Case High School School Description Original Construction: 1966 Building Additions: None Gross Square Footage: 288,660 ft 2 Site Acreage: 70 acres 7 RACINE L UNIFIED SCHOOL DISTRICT Demographics Assessment Enrollment (students) Facility Capacity (students) Facility Utilization Current 1,798 2,513 72% Phase 1 Projects Phase 2 Projects Replace high priority roofing sections. Expand track to 8 lanes and widen infield for sythetic turf on Hammes field. Replace fire alarm system and provide emergency backup power for phone systems. Convert pool area into construction, woods, tech. lecture, and expanded fitness. Renovate existing tech. ed. and science areas. Open library to a learning commons. Restrooms/concessions for south fields. Construct 1,000 seat performing arts center on north side. Convert existing auditorium area into culinary arts, FACE, SPED, and Student Services. Infill for future 2nd floor classrooms above. Address 0-10 yr. FCA needs including new HVAC, interior finishes, building envelope and hardscape projects.

Upload: others

Post on 24-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: lJ UNIFIED - RUSD

Case High School

School Description Original Construction: 1966Building Additions: None Gross Square Footage: 288,660 ft2

Site Acreage: 70 acres

ID7 RACINE L\lJ UNIFIED

SCHOOL DISTRICT

Demographics Assessment Enrollment (students) Facility

Capacity (students)

Facility Utilization

Current 1,798 2,513

72%

Phase 1 Projects

Phase 2 Projects

Replace high priority roofing sections. Expand track to 8 lanes and widen infield for sythetic turf on Hammes field. Replace fire alarm system and provide emergency backup power for phone systems. Convert pool area into construction, woods, tech. lecture, and expanded fitness. Renovate existing tech. ed. and science areas. Open library to a learning commons. Restrooms/concessions for south fields.

Construct 1,000 seat performing arts center on north side. Convert existing auditorium area into culinary arts, FACE, SPED, and Student Services. Infill for future 2nd floor classrooms above. Address 0-10 yr. FCA needs including new HVAC, interior finishes, building envelope and hardscape projects.