lithium hydride absorber program update alan bross mice cm sofia – october 5 th, 2010

10
Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th , 2010

Upload: beverly-hall

Post on 19-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

Lithium Hydride Absorber ProgramUpdate

Alan BrossMICE CM

Sofia – October 5th , 2010

Page 2: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

LiH Discs

2Alan Bross MICE CM - Sofia October 5, 2010

We will Procure: An instrumented LiH disc (30 cm

diameter, 4 cm thick) for measuring thermal properties

Two small (1.25” diameter X 0.25” thick) samples for radiation stability tests

One LiH disc (50 cm diameter, 6.5 cm thick) For use in MICE Step III.1 - IV

Two LiH wedges For use in MICE Step IV?

Page 3: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

MICE Step III.x or IV

3Alan Bross MICE CM - Sofia October 5, 2010

Page 4: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

Y12 National Security Complex

4Alan Bross MICE CM - Sofia October 5, 2010

Y12 is producing the LiH Produced by Hot Isostatic Pressing

(150 oC, 30,000 psi) Will use existing mold

Final parts will be Tested for Chemical composition and

purity Radio-graphed to ensure no voids Machined to size Dimensional inspection Coated with epoxy completely

Page 5: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

5Alan Bross MICE CM - Sofia October 5, 2010

The MICE Energy Absorber

New Hanger Arrangement 3 SS straps 1 Machined SS

clamp 45 cm diameter

& 65 mm thick

Page 6: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

Procurement - Disks

Current Schedule All disks are complete except for some

final machining on the 12” disk that is to be instrumented.

Problem with a few of the holes Other disks are in inspection All machining should be done in 1 week Then 1 week to do the paralene coating Ship by November 1

6Alan Bross MICE CM - Sofia October 5, 2010

Page 7: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

Procurement - Wedges

7Alan Bross MICE CM - Sofia October 5, 2010

Page 8: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

Wedge 1 – 90o

8Alan Bross MICE CM - Sofia October 5, 2010

Page 9: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

Wedge - Procurement

We have ordered a 90 wedge, but it will come in two pieces

Need to develop hanger Run with full or ½ wedge

Wedge machining has not yet started I do not have a delivery date yet.

9Alan Bross MICE CM - Sofia October 5, 2010

Page 10: Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010

Final ½ Wedge

10Alan Bross MICE CM - Sofia October 5, 2010