON(RRFB).

04/30/20 $245,968 $226,100

04 STPLZ-5030(056) Vallejo SACRAMENTO STREET OH IN THE CITY OF VALLEJO BETWEEN ILLINOIS ST. AND FARRAGUT AVE. SEISMIC RETROFIT - REPLACE BRIDGE

03/19/20 $9,518,760 $8,383,792

page 6 of 22

Page 7: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 05 BHLO-5199(032) Arroyo Grande City Of Arroyo Grande - Environmental Mitigation & Monitoring For

-- Bridge St Bridge - Br. No. 49C-0196 - Related To Parent Fpn Bhlo-5199(027) - Tc Environmental Mitigation & Monitoring -- Bridge St Bridge - Br. No. 49C-0196 - Related To Parent Fpn Bhlo-5199(027) - Tc

05/20/20 $250,000 $250,000

05 ATPSB1L-5944(134) Monterey County Moss Landing - Monterey Bay Sanctuary Scenic Trail Construct Class I Bicycle/Pedestrian Path And Bridge Over Elkhorn Slough From Moss Landing Road To Moss Landing North Harbor Facilities.

05/29/20 $9,369,800 $1,157,903

05 HSIPL-5944(132) Monterey County Intersections Of Castroville Blvd At Elk Horn Rd (In The Community Of Castroville) And Rio Rd At Via Nona Marie (In The Community Of Carmel Valley) Install Pedestrian Activated Overhead Beacon And Streetlights; Install Rectangular Rapid Flashing Beacons

06/26/20 $201,000 $201,000

05 HSIPL-5944(132) Monterey County Intersections Of Castroville Blvd At Elk Horn Rd (In The Community Of Castroville) And Rio Rd At Via Nona Marie (In The Community Of Carmel Valley) Install Pedestrian Activated Overhead Beacon And Streetlights; Install Rectangular Rapid Flashing Beacons

06/26/20 $43,500 $43,500

05 ACSTP-40A0(004) Morro Bay NORTH JAMESON LANE REMOVE DEBRIS, CLEAN AND SWEEP ROADWAY 05/20/20 $54,984 $0 05 ACSTP-40A0(005) Morro Bay PHILBRIC ROAD REPLACE PIPE, CONSTRUCT NEW HEADWALLS, BACKFILL AND

COMPACT AROUND PIPE, INSTALL ROAD BASE, AC, AND STRIPING 05/27/20 $69,225 $0

05 ATPL-5045(031) Salinas BARDIN ROAD ROAD DIET AND ROUNDABOUT (TC) 05/27/20 $12,146,680 $4,430,000 05 ATPL-5016(057) San Luis Obispo IN THE CITY OF SAN LUIS OBISPO BETWEEN TAFT ST. AND PEPPER ST. CONSTRUCT A

CLASS I TWO WAY BICYCLE FACILITY AND BICYCLE AND PEDESTRIAN OVERPASS ACROSS THE UPRR.

04/15/20 $5,784,350 $3,244,000

05 HSIPL-5007(076) Santa Barbara PERIMETER OF DOWNTOWN SANTA BARBARA INCLUDING PARTS OF DE LA VINA, CHAPALA, SOLA, ANACAPA, AND GUTIERREZ STREETS INSTALLATION OF NEW CORRIDOR AND CROSSWALK LIGHTING, NEW MARKED PEDESTRIAN CROSSWALKS, YIELD LINES, WARNING SIGNS AND EDGE LINES

07/13/20 $1,966,800 $1,966,800

05 BRLO-5951(141) Santa Barbara County Fernald Pt. Ln. Bridge #51C0137 @ Romero Crk In Santa Barbara County Bridge Replacement (Tc)

05/12/20 $4,596,747 $2,135,000

05 ER-38M0(002) Santa Barbara County NORTH JAMESON LANE, FROM OLIVE MILL RD TO SHEFFIELD RD INCLUDING BR 51C-341,51C-342,51C-343 IN THE VILLAGE OF MONTECITO REPAIRS TO BRIDGE RAILINGS, CRASH CUSSIONS, DIKE, DRAINAGE AND STRIPING. BRING ALL ELEMENTS UP TO CURRENT STANDARDS

03/26/20 $308,775 $277,579

page 7 of 22

Page 8: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 05 ER-38M0(006) Santa Barbara County SHEFFIELD ROAD BRIDGE # 51C-048 AT ROMERO CREEK IN THE COMMUNITY OF

MONTECITO IN THE COUNTY OF SANTA BARBARA REPAIR BRIDGE RAILS AND CONSTRUCT APPROACH RAILS PER CURRENT STANDARDS. REPLACE TRAFFIC CONTROL SIGNS, PAINT MARKINGS, FENCING AND LANDSCAPING

08/20/20 $195,410 $172,997

05 ER-40A0(006) Santa Barbara County PARADISE ROAD REPAIR EMBANKMENT AND ROADWAY 03/03/20 $151,988 $0 05 ACSTP-32L0(013) Santa Cruz County IN THE COUNTY OF SANTA CRUZ ON NORTH RODEO GULCH PM 3.82 RECONSTRUCT

RETAINING WALL 07/20/20 $0 $0

05 ACSTP-32L0(015) Santa Cruz County IN THE COUNTY OF SANTA CRUZ ON NORTH RODEO GULCH RD PM 4.94 STABILIZE SLOPE AND RECONSTRUCT ROADWAY

07/20/20 $0 $0

05 ACSTP-32L0(065) Santa Cruz County IN THE COUNTY OF SANTA CRUZ ON HAZEL DELL PM 2.0 REPAIR ROADWAY AND STABILIZE SLOPE

03/10/20 $0 $0

05 ACSTP-32L0(202) Santa Cruz County IN THE COUNTY OF SANTA CRUZ ON NORTH RODEO GULCH PM 4.31 STABILIZE AND RECONSTRUCT ROADWAY

07/06/20 $0 $0

05 ER-32L0(013) Santa Cruz County IN THE COUNTY OF SANTA CRUZ ON NORTH RODEO GULCH PM 3.82 RECONSTRUCT RETAINING WALL

07/20/20 $168,000 $149,073

05 ER-32L0(015) Santa Cruz County IN THE COUNTY OF SANTA CRUZ ON NORTH RODEO GULCH RD PM 4.94 STABILIZE SLOPE AND RECONSTRUCT ROADWAY

07/20/20 $148,000 $131,367

05 ER-32L0(065) Santa Cruz County IN THE COUNTY OF SANTA CRUZ ON HAZEL DELL PM 2.0 REPAIR ROADWAY AND STABILIZE SLOPE

03/10/20 $114,275 $101,511

05 ER-32L0(202) Santa Cruz County IN THE COUNTY OF SANTA CRUZ ON NORTH RODEO GULCH PM 4.31 STABILIZE AND RECONSTRUCT ROADWAY

07/06/20 $15,000 $13,279

05 ER-32L0(202) Santa Cruz County IN THE COUNTY OF SANTA CRUZ ON NORTH RODEO GULCH PM 4.31 STABILIZE AND RECONSTRUCT ROADWAY

07/06/20 $128,000 $114,005

05 HSIPL-5031(036) Watsonville IN THE CITY OF WATSONVILLE AT THE INTERSECTION OF AIRPORT BLVD AND HOLM RD INSTALL TRAFFIC SIGNAL, STRIPING AND SIGNAGE

03/05/20 $481,600 $481,600

06 CML-5109(256) Bakersfield MING AVENUE AT STINE ROAD MEDIAN MODIFICATION: CONSTRUCT DUAL LEFT TURN LANE

04/02/20 $300,000 $265,590

06 CML-5109(258) Bakersfield Intersection Of Ming Avenue And Allen Road And On Ming Avenue Between Allen Road And Buena Vista Road. Install New Traffic Signal And Interconnect

03/30/20 $497,530 $440,463

06 CML-5109(260) Bakersfield Rosedale Hwy Between Verdugo Ln And Jet Way And Brimhall Rd Between Calloway Dr. And Jewetta Ave. Interconnect Signals

04/02/20 $787,490 $697,164

06 STPL-5109(254) Bakersfield BRUNDAGE LANE BETWEEN WASHINGTON ST TO OSWELL STREET PAVEMENT REHABILITATION

04/02/20 $2,700,691 $2,390,921

06 HSIPL-5146(014) Coalinga Elm Avenue (Sr33) And Cambridge Avenue Install Traffic Signals 03/03/20 $638,410 $437,000

page 8 of 22

Page 9: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 06 STPL-5227(063) Delano Location 1 - Albany St. Between 20Th Ave & County Line Rd

Location 2 - Princetion St. Between Cecil Ave And 20Th Ave Location 3 - Schuster Between S. Lexingtion St & Browning Rd Pavement Resurfacing And Rehabilitation

05/04/20 $763,218 $563,473

06 ATPL-5060(333) Fresno CEDAR AVE. AND WOODWARD AVE. INSTALL TRAFFIC SIGNAL 05/04/20 $582,604 $442,400 06 CML-5060(336) Fresno VENTURA ST./KINGS CANYON RD. FROM VAN NESS AVE. TO CHESTNUT AVE. ITS

INSTALLATION AND SYNCHRONIZATION (TC) 03/18/20 $1,940,000 $1,923,483

06 CML-5060(338) Fresno BLACKSTONE AVE. AND ABBY ST. FROM DIVISADERO ST. TO MCKINLEY AVE. ITS INSTALLATION AND SIGNAL SYNCHRONIZATION (TC)

03/18/20 $1,657,000 $1,639,600

06 STPL-5060(319) Fresno Abby Street From Divisadero Street To Olive Avenue. Ac Overlay And Installation Of Curb Ramps, Signal Loop Detectors, Signing And Striping (Tc)

06/26/20 $1,523,900 $1,523,900

06 STPL-5060(321) Fresno Along Jensen Avenue From Cornelia Avenue To Chateau Fresno Avenue. Ac Overlay, Installation Of Curb Ramps, Signal Loop Detectors, Signing And Striping. (Tc)

06/10/20 $3,261,300 $3,261,300

06 STPL-5060(340) Fresno OLIVE AVENUE FROM YOSEMITE AVENUE TO ROOSEVELT AVENUE PEDESTRIAN WALKWAY IMPROVEMENTS: CROSSWALKS, STREETLIGHTS, WIDEN SIDEWALKS AND CURB EXTENSIONS (TC)

04/13/20 $1,433,700 $1,433,700

06 STPL-5060(354) Fresno Bullard Avenue From First Street To Cedar Avenue Ac Overlay That Includes Curb Ramp Improvements, Signal Loop Detectors, Signage And Striping, And Class Ii Bike Lane

05/04/20 $1,851,754 $1,633,033

06 ATPL-5942(275) Fresno County Fowler Avenue, Bliss Avenue, Gonser Avenue, Latonia Avenue, And Murphy Avenue Install Warning Lights, Warning Signs, Construct Sidewalks, Pedestrian Walkways, And Culvert Extension. (Tc)

07/20/20 $3,343,669 $3,227,119

06 BRLO-5942(225) Fresno County Bridge 42C0343 On East Mckinley Over Fresno Canal Replace 2 Lane Bridge With 2 Lane Bridge (Tc)

05/04/20 $2,475,000 $425,000

06 BRLO-5942(238) Fresno County Bridge 42C0099 On Ennis Rd. Over Sand Creek Replace 2 Lane Bridge With 2 Lane Bridge (Tc) 08/21/20 $2,690,000 $2,010,342

06 ATPL-5950(441) Kern County From The Western Terminus Of The Existing Kern River Parkway Bike Trail To Buena Vista Lake Recreation Area Class I Bike Trail

04/15/20 $8,017,622 $7,098,000

06 CML-5950(462) Kern County In Lamont Area ,Wilson Ave: Hope Ave To Southern Terminus Hope Ave: Habecker Rd To Tatum Street Tatum St: Hope Ave To Hall Road Paving Dirt Roads And Shldrs And Construct Curb And Gutter.

03/05/20 $748,500 $539,500

06 CML-5950(463) Kern County Mathews Ave (Mettler To Timmons), Brutton St (Mathews To Cecil), And Christina St (Mathews To Cecil) Surface Unpaved Roads With Asphalt Concrete

05/11/20 $3,603,200 $3,064,200

page 9 of 22

Page 10: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 06 CML-5950(468) Kern County Meacham Road: Heath Road To 200' East Of Jenkins Road Construction Of Ac Shoulders And

Curb And Gutter 03/25/20 $1,938,100 $1,715,700

06 CML-5115(036) Lemoore East Side Of Vine Street From Green Lane To Caddie Loop Construct Pedestrian And Bike Path 06/04/20 $196,900 $154,000

06 CML-5941(129) Madera County Road 30; From Avenue 12 To 500 Ft North Pave Shoulder And Construct Curb, Gutter, And Sidewalk

05/20/20 $375,481 $142,000

06 CML-5343(014) Mcfarland City Of Mcfarland Yard Located At 100 E. Industrial Street Construct Electic Vehicle Charging Station.

04/15/20 $838,469 $516,187

06 CMLSTBGL-5285(023) Mendota In The City Of Mendota, At The Intersection Of Bass Avenue And Barboza Street. Construct Roundabout. (Tc)

06/01/20 $877,100 $877,100

06 CML-5301(021) Orange Cove D Street From 9Th Street To Center Street Construct Sidewalks And Ada Ramps 05/28/20 $86,330 $76,426 06 CML-5122(083) Porterville In And Along The Tule River Floodway From Main St Extending East To Plano St Construct Bike

Path And Pedestrian Trail, Phase 3 04/27/20 $2,365,084 $1,916,000

06 CML-5216(049) Reedley East Avenue From Lincoln Avenue To August Avenue Construct 1,900 Feet Of Sidewalk, Install/Upgrade Curb Ramps To Ada Standards

06/12/20 $745,040 $655,196

06 HSIPL-5216(052) Reedley Reed Ave., Manning Ave, I St., 11Th St., Dinuba Ave., Frankwood Ave, Olson Ave., And Buttonwillow Ave. Evaluate Roadway Signing Upgrades Though Rssa. Install And/Or Upgrade Signs.

05/27/20 $180,400 $180,400

06 STPL-5216(050) Reedley Manning Avenue From 1,200 Ft West Of Reed Avenue To Frankwood Avenue Reconstruction/ Ac Overlay, Sidewalk, Ada Ramps, Reconstruct Median Island, Signing And Striping

07/07/20 $3,421,726 $1,863,494

06 STPL-5197(032) Sanger Bethel Ave Between Annadale Ave. And Jensen Ave. Pavement Rehabilitation, Widen A Portion Of Roadway, Add Bike Lanes, Replace Damaged Curb, Gutter And Sidewalks, And Install Ada Curb Ramps

03/06/20 $1,969,356 $901,100

06 STPL-5197(037) Sanger Faller Ave Between Church Ave To Florence Ave Road Rehabilitation, Including Curb, Gutter, Sidewalk, Curb Ramps, And Roadway Signage/Striping

05/20/20 $579,150 $457,303

06 STPL-5096(038) Selma Nebraska Street. From Sr43 To Mitchell Avenue Roadway Rehabilitation And Widening Consisting Of Two 12 Ft Lanes And 6 Ft-8 Ft Wide Paved Shoulders (Tc)

07/07/20 $588,000 $588,000

06 STPHIPL-5281(029) Shafter James St Between Central Ave To Shafter Ave Road Reconstruction 03/25/20 $756,690 $526,000 06 CML-5044(122) Visalia INTERSECTION OF TULARE AVENUE AND SANTA FE STREET CONSTRUCTION OF A NEW

ROUNDABOUT WITH A CLASS I MULTI-USE TRAIL ALONG THE PERIMETER 05/12/20 $3,336,678 $2,287,000

page 10 of 22

Page 11: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 06 STPL-5044(131) Visalia BASE BID: GOSHEN AVE FROM EAST OF SHIRK ST. TO WEST OF AKERS

ALTERNATE BID NO. 1: GOSHEN AVE FROM AKERS TO WEST OF DEMAREE ALTERNATE BID NO. 2: GOSHEN AVE FROM EAST OF DEMAREE TO WEST OF MOONEY BLVD. ROAD REHABILITATION (TC)

05/27/20 $1,500,000 $1,500,000

07 BHLO-5435(017) Agoura Hills Roadside Drive Over Medea Creek, 0.3 Mile East Of Kanan Road. Bridge #53C0290) Bridge Rehabilitation. (Tc)

07/17/20 $3,542,900 $3,462,900

07 STPL-5325(018) Cerritos 166Th Street Drom Carmenita Road To Bloomfield Avenue. Pavement Rehabilitation (Tc). 03/04/20 $950,000 $906,000

07 BHLS-5240(026) Culver City Higuera Street Bridge Over Ballona Creek, Br. No. 53C-0876 Replacing The Existing 3-Lane With A 4-Lane Bridge

05/20/20 $9,003,049 $7,915,068

07 HSIPL-5240(035) Culver City Citywide 12 Intersections Traffic Signal Left Turn Phasing For 12 Intersections Replace Existing Permisive Left Turn Movements With Protected Permisive Left Turn Phases,New Signals

06/02/20 $2,083,210 $2,083,210

07 HSIPL-5334(064) Downey Imperial Hwy (Old River School Rd. - Woodruff Ave.) Upgrade Traffic Signals To Provide Separate Left-Turn Phasing At 3 Intersections And Provide Various Safety Improvement At Other Intersections

03/05/20 $1,243,100 $1,243,100

07 STPL-5334(059) Downey Old River School Rd Between Imp Hwy And Arnett St. Pavement Rehab (Tc) 07/17/20 $3,353,203 $1,870,000 07 STPL-5334(067) Downey Tweedy Lane Between Florence Ave. And Suva St. Rehabilitation Of The Existing Pavement 03/09/20 $454,325 $372,536

07 HSIPL-5144(073) Glendale Pacific Ave And Spencer St, Montrose Ave Between La Crencenta Ave And Ramsdell Ave, La Crenscenta Ave And Piedmont Ave, Colorado St And Kenwood St Rectangular Rapid Flashing Beacon(Rrfb9 Project

04/27/20 $485,000 $247,500

07 HSIPL-5144(074) Glendale Thirty Four (34) Roadway Segments Throughout Glendale. Upgrade Damaged, Substandard Or Missing Guardrails.

03/12/20 996,000 996,000

07 HSIPL-5164(031) Inglewood La Brea Avenue At 6 Intersections: 64Th St, Fairview Blvd, Plymouth St, Hyde Park Blvd, Hazel St And Beach Avenue Install 12" Led Vehicle Heads, Back-Plates And Mountings, Pedestrian Push Buttons And Led Lighting

03/04/20 $193,800 $193,800

07 HSIPL-5164(032) Inglewood Prairie Ave At 8 Intersections: Grace Ave, Regent St, Manchester Bl, Kelso St /Pincay Dr, 104 Th St, Lennox Bl/108Th St And 111Th St Traffic Signal Improvements Project. Install 12" Led Vehicle Heads, Back-Plates And Mountings, Pedestrian Push Buttons And Led Lighting At Pedestrian Countdown Signal Heads, New Mast Arm Signal Pole, Protected Left Turn Phase And Ada Compliant Curb Ramps

03/05/20 $875,400 $875,400

page 11 of 22

Page 12: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 07 CML-5417(021) La Canada Flintridge Foothill Blvd Link Project, Within City Of La Canada Flintridge The Project Spans Foothill Blvd:

Briggs Ave/Alta Canyada Rd. Construction Of 1.5 Miles Of Class Ii Bike Lanes, Bike & Bus Facilities , Raised Med 0.5 Miles Pedestrian Beltway And Hardscape

06/11/20 $3,072,888 $1,412,000

07 HSIPL-5149(022) La Verne Fruit Street Between Baseline Road And Foothill Boulevard

H8-07-016 (Install Protected Left Turn Phase Improvements At Baseline Road And Install Raised Medians Along Fruit Street From South Of Interstate 210 Freeway To North Of Foothill Boulevard.) Install Protected Left Turn Phase Improvements At Baseline Road And Install Raised Medians Along

07/15/20 $654,760 $589,283

07 ATPL-5108(184) Long Beach South Side Of Ocean Blvd., Begins At The East Side Of Pico Ave. And Ends At The Beginning Of The Ocean Blvd. Bridge. Class I Bike Path On Ocean Blvd. Bridge Connecting The Future Bixby Memorial Bike Path To The City Of Long Beach Existing/Future Bike Network; Will Connect To La River Bike Path And Close A Gap In The California Coastal Trail.

03/25/20 $12,300,000 $7,113,000

07 ATPL-5006(848) Los Angeles IN THE CITY OF LOS ANGELES (BOYLE HEIGHTS AREA) BOUNDED BY 4TH STREET TO THE NORTH, JESSE STREET TO THE SOUTH, ANDERSON STREET TO THE WEST, AND CLARENCE STREET TO THE EAST. BOYLE HEIGHTS PEDESTRAIN LINKAGES PEDESTRIAN IMPROVEMENTS INCLUDING SIDEWALK REPAIRS, NEW SIDEWALKS, INSTALLATION OF PEDESTRIAN LIGHTING, CONTINENTAL CROSSWALKS, AND CURB RAMPS. (TC)

08/11/20 $5,000,000 $5,000,000

07 HPLUL-5006(641) Los Angeles PICO BLVD, NORMANDIE AVE AND HOOVER ST LANI - BLQ TRANSIT PLAZAS 08/24/20 $450,000 $80,000 07 HPLUL-5006(642) Los Angeles LANI KOREATOWN NORMANDIE AVE AND OLYMPIC BLVD MISCELLANEOUS - OTHER 08/24/20 $188,649 $38,924

page 12 of 22

Page 13: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 07 STPL-5006(901) Los Angeles Project Locations Include Upto 100 Ft Long, From All Intersectionsand Within The Listed

Boundaries 1. Temple St., Between Los Angeles St/Alameda St.; Judge John Aiso St Between 1St St./Temple St.; 1St St. Between

Los Angeles St/Judge John Aiso St Aiso St. And Los Angeles St. Between 1St St/300' N/O 1St Street

2. 1St St.Between Hill St./Spring St. And Spring St Between 1St St/300 Ft N/O 1St Street 3. 7Th St. Between Atalina St/Hoover St.; Westmoreland Ave Between 7Th St/300' S/O 7Th Street 4. Rossmore Ave Between Beverly Blve/Ilshire Blvd; 3Rd St Between Rossmore Ave/Arden Blvd; And 5Th Street

Between Murfoeld Road/Arden Blvd 5. Broadway Between Washington Blvd / Pico Blvd; And 15Th Street/Venics Blvd/14Th Street/14Th Place Between Hill St/Main St.. This Project Will Convert High Voltage Series Lighting Circuits To Low Voltage Multiples. Abandon Existing Conduits, Remove Existing Wires And Luminaires, Install New Conduits, Services, Pull-Boxes, Wiring And Luminaires For Lights On Federal Aid Routes As Well As Lights On Side Streets On The Same Voltage Circuit. No New Above-Ground Structures Will Be Installed (Tc)

06/29/20 $3,706,000 $3,706,000

07 TCEPSB1L-5006(881) Los Angeles Port Of Los Angeles At W. Harry Bridge Blvd In Wilmington Alameda Corridor Southern Terminus Gap Closure Project. This Project Will Provide Separate Rail Access To Two Adjacent On-Dock Railyards, Thus Eliminating The Potential For Train Collisions. The New Double Track Segment Will Also Reduce Moving Train Blockages At Two Immediately Adjacent Rail Crossings On Roadways, Which Also Reduces The Potential For Train-Vehicular Collisions.

06/16/20 $11,314,113 $5,992,000

07 BPMPL-5953(680) Los Angeles County 21 Bridges Within Los Angeles County Bridge Preventative Maintenance Program - Group 6 (Tc) 07/17/20 $62,629,677 $62,280,927

07 BPMPL-5953(688) Los Angeles County 31 Bridges Within La County Bridge Preventive Maintenance Program --- Group 7 & Group 8 (Tc) 07/17/20 $237,459,312 $27,130,514

07 BPMPL-5953(707) Los Angeles County Six Bridges In The Cities Of Cerritos, Compton, Downey, Lakewood, Paramount, And La Palma Bridge Preventative Maintenance Program - Group 9 (Tc)

07/17/20 $1,725,367 $196,609

07 ER-32L0(558) Los Angeles County TURNBULL CANYON RD - FROM CM 0.52 TO CM 5.00 EO: REMOVED 1,500 CY OF SLIDE MATERIALS FROM THE ROADWAY, SHOULDERS & CULVERT INLETS.

04/27/20 $219,840 $217,348

page 13 of 22

Page 14: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 07 ER-32L0(559) Los Angeles County MT BALDY RD -FROM CITY OF CLAREMONT BDY (MM 5.44) TO GLENDORA RIDGE RD

DEBRIS REMOVAL 05/05/20 $367,869 $366,114

07 ER-32L0(560) Los Angeles County THE OLD ROAD @ MM12.62, 13.66 AND @ WELDON RD; ELIZABETH LAKE RD @ MM 17.62, 18.13, 18.53 AND 18.85 EO: REMOVED DEBRIS ALONG THE ROADWAY, SHOULDERS, CULVERTS AND BEHIND THE K-RAILS.

07/15/20 $632,306 $622,161

07 ER-32L0(561) Los Angeles County ANGELES FOREST HWY FROM MM 6.00 TO MM 24.98 & BIG TUJUNGA CANYON RD FROM MM 0.00 TO MM 9.94 EO: DEBRIS REMOVAL

05/11/20 $1,281,328 $1,277,229

07 ER-32L0(562) Los Angeles County EAST FORK ROAD FROM HWY 39 @ MM 0.00 TO GLENDORA MOUNTAIN ROAD @ MM 5.28 EO: DEBRIS REMOVAL

08/24/20 $328,571 $312,686

07 ER-38M0(019) Los Angeles County LITTLE TUJUNGA CANYON RD @ MM 15.82 REPLACE THE DAMAGED WOODEN RETAINING WALL WITH 350' OF 2-3 TON RIP RAP.

08/24/20 $1,238,400 $1,096,356

07 INFRAL-6065(240) Los Angeles County Metropolitan Transportation Authority

Northern Los Angeles County From I-5/Sr14 Jct. To Parker Road. The Interstate 5 (I-5) Golden State Chokepoint Relief Project (The Project) Offers A Comprehensive Approach To Fix Congestion, Improve Safety, And Enhance Freight Movement And Transportation Mobility Along A Critical Chokepoint In The Rapidly Growing Santa Clarita Valley The Project Consists Of Several Components Along 14.1 Miles Of This Chokepoint As I-5 Travels Through The Valencia Industrial Center, And Intersects With Sr-126 And Sr-14. The Project Will Extend The High Occupancy Vehicle (Hov) Lanes, From The Sr-14 Interchange To Just South Of The Parker Road Interchange, Incorporating An Additional Northbound Truck Climbing Lane From Sr-14 To Calgrove Boulevard And An Additional Southbound Truck Climbing Lane From Pico Canyon Road/Lyons Avenue To Sr-14. Includes Its Hub (I-5 Pm 41.4 - 43.8) And Extended Project Limits Related To Pavement Delineation And Advanced Signage (I-5 Pm 45.0 -59.6)

07/27/20 $533,596,550 $47,000,000

07 HPLUL-5212(005) Manhattan Beach State Route 1 From 33Rd St. To Rosecrans Av. Bridge Widening From 6 To 7 Lanes 03/25/20 $15,467,000 $8,253,165 07 ACSTP-30X0(002) Mendocino County SOLEDAD CANYON ROAD AT MM 15.70 REPLACE DESTROYED BOARDWALK WITH 820'

OF RIP RAP TO PROTECT THE ROAD EMBANKMENT. 06/05/20 $569,163 $0

07 HSIPL-5069(013) Monrovia Huntinton Dr./ 5Th Ave; Foothill Blvd./Sunset Pl & Foothill Blvd/ California Ave Install Ped Safety Devices And Crosswalk Lighting System, Upgrade Traffic Signals

08/04/20 $827,284 $658,000

07 HSIPL-5283(010) Palos Verdes Est Pve Guardrail: 11 Sites Throughout The City Upgrade Existing Metal Beam Guardrail To Mgs Standards. The Project Will Include Adding End Tratment And Beam Sections And Relocating Existing Guardrail.

07/17/20 $367,592 $243,400

page 14 of 22

Page 15: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 07 STPL-5064(088) Pasadena ORANGE GROVE BLVD BETWEEN LINCOLN AVE TO SIERRA MADRE VILLA AVE

RESURFACING ONE STREET WITHIN THE CIY OF PASADENA (TC) 03/30/20 $5,351,173 $2,600,000

07 CML-5026(054) San Buenaventura Bike Path On Property Along Hwy 126 Construction On Bike Path (Tc) 06/09/20 $1,006,000 $994,530 07 SRTS-5202(013) San Fernando Various Intersection Locations Within City Of San Fernando: Maclay Ave And Fifth St, Brand Blvd

And Library St, Brand Blvd And Fifth St, Fifth St And Hager St, Fifth St From Hager St To Alexander St, Chatsworth Dr. And Woodworth St, Chatsworth Dr. And O'Melveny St, Woodworth St And Wolfskill St Curb, Gutter And Sidewalk Replacements, Tc

05/20/20 $1,056,803 $994,126

07 SRTSL-5202(016) San Fernando In The City Of San Fernando At 18 Intersections Adjacent To The Following Five Public Schools: Gridley Es, Morningside Es, O'Melveny Es, San Fernando Es, And San Fernando Ms(Adjacent To Six Private Schools.) Construct Bulb-Outs With Perpendicular Curb Ramps, Tc

05/12/20 $1,212,493 $999,850

07 HSIPL-5450(094) Santa Clarita Citywide. Upgrade Existing Guardrail And End Treatments. 03/09/20 $1,182,500 $1,182,500 07 STPL-5121(026) Santa Paula Peck Rd. Fr E/B Rte 126 Off-Ramp/Acacia To Peck Rd Ovrpass:Peck Rd Fr Sta Barbara St To

Santa Paula St;Faulkner Rd Fr W/B Rte 126 Ramps Pavement Rehab Including Cold Plane And New Ac Overlay (Tc)

06/05/20 $596,605 $200,000

07 HSIPL-5071(019) South Pasadena MISSION ST/DIAMOND AVE, MISSION ST/FAIRVIEW AVE, AND FREMOUNT AVE/LYNDON ST UPGRADE CROSSWALKS; INSTALL IN-ROADWAY WARNING LIGHTS

03/12/20 $264,962 $238,465

07 ATPSB1L-5392(058) Thousand Oaks On Conejo School Road And Willow Lane, From Hillcrest Drive To Hampshire Road. Install New Sidewalks, New And Retrofit Existing Curb Ramps, Reconstruction Of Driveways To Provide Ada Walkways, Pedestrian Crosswalk Enhancements At Manzanita Lane, Stripe New Class 2 (3,500 Lf), Class 3 (1,400 Lf) Sharrows, Modify Vehicle Striping, Replace Water Service Laterals, And Replace Water Service Appurtenances Within Project Limits.

07/17/20 $5,119,806 $1,709,150

07 ACSTP-32L0(554) Trinity County KANAN DUME RD FROM MULHOLLAND HWY TO CITY MALIBU, KANAN RD FROMMULHOLLAND HWY TO CITY OF AGOURA AGOURA HILLS, MALIBU CNYN RD FROM THE CITY OF MALIBU TO LAS VIRGENES RD, ENCINAL CYN RD FROM LECHUSA RD TO MULHOLLAND HWY EO: DEBRIS REMOVAL

08/24/20 $1,229,766 $0

07 HSIPL-5952(201) Ventura County Pedestrian Crossing Improvements Within The County Of Ventura Installation Of Rectangular Rapid Flashing Beacons

06/02/20 $250,000 $250,000

07 STPLG-5111(066) Whittier Greenleaf Ave At Putnam St & Whittier Greenway Trail Upgrade Traffic Signals (Tc) 06/02/20 $351,000 $351,000 08 HSIPL-5298(028) Barstow Various Locations On Main Street And Barstow Road In The City Of Barstow Upgrade Traffic

Signals And Install Pedestrian Countdown Heads (Tc) 07/17/20 $892,200 $802,900

page 15 of 22

Page 16: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 08 ACSTP-40A0(049) Cathedral City DATE PALM DRIVE AT WHITEWATER RIVER. SCOUR AND DISPLACEMENT OF TOP SOIL

AND SLOPE PROTECTION UNDER BRIDGE ALONG EAST SIDE. DESCRIPTION OF WORK: REGRADE AND PROTECT SLOPE PAVING. COVER ARTICULATED BLOCK UNDER BRIDGE.

06/05/20 $23,600 $0

08 ACSTP-40A0(071) Cathedral City DATE PALM DR AT LOS GATOS RD. REPAIR LANES AND SHOULDER FOR TEMPORARY OPENING

06/11/20 $10,656 $0

08 RPSTPL-6164(023) Coachella Valley Association of Governments

Along The Whitewater River Storm Channel From The City Of Palm Springs To The City Of Coachella, Phase 1, Segment 1 Construct 13.47 Miles Of New Bike/Pedestrian/Low-Speed Electric Vehicle Path (Tc)

05/29/20 $33,009,000 $18,655,000

08 HSIPL-5486(005) Eastvale Forty-Six (46) Intersections Throughout The City Of Eastvale Pedestrian Countdown Heads, Ada-Compliant Push Buttons, And Crosswalk Striping And Markings

04/23/20 $514,206 $206,500

08 ACSTP-40A0(072) Indio AVENUE 44 AT CV STORMWATER CHANNEL EMERGENCY OPENING AND RESTORATION REPAIR AND GROUT ROAD SECTION

08/24/20 $396,050 $0

08 HSIPL-5487(002) Jurupa Valley Unsignalized Intersections On Pedley Road From 60Th Street To Jurupa Road Left-Turn Lanes, Relocating Storm Drain Headwalls, And Guardrails

06/16/20 $1,299,710 $1,169,739

08 ATPL-5441(069) Moreno Valley Juan Bautista De Anza Historic Corridor From El Potrero Park To Iris Avenue Construct Segment Of Multi-Use Trail (Tc)

08/24/20 $1,431,000 $1,431,000

08 HSIPL-5441(068) Moreno Valley 65 Signalized Intersections Throughout The City Of Moreno Valley Install Advance Dilemma Zone Detection Systems

03/25/20 $3,841,900 $3,841,900

08 HSIPL-5441(070) Moreno Valley Twenty-Two (22) Locations Throughout The City Of Moreno Valley Upgrade Guardrail 03/04/20 $779,900 $779,900 08 BRLO-5282(017) Palm Springs Indian Canyon Drive Overhead At The Union Pacific Railroad South Of Garnet Avenue, Br. No.

56C-0025 Bridge Widening To Six Lanes 06/09/20 $26,425,723 $1,635,943

08 BRLS-5956(230) Riverside County Hamner Avenue Over Santa Ana River, Br. No. 56C-0446 Replace 2-Lane Bridge With 6-Lane Bridge

06/16/20 $74,440,549 $7,390,484

08 STPLN-6054(098) Riverside County Transportation Commission

State Route 91 From The State Route 241 Interchange In The City Of Yorba Linda In Orange County To The Green River Road Interchange The City Of Corona In Riverside County Add A Westbound General-Purpose Lane

05/18/20 $31,677,000 $23,576,997

08 ACSTP-38R0(002) San Bernardino County ESSEX ROAD REPAIR OF ASPHALT DOWN DRAINS 06/11/20 $194,410 $0 08 ACSTP-38R0(003) San Bernardino County NEEDLES HIGHWAY EMERGENCY OPENING. REPAIR ASPHALT. 06/05/20 $25,254 $0 08 ACSTP-38R0(004) San Bernardino County NIPTON ROAD REMOVAL OF DIRT AND ROCK DEBRIS AS WELL AS REPAIR OF ASPHALT

DOWN DRAINS 06/11/20 $54,195 $0

page 16 of 22

Page 17: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 08 ACSTP-40A0(062) San Bernardino County STORM EVENTS THAT OCCURED IN MID-FEBRUARY, 2019 CAUSED EXCESSIVE RUNOFF

NORTH OF 7TH STREET PARK PROPERTY. RUNOFF WAS ABLE TO WASH AWAY BACKFILL IN AN EXISTING STORM DRAIN PIPE TRENCH AND THE ASPHALT PAVEMENT HAS CRACKED AND SUNK SEVERAL INCHES FOR APPROX. 280 FEET. EMERGENCY OPENING (EO) AND PERMANENT RESTORATION (PR)

06/05/20 $305,135 $0

08 ACSTP-40A0(062) San Bernardino County STORM EVENTS THAT OCCURED IN MID-FEBRUARY, 2019 CAUSED EXCESSIVE RUNOFF NORTH OF 7TH STREET PARK PROPERTY. RUNOFF WAS ABLE TO WASH AWAY BACKFILL IN AN EXISTING STORM DRAIN PIPE TRENCH AND THE ASPHALT PAVEMENT HAS CRACKED AND SUNK SEVERAL INCHES FOR APPROX. 280 FEET. EMERGENCY OPENING (EO) AND PERMANENT RESTORATION (PR)

06/05/20 $54,200 $0

08 ER-40A0(063) San Bernardino County MOUNT BALDY ROAD DEBRIS REMOVAL, SHOULDER REPAIR, PAVEMENT REPAIR, SWEEPING AND OTHER RELATED WORK.

05/12/20 $386,600 $375,519

08 BRLS-6507(003) San Bernardino County Transportation Authority

Mount Vernon Avenue Overhead At The Burlington Northern Santa Fe Railroad Yard From King Street To 5Th Street, Br. No. 54C-0066 Bridge Replacement

05/29/20 $224,564,085 $6,156,211

08 STPLN-6507(011) San Bernardino County Transportation Authority

I-10 Corridor Express Lane Widening From San Antonio Avenue In The City Of Pomona To The I-10/I-15 Interchange In The City Of Ontario, Phase 1 Design-Build A Toll Express Lane Collection System (Tc)

05/14/20 $33,438,891 $18,157,563

08 BHLS-5380(026) Victorville Bear Valley Road Overhead At The Bnsf Railroad, Amtrak & Uprr, 3.8 Miles East Of I-15, Br. No. 54C-0547 Bridge Rehabilitation And Widening

06/09/20 $10,024,581 $6,460,824

08 HSIPL-5484(012) Wildomar Various Locations Throughout The City Of Wildomar Install Pedestrian Countdown Heads, Ada-Compliant Push Buttons, And Crosswalk Striping And Markings

03/25/20 $365,611 $250,000

08 HSIPL-5484(013) Wildomar Various Locations Throughout The City Of Wildomar Upgrade Existing Guardrail And Associated Improvements

03/25/20 $405,732 $365,159

08 HSIPL-5466(023) Yucca Valley Yucca Trail From The Intersection Of Warren Vista Avenue To Avalon Avenue Widen Roadway To Construct Left-Turn Lane

07/31/20 $1,232,400 $1,109,160

09 RSTPL-5399(028) California City Hacienda Boulevard From South Loop Boulevard To Eucalyptus Avenue Road Rehabilitation 03/18/20 $54,000 $47,806

09 STPL-5399(028) California City Hacienda Boulevard From South Loop Boulevard To Eucalyptus Avenue Road Rehabilitation 03/18/20 $471,464 $356,644

09 CML-5961(011) Kern County (District 9) Rosamond Boulevard From Stevenson Street To 25Th Street W, 30Th Street W From Orange Street To Rosamond Boulevard, And 25Th Street W From West Holiday Avenue To Rosamond Boulevard In The Community Of Rosamond Shoulder Widening For Class Ii Bicycle Lanes

03/10/20 $1,286,700 $1,139,100

page 17 of 22

Page 18: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 09 STPL-5184(036) Tehachapi East Tehachapi Boulevard From 150 Feet East Of The Westbound Sr 58 Off-Ramp To Monolith

Street And At 80 Feet West Of Robinson Street And On Capital Hills Parkway From Magellan Drive To Challenger Drive Road Rehabilitation

03/10/20 $378,268 $334,880

10 CML-5254(028) Atwater Mitchell Ave Nue (Norvel Street To Willow Street); Grove Avenue (Mitchell Ave Nue To Winton Way); Heights Avenue (Mitchell Avenue To Winton Way); Juniper Ave Nue (Herman Street To Liberty Street); Suncrest Street (Briarwood Street To Herman Street); Herman Street (Mitchell Ave Nue To Suncrest Street)Liberty Street (Heights Avenue To Juniper Avenue); And Dolores Street (Heights Avenue To Juniper Avenue) Pedestrian Improvements

08/13/20 $577,327 $508,307

10 CML-5254(029) Atwater Juniper Ave, Seventh Street, Laurel Ave, Ivy Ave & Second Street Pedestrian Improvements (Sidewalks) Near Mitchell Schools

08/13/20 $508,621 $448,601

10 BRLO-5930(067) Calaveras County Schadd Road Over Forest Creek (Bridge 30C0084) Bridge Replacement (Tc) 05/28/20 $3,359,866 $3,359,866 10 CML-5241(070) Ceres Intersection Of El Camino Avenue And Pine Street / Park Street Replace Existing 4-Way Stop

Intersection With Roundabout 08/05/20 $946,093 $549,957

10 CML-5230(011) Gustine Along Meredith Avenue Between West Avenue And Grove Avenue. (Meredith Avenue - Phase 2) Multiuse Pedestrian And Bike Path.

08/24/20 $719,896 $637,323

10 STPL-5154(049) Lodi In The City Of Lodi. Lodi Avenue (From Ham Lane To Hutchins Street) And Mills Avenue (From Lodi Avenue To Kettleman Lane). Roadway Resurfacing: It Includes Localized Pavement Repair, Resurfacing With Slurry Seal And Rubberized Cape Seal (Rubberized Chip Seal & Slurry Seal) And Necessary Ada Improvements. (Tc)

05/27/20 $1,717,192 $1,656,281

10 BRLS-5940(004) Mariposa County Darrah Road (Bridge 40C0033) Over Chowchilla River Bridge Replacement 05/01/20 $4,472,751 $538,200 10 CML-5939(117) Merced County Washington Blvd Between Sr-140 And Atwater-Jordan Rd Pave Dirt Road 05/12/20 $1,844,675 $1,103,083 10 CML-5059(236) Modesto FIVE INTERSECTIONS WITHIN THE CITY OF MODESTO AS FOLLOWS: 1.) BLUE GUM

AVE/CARPENTER AVE, 2.) I ST/14TH ST, 3.) I ST./17TH ST, 4.) G ST/12TH ST, AND 5.) G ST/17TH ST UPGRADE TRAFFIC SIGNALS (TC)

04/01/20 $1,200,000 $1,200,000

10 CML-5059(238) Modesto CITY OF MODESTO UPGRADE ATMS CENTRAL SOFTWARE AND TRAFFIC SIGNAL CONTROLLERS (TC)

07/20/20 $1,200,000 $1,200,000

10 STPL-5059(219) Modesto Paradise Road From S Carpenter Rd To Sheridan Pavement Rehabilitation (Tc) 08/05/20 $2,330,464 $2,330,464 10 CML-5172(029) Newman Yolo Avenue - Real Avenue To R Street. Construct Infill Pedestrian Improvements 08/13/20 $416,513 $368,739 10 CML-5172(031) Newman Fig Lane - Lucille Avenue To Yolo Street Pedestrian Sidewalk Improvements 08/24/20 $260,252 $230,400 10 STPL-5172(030) Newman Main Street - Kern Street To Merced Street Pavement Rehabilitation (Tc) 08/13/20 $296,504 $296,504 10 STPL-5153(034) Oakdale First Ave. From F Street To G Steeet Pavement Reconstruction 05/27/20 $551,383 $307,962 10 CML-6089(084) Stanislaus Council of

Governments Throughout Stanislaus County Regional Rideshare Program 03/05/20 $218,484 $193,424

page 18 of 22

Page 19: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 10 STPL-6089(085) Stanislaus Council of

Governments Throughout Stanislaus County Planning And Monitoring Activities 03/11/20 $67,774 $60,000

10 BRLO-5938(190) Stanislaus County Gilbert Road (Bridge 38C0150) Over Turlock Irrigation District (Tid) Ceres Main Canal, Just South Of Hatch Road Bridge Replacement (Tc)

07/13/20 $2,436,750 $443,000

10 BRLO-5938(226) Stanislaus County Pleasant Valley Road Over South San Joaquin Main Canal (Bridge 38C0154) Bridge Replacement (Tc)

08/05/20 $3,671,750 $613,000

10 CML-5008(148) Stockton BRT PHASE 1-B ALONG PACIFIC AVENUE, MADISON STREET, FREMONT STREET SIGNAL PRIORITIZATION EQUIPMENT FOR BUS RAPID TRANSIT (BRT) OPERATION (TC)

08/03/20 $1,218,280 $987,180

10 CML-5008(174) Stockton MONTAUBAN AVE AND HAMMERTOWN DRIVE ROUNDABOUT AND BICYCLE LANE IN STOCKTON, AT INTERSECTION OF MONTAUBAN AVENUE AND HAMMERTOWN DRIVE. REPLACE ALL-WAY STOP WITH ROUNDABOUT. INSTALL CLASS II BICYCLE LANE ON MONTAUBAN BETWEEN HAMMERTOWN AND SWAIN ROAD. INSTALL CORNER SIDEWALK ADA UPGRADES, POINT-TILT-ZOOM CAMERA INTERCONNECTED TO MONTAUBAN-SWAIN INTERSECTION), NEW STREET LIGHTING, AND UPGRADE EXISTING AMENITIES AS NEEDED.

08/05/20 $1,077,815 $947,992

10 CML-5008(175) Stockton In Stockton, Bear Creek And Pixley Slough Bicycle And Pedestrian Path. Install And Upgrade Various Bicycle Facilities . Project Includes New Bollards/Gates, Upgrading Ada Ramps, New Signing And Striping On Existing And New Facilities, Installing Rapid Flashing Beacons At Four Trail Crossings Installing Class Ii Bicycle Lanes, Installing New Class I Bicycle Path And Widening Shoulders And Installing Striping And Class Iii Bike Route Signage

08/05/20 $2,388,900 $1,529,010

10 CML-5008(179) Stockton In Stockton, Parallel To March Lane In The East Bay Mud Corridor Between Brookside Road And Hillsboro Way. Reconstruct, Widen And Improve Existing Pathway To Class I Bicycle And Pedestrian Path Standards. Install Intersection And Midblock Improvements, High Visibility Crosswalks, Striping, Gap Closures, Upgrade Of Ada Ramps, Install Flashing Beacons, And Improve Path Connections To Adjacent Businesses. Add Wayfinding Signage On Pathway Between Brookside Road And Hillsboro Way, On March Lane Between Hillsboro Way And West Lane, And On West Lane Between March Lane And The East Bay Mud Pathway.

08/05/20 $4,576,525 $3,106,285

10 HRRRL-5932(090) Tuolumne County Various Locations In Tuolumne County Roadway Safety Signing Audit (Rssa). Signing Upgrade And Roadway Safety Signing Audit

08/05/20 $1,691,600 $1,691,600

page 19 of 22

Page 20: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 10 HRRRL-5932(093) Tuolumne County Shaws Flat Road At Sr 49 Intersection In Tuolumne County Install Upgraded Led-Enhanced

Flashing Stop And Stop Ahead Signs, Install Transverse Rumble Strips, Improve Sight Distance 07/13/20 $113,650 $102,285

10 CML-5165(093) Turlock In Turlock: Intersection Of Monte Vista Avenue And Fosberg Road New Traffic Signal (Tc). 07/23/20 $676,038 $676,038

10 CML-5165(094) Turlock Intersection Of Tully Road And Tuolumne Road Install A Stand-Alone Traffic Signal, Access Ramps, And Various Striping Improvements (Tc)

08/05/20 $627,997 $627,997

10 STPL-5165(095) Turlock Golden State Blvd Between Marshall Ave And Fulkerth Rd Pavement Rehabilitation 08/05/20 $2,107,627 $929,033 11 STPL-5167(042) Brawley Legion Street From The Street Deflection Point Near The West City Limits To East Of Kelley

Avenue Road Rehabilitation 06/26/20 $718,336 $620,000

11 BRLS-5203(042) Chula Vista Willow Street Bridge At Sweetwater River. New Bridge No. 57C-0855 Years 2 To 5 Environmental Compliance (Mitigation Monitoring, Reporting, And Maintenance). Willow St Bridge Replacement Project, Federal Project # Brls 5203(042) Is Linked To Federal Project # Bhls 5203(016).

03/04/20 $200,000 $177,060

11 CML-5174(031) Holtville North Side Of 9Th Street From Beale Avenue To Ash Avenue Construct Curb, Gutter, Sidewalk, And Cross Gutter

08/11/20 $374,000 $331,000

11 STPL-5174(032) Holtville Orchard Road From The Alamo River Bridge To 4Th Street Road Rehabilitation 08/11/20 $448,000 $396,000 11 CML-5134(023) Imperial North Side Of Aten Road From Puerto Vallarta Avenue To Dogwood Road Class I And Class Ii

Bicycle Lane 08/11/20 $648,998 $432,026

11 ATPL-6066(129) Imperial County From 32Nd Street To Park Boulevard And The Waterfront Promenade Adjacent To Harbor Drive In The City Of San Diego (Barrio Logan Segment) 2.5 Mile Class 1 Bikeway

06/09/20 $13,465,000 $4,944,000

11 HRRRL-5958(100) Imperial County Intersection Of Keystone Road And Austin Road Paving, Lighting, And Safety Appurtenances 07/21/20 $233,200 $209,880

11 STPL-5958(114) Imperial County Clark Road Overlay Improvements From Wahl Road To Approximately 0.5 Miles North Of State Route 98 And From Heber Road To 0.5 Mile North Of Heber Road Asphalt Concrete Overlay

04/27/20 $1,523,000 $1,348,312

11 BUILDL-6471(017) Imperial County Transportation Commission

0.7 Mile South Of Route 7 Near The Us/Mexico Border At The Calexico East Port Of Entry Truck Crossing And The California Commercial Vehicle Enforcement Facility (Cvef) In Imperial County East Of The City Of Calexico Widen Border Crossing Bridge Over The All American Canal For The Expansion Of The Calexico East Port Of Entry

07/29/20 $28,183,443 $20,000,000

11 HSIPL-5004(210) San Diego 215 INTERSECTIONS WITHIN CITY OF SAN DIEGO LIMIT INSTALL PEDESTRIAN COUNTDOWN SIGNAL

04/13/20 $499,000 $499,000

page 20 of 22

Page 21: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 11 HSIPL-5004(211) San Diego Sixty-Six (66) Intersections Throughout The City Of San Diego Install Activated Blank Out Signs

With Leading Pedestrian Intervals, Pedestrian Countdown Timers, And High Visibility Crosswalks 06/26/20 $2,129,880 $2,129,880

11 ATPL-6066(159) San Diego Association of Governments

In The City Of Encinitas At El Portal Street At Railroad Milepost (Mp) 237.1 On The Lossan Corridor Between Pacific Coast Highway (West) And Vulcan Avenue (East). Grade Separated Pedestrian And Bike Underpass Railroad Crossing

04/15/20 $6,020,928 $3,802,000

11 BPMPL-5957(123) San Diego County Various Bridges Throughout San Diego County Bridge Preventive Maintenance 08/20/20 $57,575,385 $50,971,486 11 BRLS-5957(105) San Diego County Live Oak Park Road Over San Luis Rey Tributary In The Community Of Fallbrook, Br. No. 57C-

0709 Bridge Replacement 08/11/20 $6,575,000 $5,621,654

11 HSIPL-5382(037) Vista Signalized Intersections On The Following Corridors: North Melrose Drive, Santa Fe Avenue, Civic Center Drive, Vista Way/Vista Village Drive, And Bobier Drive/Foothill Drive Install Traffic Signal Interconnect System Including: Conduit, Cable, Monitoring Devices, Controllers, And Related Communication Equipment.

03/05/20 $1,574,215 $710,200

12 ER-37F0(001) Butte County ON STATE ROUTE: 241. IN ORANGE COUNTY, ON STATE ROUTE 91 AND TOLL ROUTES 241, 261 IN THE CITIES OF ANAHEIM, TUSTIN AND ORANGE REPLACE DAMAGES TO METAL BEAM GUARDRAILS, ROADWAY SIGNS, DRAINAGE INLETS, CULVERTS, PAVEMENT DELINEATIONS, TRAFFIC CONTROL DEVICES AND FENCING AS A RESULT OF THE COAL CANYON 2 FIRES

08/11/20 $15,650,100 $13,855,026

12 HSIPL-5312(102) Costa Mesa Fairview Road From Adams Avenue To Baker Street Raised Directional Median Island And Traffic Signal

05/12/20 $1,553,493 $630,540

12 HSIPL-5328(084) Garden Grove Intersection Of Trask Avenue And Roxey Drive New Traffic Signal 05/11/20 $310,000 $310,000 12 HSIPL-5328(085) Garden Grove The Intersection Of Trask Avenue And Newland Street Install Protected Left-Turn Phasing At All

Directions 05/11/20 $310,000 $310,000

12 HSIPL-5328(086) Garden Grove Twenty-One School Locations Throughout The City Of Garden Grove. Install 42 Speed Rader Feedback Signs At Twenty-One School Crossing Locations Throughout The City Of Garden Grove.

05/11/20 $249,450 $249,450

12 HSIPL-5073(083) Orange Intersection Of Glassell Street And Meats Avenue Left-Turn Signal Phasing For Both N/B & S/B Approaches On Glassell St. To Meats Ave.

06/05/20 $249,300 $249,300

12 CML-5955(108) Orange County Begin At The Existing El Cajon Trail At The Intersection Of Fairlynn Boulevard And Oakvale Drive And Runs Along Fairlynn Boulevard To Esperanza Road; From Esperanza Road To He Fairmont Connector, Then Along Fairmont Boulevard To La Palma Avenue, Connecting To The Santa Ana River Trail At Yorba Regional Park. Installation Of Class Ii, Iii, & Iv Bikeweay Facilities

05/11/20 $3,382,937 $2,107,054

page 21 of 22

Page 22: Local Agency Construction Projects Authorized · acstp-38y0(006) butte county skyway between rocky bluffs dr and paradise town limits. emergency force account agreement with apex

DIST PROJECTID AGENCY NAME DESCRIPTION DATE TOTAL COST FED FUNDS 12 HSIPL-5955(101) Orange County Santiago Canyon Road From Live Oak Canyon Road To The Sr 241/Sr261 Interchange In

Eastern Orange County Hi-Friction Surface Treatment, Flashing Beacons, Delineators, Bicycle Lane Buffer Zone, Rumble Strips, & Signage

03/12/20 $3,801,979 $1,942,740

12 CML-5063(183) Santa Ana BRISTOL STREET FROM EDINGER AVENUE TO 1ST STREET PROTECTED BICYCLE LANES INCLUDING RAISED MEDIANS, ADA RAMPS, BUS SHELTERS, TRAFFIC SIGNAL MODIFICATIONS, STRIPING, SIGNAGE, & TRAFFIC LOOP DETECTORS

07/17/20 $2,956,194 $2,271,000

page 22 of 22