load operated railway gate.docx

5
SYNOSIS OF PROJECT ON MECHANICAL LOAD OPERATED RAIWAY BARRIER FOR THE PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE AWARD OF BACHELOR OF TECHNOLOGY SHANTI INSTITUTE OF TECHNOLOGY KURALI 1 | P a g e Submitted To UPTU Submitted by Seet!" MBA IIIRd Sem

Upload: gsrawat123

Post on 04-Nov-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

SYNOSIS OF PROJECT ONMECHANICAL LOAD OPERATED RAIWAY BARRIERFOR THE PARTIAL FULFILLMENT OF THE REQUIREMENTFOR THE AWARD OFBACHELOR OF TECHNOLOGYSubmitted ToUPTUSubmitted bySheetal MBA IIIRd Sem

SHANTI INSTITUTE OF TECHNOLOGYKURALI

[1]INTRODUCTION

1.1 INTRODUCTIONAim of this project is to control the unmanned rail gate automatically using load operated platform. Today often we see news papers very often about the railway accidents happening at un- attended railway gates. Present project is designed to avoid such accidents if implemented in spirit. This project is developed in order to help the INDIAN RAILWAYS in making its present working system a better one, by eliminating some of the loopholes existing in it. Based on the responses and reports obtained as a result of the significant development in the working system of INDIAN RAILWAYS,This project can be further extended to meet the demands according to situation. This can be further implemented to have control room to regulate the working of the system. Thus becomes the user friendliness.In this project no electronic sensor based but will be used rather purely mechanical analog system will be used to drive railway gates this system will also produce electricity while load of train will put on the track through rack and pinion mechanism.

1.2 BLOCK DIAGRAM

Rack and pinion mechanism

Load handleLoad activated gateLoad of train on track

Existing systemManual and manpower requiredElectronic : sensors can activate with other objects also

In proposed system: not need of manpower , it will activate only when train will come

1 | Page