list of ps divisional notes 1994 - cernconversion psi: ze & rf-instrumentation ps & tt...
TRANSCRIPT
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE
CERN u PS DiV!SION
PS/DI/Note 95-01 (Info)
January 1995
List of PS Divisional Notes 1994
AR
PS/ AR/ Note 94-01
PS/ AR/ Note 94-02
PS/ AR/ Note 94-03
PS/ AR/ Note 94-04
PS/ AR/ Note 94-05
PS/ AR/ Note 94-06
PS/ AR/ Note 94-07
PS/ AR/ Note 94-08
PS/ AR/ Note 94-09
SAP Mtg 09
PS/ AR/ Note 94-10
SAP Mtg 10
PS/ AR/ Note 94-11
(Min.)
(MD)
(MD)
(MD)
(Info.)
(Min.)
(Min.)
Minutes of the Forum of Symbolic Computing for Accelerator Physics held vn Friday 16December1993 M. lv!attini
Low b's and D = 0 in LEAR without Additional Quadrupoles
R. Giannini
Summary of the MD'S on ECOOL - December 1993
Reported by]. Bosser (15.1.1994)
Mesures sur le Refroidissement Stochastique de LEAR
F. Caspers, M. Chanel, J.C. Perrier, E. Roux, /.L. Sanchez
Ameliorations du Systeme de Refroidissement Stochastique Transversal de LEAR M. Chanel
Effet de charge d'espace d'un faisceau refroidi par electrons en fonction du point de fonctionnement a LEAR
M. Chanel
Patrouille de securite dans le AAC
/. Ottaviani et B. Williams
Caracteristiques et perfonnances des differentes cibles utilisees au AA cntre 1980et1986
G. Adrian
Minutes of the Forum of Symbolic Computing for Accelerator Physics
M. Martini
Minutes of the Forum of Symbolic Computing for Accelerator Physics
M. Martini
Magnetized Electron Beam Cooling Time for Heavy Ions
/. Bosser, I. Meshkov, G. Tranquille
1
PSI AR/ Note 94-12
PS/ AR/ Note 94-13 (Spec.)
PS/ AR/ Note 94-14
PSI ARI Note 94-15 (MD)
PS/ AR/ Note 94-16
PS/ AR/ Note 94-17 (Min.)
SAP Mtg 11
PS/ AR/ Note 94-18
PS/ AR/ Note 94-19
PS/ AR/ Note 94-20 (Min.)
SAP 12
PS/ AR/ Note 94-21 (Info.)
PS/ AR/ Note 94-22 (MD)
PS/ AR/ Note 94-23 (MD)
PS/ AR/ Note 94-24
Pbar Note 552 Fermilab
PS/ AR/ Note 94-25
SAP Mtg 13
Combined Longitudinal and Transverse Multiturn Injection in Heavy Ion Accumulator Ring
S. Maury and D. Mohl
Complement to the Official Agreement signed between CERN and Russia for Studies on the Neutralization of Dense Electron Beams
J. Bosser and I.N. Meshkov
Possible AAC Stacking Rate Improvements F. Caspers, 5. Maury, J.C. Schnuriger
LEAR MD Report: Bunched Beam Schottky Spectrum J. Bosser, F. Caspers, M. Chanel, M. Church (FNAL), S. Jacobson, S. Maury, and D. Mohl
Proposal to build a New Conical Converter Solenoid for LIL
J.C. Schnuriger
Minutes of the Forum of Symbolic Computing for Accelerator Physics
M. Martini
A collection of accelerator algorithms for the personal computer -Part II (e-e+ converter, linac, solenoid, pp- target, etc.)
J .-C. Schnuriger
Coherent instabilities of primary ions due to electron-cooling system in LEAR P. Zenkevitch, visitor from ITEP, Moscow
Symbolic computing for accelerator physics (Minutes of the forum held on 7.7.1994)
M. Martini
Ferrimagnetic resonance (FMR)A method to measure magnetic fields in accelerator environment (First results from PS)
F. Caspers
Compte rendu des MD effcctues entre mars et avril 1994
R. Ley
AAC - Compte rcndu des MD effectues de mars a juin 1994
C. Metzger
Deceleration and collider mode for the Fermilab antiproton accumulator M. Church and S. Maury
Symbolic computing for accelerator physics. (Minutes of the forum held on 3.11.1994)
M. Martini
2
)
PS/ AR/ Note 94-26 (MD)
PS/ AR/ Note 94-27 (Spec.)
PS/ AR/ Note 94-28 (MD)
PS/ AR/ Note 94-29 (Min.)
BO
PS/ BD/ Note 94-01
PS/ BD/ Note 94-02
PS/ BD/ Note 94-03 (MD)
PS/ BD/ Note 94-04
PS/ BD/ Note 94-05 (MD)
PS/ BD/ Note 94-06 (Min.)
PS/ BD I Note 94-07 (Min.)
PS/ BD/ Note 94-08
PS/ BD/ Note 94-09 (Min.)
PS/ BD/ Note 94-10 (Min.)
PS/ BD/ Note 94-11 (Tech.)
MD Cycles simulant Jes Ions Pb53+
M. Chanel, R. Ley, equipe operation
Status of the Studies of the Neutralisation of Dense Electron Beams J. Bosser
MD Summary Report. Week 31, October 1994. Ecool Team
S. Maury
Collection of Transparencies from Discussion Meeting on Electron Beam Neutralisation
Use of micro-calorimeters
J. Bosser
Real-time program for the PS FFT Q-measurement
S. Johnston
Preparation of PS instrumentation for the LHC test
J. Belleman, J.L. Gonzalez, S. Johnston, E. Schulte
Profilometer for small dimension proton beams
J. Bosser, I. Meshkov
PSB Q-measurement by FFT for LHC test
A. Chapman-Hatchett, S. Johnston
Fast Q-measurement for the PS BY FFT Analysis. Slides presented to PS operators (February 25, 1994)
J.L. Gonzalez
Meeting on Booster Q-measurement held on 17.01.1994
A. Chapman-Hatchett
Implementation du timing du PSB en vue de l'injection d'ions de Pb53
/.-D. Schnell
Minutes of a visit to LETI, Grenoble, May 9, 1994.
E. Schulte
Minutes of the visit of Mrs. Yan Yin to CERN, 19-26.5.94
E. Schulte
Local Oscillator Upgrade for the PS
J.L. Gonzalez
3
PSI BD/ Note 94-12
PS/ BO/ Note 94-13 (Min.)
a>
PS/ CO/ Note 94-01 (Spec.)
PSI CO/ Note 94-02
PS/ CO/ Note 94-03 (Tech.)
PS/ CO/ Note 94-04 (Min.)
PS/ CO/ Note 94-05 (Spec.)
PS/ CO/ Note 94-06 (Spec.)
PS/ CO/ Note 94-07 (Tech.)
PSI CO/ Note 94-08 (Min.)
PS/ CO/ Note 94-09
PS/ CO/ Note 94-10 (Info.)
PS/ CO/ Note 94-11 (Min.)
Interface specifique pour le timing des equipements d'acquisition des transfonnateurs de faisceau des Jinacs II et III et de la ligne d'injection du PSB
].D. Schnell
Minutes of 1191-Z17 Meetings held on 25, 27, 31 May and 7, 15June1994
V. Agoritsas
Emittance Measurement - Software Specifications
R.M. Suresh Babu, A.Bandyiopadhyaya, Luc De Bois
Protocole de Controle - Description et Utilisation des Impulsions de Timing
G. Benincasa
PSB93-PM - Posbnortem des tests du 16 au 22.12.1993
C. Serre
CPS94-03 Conversion PSl - Zone Est et Etude RF PS (Reunion du 18.1.1994) C. Serre
The DSC Configuration Management Tools at PS. Using the database application "hardware" for the DSC
]. Cuperus, A. Gagnaire
Description of the PS/CO G64 System. Interfacing the stepping motors in the PS Complex
C. Dehavay
New Directory Organisation for DSC Applications (EMs & RT Tasks)
C.-H. Sicard
PSB 93-17 Conversion Booster. Etat du travail; tests de demarrage (9.2.1994)
C. Serre
1993 Annual Report - Controls Group
F. Perriollat for the CO Group
Transparents presentes aux Operateurs du Groupe PS/OP
Ch. Serre
Compte rendu de la reunion du 4 fevrier 1994
Cl. Dehavay
4
PS/ CO/ Note 94-12
PS/ CO/ Note 94-13
Revised 31.3.94
PS/ CO/ Note 94-14
PS/ CO/ Note 94-15
PS/ CO/ Note 94-16
PS/ CO/ Note 94-17
PS/ CO/ Note 94-18
PS/ CO/ Note 94-19
PS/ CO/ Note 94-20
PS/ CO/ Note 94-21
PS/ CO/ Note 94-22
PS/ CO/ Note 94-23
PS/ CO/ Note 94-24
PS/ CO/ Note 94-25
PS/ CO/ Note 94-26
(Min.)
(Tech.)
(Tech.)
(Tech.)
(Spec.)
(Min.)
(Tech.)
(Min.)
(Min.)
(Min.)
(Info.)
(Info.)
(Min.)
(Tech.)
(Spec.)
CPS 94-03 Conversion PSI: ZE & RF-Instrumentation PS & TT (Reunion du 22.2.1994)
Ch. Serre
Replacement of the ICVI 96 by the VMOD-TTI.. Module
A. Gagnaire, W. Heinze
Pulse Train Generator for Cyclic MPV908 Applications
W. Heinze
Timing-interrupts pour le PPM du PSB
M. Arruat, G. Daems
The PS G64 Stepping Motors Interface System: Installation Guide
C. Dehavay
EXM 94-01 G. Daems
Development of a VME Dual Port Memory with Up/Down Counter
A. AAS
EXM 94-02
G. Daems
CPS 94-04 Conversion PSI : ZE & RF - Planning ZE et Etude RF (21.4.1994)
C. Serre
EXM 94-03
G. Daems
The IHEP-CERN ColJaboration on UNK Accelerator Controls. (Briefing of L. Evans for his CRC attendance in May 1994)
B. Kuiper
Renovation du SOS F. Perriollat
PSB93-19 Conversion Booster. Postmortem demarrage mars/avril 1994 (26.4.94) .
C. Serre
Proposition pour les Archives ]. Cuperus, F. di Maio
Posting requests for a correction or an extension of a generic application
F. Di Maio, A. Risso
5
PS/ CO/ Note 94-27
PS/ CO/ Note 94-28
PS/ CO/ Note 94-29
PS/ CO/ Note 94-30
PSI CO/ Note 94-31
PS/ CO/ Note 94-32
PSI CO/ Note 94-33
PS/ CO/ Note 94-34
PS/ CO/ Note 94-35
PS/ CO/ Note 94-36
PS/ CO/ Note 94-37
PS/ CO/ Note 94-38
PSI CO/ Note 94-39
PS/ CO/ Note 94-40
PS/ CO/ Note 94-41
PSI CO/ Note 94-42
(Tech.) The PLS Display Module in Euro-Mechanic Format
Cl. Dehavay
(Min.) CPS 94-05 Conversion PSl : East Hall, RF, Instrumentation & Layout (17.5.1994)
(Min.)
(Min.)
(Min.)
Ch. Serre
EXM94-04 G. Daems
Software Sharing
B. Kuiper
EXM94-05 G. Daerns
EXM 94-06 G. Daerns
(Tech.) PSB Beam Statistics - The User's Manual
V. Adorni
(Min.)
(Min.)
(Spec.)
(TecJ:t.)
(Min.)
(Min.)
The Integration of the Setup. Diagnosis and Recovery in Accelerator Control P. Skarek, L.Z. Varga
The PNPI-shell and the Setup
L.Z. Varga
EXM94-07 G. Daerns
CP594-06 - Conversion PSl - East Hall, Layout CPS04 (14.6.1994)
C. Serre
Application VistarPSB. Specifications M. Gourber
Application VistarPSB. AlgoriThm Specifications
M. Gourber
EXM 94-08 G. Daerns
EXM 94-09 G. Daems
(Tech.) Timing Event Generation: User Requirements
C.-H. Sicard
6
PSI CO/ Note 94-43 (Tech.)
PSI CO/ Note 94-44 (Tech.)
PSI CO/ Note 94-45 (Min.)
PSI CO/ Note 94-46 (Min.)
PSI CO/ Note 94-47
PS/ CO/ Note 94-48 (Tech.)
PSI CO/ Note 94-49 (Tech.)
PSI CO/ Note 94-50 (Tech.)
PS/ CO/ Note 94-51 (Tech.)
PS/ CO/ Note 94-52 (Tech.)
PS/ CO/ Note 94-53 (Tech.)
PSI CO/ Note 94-54 (Min.)
PS/ CO/ Note 94-55 (Spec.)
PSI CO/ Note 94-56 (Spec.)
PSI CO/ Note 94-57 (Min.)
PS/ CO/ Note 94-58 (Spec.)
RT Task "templates" and parametrisation
C.-H. Sicard
General Module Class Variants
]. Cuperus
CPS94-07 I CPS-RFll. Layout de la tranche CPS94 -Travaux logiciels.
F. di Maio
EXM 94-10 (21.7.1994)
G. Daems
Proposal for Diagnosing Timing Problems Related to BCD Structures
Isabel Campos, Paul Skarek, Laszlo Zs. Varga
Test Procedure for the DP-RAM
W. Heinze
User Manual for the DP-RAM
W. Heinze
Specifications For Composite Variable Modules (CVMS) In DSCs C.-H. Sicard
SPECS : Program Interaction with RT Tasks in DSC's
C.-H. Sicard
The Tg8 Device Driver
/ulian Lewis
Reduce Useless Equipment Accesses
A. Risso
EXM No. 94-11
G. Daems
Using DSC at PS . User's Manual for 1/0 Configuration Management with Hardware
A. Gagnaire
The Timing Transfer Survey Application
M. Gourber-Pace
EXM 94-12
G. Daems
Radial Perturbations. Specifications
M. Pace-Gourber
7
PS/ CO/ Note 94-59 (Tech.)
PS/ CO/ Note 94-60 (Tech.)
PS/ CO/ Note 94-61 (Spec.)
PS/ CO/ Note 94-62 (Spec.)
PS/ CO/ Note 94-63 (Spec.)
PSI CO/ Note 94-64 (Min.)
PS/ CO/ Note 94-65 (Min.)
PSI CO/ Note 94-66 (Min.)
PS/ CO/ Note 94-67 (Min.)
PS/ CO/ Note 94-68 (Tech.)
PS/ CO/ Note 94-69 (Tech.)
PS/ CO/ Note 94-70 (Spec.)
PS/ CO/ Note 94-71 (Min.)
PS/ CO/ Note 94-72 (Info.)
PS/ CO/ Note 94-73 (Tech.)
PS/ CO/ Note 94-74 (Tech.)
Process in the Console Manager
F. di Maio
Modifications to the GM Data-tables, library and Oracle interface planned for shutdown 95
C.-H. Sicard
Proposal for a DSC Software Interface to the TDC CAEN ModV 488 VME module
A. Gagnaire
General Sampler Oass Specifications
F. di Maio, C.-H. Sicard
Phase Modulation Control for 200 MHz Cavities
M. Gourber-Pace
EXMNo.13
G. Daems
EXM 94-14
G. Daems
Minutes of the Meeting on TG8 and Drivers Cards
W. Heinze
EXM 94-15
G. Daems
Double PPM for Power Supplies
W. Heinze
GMl Addresses and Lower level Modules
}. Cuperus
CPS94 Timings. Software Interface Specifications
Franck Di Maio
CPS94#08 Conversion PSl. Programmes des tests de decembre
Christian Serre
VME in the DSC at PS. VMe hardware approach by W. Heinze. VME Basic Access VME 1/0 by A. Gagnaire
DAC Versions for the GFAS
W. Heinze
User Manual for VMOO-DOR
W. Heinze
8
PS/ CO/ Note 94-75
PS/ CO/ Note 94-76
PS/ CO/ Note 94-77
PS/ CO/ Note 94-78
PS/ CO/ Note 94-79
PS/ CO/ Note 94-80
PS/ CO/ Note 94-81
PS/ CO/ Note 94-82
PS/ CO/ Note 94-83
PS/ CO/ Note 94-84
PS/ CO/ Note 94-85
PS/ CO/ Note 94-86
DI
PS/ DI/ Note 94-01
PS/ DI/ Note 94-02
PS/ DI/ Note 94-03
Tech. Mtg N° 49
(Min.)
(Min.)
(Spec.)
(Min.)
(Tech.)
(Min.)
(Tech.)
(Spec.)
(Min.)
(Min.)
(Min.)
(Info.)
(Min.)
EXM94-16
Ch. Serre
EXM 94-17
G. Daems
BCD Checker and BCD Rule Editor - User's Guide
I. Campos, P. Skarek, L. Varga
CPS94-09-CPS94-RF15- Conversion PSl. Etat d'avancement des travaux pour les tests de decembre 94
Ch. Serre
Analog and Digital Input/Output with Standard VME Modules
W. Heinze
EXM94-18
G. Daems
Knowledge Based Setup Facility
J.-M. Bouche, G. Daems, V. Filimonov, V. Khomoutnikov, I. Riabov
Hints for Using the TDC CAEN V488
W. Heinze
Equipment Module Read-Only Editor: Specifications
C.-H. Sicard
Timing and Event Distribution via the MTG-System and MTG-Cable. (Minutes of a meeting on 18.11.94)
G. Daems
EXM94-19
G. Daems
EXM 94-20
G. Daems
List of PS Divisional Notes 1993
Edited by S.L. Neboux
Justification for the PS Exploitation Budget
B. W. Allardyce
Compte rendu de la mini-reunion technique N°. 49 du 19janvier1994.
B. W. Allardyce
9
PS/ DI I Note 94-04
Tech. Mtg N° 50
PS/ DI/ Note 94-05
Tech. Mtg N° 51
PS/ DI/ Note 94-06
PS/ DI/ Note 94-07
Tech. Mtg N° 52
PS/ DI/ Note 94-08
Tech. Mtg N° 53
PS/ DI/ Note 94-09
PS/ DI/ Note 94-10
PSI DI/ Note 94-11
Tech. Mtg N° 54
PS/ DI/ Note 94-12
PS/ DI/ Note 94-13
Tech. Mtg N° 55
PS/ DI/ Note 94-14
Tech. Mtg N° 56
PS/ DI/ Note 94-15
Tech. Mtg N° 57
PS/ DI/ Note 94-16
Tech. Mtg N° 58
PS/ DI/ Note 94-17
PS/ DI/ Note 94-18
Tech. Mtg N° 59
(Min.)
(Min.)
(Min.)
(Min.)
(Min.)
(Min.)
(Min.)
(Min.)
(Min.)
(Min.)
(Min.)
(Min.)
(Tech.)
(Min.)
Operation avec antiprotons
B. W. Allardyce
Proton Injector Performance and OutJook
B. W. Allardyce
Lead ion accelerating facility: notes on the 17th co-ordination and specification meeting held on November 26, 1993 at CERN H. Umstiitter
Applications of Symbolic Computing at PS in 1994 B. W. Allardyce
Champ magnetique principal PS
B. W. Allardyce
LEAR in ppbar Collider Mode (Preliminary Feasibility study)
P. Lefevre
Compte rendu de la reunion PS sur le budget 1994le16 mars 1994 B. W. Allardyce
Ions plomb dans LEAR pour LHC: le test de decembre 1994
B. W. Allardyce
Lead Ion Accelerating facility: Notes on the 18th Co-ordination and Specification Meeting held on February 11, 1994 at CERN
H.H. Umstiitter
MOAS94
M. Boutheon
Preparations for the CERN/Canada workshops of 9-11May1994 Brian Allardyce
Application of symbolic computing in the PS in 1994 Brian Allardyce
Laser Ion Source
Brian Allardyce
Upgrading of the PS complex as LHC proton pre-injector. Project proposal. K. Schindl
Demarrage des machines en 1994 B. Allardyce
10
PSI DI/ Note 94-19 (Min.) Renovation des stations de refroidissement du PS et politique
Tech. Mtg N° 60 d'utilisation des groupes diesel du CERN.
B. Allardyce
PSI DI/ Note 94-20 (Min.) Projet de conversion du PS pour LHC
Tech. Mtg N° 61 B. Allardyce
PSI DI/ Note 94-21 (Min.) Lead Ion Accelerating Facility: Notes on the 19th Co-ordination and Specification Meeting held on May 6, 1994 at CERN
R.H. Umstlitter
PS/ DI/ Note 94-22 PS Training Plan 1994-1995
D. Dekkers
PS/ DI/ Note 94-23 Status of FPP Project D-082
B.W. Allardyce
PS/ DJ/ Note 94-24 Timing Booster; reflexions suite au memorandum de H. Koziol du 11.8.1994.
M. Boutheon
PS/ DI/ Note 94-25 (Min.) Minutes of PS Budget Meeting held on 2nd November 1994
B.W. Allardyce
PS/ DI/ Note 94-26 (Min.) Compte rendu de la reunion technique du PS N°62 du 9 novembre 1994
Tech. Mtg N° 62 B.W. Allardyce
PS/ DJ/ Note 94-27 The Accelerators for the AUSTRON Spallation Source
F. Baumann, B. Blind, P.J. Bryant, E. Griesmayer, ]. Janik, M. Pavlovic, T. Wang, L. Coull, G. Eaton, D. Fiander, 0. Grobner, K. Henrichsen, G. Heritier, C. Hill, K. Johnsen, H. Koziol, A. Lombardi, K.D. Metzmacher, S. Pichler, W. Pirkl, M. Regler, K. Schindl, H. SchOnauer, H. Schanbacher, A. Sullivan, B. Szeless, B. Zotter
) PSI DI/ Note 94-28 (Min.) The Laser Ion Source Experiment
Tech. Mtg N° 63 B.W. Allardyce
PS/ DI/ Note 94-29 (Min.) Minutes of PS Budget Meeting held on 30th November 1994
B.W. Allardyce
PSI DI! Note 94-30 (Min.) Le "fantOme" de Lear ou "Unexpected Beam Blowup"
Tech. Mtg N° 64 B.W. Allardyce
PS/ DI/ Note 94-31 (Min.) Revision du projet D-067
Tech. Mtg N° 65 B.W. Allardyce
PS/ Dl/ Note 94-32 (Min.) Stabilisation du champ magnetique principal PS
Tech. Mtg N° 66 B.W. Allardyce
11
PS/ HI/ Note 94-01
PSI HI/ Note 94-02 (MD)
PS/RF/Note 94-11 (MD)
PS/ HI/ Note 94-03
PS/ HI/ Note 94-04 (ME)
PS/ HI/ Note 94-05
PSI HI/ Note 94-06
PS/ HI/ Note 94-07
PS/ HI/ Note 94-08 (ME)
PS/ HJ I Note 94-09 (ME)
PSI HJ I Note 94-10 (Spec.)
PS/ HI/ Note 94-11 (Spec.)
PS/ HI/ Note 94-12
PS/ HI/ Note 94-13
PSI HJ/ Note 94-14 (ME)
PS/ HI/ Note 94-15
The PSB Energy Increase to 1.4 GeV (MD report)
K. Schindl
Setting-up of Linac 2 for High Intensity
C. Hill, A. Lombardi, M. Vretenar
Possible RFQ Designs for a Lead Ion Beam generated by a Laser Ion Source
Alessandra Lombardi
PSB ME-News: Introduction of PPM Mode between Cycles with low and high BOOT
H. Fiebiger, N. Rasmussen
Calculations for Pb53+ Injection into the PS Booster
N. Rasmussen
A Complete Expression for the Longitudinal Beam Transfer Function
N. Rasmussen
Tracking Particle Trajectories in the Phase Plane
N. Rasmussen
PSB ME News: First Injection of Pb53+ Ions into the PSB
H. Schonauer
PSB ME-News: First Acceleration of Pb53+ in PSB Ring 3
E. Jensen, K. Schindl
Video Emittance Measurement
S.K. Bose, S. V. Deshpande
Virtual Scope - Software Specifications
S.K. Bose, S. V. Deshpande, Balhans ]ayaswal, U. Raich
RFQ - Principe du Folded Dipole
I. Hassine
RFQ UNAC a Basse Energie - Modifications et Adaptation au PC du Programme RFQLOW
V. Desille, N. Catalan Lasheras
PSB ME NEWS: First Acceleration of Pb53+ Ions in the PS: Booster Part
H. Schonauer
Lead Ions Acceleration: Budget
D. Dekkers
12
)
PS/ HI/ Note 94-16
PS/ HI/ Note 94-17
LP
PS/ lP/ Note 94-01
PS/ lP/ Note 94-02
PS/ lP/ Note 94-03
PS/ lP/ Note 94-04
PS/ lP I Note 94-05
PS/ lP I Note 94-06
PS/ lP I Note 94-07
PS/ lP/ Note 94-08
PS/ lP I Note 94-09
PS/ lP/ Note 94-10
PS/ LP/ Note 94-11
AT/MA/ Note
PS/ lP/ Note 94-12
(Tech.)
(Min.)
(Min.)
(Spec.)
(Min.)
(Tech.)
(Min.)
(Min.)
(Tech.)
(Min.)
(Info.)
(Tech.)
(Min.)
Test of ProgTam RFQLOW
N. Catalan Lasheras
Gating of the ECR on unwanted Linac 3 Cycles
J. Knott
CR du 18eme LPI Techn. Mtg.
J.P. Potier
CR Du 17eme LPI Techn. Meeting
J.P. Potier
Specifications pour un nouvel ensemble de Production de e•
J.C. Godot, L. Rinolfi
Min. of Mtg. held on 27. 1. 94 (Uppsala Collaboration)
F. Chautard
Delay Time Experienced by a Laser Pulse on Transit through a Substrate
P. M. Devlin-Hill, P. Joly
CUC Agenda 18February1994
J.H.B. Madsen
The CTF Run N° 4 1993. Results and comments H. Braun, JHB. Madsen and S. Schreiber.
J.H. B. Madsen
Autocorrelateur du l.aboratoire de Photoemission
P. Joly
CTF Run N° 1 - 1994 J.H.B. Madsen
Collaboration Uppsala University I CERN Visit of Prof. T. Ekelof, D. Reistad, Y. Yin at CERN on 17 March 1994
J.P. Dclahaye
Mcsure Magnetique du Solenoide ''bridge coil" SNX pour le LIL M. Comuet, G. Patron
Minutes of the Meeting held on 17 March 1994
F. Chautard
13
PS/ IP/ Note 94-13
PS/ lJ> I Note 94-14
PSI IP I Note 94-15
PSI IP I Note 94-16
PS/ IP/ Note 94-17
PS/ IP/ Note 94-18
PS/ IP/ Note 94-19
PS/ IP/ Note 94-20
PS/ IP/ Note 94-21
PS/ IP/ Note 94-22
PS/ IP I Note 94-23
PS/ IP I Note 94-25
PS/ LP I Note 94-26
PS/ LP I Note 94-27
(Min.) CUC Agenda 15 April 1994
/.H.B. Madsen
(Tech.) Combining Wideband Signals from a Wall Current monitor
/.Durand
(Min.) Minutes of a Meeting of the Uppsala University /CERN Collaboration
E. Schulte
(Spec.) Technical Specification for High Power Pulsed Klystrons for the LPI Accelerator
P. Pearce
(Min) Notes of Visits to Several Companies in the UK during 21-23 March 1994
(Tech.)
(Spec.)
(Min.)
(Min.)
(Tech.)
(Info.)
(Tech.)
(Min.)
(Spec.)
P. Pearce
Mesure Magnetique du Solenoide SNFll de Reserve pour le CTF
D. Cornuet et de G. Patron
Technical Specification. Manufacture of the Magnetic Bunch Compressor of the CLIC Test Facility
P. Pearce
Notes on the PS Specification Meeting concerning the Repair and Purchase of Klystrons for the LPI Machine
P. Pearce
Minutes of a Meeting held on 28. 4. 94 concerning the Development of new ON/OFF Coordinators for the LIL machine
P. Pearce
A Faulty Interlock Display Program for LPI Modulators
R. Gilmour
Procedure pour Faisceau CMS dans LEA
L. Rinolfi
Using a 0.5 - 700 MHz Electrostatic Pick-up at the PS/LP Photoemission Laboratory
/.Durand
Min. of a Tcchn. Presentation on 30 GHz RF power Sources given by Thorrn Microwave Limited UK
P. Pearce
Technical Specification for the repair and reconditioning of high power pulsed klystrons for the LPI accelerator
P. Pearce
14
PSI LP I Note 94-28
PS/ LP/ Note 94-29
PS/ LP/ Note 94-30
PS/ LP/ Note 94-31
DO 15300/PS
PS/ LP/ Note 94-32
PSI LP I Note 94-33
PS/ LP/ Note 94-34
PS/ LP/ Note 94-35
PS/ LP/ Note 94-36
PS/ LP I Note 94-37
PS/ LP/ Note 94-38
PS/ lJ> I Note 94-39
PSI LP I Note 94-40
(Spec.)
(Info.)
(Tech.)
(Spec.)
(Min)
(Tech.)
(Tech.)
(Tech.)
(Tech.)
(Spec.)
(Tech.)
(Min.)
(Tech)
Technical Specification for the Purchase of High Power Pulsed Klystrons for the LPI Accelerator
P. Pearce
An Outline of the Programme for the CTF Run N° 2, Started 5/07 /94
].H.B. Madsen
The CTF Run N° 1 1994. Results and Comments H. Braun, /HB. Madsen and S. Schreiber
Technical Specification for the machining and Welding of components for a new converter Electrons - Positrons J.C. Godot
Visite au LAL
J.C. Godot
LPI Modulator Interlock Fault Data Collection Program
R. Gilmour
LPl Modulator Interlock Fault Data Display Program - Workstation Version
R. Gilmour
LPI Modulators Interlock Fault Data Statistical Analysis Program
R. Gilmour
User Level Software for the New Interlock System of the LPI Klystron Modulators
R. Gilmour
Technical Specification. For The Purchase Of A 30 GHz Travelling Wave Tube Amplifier System P. Pearce
Operating Procedure for the crF Laser S. Hutchins
Review of the Tender IT-2257 /PS concerning Repair and Reconditioning of High Power Klystron Tubes Peter Pearce
A Review of L-Band Klystrons (15 GHz for Peak Pulsed Power up to 40 MW
P. Pearce
15
PS/ U'/ Note 94-41 (Min.) CLIC Meeting Minutes
/.H.B. Madsen
PS/ U' I Note 94-42 (Tech.) Polarized Positron Sources
A.A . . Mikhailichenko
PS/ U' I Note 94-43 (Tech.) Beam Loading Effects on a Single Bunch and on a Bunch Train in the CI'F 95
F. Chautard
PS/ U'/ Note 94-44 (Tech.) Fringe Field in the Bunch Compressor for the CI'F
F. Chautard
PS/ LI'/ Note 94-45 (Min.) The CTF Run No. 2 - 1994. Results and Comments
/.H.B. Madsen
PS/ IJ>/ Note 94-46 (Min.) Summary of the CUC/PS Meeting on 21st October 1994
/.H.B. Madsen
PS/ IJ>/ Note 94-47 (Tech) Review of the Faults occurring in MDK13 during Run N°2
G. Coudert, G. McMonagle, P. Pt!llrce, G. Rentier
PS/ U'/ Note 94-48 (Tech.) Requirements for the Assembly and Magnetic Measure- ments of the CERN Bunch Compressor for the CTF
P. Bossard, F. Chautard, D. Cornuet, L. Rinolfi
PS/ IJ>/ Note 94-49 (Tech.) Notes on a Visit to Sincrotrone Trieste on the 26th and 27th September 1994
P. Pt!llrce
PS/ IJ>/ Note 94-50 (Tech.) Propositions pour la Section Acceleratrice "ACS 25" du UL
L. Rinolfi
PS/ LI'/ Note 94-51 (Min.) CUC PS Meeting 4. 11. 94 )
/.H.B. Madsen
PS/ LP/ Note 94-52 (Tech.) Bunch Compressor Limitations
F. Chautard
PS/ LP I Note 94-53 (Min.) Notes of a Visit to PSI Vi11igen on the 21st September 1994 concerning the SLS Modulator Collaboration
P. Pt!llrce
PS/ LI'/ Note 94-54 (Min.) CLIC Beam Dynamics Meeting No 1
A. Riche
PS/ IJ>/ Note 94-55 (Min.) CLIC Beam Dynamics Meeting No 2
A. Riche
PS/ LP/ Note 94-56 (Min.) Reunion Techn . CR du 9. 11. 94
f.P. Potier
16
PS/ LP I Note 94-57 (Min.)
PS/ LP/ Note 94-58 (Min.)
OP
PS/ OP/ Note 94-01 (Tech.)
PS/ OP/ Note 94-02 (Tech.)
PS/ OP/ Note 94-03
PS/ OP/ Note 94-04 (Tech.)
PSI OP I Note 94-05 (Min.)
PS/ OP/ Note 94-06
PS/ OP/ Note 94-07 (Info.)
PS/ OP/ Note 94-08 (Min.)
PS/ OP/ Note 94-09 (MD)
PS/ OP I Note 94-10 (Min.)
PS/ OP/ Note 94-11 (MD)
PS/ OP/ Note 94-12 (MD)
PS/ OP/ Note 94-13 (Tech.)
CUC/PS Meeting 18 November 1994
].H.B. Madsen
Resume de la Reunion CUC du 2. 9.94
J.C., Godot, G. Suberlucq
Use of Real-time Oock to program Energy-related Functions
B. Frammery
L'Interface PLS - Point de vue des utilisateurs
B. Frammery
Operation du Complexe PS pendant la periode 4 de 1993
]. Boillot, D. Dagan
Fast Extraction for PS196
E. Roux
Minutes of the meeting (20.1.1994) on rhw PS fast wire scanner
Ch. Steinbach
Operation Statistics of the PS Accelerator Complex for the Year 1993
G. Azzoni, D. Dagan
Transparents presentes aux Techniciens d'Operation en janvier 1994
H. Mulder
NOASNo.20
B. Frammery
Creation et utilisation des cycles magnetiques dans le cadre du test LHC
N. Blazianu
Compte rendu de la reunion du 4.2.94 concemant le systeme de recherche de personnes (RP) et du telephone cellulaire (GSM)
Use of the PS Fast Wire Scanner during the LHC Test beam Machine Development of December 1993
E. Falk, F. Hoekemeijer, J. Os/ors, Ch. Steinbach
Test LHC 1,4 GeV /c: Modulation des Courants des Septa et d'un Quadrupole par PLS G. Cyvoct, G. Daems
Feasibility Study towards using DEC-RTI GUI's: Spectrum Analysers Emulator
J-L. Sanchez Alvarez
17
PS/ OP I Note 94-14
PS/ OP/ Note 94-15
PS/ OP/ Note 94-16
PS/ OP/ Note 94-17
PS/ OP/ Note 94-18
PS/ OP/ Note 94-19
PS/ OP I Note 94-20
PS/ OP I Note 94-21
PS/ OP I Note 94-22
PS/ OP/ Note 94-23
PS/ OP I Note 94-24
PS/ OP I Note 94-25
PSI OP I Note 94-26
PS/ OP I Note 94-27
(Info.)
(Min.)
(Info.)
(Info.)
(MD)
(Min.)
(Min.)
Transparents presentes aux Techniciens d'Operation en janvier 1994 (cours)
K.H. Schindl
N20AS 21. Compte Rendu de la reunion du 16 fevrier 1994
B. Frammery
Programme d'Operation du Complexe PS en 1994
J. Boillot
Le Timing AAC COte Hardware
J. Ottaviani
Timings d'injection - Le tycle LEAR et son timing inteme (Cours donnes aux techniciens d'operation PS/OP /U.AR/ AAC)
J. Duran-Lopez
Summary of MD sessions on LEAR fast extraction at 105 MeV I c (13-14.12.1993)
S. Baird
Repartition of the cycles in 1994
J. Boillot, D. Manglunki
Programme de demarrage du PS en mars 1994
Ch. Steinbach
Compte rendu de la reunion du groupe d'etudes sur la stabilite du champ principal PS (reunion du 7.3.1994)
Ch. Steinbach
Preparation du demarrage mars 1994
A. Nicoud, C. Saulnier
(Info.) Acceleration d'ions Plomb au CERN Transparents presentes tors du cours donne aux techniciens d'operation pendant le grand arret 1994
D. Dekkers
(Tech.) Proposition de CATV pour les informations generates du PS G. Mercer
(Info.) Ultra Slow Extraction (Course given to LEAR/ AAC operators during the shutdown)
H. Mulder
(Info.) Source d'lons Plomb Cours donne aux techniciens d'operation PS/Ll/PSB K. Langbein
18
PS/ OP/ Note 94-28
PS/ OP I Note 94-29 (Info.)
PS/ OP/ Note 94-30 (Info.)
PS/ OP I Note 94-31 (Info.)
PS/ OP/ Note 94-32 (Info.)
PS/ OP/ Note 94-33 (Info.)
PS/ OP I Note 94-34 (Tech.)
PS/ OP/ Note 94-35 (Min.)
PS/ OP/ Note 94-36 (Tech.)
PS/ OP I Note 94-37 (Tech.)
PS/ OP/ Note 94-38 (Tech.)
PS/ OP/ Note 94-39 (Min.)
PS/ OP/ Note 94-40 (Tech.)
PS/ OP/ Note 94-41 (MD)
PC Based Data Logging System with Two Channels of Output and Four Channels of Input
A. Findlay
LEAR Injection Tuning. Cours donne aux technidens d'operation PS/LEAR/ AAC
J.-L. Sanchez Alvarez
AAC Timing. Course given to the AAC and LEAR Operation Technicians during the 1994 shutdown
T. Eriksson
AAC Modes. Course given to AAC and LEAR operation technicians during 1994 shutdown
T. Eriksson
Ejection Lente au PS. Notes du cours donne aux techniciens d'operation le 11.3.1994
Ch. Steinbach
Lead Ions in the PSB. Cours donne aux techniciens d'operation le 10.3.1994
H. SchOnauer
A broadband based video system for the PS complex
G. Mercer
Minutes of the briefing of 16 March 1994
Ch. Steinbach
Vacuum Display Facility
S. Jacobsen
Programme d'Alarmes pour le Mode Economie
G. Adrian
Journal de demarrage du PS apres l'arret de 1994
C. Steinbach
N20AS - Compte rendu de la reunion du 14 avril 1994
B. Frammery
Projet d'amenagement de la salle 354 1-011
D. Manglunki
Compte rendu d'etudes machine sur la stabilite du champ magnetique principal du PS
Ed. Ch. Steinbach
19
PS/ OP I Note 94-42 (MD)
PS/ OP I Note 94-43 (Min.)
PS/ OP/ Note 94-44 (Min.)
PS/ OP I Note 94-45 (Min.)
PS/ OP/ Note 94-46 (Tech.)
PS/ OP/ Note 94-47
PS/ OP I Note 94-48 (Min.)
PS/ OP/ Note 94-49 (Tech.)
PS/ OP I Note 94-50 (Tech.)
PS/ OP I Note 94-51
PS/ OP I Note 94-52
PS/ OP/ Note 94-53 (Min.)
PS/ OP/ Note 94-54 (Min.)
PS/ OP/ Note 94-55 (Tech.)
PS/ OP I Note 94-56 (Min.)
Spill Control Using Extraction Intensity Feedback (MD of 18.4.1994)
H. Mulder
Compte rendu de la reunion du Groupe d'etudes sur la stabilite du champ principal PS (22.4.1994)
Ch. Steinbach
N20AS - Compte rendu de la reunion du 27.4.94
B. Frammery
N20AS - Compte rendu de la reunion du 11 mai 1994
B. Frammery
Spectrum Logger Facility
S. Jacobsen
Groupe d'etude sur la stabilite du champ principal du PS : Etat des travaux debut juin 1994
P. Bossard, D. Cornuet, B. Godenzi, Ch. Steinbach, H. Ullrich
Compte rendu des tests partiels du 13.6.1994
C. Saulnier
LEAR Info
E.Roux
LEAR Injection Line Trajectories
J.L Sanchez Alvarez
Operation du Complexe PS pendant la periode 1de1994
/.Boillot, D. Dagan
Operation du Complexe PS. Suivi des problemes suite A la premia-e periode d'operation de 1994
/. Boillot
Problemes du vide du Booster - Compte rendu de la reunion 10/8/94
£ Wildner
N20AS. Reunion du 27juillet1994
B. Frammcry
Mode d'Utilisation du Programme Scope
/.L. Mary
Compte rendu de la reunion du groupe d'etude sur la stabilite du champ principal PS du 12 ao'llt 1994
C. Steinbach
20
PS/ OP/ Note 94-57 (Tech.)
PS/ OP I Note 94-58 (Tech.)
PS/ OP/ Note 94-59 (Min.)
PS/ OP I Note 94-60 (Min.)
PS/ OP I Note 94-61 (Min.)
PS/ OP/ Note 94-62 (Tech.)
PS/ OP I Note 94-63
PS/ OP I Note 94-64 (MD)
PS/ OP I Note 94-65 (Info.)
PS/ OP I Note 94-66 (Tech.)
PSI OP I Note 94-67
PS/ OP/ Note 94-68 (Min.)
PS/ OP/ Note 94-69 (Min.)
PS/ OP/ Note 94-70 (Min.)
PS/ OP I Note 94-71 (Min.)
PS/ OP/ Note 94-72 (Tech.)
System Design For Remote Signal Processor
Henk Mulder
Emittance Evolution Program for LEAR
f .-L. Sanchez Alvarez
NOAS28
B. Frammery
Compte Rendu de la Reunion du Groupe d'Etudes sur la Stabilite du Champ Principal PS (27.9.1994)
Ch. Steinbach
Compte rendu de la reunion des Tests Partiels du 10.10.1994
Ch. Steinbach
Mise en marche des scrapers AAC apres une coupure de courant
f. Ottaviani
Measurement of Local Tune and Emittance from Schotttky-Scans in LEAR
M. Ludwig
ISOLDE Beam Profile Test with Sem Grids (MD du 29.9.1994)
Reported by E. Wildner
Ions Plomb dans le PS. Copie des transparents
D. Manglunki
AAC-LEAR Transfer Efficiencies From 18/07 to 23/10
Jose-Luis Sanchez Alvarez
Operation du Complexe PS. Statistiques de fonctionnement pendant Ja periode 2/1994
D. Dagan
Compte rendu du briefing du PS du 31.10.1994
Ch. Steinbach
Compte rendu de la reunion NOAS No. 29
B. Frammery
Section LPI: Compte rendu de la reunion du 28.10.1994
B. Frammery
NOASNo.30
B. Frammery
Operation du Complexe PS. Suivi des problemes suite a la deuxieme periode d'operation de 1994 ·
f. Boillot
21
PS/ OP I Note 94-73 (Min.)
PS/ OP I Note 94-74 (Min.)
PS/ OP/ Note 94-75 (Min.)
PS/ OP/ Note 94-76 (Tech.)
PA
PS/ PA/ Note 94-01 (MD)
PS/ PA/ Note 94-02 (MD)
PS/ PA/ Note 94-03 (MD)
PS/ PA/ Note 94-04 (MD)
PS/ PA/ Note 94-05 (Spec.)
PS/ PA/ Note 94-06 (MD)
PS/ PA/ Note 94-07 (MD)
PS/ PA/ Note 94-08 (Min.)
PS/ PA/ Note 94-09 (PPC)
PS/ PA/ Note 94-10 (PPC>
Compte rendu du briefing du PS du 6.12.1994
Ch. Steinbach
Compte rendu de la reunion des tests partiels du 13.121994
C. Saulnier
Compte rendu de la reunion du 16.12.1994 sur la distribution du timing Bdot
Ch. Steinbach
AAC- LEAR Transfer Efficiencies from 09.11to14.12.1994
].-L. Sanchez Alvarez
Chromaticity Correction in the PS
G. Azzoni, M. Martini
Double Batch Filling in the PS G. Daems, ]. Philippe, J.P. Riunaud
Single Bunch Transverse Instabilities at 1 GeV PS-MD Report
R. Cappi
Test of the 2Qy=12 Resonance Compensation for the LHC Test Beam
R. Cappi, E. Wildner
Technical Specificationfor Low Loss, SF6 Gas Pressurized, 26.30 High Voltage Coaxial Cable for PS Injection Kicker Magnets
K. Metzmacher
Les Septa DC du PSB et du PS utilises a 1.4 GeV pour le "test LHC"
M. Thivent
Pulsing the PSB Ring 3 Extraction Kicker for the ''LHC test"
A. Fowler, K. Metzmacher, L. Sermeus
Minutes of the Meeting about the TI'2 Stripper held on 21.1.94
D. Manglunki
Minutes of the PPC Meeting held on 1.2.94
D. Manglunki
Minutes of the PPC Meeting held on 8.2.94
D. Manglunki
22
PS/ PA/ Note 94-11
PS/ PA/ Note 94-12
PS/ PA/ Note 94-13
PS/ PA/ Note 94-14
PS/ PA/ Note 94-15
PS/ PA/ Note 94-16
rs; PA/ Note 94-17
rs; PA/ Note 94-18
Replaces PS/El 79-8
rS/ PA/ Note 94-19
rs/ PA/ Note 94-20
PS/ PA/ Note 94-21
rs/ PA/ Note 94-22
PS/ PA/ Note 94-23
PS/ PA/ Note 94-24
PS/ PA/ Note 94-25
PS/ PA/ Note 94-26
(PPC) Minutes of the PPC Meeting held on 22.2.94
D. Manglunki
AUSTRON Extraction Kicker Feasibility Study
K. Metzmacher
DIRAC (1191) Preliminary Optics in East Hall
Luc Durieu
(Tech.) Schema et Utilisation du Systeme de ContrOle des Collimateurs de la Zone Experimentale Sud
K. Blitzner, M. Chassard, G. Granger
(PPC) Minutes of the PPC Meeting held on 15.3. 1994
D. Manglunki
(Min.) Compte Rendu de la lOeme Reunion PS/PA et AT /VA, du 19 avril 1994
L. Danloy
(MD)
(MD)
(MD)
Cl Transfer Line of LEAR for PS208-Hot Nuclei Experiment
J.-Y. Hemery
Fast Bumper System (F.B.) - (Continuous Transfer) Safety Instructions Revised
L. Sermeus
Ml Transfer Line of LEAR for PS185-Hyperons Experiment
M. Giovannozzi and ].-Y. Hemery
MD Report on the transport of fast extracted 3.5 GeV /c beam.
K. Biitzner and L. Durieu
Initiation aux Lasers
L. Danloy
Steering in the ES Line of LEAR
M. Giovannozzi, J.-Y. Hemery
Safety Instructions for AAC Kicker Systems
/. Schipper
Energy Amplifier Test Line Modification and Setting-up
L. Durieu
MD Report of Sessions of 4 July and 5 July, 1994
Reported by K. Biitzner
PS MD Report of 29-30 August 1994
R. Cappi
23
PS/ PA/ Note 94-27
PS/ PA/ Note 94-28
PS/ PA/ Note 94-29
PS/ PA/ Note 94-30
PS/ PA/ Note 94-31
PS/ PA/ Note 94-32
Rep1aces
PS/ PA/ Note 94-33
PS/ PA/ Note 94-34
PS/ PA/ Note 94-35
PS/ PA/ Note 94-36
ro
PS/ PO/ Note 94-01
PS/ PO/ Note 94-02
PS/ PO/ Note 94-03
Rev.
PS/ PO/ Note 94-04
PS/ PO/ Note 94-05
(PPC)
(Tech.)
(PPC)
(Min.)
(MD)
(PPC)
(MD)
(Spec.)
(Tech.)
(Tech.)
(Tech.)
(Info.)
Initial Testing of Septum SMH 16 (Lead Ion)
]. Borbourgh and M. Hourican
Minutes of the PPC Meeting held on 23.6.94
D. Manglunki
Systene de Detection des Sur-temperatures de l'Aimant Principal du PS
M. B6le-Feysot and P. Bossard
53 Transfer Line of LEAR for PS-207-LEX Experiment
].-Y. Hemery
Minutes of the PPC Meeting held on 22.9.1994
D. Manglunki
Safety Instructions for KF A45 PS Injection Kickers
H. Gaudillet
Compte rendu de la 1 leme Reunion PS/PA et AT IV A du 18 octobre 1994
L. Danloy
Results from the Setting up of the S4 line of LEAR for PS200-TRAP Experiment
M. Giovannozzi and ].-Y. Hemery
Minutes of the PPC meeting held on 8.11.94
D. Manglunki
Results from the setting up of the joint run of PS-197 Crystal barrel and PS-201 Obelix
M. Giovannozzi and J.-Y. Hemery
Specification for Power Electronics Capacitors
E. Kaufmann
Projet de Renovation de la Zone Est
]. Buttkus
Groupe de Support Technique PS-PO. Rapport Annuel des Activites 1993 -1994
]. Gruber
Test du PS comme futur prE!-injecteur du LHC. Modification des convertisseurs pour 1.4 GeV
Listes d'appel du Groupe PS/PO
]. Gruber
24
PS/ PO/ Note 94-06 (Tech.)
PS/ PO/ Note 94-07 (Tech.)
PS/ PO/ Note 94-08 (Spec.)
PS/ PO/ Note 94-09 (Tech.)
PS/ PO/ Note 94-10
PS/ PO/ Note 94-11 (Min.)
PS/ PO/ Note 94-12 (Tech.)
PS/ PO/ Note 94-13 (Spec.)
PS/ PO/ Note 94-14 (Info.)
PS/ PO/ Note 94-15 (Tech.)
RF
PS/ RF I Note 94-01
PS/ RF/ Note 94-02
PS/ RF I Note 94-03 (MD)
Consignes d'operation et de securite des alimentations gamma transition (DlKlTR, SPARE DlKlTR, DSHlTR, SPARE DSHlTR)
]. Lahaye
Consignes d'operation et de securite des alimentations septa pulses -Injection et transfert (Bll.SMV, Bl2.SMV, BI4.SMV, BT.SMV30, BI.SMH, SPARE)
/. Lahaye
Specification technique d'alimentations a decharge de condensateurs pour des aimants a septum de la ligne de transfert PSB-PS J.-P. Royer
New Control Loop for the improvement of the PS Main Magnet Field. Part 1: The Control Loop of the Water Circuit T. Salvermoser
Compte Rendu de la reunion sur la regulation des champs PS avec le Signal B de l'aimant de reference (unite 101) H. Ullrich
Compte rendu des reunions du 8 Juin 1994 entre OCEM et le CERN concemant le contrat des alimentations du distributeur F. Voelker
Alimentation du Bump de l'Ejection Lente du PS par une Tekelec T700
R. Pittin
Technical Specification for a Power Converter for Magnets
/.Buttkus
The Power Converters (PC's) for the FI-Factory Complex DAPHNE at INFN-LNF/Frascati
F. Voelker
Test: B Regulation of the PS Main Magnet Power Supply
T. Salvermoser
Phase Loop Amplifier F. Blas
Concise Description of the Responsibilities of the PS-RF Group
R. Garoby
Acceleration with H = 1 and 2 OF LHC Test Beam in the PSB, Machine Developments End 1993
Participants : F. Blas, /. Boucheron, R. Garoby, F. Pedersen, G.C. S chneider (Author).
25
PS/ RF/ Note 94-04 (MD)
PS/ RF/ Note 94-05 (MD)
PS/ RF I Note 94-06
PS/ RF/ Note 94-07 (Min.)
PS/ RF/ Note 94-08 (Min.)
PS/ RF/ Note 94-09
PS/ RF/ Note 94-10
PS/ RF/ Note 94-11 (MD)
PS/HI/Note 94-02 (MD)
PS/ RF/ Note 94-12 (Min.)
PS/ RF I Note 94-13 (Min.)
PS/ RF/ Note 94-14 (Min.)
PS/ RF/ Note 94-15
PS/ RF/ Note 94-16 (Min.)
PS/ RF/ Note 94-17
Longitudinal beam manipulations in the PS for the LHC
R. Garoby, S. Hancock
Tests of controlled longitudinal blow-up in the PSB R. Garoby, S. Hancock
Description of PLDs used in the "Frequency Translation" Plug-in (PS/ AC Synchronisation loop)
B.J. Evans
CPS94-RF No. 1. Reunion du 25.1.1994 R. Garoby
CPS94-RF No. 2. Reunion du 1.2.1994
R. Garoby
The Low Frequency Fundamental RF System for the LHC Beam Tests in the PSB.
J.M. Baillod, M. Corcelle, P. Gourcy, A. Krusche, M. Paoluzzi, V. Sabaiduc
The Second Harmonic RF System for LHC Beam Tests in the PSB. J.M. Baillod, M. Corcelle, P. Courcy, A. Krusche, M. Paoluzzi, V. Sabaiduc
Setting-up of Linac 2 for High Intensity MD of December ~5, 1993 C. Hill, A. Lombardi, M. Vretenar
CPS94-RF No. 3. Reunion du 8.2.1994
R. Garoby
CPS94-RF No. 4. Reunion du 15.2.1994
R. Garoby
Minutes of the 1st meeting of the Specification committee for the supply, forging, and machining of mechanical pieces for the PS/RF 40 MHz (LHC> prototype cavity. (PE-2232/LHC/PC)
£.Jensen
Modules in the PS 114 MHz Lepton Acceleration Low-Level RF System B.J. Evans
CPS94-RF No. 5. Reunion du 14.3.1994 R. Garoby
Description of "Converter and Data Link" (PS/RF-LL 2028/2) and "Stepper Motor Display". B.J. Evans
26
\
PS/ RF/ Note 94-18
PS/ RF/ Note 94-19
PS/ RF/ Note 94-20
PS/ RF/ Note 94-21
PS/ RF/ Note 94-22
PS/ RF I Note 94-23 (Spec.)
PS/ RF/ Note 94-24 (Min.)
PS/ RF/ Note 94-25
PS/ RF/ Note 94-26
PS/ RF/ Note 94-27 (Min.)
PS/ RF/ Note 94-28
PS/ RF I Note 94-29 (Min.)
PS/ RF/ Note 94-30 (MD)
PS/ RF/ Note 94-31 (Min.)
PS/ RF I Note 94-32
Description of "Digital Loop Processor" (PS/RF-LL 2003-2)
B.J. Evans
Voltage Controlled Amplifiers Used in the AA Production Beam Low-Level RF System
B.J. Evans
Description of "Dual ITL SP 2T' with Added Inverter
B./. Evans
Description of "Inductance Bias Control" (PS/RF-LL 2034/2) and "Inductance Bias Control Interlock" card.
B.J. Evans
Notes on the "114 MHz Switch and Delay" (PS-RF-LL-2065) and "EPA Switch and Delay" (PS/RF-LL-20661) Plug-ins
B.J. Evans
Technical Specification for the PS-RF NIM Powered Crates
J-L. Vallet
CPS94-RF No. 6. Reunion du 11.4.1994
R. Garoby
Logarithmic or Linear Automatic RF Voltage Control (Module PS/RF-HC3155)
D. Grier and P. Maesen
The G64 Interface Used to Control the Radio Frequency Equipment in the PS Booster.
Cl. Dehavay, P. Maesen
CPS94-RFNo. 7. Reunion du 19.4.1994
R. Garoby
Description of PLDs Used in the "High Resolution Phase Shi.fter" (PS/RF-LS 5001).
B./. Evans
CPS94-RF No. 8. Reunion du 3.5.1994
R. Garoby
Acceleration Using the Lead Ion Beam Control with a ~nic Number Change on Intermediate Flat-Top in the PSB Participants : R. Garoby, M. Paoluzzi, G.C. Schneider (Author)
CPS94-RFNo. 9. Reunion du 24.5.1994
R. Garoby
120 W, 100 kHz to 110 MHz Solid State Amplifier (PS/RF-HC 3115)
M. Paoluzzi
27
PS/ RF I Note 94-33 (Min.}
PS/ RF/ Note 94-34 (MD}
PS/ RF/ Note 94-35 (Min.)
PS/ RF I Note 94-36 (MD)
PS/ RF/ Note 94-37
PS/ RF/ Note 94-38 (MD)
PS/ RF/ Note 94-39 (Spec.}
PS/ RF I Note 94-40 (Spec.)
PS/ RF/ Note 94-41 (Min.)
PS/ RF/ Note 94-42 (Min.)
PS/ RF/ Note 94-43 (Min.)
PS/ RF/ Note 94-44 (Min.)
PS/ RF/ Note 94-45
PS/ RF/ Note 94-46
PS/ RF I Note 94-47
CPS94-RF No. 10. Reunion du 7.6.1994
R. Garoby
Compte rendu de MD PSB Plomb, Cycle MDION (4 &: 6 .7.1994)
F. Blas (auteur), R. Garoby, G. Schneider
CPS94 - No. 12 - Reunion du 2/~/94
R. Garoby
Compte Rendu de MD sur le PSB. Acceleration d'ions Plomb , Cycle Mdion (29 juillet 1994)
F. Blas (auteur), R. Garoby, F. Pedersen, G. Schneider
Description of PLD's used in the Linac 3 ECR Source Controls Interface
B.f. Evans
PS Machine Development Report. Premiere tentative d'acceleration d'ions Pb53
• au PS
R. Garoby
Technical Specification for a Digitizing Oscilloscope
F. Blas
Technical Specification for Solid-State RF Power Amplifiers for the CERN LINAC III 202 MHz RF System
/. Broere
CPS94 - No. 13 - Reunion du 16/9/94
R. Garoby
Minutes of a Meeting on Vacuum Aspects of the PS/RF 40 MHz (LHC} Prototype Cavity (PE-2232/LHC/PS, IT 2232/LHC/PS}
E. Jensen
Minutes of a Meeting on the Amplifier of the PS/RF 40 MHz (LHC) Prototype Cavity
E. /ensen
CPS94 - No. 14 - Reunion du 18/10/1994
R. Garoby
Digitizing Recorder
F. Blas
Digital Loop Processor
F. Blas
Digital Arithmetic Unit
F. Blas
28
PS/ RF/ Note 94-48 (Min.)
PS/CO/Note 94-78 (Min.)
PS/ RF/ Note 94-49
PSI RF/ Note 94-50
PS/ RF/ Note 94-51
PS/ RF/ Note 94-52
PS/ RF I Note 94-53
Distribution
B.W. Allardyce M.Boutheon D.J.Simon PS Group Leaders PS Secretaries
(Min.)
CPS94-No. 15- Reunion du 15/11/1994
Ch. Serre
Definition of the Control Parameters for the RF Systems of Linacs 2 &: 3
J.B. Evans
Minutes of a Meeting on the Forging of the PS/RF 40 MHz (LHC) Prototype Cavity
E. Jensen
Digital Comb Filter PS/RF-LL 2060/2
F. Blas R. Garoby
Cahier des Charges pour un ''B Train Interface"
F. Blas
Digital 8 Bit Notch Filter PS/RF-LL 2062/2
F. Blas
Edited by Susan Neboux
Database available on PS Server PSDIV\PS\PSNOTES\PSNOTE94.FM and SECRETARIES \PUBLIC\PSNOTES\PSNOTE94.FM
29