Customer Scope of project Project Name / Location
PC Year of
Execution
Energika
Planning, design, manufacture, supervision of erection and commissioning of 3,2 MW condensing steam turbine for generator drive, type specification EST 20C
MPEC Lomza / Poland
1
Under execution (signature
2020)
Energoservis Lublin
Planning, design, manufacture, supervision of erection and commissioning of 12 MW backpressure steam turbine for generator drive, type specification EST 30B
Megatem Lublin / Poland
1
Under execution (signature
2020)
Yantai wanhua Chemical Co., ltd
Planning, design, manufacture, supervision of erection and commissioning of 8,9 MW condensing steam turbine for compressor drive, type specification EST 30C
Yantai II China 1 2020
Shanxi Gaoyi Steel Co., ltd
Planning, design, manufacture, supervision of erection and commissioning of 30 MW condensing steam turbine for compressor drive, type specification EST 40C
Yuncheng China 1 2020
Chongqing huafeng Chemical Co., ltd
Planning, design, manufacture, supervision of erection and commissioning of 10 MW condensing steam turbine for compressor drive, type specification EST 30 C
Chongqing China
1 2019
HSFC Samut
Planning, design, manufacture, erection and commissioning of 25 MW backpressure steam turbines for generator drive, type specification EST 40 B
Bangkok Thailand
1 2019
HSFC Samut
Planning, design, manufacture, erection and commissioning of 6,5 MW condensing steam turbines for generator drive, type specification EST 30 C
Yantai II China 1 2019
KERNEL Group
Planning, design, manufacture, erection and commissioning of 13,6 MW condensing steam turbines for generator drive, type specification EST 30 CE
Yuncheng China 1 2019
KERNEL Group
Planning, design, manufacture, erection and commissioning of 12,1 MW condensing steam turbines for generator drive, type specification EST 30 CE
Chongqing China
1 2019
KERNEL Group
Planning, design, manufacture, erection and commissioning of 23,75 MW condensing steam turbines for generator drive, type specification EST 30 CE
Bangkok Thailand
1 2019
Etihad Food Industries, Co
Planning, design, manufacture, erection and commissioning of 20 MW condensing steam turbines for generator drive, type specification EST 40 CE, part of EPC project
Babylon Iraq 2 2018
E.S.I.I.C Egypt
Planning, design, manufacture, erection and commissioning of 6 MW backpressure steam turbines for generator drive, type specification EST 30 B
Kom-Ombo Egypt
1 2018
BARLINEK Inwestycje Sp. Z o.o.
Planning, design, manufacture, erection and commissioning of 5,8 MW backpressure steam turbines for generator drive, part of EPC Project, type specification 30 BE
Barlinek Poland 1 2017/2018
BIOMASS TO ENERGY BENKOVAC d.o.o.
Planning, design, manufacture, erection and commissioning of 5,6 MW condensing steam turbine for generator drive, part of EPC Project, type specification 30 C
Benkovac Croatia
1 2016/2017
KPS RIA Brno
Planning, design, manufacture, erection and commissioning of 25,3 MW condensing steam turbine for generator drive, including complete equipment of engine room, type specification 50 CE
Slovakia 1 2016/2017
JAZAN Sugar Refinery
Planning, design, manufacture, erection and commissioning of 7 MW backpressure steam turbines for generator drive, type specification EST 30 B
Saudi Arabia 2 2016/2017
WANHUA Chemical Yantai
Planning, design, manufacture, erection and commissioning of 8,9 MW condensing steam turbine for generator drive, type specification EST 30 C
Yantai
China 1 2016
SHCHEKINO AZOT
Planning, design, manufacture, erection and commissioning of 2,4 MW condensing steam turbine for pump drive power, type specification EST 20 C
Shchekino Russia
1 2016
SHAANXI Qinfeng Gas
Planning, design, manufacture, erection and commissioning of 25 MW condensing steam turbine for compressor drive, type specification EST 40 C
Mingshui China 2 2015
Soda Polska Ciech
Planning, design, manufacture, erection and commissioning of 10,5 MW backpressure steam turbine for generator drive, type specification EST 40 BE
Soda Inowroclav Poland
1 2016
Mostosal
Planning, design, manufacture, erection and commissioning of 15 MW condensing steam turbine for generator drive, type specification EST 40 CE
Szczecin Poland 1 2015
KPS RIA Brno
Planning, design, manufacture, erection and commissioning of 25 MW condensing steam turbine for generator drive, type specification 50 CEE
Lovochemistry Czech Republic
1 2015
E.S.I.I.C Cairo
Planning, design, manufacture, erection and commissioning of 3,8 MW backpressure steam turbine for generator drive, type specification EST 20 B
Quous 2
Egypt 1 2014
BUDIMEX
Planning, design, manufacture, erection and commissioning of 9 MW condensing steam turbine for generator drive, type specification 30 CE
ZUOK Bialystok Poland
1 2014
ETIHAD Food Industries
Planning, design, manufacture, erection and commissioning of 10 MW backpressure steam turbine for generator drive, type specification EST 30 B
ETIHAD Sugar Refinery Iraq
2 2014
Teplárna Loučovice
Planning, design, manufacture, erection and commissioning of 7,5 MW condensing steam turbine for generator drive, type specification EST 30 CE
Loučovice Czech Republic
1 2014
SCS Proyectos
Planning, design, manufacture, erection and commissioning of 4 MW backpressure steam turbine for generator drive, type specification EST 30 CE
Cosoleasaque Veracruz Mexico
1 2013
ČKD Kompresory
Planning, design, manufacture, erection and commissioning of 14 MW condensing steam turbine for compressor drive, type specification EST 40 CE
ČKD Kompresory
Czech Republic 1 2013
SEA Kolin
Planning, design, manufacture, erection and commissioning of 6,5 MW condensing steam turbine for generator drive, type specification EST 30 C
IZOL Kolín Czech Republic
1 2013
ELSACO Botosani Planning, design, manufacture, erection and commissioning of 3,5 MW steam turbine for generator drive, type specification EST 30 B
CET Bacau Romania
1 2013
KAZANCOMPRESSORMASH
Planning, design, manufacture, erection and commissioning of 3,5 MW condensing steam turbine for compressor drive, type specification EST 20 C
Kazan 2 Russia 1 2013
Energo Future
Planning, design, manufacture, erection and commissioning of Biomassa Power Plant inclusive 5,8 MW backpressure steam turbine with generator, type specification EST 30 B
Sviadnov Czech Republic
1 2012
A6 Impex
Planning, design, manufacture, erection and commissioning of 9,7 MW condensing steam turbine with generator, type specificationEST 30 CE
DEJ Romania Romania
1 2012
Mostostal
Planning, design, manufacture, and commissioning of 25 MW condensing steam turbine with two controlled extractions, type specification EST 40 CE
Elbag Poland 1 2012
EnergoPromCity
Planning, design, manufacture, and commissioning of 14 MW condensing steam turbine for compressor drive, type specification EST 40 C
Ekibastuz Kazakhstan
2 2012
Energetika Dwory
Planning, design, manufacture, erection and commissioning of 27,5 MW backpressure steam turbine with generator, type specification EST 50 BE
Dwory Poland 1 2012
Fabian-Vanko
Planning, design, manufacture, erection and commissioning of 7 MW condensing steam turbine with generator, type specification EST 30 CE
Badin Slovenso 1 2012
TENZA, a.s
Planning, design, manufacture, erection and commissioning of 2,9 MW condensing steam turbine with generator, type specification EST 20 CE
Mydlovary Czech Republic
1 2011
Bučina Zvolen
Planning, design, manufacture, erection and commissioning of 5,4 MW condensing steam turbine with generator, type specification EST 30 CE
Bučina Zvolen Slovakia
1 2011
KAZANCOMPRESSORMASH
Planning, design, manufacture, erection and commissioning of 4,5 MW condensing steam turbine for compressor drive, type specification EST 30 C
Kazan 1
Russia 1 2011
Energy Edge ZC, Spol. s.r.o
Planning, design, manufacture and commissioning of 11 MW condensing steam turbine with generator, heat exchanger and other accesories,type specification EST 30 C
Žarnovica Slovakia
1 2012
Teplárna České Budějovice
Planning, design, manufacture and commissioning of 12 MW condensing steam turbine with generator, heat exchanger and other accesories, type specificationEST 30 C
České Budějovice
Czech Republic 1 2011
Carthamus, a.s
Planning, design, manufacture and commissioning of 8,45 MW condensing steam turbine with generator, heat exchanger and other accesories, type specification EST 30 CE
Domoradice Czech Republic
1 2012
E.S.I.I.C Cukrovar
Planning, design, manufacture erection and commissioning of 6 MW backpressure steam turbine with generátor, type specification EST 30 B
Qous
Egypt 1 2010
E.S.I.I.C Cukrovar
Planning, design, manufacture erection and commissioning of 6 MW backpressure steam turbine with generátor, type specification EST 30 B
EDFU
Egypt 1 2010
Teplárna Dalkia Kolín, a.s Planning, design, manufacture, erection and commissioning of rotating reduction for boiler 0,7 MW, , type specification EST 10 B
Kolín Czech Republic
1 2009
ACTHERM, s.r.o.
Planning, design, manufacture and commissioning of 20 MW condensing steam turbine with two controlled extractions, type specification EST 40 CEE
Chomutov Czech Republic
1 2007
Nile Sugar Company Cairo Supply of two 8 MW backpressure steam turbines, type specification EST 30 B
Alexandria Egypt
2 2007
EC Kielce
Planning, design, manufacture and commissioning of 10 MW condensing steam turbine with generátor, heat exchanger and other accesories, type specification EST 30 B
Kielce
Poland 1 2008
PEC
Planning, design, manufacture and commissioning of 7,35 MW backpressure steam turbine with heat exchanger type specification EST 30 B
Suwalski Poland 1 2008
Dalkia Modification of 12 MW condensing steam turbine generátor aimed at power increase by 1 MW, type specification P 12-4,1/1,1
Kolín Power Plant
Czech Republic
1 2007
Anwil Planning, design, manufacture and commissioning of 1,6 MW backpressure steam turbine, type specification EST 20 B
Wloclawek Poland
1 2007
Hiang Seng Fibre Container Co
Retrofit of backpressure steam turbine with one controlled extraction, type specification EST 60 B
Bangkok Thailand
1 2007
DOTEC Energo International
Planning, design, manufacture and commissioning of 5,6 MW condensing steam turbine with one controlled extraction, type specification T 5,6 - 3,8/0,3.
Jindřichův HradecCzech
Republic 1 2007
Eon - Tp Tábor Planning, design, manufacture and commissioning of 10 MW condensing steam turbine, type specification EST 30 C
Tábor Czech Republic
1 2006/2007
Nobaria Sugar and Rafining company
Planning, design, manufacture and commissioning of 8 MW backpressure steam turbine, type specification EST 30 B
Nobaria
Egypt 2 2006/2007
GETEC Borken Planning, design, manufacture and commissioning of 6,5 MW condensing steam turbine, type specification EST 30 C
Borken
Germany 1 2006
HSFC Co. Ltd. Bangkok Delivery of 20,4 MW backpressure steam turbine including generátor, type specification EST 30 B
Bangkok
Thailand 1 2006
ADATO Planning, design, manufacture and commissioning of 5,4 MW condensing steam turbine, type specification EST 30 C
Banská Bystrica Slovakia
1 2006
ADATO Planning, design, manufacture and commissioning of 1,64 MW backpressure steam turbine, type specification EST 20 B
Banská Bystrica Slovakia
1 2006
Sokolská uhelná, a.s Revision and repair of 60 MW condensing steam turbine, type specification PP 57 - 6,6/3,5/0,55.
Vřesová Czech Republic
1 2006
Sokolská uhelná, a.s
Moderniztion of turbine, replacement of inlet extensions, reblading of some rows of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5
Vřesová Czech Republic
1 2006
Energetika Třinec Overhaul und reblading of 17 MW steam turbine type specification T17/17- 1,8/0,12.
Třinec Czech Republic
1 2006
S.I.I.C Cairo Planning, design, manufacture and commissioning of backpressure steam turbine type specification EST 30 B
Armant
Egypt 1 2005
COLTERM Dinuinstal
Planning, design, manufacture and commissioning of backpressure steam turbine, type specification EST 40 B for generátor drive.
Timisoara Romania
1 2005
Škoda Power, s.r.o Supply of spare parts, modification, erection and commissioning of 33 MW steam turbine type specification PT 33 - 9,0/1,2/0,5.
Dalkia Ostrava Czech Republic
1 2005
ČKD Nové Energo, a. s.
Modernization, modification, and repair of 11 MW condensing steam turbine, type specification T 11/9,5 - 15,0/2,0 for blastfurnace compressor drive.
Energetika Třinec
Czech Republic 1 2005
Sokolovská uhelná, a. s. Overhaul and repair of 55 MW backpressure steam turbine, type specification PR 55 - 13,0/3,5/0,5.
Vřesová Czech Republic
1 2005
Sokolovská uhelná, a. s. Overhaul and repair of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5.
Vřesová Czech Republic
1 2005
ACETO Industries, a.s Update of hydraulic governing system in ŠKODA 110 MW steam turbine.
KAFR EL DAWAR Egypt
1 2004
DALKIA ČR, a. s. Complete overhaul of 13 MW turbine. Ostrava Czech
Republic 1 2004
Teplárna České Budějovice Complete overhaul of R 25 - 9,0/1,0 steam turbine including new blading.
České Budějovice
Czech Republic 1 2004
Ško-Energo, a. s. Repair of 44 MW condensing steam turbine. Mladá Boleslav Czech Republic
1 2004
Sokolovská uhelná, a. s. Overhaul and repair of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5.
Vřesová Czech Republic
1 2004
ZRE Katovice S.A. Inspection of 5 MW condensing steam turbine.
Katowice Poland
1 2003
Vihorlat s.r.o. Inspection and repair of 6 MW condensing steam turbine, type specification P 6 - 4,0.
Snina Slovakia 1 2003
Martinská teplárenská, a.s. Overhaul of 12 MW steam turbine, type specification PR 12/7 - 5,4/0,8/0,12.
Martin Slovakia 1 2003
SES, a. s. Tlmače
Planning, design, manufacture and commissioning of backpressure steam turbine, type specification ER 5,5 - 13/1,4 for turbo-feed pump drive, 200 MW unit powerplant Starobeshevo.
Starobreshevo power plant /
Ukraine 1 2003-2004
Ško-Energo, a. s. Repair of 44 MW condensing steam turbine. Mladá Boleslav Czech Republic
1 2003
ACTHERM Chomutov s.r.o. Overhaul of 6 MW backpressure steam turbine, type specification R6 - 3,5.
Chomutov Czech Republic
1 2003
Chemopetrol Litvínov, a.s. Overhaul of 16 MW condensing steam turbine, type specification K 16,5 - 4,5.
Litvínov Czech Republic
1 2003
Sokolovská uhelná, a.s. Overhaul of 55 MW backpressure steam turbine, type specification PR 55 - 13,0/3,5/0,5.
Vřesová Czech Republic
1 2003
Schering AG
Planning, design, manufacture, supply, commissioning of backpressure steam turbine with starting condenser, with controlled extraction, type specification PR 10,3 - 7,3/0,5-0,23E
Berlin Germany 1 2003
Sokolovská uhelná, a.s. Revision and repair of 60 MW condensing steam turbine, type specification PP 57 - 6,6/3,5/0,55.
Vřesová Czech Republic
1 2002
Sokolovská uhelná, a.s. Revision and repair of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5.
Vřesová Czech Republic
1 2002
BKH Planning, design, manufacture, delivery, comissioning of condensing steam turbine, type specification EST 30 CE
Grossaitingen Germany
1 2002
Kronospan Planning, design, manufacture, delivery, comissioning of condensing steam turbine, type specification EST 30 C
Lampertswalde Germany
1 2002
Actherm Chomutov a.s. Overhaul of 12 MW condensing steam turbine with automatic double extraction, type specification PT 12 - 3,5/1,3/0,12.
Chomutov Czech Republic
1 2002
MEGATEM EC. Lublin Overhaul of 15 MW steam turbine. Lublin Poland 1 2002
Slovenské cukrovary, a. s. Revision and repair of 10 MW backpressure steam turbine, type specification R 10 - 5,9/0,7.
Sereď Slovakia 1 2001
Lovochemie, a.s. Revision and repair of 9 MW condensing steam turbine, type specification PP 9 - 3,7/1,1/0,4.
Lovosice Czech Republic
1 2001
Žilinská teplárenská, a. s. Revision and repair of 12 MW backpressure steam turbine, type specification R 12 - 9,0/1,3.
Žilina Slovakia 1 2001
Zvolenská teplárenská, a. s.
Revize a oprava 25 MW parní protitlakové turbíny, typu R 25 - 13,0/1,3.
Zvolen Slovakia 1 2001
Žďas, a.s. Revize a oprava 6 MW parní kondenzační turbíny Škoda, typ P 6 - 3,5/0,4.
Žďár n / Sázavou Czech
Republic 1 2001
Energetika Třinec, a.s. Rekonstruction and reblading of 10 MW condensing steam turbine, type specification T 9,8 -1,8/0,12.
Třinec Czech Republic
1 2001
MVA
Project, design, manufacture, delivery, putting into operation of 5,6 MW, backpressure steam turbine, type specification EST 30 B
Bielefeld Germany
1 2001
Elektrárna Kolín, a.s.
Project, design, manufacture, delivery, putting into operation of 560 kW, backpressure steam turbine, type specification EST 10 B
Kolín Czech Republic
1 2001
Sokolovská uhelná, a.s. Inspection and repair of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5.
Vřesová Czech Republic
1 2001
Sokolovská uhelná, a.s. Inspection and repair of 60 MW condensing steam turbine, type specification PP 57 - 6,6/3,5/0,55.
Vřesová Czech Republic
1 2001
S.I.I.C.Cairo Planning, design and manufacture, delivery, commisioning of 4,5 MW backpressure steam turbine, type specification EST 30 B
Qous Egypt 1 2000
Cinergetika Ú/L
Turbine modification, modernization, power increase from 6 MW to 8,6 MW, turbine base plate modification, generátor replacement (biger output), type specification PR 8,6 - 6,0/1,5/0,7.
Ústí nad Labem Czech Republic
1 2000
Teplárna Otrokovice, a.s. Overhaul and connection to the 25MW backpressure parent kontrol system, type specification PR 25 - 9,0/1,5/0,7.
Otrokovice Czech Republic
1 2000
Sokolovská uhelná, a.s.
Turbine modernization, replacement of parts in turbine steam inlet section, reblading of some rows of 55MW turbine. Type specification PP 55 - 13,0/3,5/0,5.
Vřesová Czech Republic
1 2000
LOBBE, Švýcarsko Planning, design and manufacture of condensing steam turbine with 14500/1500 gearbox, type specification EST 20 C
Dąbrowa Górnicza Poland
1 2000
Moravskoslezské teplárny, a.s.
12 MW backpressure steam turbine modification and reblading, type specification R 12 - 3,6/0,25.
Karviná Czech Republic
1 2000
Kaučuk, a.s.
Planning, design, manufacture and delivery of 25 MW h.-p. stage for 30 MW condensing steam turbine, reblading of m.-p. and I.-p. stages. Power increase from 30 MW to 33 MW, type specification 70 CEE
Kralupy n / Vltavou Czech
Republic 1 2000
Vihorlat, a.s. 6 MW condensing steam turbine inspection and repair, type specification P 6 - 3,5/0,6 (ŠKODA).
Snina Slovakia 1 2000
Cukrovar NOVA, a.s. 10 MW backpressure steam turbine inspection and repair, type specification R 10 - 5,9/0,7.
Sereď Slovakia 1 2000
SSE š.p. Žilina, závod Tepláreň Martin
32 MW backpressure steam turbine repair, turbine base plate modification. Type specification PR 32 - 9,0/0,8/0,17.
Martin Slovakia 1 2000
Slovenské elektrárne, a.s. 32 MW condensing steam turbine overhaul, oil system and control system modification - type specification T 32 - 6,95/0,25.
Nováky Slovakia 1 2000
Povážské strojárne, a.s. - Energetika
Overhaul of 6 MW backpressure steam turbine, reblanding, type specificaton R 6 - 3,5/0,6.
Povážská Bystrica Slovakia
1 2000
Vihorlat, a.s. Overhaul and repair of 6 MW back-pressure turbine, type specification R 6 - 3,5/0,5.
Snina Slovakia 1 1999
Tp Bratislava PR 6,4 - 1,6/0,7 steam turbine repair.. Bratislava Slovakia
1 1999
LOVOCHEMIE, a .s. General overhaul of PP 9 - 3,7/1,1/0,4 steam turbine.
Lovosice Czech Republic
1 1999
KUTNOHORSKÁ a.s.
Planning, design, manufacture, supply and comiisioning of P 12 - 4,1/1,1 condensing steam turbine with one controlled extraction, 12 MW output. .
Kolín Czech Republic
1 1998
ELEKTRÁRNA POČERADY Modification of D 7,5 turbines for feed water pump driving.
Počerady Czech Republic
5 1998
VÝTOPNA FRÝDEK-MÍSTEK Modification and instrallation of Bergmann-Borsig turbine including piping, replacement of control system for WOODWARD systém.
Frýdek Místek Czech Republic
1 1997
VÝTOPNA FRÝDEK-MÍSTEK
Conversion of heating plant into power and heating plant. Supply and installation of steam turbine, step-down station and heat exchangers.
Frýdek Místek Czech Republic
1 1997
TEPLÁRNA OTROKOVICE, a.s.
Modification of PR 25 steam turbine - HP part reblanding, replacement of control systém for WOODWARD systém, replacement of monitoring system for BENTLY NEVADA system.
Otrokovice Czech Republic
1 1997
KARLOVARSKÁ TEPLÁRENSKÁ, a.s.
General overhaul of MV 550 steam turbine. Karlovy Vary
Czech Republic 1 1996
OSTROVSKÁ TEPLÁRENSKÁ, a.s.
Modification of ER/6 - 3,5/0,68 back-pressure steam turbine
Ostrov Czech Republic
1 1996
SELIKO, a.s. General overhaul R1,5 - 3,5/0,35 steam turbine.
Kojetín Czech Republic
1 1995
OLŠANSKÉ PAPÍRNY, a.s. General overhaul R1,5 -3,7/0,6 steam turbine.
Olšany Czech Republic
1 1995
LOVOCHEMIE a.s. EPR 4/4-3,9/1,1/0,4 steam turbine supply Lovosice Czech
Republic 1 1996
HARMANECKÉ PAPIERNE, a.s.
EPR 2/2 - 3,6/1,1/0,4 steam turbine overhaul Harmanec Slovakia
1 1996
JITKA a.s. PR 2,8/2,8 - 3,5/0,6/0,18 steam turbine overhaul.
Jindřichův Hradec Czech
Republic 1 1995
TEPLÁRNA TRMICE a.,s. Adjustment of 12,75/1,67 steam turbine control system.
Ústí n / L Czech Republic
1 1995
SANBORN a.s. Overhaul of nozzle segments and trial run of R16 - 12,75/1,67 steam turbine.
Velké Meziříčí Czech Republic
1 1995
ČEZ,a.s. Elektrárny Poříčí General overhaul of K5 - 0,5 turbine. Heating plant Náchod Czech
Republic 1 1995
OLŠANSKÉ PAPÍRNY a.s. Technical assistance during R1,5/3,7/0,6 steam turbine overhaul.
Olšany Czech Republic
1 1995
TONUS a.s. Adjustment of R1,5 - 3,5/0,45 steam turbine control system.
Jaroměř Czech Republic
1 1994
Tlaková plynárna Ústí n/L R12 - 3,2/0,4 steam turbine repair. Ústí n / L Czech
Republic 1 1994
Seliko Kojetín Repair of R1,5 - 3,5/0,35 steam turbine control system
Kojetín Czech Republic
1 1994