list of public private partnership (ppp) projects...

8
List of Public Private Partnership (PPP) Projects (Punjab) Implementation Stage Sr. No Project Length Project Details Status Map (Km) 1 Service Areas - 10 Nos. (M-2) - Establishment of Ten (10) Service Areas under a 15 Years Concession Period - ON BOT BASIS Concession of M/s DAEWOO completed, now handed over to M/s MORE as part of M-2 Concession. Map View 2 Overlay and Modernization of Lahore-Islamabad Motorway (M2) 357 Overlay and application of Total Solution / Intelligent Transportation System (ITS) on 357 km long existing 6-lane Motorway - ON BOT BASIS Concessionaire : M/s MORE, Pakistan - Under Construction Map View 3 Habibabad Bridge (N-5) 2 Construction of new 4-lane Railway Overhead Bridge on N-5 with 2 Km approach roads - ON BOT BASIS Concessionaire : M/s HOME, Pakistan - Construction Completed Map View

Upload: phunghanh

Post on 08-May-2018

228 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: List of Public Private Partnership (PPP) Projects …nha.gov.pk/wp-content/uploads/2016/04/Bot-Punjab-Final.pdfList of Public Private Partnership (PPP) Projects ... a 15 Years Concession

List of Public Private Partnership (PPP) Projects (Punjab)

Implementation Stage

Sr. No Project

Length Project Details Status Map

(Km)

1 Service Areas - 10 Nos. (M-2) -Establishment of Ten (10) Service Areas under

a 15 Years Concession Period - ON BOT BASIS

Concession of M/s DAEWOO completed, now handed over to M/s MORE as part of M-2 Concession.

Map View

2Overlay and Modernization of Lahore-Islamabad Motorway (M2)

357

Overlay and application of Total Solution / Intelligent Transportation System (ITS) on 357 km long existing 6-lane Motorway - ON BOT BASIS

Concessionaire: M/s MORE, Pakistan - Under Construction

Map View

3 Habibabad Bridge (N-5) 2 Construction of new 4-lane Railway Overhead

Bridge on N-5 with 2 Km approach roads - ON BOT BASIS

Concessionaire: M/s HOME, Pakistan -Construction Completed

Map View

Page 2: List of Public Private Partnership (PPP) Projects …nha.gov.pk/wp-content/uploads/2016/04/Bot-Punjab-Final.pdfList of Public Private Partnership (PPP) Projects ... a 15 Years Concession

List of Public Private Partnership (PPP) Projects (Punjab)

Development Stage -Upcoming Projects

1 Tarnol-FatehJang (N80) 32 Conversion of existing 2- lane carriageway into a 4-

lane, divided Highway Project Preparation Stage Map View

2 Two Service Areas on M-4 -Construction of Two Service Areas on Faisalabad -

Gojra Section of M-4 Project Preparation Stage Map View

3 Operating Concessions of N-5 etc.Operating Concession of identified stretch of National

Highways and Motorways Project Preparation Stage Map View

Procurement StageSr.No

ProjectLength

Project Details Status Map(Km)

1 Tarnol - Taxila (N-5) 20

Improvement/widening of existing N-5 segment of 20 Kms length to provide a fast track facility of international standard. Scope of work also includes a flyover at Tarnol railway crossing - 6-Lane Facility.

Concession Negotiation stage

Map View

2Multan - Muzaffargarh - D.G. Khan (N-70)

80 Conversion of existing 2-lane highway into 4-Lane

divided facility including Bridge at Ghazi GhatConcession Negotiation stage

Map View

3Pindi Bhattian-Faisalabad Motorway (M-3) & Faisalabad-Gojra Section M-4

111 Conversion of existing 4-Lane into a 6-Lane Motorway

plus overlay on existing 4-lanes (Land and 6-lane structures are already available)

Three parties submitted PQ Application: (1) FWO, (2) NLC/Habib JV and (3) Yunnah Railway Corp. China

Map View

4 Sialkot – Lahore Motorway 91 Construction of 6-lane motorway, connecting industrial

city Sialkot with Lahore. Bid under evaluation. Map View

Page 3: List of Public Private Partnership (PPP) Projects …nha.gov.pk/wp-content/uploads/2016/04/Bot-Punjab-Final.pdfList of Public Private Partnership (PPP) Projects ... a 15 Years Concession

M-2 (Lahore – Islamabad Motorway) 357 Km

Lahore

Islamabad

India

Indian Occupied Kashmir

M1

M4

Page 4: List of Public Private Partnership (PPP) Projects …nha.gov.pk/wp-content/uploads/2016/04/Bot-Punjab-Final.pdfList of Public Private Partnership (PPP) Projects ... a 15 Years Concession

Tarnol

Taxila

Page 5: List of Public Private Partnership (PPP) Projects …nha.gov.pk/wp-content/uploads/2016/04/Bot-Punjab-Final.pdfList of Public Private Partnership (PPP) Projects ... a 15 Years Concession

Multan - Muzaffargarh - D.G. Khan (N-70)

Page 6: List of Public Private Partnership (PPP) Projects …nha.gov.pk/wp-content/uploads/2016/04/Bot-Punjab-Final.pdfList of Public Private Partnership (PPP) Projects ... a 15 Years Concession
Page 7: List of Public Private Partnership (PPP) Projects …nha.gov.pk/wp-content/uploads/2016/04/Bot-Punjab-Final.pdfList of Public Private Partnership (PPP) Projects ... a 15 Years Concession

Fatehjang

Tarnol

N-80

Page 8: List of Public Private Partnership (PPP) Projects …nha.gov.pk/wp-content/uploads/2016/04/Bot-Punjab-Final.pdfList of Public Private Partnership (PPP) Projects ... a 15 Years Concession

Sialkot – Lahore Expressway (91 km)

Daska

Kamoki

Pasrur

Muridke

Narowal

Sambrial

Ferozwala

Wazirabad

Zafar Wal

Gujranwala

Shiekhupura

FarooqAbad

Wahga

NowsheraVirkan

§̈¦M-2

N-5

Eminabad

Kanwalit

Thaliwala -Nizampur

Kala Shah KakuInterchange

M2