Global Symphony Track Record TRACK RECORD GLOBALOFFSHORE.CO.UK Date Project Client Details September 2018 Kincardine Offshore Wind Farm Cobra Wind Installation and burial of 17.3km 33kV export cable including shore end pull-in, floating turbine pull in, PLGR, rock bag and mattress installation July 2018 Shell Gannet GC4- 04 Tie Back Subsea 7 Hybrid trenching of 3km flexible flowline at Shell Gannet C July 2018 Shell Nelson South Shell UK Limited Installation and burial of 6km umbilical at Shell Nelson South June 2018 Shapinsay to Stronsay SSE Installation of 14km 33kV submarine cable, shore end pull ins, burial and rock bag installation May 2018 Westray - Rousay SSE Jet trenching of 2.5km replacement 33kV HVAC interconnector from Westray to Rousay May 2018 Westray – Rousay (Completed by Topaz Installer) SSE Installation of 11km HVAC Submarine cable, shore end pull ins, pre-lay mattress Installation and Post Lay Rock Bag Installation. Mar 2018 Merkur Tideway Installation of 36 array cables and burial of 17 array cables at Merkur Offshore Windfarm October 2017 Al-Jurf Riser Replacement (Libya) Ocean Installer Removal and abandonment & installation of replacement static/dynamic production riser sections between platform & FPSO March 2017 Rampion E.ON Installation and burial on Second phase of 33kv array cables on Rampion offshore windfarm total 62 cables between turbines with a 81km total length August 2016 Rampion E.ON Installation and burial on first phase of 33kv array cables on the Rampion Offshore Wind Farm March 2015 Quad 204 Technip UK Installation of new Subsea Infrastructure December 2014 Humber Gateway E.ON Installation of 8 array cables and second end pull-in to TP of 2 prelaid cables. Work carried out during trenching campaign October 2014 Golden Eagle Technip UK Umbilical Installation October 2014 Germany NSW UXO Identification & Investigation

Upload: others

Post on 12-Nov-2021

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: loal ony rac ecor - Global Offshore

Global Symphony Track Record

TRACK RECORD

GLOBALOFFSHORE.CO.UK

Date Project Client Details

September 2018Kincardine Offshore

Wind FarmCobra Wind

Installation and burial of 17.3km 33kV export cable including shore end pull-in, floating turbine pull in, PLGR, rock bag and mattress installation

July 2018Shell Gannet GC4-

04 Tie BackSubsea 7 Hybrid trenching of 3km flexible flowline at Shell Gannet C

July 2018 Shell Nelson SouthShell UK

Limited Installation and burial of 6km umbilical at Shell Nelson South

June 2018Shapinsay to

StronsaySSE

Installation of 14km 33kV submarine cable, shore end pull ins, burial and rock bag installation

May 2018 Westray - Rousay SSE Jet trenching of 2.5km replacement 33kV HVAC interconnector from Westray to Rousay

May 2018

Westray – Rousay

(Completed by

Topaz Installer)

SSE Installation of 11km HVAC Submarine cable, shore end pull ins, pre-lay mattress Installation and Post Lay Rock Bag Installation.

Mar 2018 Merkur Tideway Installation of 36 array cables and burial of 17 array cables at Merkur Offshore Windfarm

October 2017Al-Jurf Riser

Replacement (Libya)

Ocean

Installer

Removal and abandonment & installation of replacement static/dynamic production riser sections between platform & FPSO

March 2017 Rampion E.ONInstallation and burial on Second phase of 33kv array cables on Rampion offshore

windfarm total 62 cables between turbines with a 81km total length

August 2016 Rampion E.ONInstallation and burial on first phase of 33kv array cables on the Rampion

Offshore Wind Farm

March 2015 Quad 204 Technip UK Installation of new Subsea Infrastructure

December 2014 Humber Gateway E.ONInstallation of 8 array cables and second end pull-in to TP of

2 prelaid cables. Work carried out during trenching campaign

October 2014 Golden Eagle Technip UK Umbilical Installation

October 2014 Germany NSW UXO Identification & Investigation

Page 2: loal ony rac ecor - Global Offshore

For further information on Global Offshore please visit: GLOBALOFFSHORE.CO.UK or contact our sales team.

UK: +44 1245 702000 | Asia: +65 65131300

GO

01

1 v

7

February 2014 QUAD 204 Technip UK Decommissioning of Old Infrastructure and Installation of New

June 2013Quad 204 -

West of Shetland

Technip UK/

BP

Multi-phase project. Removal and recovery of 15 x dynamic risers/removal &

installation of subsea infrastructure

April 2013

Alma & Galia

Development -

North Sea

Technip UK/

EnQuest7 x flexible riser installations (wet-store ahead of FPSO installation)

March 2013 Judy Field Conoco Caisson Surveys

February 2013 FFFA Hess Gas Sampling and MBES Surveys

February 2013 Norwegian CS Maersk UK Rig Entry Surveys

January 2013 Horne & Wren Petrofac Damage Inspections

January 2013 Montrose Field Talisman OOS Surveys

November 2012 Gryphon Field Technip UK GARP Phase 6 – Continuation of Riser Installations

October 2012 Alma/Galia Field Technip UK Umbilical Installations

August 2012 Gryphon Field Technip UK GARP – Various Riser Installations

July 2012 Rochelle Field Technip UK Extensive Mattress Installations

July 2012 Gryphon Field Technip UK GARP Phase 3 – Riser Base Installations

June 2012 Causeway Field Technip UK Umbilical Installations

May 2012Gryphon Filed

UKCSTechnip UK

GARP Phase 2 – Installation of Umbilical, SSIV, Riser Bases, Mattresses &

Freepsan Correction Sandbags

March 2012

Gryphon Area

Recovery Project

(GARP) - North Sea

Technip UK/

Maersk O&

Multi-phase project. 17x dynamic riser installations (lazy-S & steep wave)/2 x

static umbilicals/multiple structure installation (>110Te)

January 2012Athena Project -

North SeaBibby/Ithaca 2 x umbilicals/3 x flexible riser installations

November 2011Balder Field,

NorwayTechnip

Exxon Mobil – Well Intervention Operations – SCM Replacement with Module

Handling System CT Winches

September 2011 Asgard, NorwayTechnip

NorwayAsgard – Hot Tap “Tee” Preparation Dredging (Scanmudring) Force NDT

September 2011 TeesideTechnip

NorwayMHS Installation of Technip Norway Module Handling System

August 2011

Shelley

Decommissioning,

UK North Sea

Technip Recovery of Flowline & Umbilical Recovered Through Vessel Moonpool & Table

Top Cutting Spread

May 2011Cofferdam,

UK North SeaChevron Cofferdam Installations for Sea Chest Valve Change-out Operations