Updated as of July 2016 List of KALAHI-CIDSS Subprojects - PAMANA as of July 2016 Region Province Municipality Barangay Phase Cycle Sub-Project Name Project Type No. Of Bgys No. Of HH Physical Target Unit Kalahi Amount LCC Amount Total Amount Date Started Date of Completion Status IV-A Quezon Buenavista Bagong Silang PAMANA-2013 3 Construction of 1.650 km Level II Water Supply System (Pump Driven) Water System 1 48 1 system 300,000.00 144,640.00 444,640.00 14-Feb-14 11-Jun-14 Completed IV-A Quezon Buenavista Bagong Silang PAMANA-2014 4 Concreting of 150lm Critical slope, FMR Road Concreting 1 162 0.15 kms 330,000.00 49,000.00 379,000.00 15-Dec-14 30-Apr-15 Completed IV-A Quezon Buenavista Batabat Norte PAMANA-2013 3 Extension of 1.18 km On-Grid Power Line Electrification 1 39 1.18 km 300,000.00 416,600.00 716,600.00 07-Mar-14 09-May-14 Completed IV-A Quezon Buenavista Batabat Norte PAMANA-2014 4 Construction of 370 Lm ABC Pathway with 4 Lm Cross Footpath / Foot Trail / Access Trail/Pathway 1 138 0.37 kms 330,000.00 54,000.00 384,000.00 06-Feb-15 30-Mar-15 Completed IV-A Quezon Buenavista Batabat Norte PAMANA-2015 5 Construction of Multi-Purpose Pavement Post Harvest Facilities 1 124 338 sq.m 333,000.00 107,000.00 440,000.00 06-Apr-16 22-Apr-16 Completed IV-A Quezon Buenavista Batabat Sur PAMANA-2014 4 Additional 1.618 ln distribution Line and 7 Units Tapstand with 3 HP Water System 1 90 1 system 300,000.00 65,630.00 365,630.00 28-Jan-15 28-Mar-15 Completed IV-A Quezon Buenavista Buenavista PAMANA-2013 3 Construction of 1.240lm Level II Gravity-Fed Water Supply System Water System 1 70 1 system 300,000.00 62,000.00 362,000.00 19-Jan-14 15-Mar-14 Completed IV-A Quezon Buenavista Buenavista PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 73 0.08 kms 300,000.00 15,000.00 315,000.00 02-Jun-16 On-going IV-A Quezon Buenavista Bukal PAMANA-2013 3 5 units Water Well Drilling with Construction of 1 unit Sanitary Toilets 1 222 1 unit 300,000.00 72,800.00 372,800.00 11-Mar-14 15-Jun-14 Completed IV-A Quezon Buenavista Bukal PAMANA-2014 4 Water Well Drilling of 9 Sites Water System 1 100 1 system 300,000.00 49,000.00 349,000.00 01-Mar-15 23-Mar-15 Completed IV-A Quezon Buenavista Bulo PAMANA-2013 3 Concreting of 60 lm Critical Slope & Construction of 60 lm Line Canal Riprap Wall / Slope Protection / Erosion Control 1 32 0.6 ln.m 300,000.00 77,000.00 377,000.00 17-Feb-14 20-Mar-14 Completed IV-A Quezon Buenavista Bulo PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 200 0.073 kms 331,666.60 28,333.40 360,000.00 03-May-16 On-going IV-A Quezon Buenavista Cabong PAMANA-2013 3 Extension of 1.215km On-Grid Powerline Electrification 1 30 1.22 kms 300,000.00 310,000.00 610,000.00 04-Feb-14 21-Mar-14 Completed IV-A Quezon Buenavista Cabong PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 166 0.062 kms 300,000.00 20,000.00 320,000.00 02-May-16 On-going IV-A Quezon Buenavista Cadlit PAMANA-2013 3 Construction of 160lm Line Canal & Installation of 6lm Box Culvert / Drainage Canal 1 150 160 lm 300,000.00 62,000.00 362,000.00 26-Nov-13 15-Mar-14 Completed IV-A Quezon Buenavista Cadlit PAMANA-2014 4 Construction of 210 Lm Line canal and 6 Lm Cross Drain Box Culvert / Drainage Canal 1 162 210 ln.m 305,280.00 73,920.00 379,200.00 01-Dec-14 30-Apr-15 Completed IV-A Quezon Buenavista Catulin PAMANA-2014 4 Concreting of 150 Lm Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 136 150 ln.m 300,000.00 85,500.00 385,500.00 29-Jan-15 20-Mar-15 Completed IV-A Quezon Buenavista Cawa PAMANA-2013 3 Construction of Barangay Health Station Health Station 1 146 41.4 sq.m 300,000.00 447,000.00 747,000.00 26-Dec-13 15-Mar-14 Completed IV-A Quezon Buenavista Cawa PAMANA-2014 4 Construction of 50 L. M. Grouted Riprap Sea Wall Riprap Wall / Slope Protection / Erosion Control 1 146 50 ln.m 300,000.00 44,000.00 344,000.00 06-Jan-15 15-Feb-15 Completed IV-A Quezon Buenavista Del Rosario PAMANA- 2012&2013 2&3 Construction of 2.21 km Level II - Gravity Feed Water Supply System Water System 1 30 2.21 km 600,000.00 105,000.00 705,000.00 23-Oct-13 07-Apr-14 Completed IV-A Quezon Buenavista Dela Paz PAMANA-2013 3 Construction of 180l LM Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 42 150 lm 300,000.00 80,000.00 380,000.00 29-Nov-13 16-Apr-14 Completed IV-A Quezon Buenavista Hagonghong PAMANA-2013 3 4 units Water Well Drilling with Construction of 2 units Sanitary Toilets 1 276 2 unit 300,000.00 177,000.00 477,000.00 26-Feb-14 30-May-14 Completed IV-A Quezon Buenavista Hagonghong PAMANA-2015 5 Construction of Solar Streetlights Electrification 1 142 8 units 330,000.00 15,000.00 345,000.00 07-Apr-16 10-Apr-16 Completed IV-A Quezon Buenavista Ilayang Wasay PAMANA-2015 5 Water Well Drilling of 6 Sites Water System 1 70 6 sites 300,000.00 8,250.00 308,250.00 19-May-16 On-going IV-A Quezon Buenavista Lilukin PAMANA-2013 3 Construction of 1.384 km Level II Gravity-Fed Water Water System 1 129 1 system 300,000.00 177,000.00 477,000.00 04-Feb-14 30-Mar-14 Completed IV-A Quezon Buenavista Lilukin PAMANA-2014 4 Concreting of 93 Lm Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 279 93 ln.m 303,858.20 122,341.80 426,200.00 20-Jan-15 15-Feb-15 Completed IV-A Quezon Buenavista Mabini PAMANA-2013 3 Construction of Day Care Center with Window Grills and Screen Day Care Center 1 23 48 sq.m 300,000.00 452,000.00 752,000.00 03-Mar-14 20-May-14 Completed IV-A Quezon Buenavista Mabutag PAMANA-2013 3 Construction of Learning Center Training Center / Facility 1 158 48 sq. m 300,000.00 90,000.00 390,000.00 10-Mar-14 15-May-14 Completed IV-A Quezon Buenavista Mabutag PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 148 0.09 kms 300,000.00 35,000.00 335,000.00 13-Jun-16 On-going IV-A Quezon Buenavista Magallanes PAMANA-2013 3 Extension of 0.64km On-Grid Power Line Electrification 1 22 0.64 km 300,000.00 149,200.00 449,200.00 10-Mar-14 09-May-14 Completed IV-A Quezon Buenavista Magallanes PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 123 0.106 kms 333,000.00 5,000.00 338,000.00 30-May-16 On-going IV-A Quezon Buenavista Maligaya PAMANA-2013 3 Extension of 0.735km On Grid Powerline Electrification 1 24 0.74 km 300,000.00 273,996.00 573,996.00 05-Feb-14 30-Mar-14 Completed IV-A Quezon Buenavista Maligaya PAMANA-2015 5 Concreting of Critical Section FMR with RCPC Road Concreting 1 190 0.061 kms 333,000.00 55,000.00 388,000.00 02-Jun-16 05-Jul-16 Completed IV-A Quezon Buenavista Manlana PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 153 0.08 kms 300,000.00 19,000.00 319,000.00 19-May-16 15-Jun-16 Completed IV-A Quezon Buenavista Masaya PAMANA-2015 5 Construction of Concrete Pathway with RCPC Footpath / Foot Trail / Access Trail/Pathway 1 103 0.137 kms 330,000.00 90,000.00 420,000.00 29-May-16 On-going IV-A Quezon Buenavista Pinamasagan PAMANA-2014 4 Construction of 108 L. M. Line Canal w/ Foot Bridge Box Culvert / Drainage Canal 1 73 108 ln.m 330,000.00 59,000.00 389,000.00 05-Feb-15 22-Mar-15 Completed IV-A Quezon Buenavista Pinamasagan PAMANA-2015 5 Construction of Stone Masonry Line Canal Box Culvert / Drainage Canal 1 80 72 ln.m 300,000.00 35,000.00 335,000.00 25-Apr-16 24-Jun-16 Completed IV-A Quezon Buenavista Poblacion PAMANA-2013 3 Construction of 160 lm Concrete Pathway w/ Masonry Line Canal & 3.50 lm RC Footbridge Footpath / Foot Trail / Access Trail/Pathway 1 397 0.16 km 300,000.00 52,000.00 352,000.00 13-Jan-14 20-Mar-14 Completed IV-A Quezon Buenavista Poblacion PAMANA-2014 4 Concreting of 75lm Road Critical Section with 50 lm Line Road Concreting 1 112 0.075 kms 300,000.00 39,000.00 339,000.00 05-Jan-15 30-Mar-15 Completed IV-A Quezon Buenavista Poblacion PAMANA-2015 5 Construction of Line Canal Box Culvert / Drainage Canal 1 420 81.1 ln.m 300,000.00 10,000.00 310,000.00 11-Apr-16 13-May-16 Completed IV-A Quezon Buenavista Rizal PAMANA-2014 4 Construction of 115 lm Concrete Pathway with 60 Lm Line Canal Footpath / Foot Trail / Access Trail/Pathway 1 69 0.115 kms 300,000.00 175,000.00 475,000.00 10-Dec-14 31-Jan-16 Completed IV-A Quezon Buenavista Sabang Piris PAMANA-2013 3 Construction of 1.68 km Level II Gravity Fed Water Supply System Water System 1 50 1 system 300,000.00 135,000.00 435,000.00 09-Jan-14 15-Mar-14 Completed IV-A Quezon Buenavista Sabang Piris PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 134 0.078 kms 300,000.00 7,000.00 307,000.00 13-Apr-16 15-Jun-16 Completed IV-A Quezon Buenavista San Diego PAMANA-2014 4 Construction of Level II Gravity FED Water System w/ I Unit Toilet Water System 1 54 1 system 360,000.00 143,444.70 503,444.70 19-Jan-15 05-Mar-15 Completed IV-A Quezon Buenavista San Isidro Ibaba PAMANA-2013 3 Construction of 190 lm Concrete Pathway with 4lm Footpath / Foot Trail / Access Trail/Pathway 1 123 0.19 kms 300,000.00 142,000.00 442,000.00 10-Feb-14 15-Mar-14 Completed IV-A Quezon Buenavista San Isidro Ibaba PAMANA-2014 4 Construction of 10 L. M. Concrete Footbridge w/ 25 C. M. Bridge / Bridge Construction 1 107 10 ln.m 300,000.00 134,000.00 434,000.00 02-Feb-15 24-Mar-15 Completed IV-A Quezon Buenavista San Isidro Ibaba PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 102 0.145 kms 300,000.00 100,000.00 400,000.00 09-Jun-16 On-going IV-A Quezon Buenavista San Isidro Ilaya PAMANA-2013 3 Extension of .739 km On-Grid Power Line Electrification 1 27 0.74 km 300,000.00 202,000.00 502,000.00 05-Mar-14 07-Apr-14 Completed IV-A Quezon Buenavista San Isidro Ilaya PAMANA-2015 5 Concreting of Pathway Footpath / Foot Trail / Access Trail/Pathway 1 106 0.125 kms 333,000.00 17,000.00 350,000.00 07-Jun-16 On-going IV-A Quezon Buenavista San Pablo PAMANA-2013 3 Extension of 1 km On-Grid Power-Line Electrification 1 36 1 km 300,000.00 370,000.00 670,000.00 07-Mar-14 07-May-14 Completed IV-A Quezon Buenavista San Pablo PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 120 0.071 kms 300,000.00 10,000.00 310,000.00 19-May-16 15-Jun-16 Completed IV-A Quezon Buenavista San Vicente PAMANA-2013 3 Extension of .89km On-Grid Power Line Electrification 1 33 0.9 HH 300,000.00 364,200.00 664,200.00 12-Mar-14 05-Apr-14 Completed IV-A Quezon Buenavista San Vicente PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 288 0.097 kms 300,000.00 60,000.00 360,000.00 02-May-16 On-going IV-A Quezon Buenavista Siain PAMANA-2013 3 Concreting of 392 sq.m. Post Harvest Pavement w/ Post Harvest Facilities 1 75 392 sq.m 300,000.00 180,535.00 480,535.00 13-Jan-14 15-Feb-14 Completed IV-A Quezon Buenavista Siain PAMANA-2014 4 Concreting of 109lm Critical Slope FMR Road Concreting 1 83 0.19 kms 316,301.00 63,999.00 380,300.00 20-Jan-15 20-May-15 Completed IV-A Quezon Buenavista Siain PAMANA-2015 5 Construction of Concrete Pathway with Stone Masonry Footpath / Foot Trail / Access Trail/Pathway 1 83 0.167 kms 300,000.00 75,000.00 375,000.00 26-May-16 On-going IV-A Quezon Buenavista Villa Aurora PAMANA-2013 3 Construction of Barangay Health Station Health Station 1 53 51.4 sq.m 300,000.00 185,800.00 485,800.00 02-Apr-14 25-May-14 Completed IV-A Quezon Buenavista Villa Batabat PAMANA-2013 3 Concreting of 82 lm Critical Slope & Construction of Road Concreting 1 162 0.082 kms 300,000.00 10,000.00 310,000.00 27-Dec-13 02-Mar-14 Completed IV-A Quezon Buenavista Villa Batabat PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 147 0.106 kms 302,580.00 15,000.00 317,580.00 11-Apr-16 On-going IV-A Quezon Buenavista Villa Magsaysay PAMANA-2014 4 Concreting of 135 L. M. Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 135 135 ln.m 300,000.00 124,000.00 424,000.00 10-Feb-15 30-Apr-15 Completed IV-A Quezon Buenavista Villa Magsaysay PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 159 0.12 kms 300,000.00 110,000.00 410,000.00 13-Jun-16 13-Jul-16 Completed IV-A Quezon Buenavista Villa Veronica PAMANA-2014 4 Concreting of 240LM Critical Slope FMR Road Concreting 1 113 0.24 kms 300,000.00 249,000.00 549,000.00 15-Dec-14 30-Apr-15 Completed IV-A Quezon Buenavista Villa Veronica PAMANA-2015 5 Concreting of 135LM Critical Section FMR Road Concreting 1 110 0.135 kms 330,000.00 159,000.00 489,000.00 27-May-16 On-going IV-A Quezon Buenavista Wasay Ibaba PAMANA-2014 4 Construction of 170lm Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 191 0.17 kms 300,000.00 138,000.00 438,000.00 15-Dec-14 11-May-15 Completed IV-A Quezon Catanauan Ajos PAMANA-2013 3 Improvement of Barangay Health Station Health Station 1 355 45.92 sq.m 300,000.00 30,000.00 330,000.00 10-Feb-14 15-Apr-14 Completed IV-A Quezon Catanauan Ajos PAMANA-2015 5 Construction of Streetlights Electrification 1 314 19 units 330,000.00 12,000.00 342,000.00 17-Jun-16 On-going IV-A Quezon Catanauan Anusan PAMANA-2012 2 Construction of 630LM FMR Road Concreting 1 40 630 lm 300,000.00 185,000.00 485,000.00 01-Jul-13 30-Oct-13 Completed IV-A Quezon Catanauan Anusan PAMANA-2013 3 Concreting of 55lm Critical Slope FMR & Construction of 50lm Line Canal Road Concreting 1 165 0.55 kms 300,000.00 9,000.00 309,000.00 06-Jan-14 26-Jan-14 Completed IV-A Quezon Catanauan Anusan PAMANA-2014 4 Concreting of 100 LM Critical Slope Section FMR Riprap Wall / Slope Protection / Erosion Control 1 168 0.1 kms 319,850.09 17,549.91 337,400.00 10-Dec-14 16-Feb-16 Completed IV-A Quezon Catanauan Bolo PAMANA-2013 3 Concreting of 50 lm Critical Slope and Construction of 95 lm Line Canal with 5 lm Pipe Culverts Road Concreting 1 92 50 lm 300,000.00 55,000.00 355,000.00 13-Nov-13 17-Dec-13 Completed IV-A Quezon Catanauan Bolo PAMANA-2014 4 Concreting of 60LM Critical Slope with 70LM Stone Road Concreting 1 272 0.06 kms 300,000.00 29,440.00 329,440.00 01-Nov-14 18-Dec-14 Completed IV-A Quezon Catanauan Bolo PAMANA-2015 5 Concreting of FMR Critical Section with Pipe Culvert Road Concreting 1 283 0.285 kms 317,256.00 28,744.00 346,000.00 27-May-16 On-going IV-A Quezon Catanauan Bulagsong PAMANA-2015 5 Improvement of Irrigation System (238LM) Construction of Small Scale Irrigation 1 54 238 lm 312,568.29 21,731.71 334,300.00 16-Jul-16 On-going IV-A Quezon Catanauan Camandiison PAMANA-2013 3 Improvement of 500lm Farm to Market Road with 225 lm Line Canal Road Rehabilitation/Improvement 1 257 0.5 kms 300,000.00 148,000.00 448,000.00 13-Dec-13 10-Jan-14 Completed IV-A Quezon Catanauan Camandiison PAMANA-2014 4 Concreting of 70 LM Critical Slope FMR w/ Construction Riprap Wall / Slope Protection / Erosion Control 1 264 0.07 kms 300,000.00 24,300.00 324,300.00 21-Oct-14 30-Nov-14 Completed IV-A Quezon Catanauan Camandiison PAMANA-2015 5 Concreting of FMR Critical Slope with Line Canal (65LM) Road Concreting 1 257 0.065 kms 300,000.00 43,000.00 343,000.00 07-Mar-16 30-May-16 Completed IV-A Quezon Catanauan Canculajao PAMANA-2014 4 Construction of 150LM Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 299 0.15 kms 330,000.00 35,000.00 365,000.00 04-Nov-14 24-Jan-16 Completed IV-A Quezon Catanauan Catumbo PAMANA-2014 4 Concreting of 50 LM Critical Slope FMR w/ 70 LM Stone Riprap Wall / Slope Protection / Erosion Control 1 193 50 ln.m 307,462.00 30,538.00 338,000.00 23-Feb-15 30-Apr-15 Completed IV-A Quezon Catanauan Catumbo PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 185 0.258 kms 306,086.02 21,913.98 328,000.00 01-May-16 On-going IV-A Quezon Catanauan Cawayanin Ibaba PAMANA-2013 3 Installation of 0.51km On-Grid Power Line Canal Electrification 1 30 7 HH 300,000.00 111,000.00 411,000.00 30-Jan-14 22-Apr-14 Completed IV-A Quezon Catanauan Cawayanin Ibaba PAMANA-2014 4 Construction of 205 LM Elevated Pathway Footpath / Foot Trail / Access Trail/Pathway 1 81 0.205 kms 330,000.00 37,300.00 367,300.00 03-Feb-15 26-Apr-15 Completed IV-A Quezon Catanauan Cawayanin Ilaya PAMANA-2013 3 Concreting of 94 lm Critical Slope FMR and Construction of 50 lm Line Canal Road Concreting 1 152 94 lm 300,000.00 25,000.00 325,000.00 24-Dec-13 28-Feb-14 Completed IV-A Quezon Catanauan Cawayanin Ilaya PAMANA-2014 4 Concreting of 65 LM Critical Slope FMR and Construction Riprap Wall / Slope Protection / Erosion Control 1 99 65 ln.m 304,739.00 22,261.00 327,000.00 03-Feb-15 13-Mar-15 Completed IV-A Quezon Catanauan Cawayanin Ilaya PAMANA-2015 5 Concreting of FMR Critical Slope with Line Canal Road Concreting 1 152 0.12 kms 309,989.00 20,011.00 330,000.00 11-Mar-16 01-Jun-16 Completed IV-A Quezon Catanauan Cutcutan PAMANA-2014 4 Construction of 500 Lm FMR with 90 Lm Stone Masonry Canal Road Construction 1 250 0.5 kms 300,000.00 69,300.00 369,300.00 12-Jan-15 05-Jun-15 Completed IV-A Quezon Catanauan Dahican PAMANA-2013 3 Construction of 18 units Street Lights Electrification 1 201 18 HH 300,000.00 28,000.00 328,000.00 03-Dec-13 25-Jan-14 Completed IV-A Quezon Catanauan Dahican PAMANA-2014 4 Improvement / Installation of Distribution Pipe Water Water System 1 185 1 system 300,618.99 29,181.01 329,800.00 02-Mar-15 16-Feb-16 Completed IV-A Quezon Catanauan Dahican PAMANA-2015 5 Construction of Elevated Water Tank Water System 1 185 1 system 330,061.90 8,938.10 339,000.00 06-Jun-16 01-Jul-16 Completed IV-A Quezon Catanauan Doongan Ibaba PAMANA-2015 5 Concreting of FMR Critical Section Road Concreting 1 192 0.246 kms 305,154.00 16,846.00 322,000.00 17-May-16 29-Jun-16 Completed IV-A Quezon Catanauan Doongan Ilaya PAMANA-2014 4 Concreting of 120LM Pathway with Construction of Footpath / Foot Trail / Access Trail/Pathway 1 489 0.12 kms 322,065.00 12,935.00 335,000.00 28-Oct-14 31-Jan-16 Completed IV-A Quezon Catanauan Gatasan PAMANA-2013 3 Concreting of 60 lm Critical Slope FMR & Construction of 60lm Line Canal Road Concreting 1 161 60 ln m 300,000.00 15,000.00 315,000.00 12-Dec-13 04-Jan-14 Completed IV-A Quezon Catanauan Gatasan PAMANA-2014 4 Concreting of 65LM Critical Slope FMR with 50LM Stone Masonry Line Canal Road Concreting 1 177 0.065 kms 318,269.50 15,230.50 333,500.00 22-Oct-14 03-Dec-14 Completed IV-A Quezon Catanauan Macpac PAMANA-2013 3 Concreting od 70lm Critical Slope FMR & Construction of 50 lm Line Canal Road Concreting 1 116 70 ln m 300,000.00 26,000.00 326,000.00 27-Nov-13 21-Dec-13 Completed IV-A Quezon Catanauan Macpac PAMANA-2014 4 Concreting of 65LM Critical Slope with 50LM Stone Road Concreting 1 117 0.065 kms 300,000.00 17,600.00 317,600.00 17-Nov-14 15-Jan-15 Completed IV-A Quezon Catanauan Macpac PAMANA-2015 5 Concreting of FMR Critical Section Road Concreting 1 113 0.18 kms 321,504.00 7,496.00 329,000.00 16-Jun-16 On-going IV-A Quezon Catanauan Madulao PAMANA-2015 5 Construction of Stone Masonry Line Canal Box Culvert / Drainage Canal 1 180 63 ln.m 360,000.00 11,000.00 371,000.00 15-Aug-16 On-going IV-A Quezon Catanauan Matandang Sabang Kanluran PAMANA-2013 3 Concreting of 250 lm Tire Path Footpath / Foot Trail / Access Trail/Pathway 1 30 250 kms 300,000.00 33,000.00 333,000.00 16-Nov-13 21-Feb-14 Completed IV-A Quezon Catanauan Matandang Sabang Kanluran PAMANA-2015 5 Construction of Streetlights Electrification 1 419 18 units 300,000.00 19,700.00 319,700.00 13-May-16 09-Jun-16 Completed IV-A Quezon Catanauan Matandang Sabang Silangan PAMANA-2013 3 Construction of 16 units Streetlights Electrification 1 362 16 HH 300,000.00 30,000.00 330,000.00 02-Dec-13 17-Feb-14 Completed IV-A Quezon Catanauan Matandang Sabang Silangan PAMANA-2015 5 Construction of Comfort Room Sanitary Toilets 1 66 66 units 330,000.00 52,000.00 382,000.00 06-Jun-16 20-Jul-16 Completed IV-A Quezon Catanauan Milagrosa PAMANA-2013 3 Concreting of 50 lm Critical Slope FMR and Construction of 120 lm Line Canal with 5 lm Pipe Culverts Road Concreting 1 168 50 lm 300,000.00 58,000.00 358,000.00 09-Dec-13 05-Mar-14 Completed IV-A Quezon Catanauan Milagrosa PAMANA-2014 4 Concreting of 95 LM Critical Section FMR Road Concreting 1 176 0.095 kms 304,931.00 20,069.00 325,000.00 10-Nov-14 16-Dec-14 Completed IV-A Quezon Catanauan Navitas PAMANA-2012 2 Improvement of 565 Meters FMR Road Rehabilitation/Improvement 1 97 565 kms 300,000.00 8,000.00 308,000.00 29-Apr-13 16-Aug-13 Completed IV-A Quezon Catanauan Navitas PAMANA-2013 3 Concreting of 70lm Critical Slope FMR and Construction Road Concreting 1 176 70 lm 300,000.00 40,000.00 340,000.00 02-Dec-13 24-Jan-14 Completed IV-A Quezon Catanauan Navitas PAMANA-2014 4 Construction of 145 LM Elevated Pathway w/ 2LM Pipe Footpath / Foot Trail / Access Trail/Pathway 1 233 0.145 kms 330,000.00 23,900.00 353,900.00 21-Oct-14 30-Mar-15 Completed IV-A Quezon Catanauan Pacabit PAMANA-2014 4 Concreting of 193LM Critical Slope Section FMR Road Concreting 1 362 0.193 kms 300,000.00 230,000.00 530,000.00 13-Nov-14 13-Mar-15 Completed IV-A Quezon Catanauan Poblacion 01 PAMANA-2013 3 Construction of 100 lm Elevated Pathway with Railings Footpath / Foot Trail / Access Trail/Pathway 1 240 0.1 kms 300,000.00 9,000.00 309,000.00 16-Jan-14 08-Feb-14 Completed IV-A Quezon Catanauan Poblacion 02 PAMANA-2013 3 Construction of 128 Lm Line Canal, 116 Lm Curb & Box Culvert / Drainage Canal 1 163 128 ln.m 300,000.00 64,000.00 364,000.00 04-Feb-14 11-Mar-14 Completed

Upload: others

Post on 24-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Updated as of July 2016

    List of KALAHI-CIDSS Subprojects - PAMANAas of July 2016

    Region Province Municipality Barangay Phase Cycle Sub-Project Name Project Type No. Of Bgys No. Of HH Physical Target Unit Kalahi Amount LCC Amount Total Amount Date Started Date of Completion Status

    IV-A Quezon Buenavista Bagong Silang PAMANA-2013 3 Construction of 1.650 km Level II Water Supply System

    (Pump Driven)

    Water System 1 48 1 system 300,000.00 144,640.00 444,640.00 14-Feb-14 11-Jun-14 Completed

    IV-A Quezon Buenavista Bagong Silang PAMANA-2014 4 Concreting of 150lm Critical slope, FMR Road Concreting 1 162 0.15 kms 330,000.00 49,000.00 379,000.00 15-Dec-14 30-Apr-15 Completed

    IV-A Quezon Buenavista Bagong Silang PAMANA-2015 5 Extension of Water System Level II Water System 1 66 1 system 300,000.00 15,000.00 315,000.00 07-Apr-16 15-Jun-16 Completed

    IV-A Quezon Buenavista Batabat Norte PAMANA-2013 3 Extension of 1.18 km On-Grid Power Line Electrification 1 39 1.18 km 300,000.00 416,600.00 716,600.00 07-Mar-14 09-May-14 Completed

    IV-A Quezon Buenavista Batabat Norte PAMANA-2014 4 Construction of 370 Lm ABC Pathway with 4 Lm Cross

    Drain

    Footpath / Foot Trail / Access Trail/Pathway 1 138 0.37 kms 330,000.00 54,000.00 384,000.00 06-Feb-15 30-Mar-15 Completed

    IV-A Quezon Buenavista Batabat Norte PAMANA-2015 5 Construction of Multi-Purpose Pavement Post Harvest Facilities 1 124 338 sq.m 333,000.00 107,000.00 440,000.00 06-Apr-16 22-Apr-16 Completed

    IV-A Quezon Buenavista Batabat Sur PAMANA-2013 3 Construction of 1,120 lm Level II Water Supply System Water System 1 120 1 system 300,000.00 68,000.00 368,000.00 19-Mar-14 11-Jun-14 Completed

    IV-A Quezon Buenavista Batabat Sur PAMANA-2014 4 Additional 1.618 ln distribution Line and 7 Units

    Tapstand with 3 HP

    Water System 1 90 1 system 300,000.00 65,630.00 365,630.00 28-Jan-15 28-Mar-15 Completed

    IV-A Quezon Buenavista Batabat Sur PAMANA-2015 5 Construction of Pathway Footpath / Foot Trail / Access Trail/Pathway 1 180 0.356 kms 330,000.00 5,000.00 335,000.00 25-Apr-16 On-going

    IV-A Quezon Buenavista Buenavista PAMANA-2013 3 Construction of 1.240lm Level II Gravity-Fed Water

    Supply System

    Water System 1 70 1 system 300,000.00 62,000.00 362,000.00 19-Jan-14 15-Mar-14 Completed

    IV-A Quezon Buenavista Buenavista PAMANA-2014 4 Concreting of 105LM Critical Slope FMR Road Concreting 1 60 0.105 kms 300,000.00 69,000.00 369,000.00 20-Jan-15 06-Jun-15 Completed

    IV-A Quezon Buenavista Buenavista PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 73 0.08 kms 300,000.00 15,000.00 315,000.00 02-Jun-16 On-going

    IV-A Quezon Buenavista Bukal PAMANA-2013 3 5 units Water Well Drilling with Construction of 1 unit

    Communal Toilet

    Sanitary Toilets 1 222 1 unit 300,000.00 72,800.00 372,800.00 11-Mar-14 15-Jun-14 Completed

    IV-A Quezon Buenavista Bukal PAMANA-2014 4 Water Well Drilling of 9 Sites Water System 1 100 1 system 300,000.00 49,000.00 349,000.00 01-Mar-15 23-Mar-15 Completed

    IV-A Quezon Buenavista Bukal PAMANA-2015 5 Construction of Pathway Footpath / Foot Trail / Access Trail/Pathway 1 84 0.12 kms 330,000.00 35,000.00 365,000.00 25-Apr-16 On-going

    IV-A Quezon Buenavista Bulo PAMANA-2013 3 Concreting of 60 lm Critical Slope & Construction of 60

    lm Line Canal

    Riprap Wall / Slope Protection / Erosion Control 1 32 0.6 ln.m 300,000.00 77,000.00 377,000.00 17-Feb-14 20-Mar-14 Completed

    IV-A Quezon Buenavista Bulo PAMANA-2014 4 Water Well Drilling of 11 Sites Water System 1 188 1 system 316,666.00 49,034.00 365,700.00 04-Feb-15 03-Jul-15 Completed

    IV-A Quezon Buenavista Bulo PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 200 0.073 kms 331,666.60 28,333.40 360,000.00 03-May-16 On-going

    IV-A Quezon Buenavista Cabong PAMANA-2013 3 Extension of 1.215km On-Grid Powerline Electrification 1 30 1.22 kms 300,000.00 310,000.00 610,000.00 04-Feb-14 21-Mar-14 Completed

    IV-A Quezon Buenavista Cabong PAMANA-2014 4 Construction of Level II Gravity Fed Water System Water System 1 80 1 system 330,000.00 129,000.00 459,000.00 16-Feb-15 15-Apr-15 Completed

    IV-A Quezon Buenavista Cabong PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 166 0.062 kms 300,000.00 20,000.00 320,000.00 02-May-16 On-going

    IV-A Quezon Buenavista Cadlit PAMANA-2013 3 Construction of 160lm Line Canal & Installation of 6lm

    Cross Drain with 8lm Concrete Pathway

    Box Culvert / Drainage Canal 1 150 160 lm 300,000.00 62,000.00 362,000.00 26-Nov-13 15-Mar-14 Completed

    IV-A Quezon Buenavista Cadlit PAMANA-2014 4 Construction of 210 Lm Line canal and 6 Lm Cross Drain Box Culvert / Drainage Canal 1 162 210 ln.m 305,280.00 73,920.00 379,200.00 01-Dec-14 30-Apr-15 Completed

    IV-A Quezon Buenavista Cadlit PAMANA-2015 5 Construction of Pathway with Footbridge Footpath / Foot Trail / Access Trail/Pathway 1 140 0.133 kms 300,000.00 105,000.00 405,000.00 11-Apr-16 On-going

    IV-A Quezon Buenavista Catulin PAMANA-2013 3 Concreting of 170 lm Critical slope FMR Road Concreting 1 121 0.17 kms 300,000.00 98,000.00 398,000.00 10-Feb-14 30-Apr-14 Completed

    IV-A Quezon Buenavista Catulin PAMANA-2014 4 Concreting of 150 Lm Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 136 150 ln.m 300,000.00 85,500.00 385,500.00 29-Jan-15 20-Mar-15 Completed

    IV-A Quezon Buenavista Catulin PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 139 0.073 kms 300,000.00 35,000.00 335,000.00 30-May-16 On-going

    IV-A Quezon Buenavista Cawa PAMANA-2013 3 Construction of Barangay Health Station Health Station 1 146 41.4 sq.m 300,000.00 447,000.00 747,000.00 26-Dec-13 15-Mar-14 Completed

    IV-A Quezon Buenavista Cawa PAMANA-2014 4 Construction of 50 L. M. Grouted Riprap Sea Wall Riprap Wall / Slope Protection / Erosion Control 1 146 50 ln.m 300,000.00 44,000.00 344,000.00 06-Jan-15 15-Feb-15 Completed

    IV-A Quezon Buenavista Cawa PAMANA-2015 5 Construction of concrete Pathway with RCPC Road Construction 1 155 0.08 kms 300,000.00 10,000.00 310,000.00 17-May-16 On-going

    IV-A Quezon Buenavista Del Rosario PAMANA-

    2012&2013

    2&3 Construction of 2.21 km Level II - Gravity Feed Water

    Supply System

    Water System 1 30 2.21 km 600,000.00 105,000.00 705,000.00 23-Oct-13 07-Apr-14 Completed

    IV-A Quezon Buenavista Del Rosario PAMANA-2014 4 Construction of 430lm Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 68 0.43 kms 300,000.00 78,500.00 378,500.00 01-Dec-14 30-Mar-15 Completed

    IV-A Quezon Buenavista Dela Paz PAMANA-2013 3 Construction of 180l LM Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 42 150 lm 300,000.00 80,000.00 380,000.00 29-Nov-13 16-Apr-14 Completed

    IV-A Quezon Buenavista Dela Paz PAMANA-2014 4 Concreting of 180LM Critical Slope FMR Road Concreting 1 254 0.18 kms 302,118.00 218,882.00 521,000.00 21-Oct-14 15-Jan-15 Completed

    IV-A Quezon Buenavista Dela Paz PAMANA-2015 5 Concreting of Critical Section, FMR Road Concreting 1 257 0.103 kms 300,000.00 30,000.00 330,000.00 21-Apr-16 01-May-16 Completed

    IV-A Quezon Buenavista Hagonghong PAMANA-2013 3 4 units Water Well Drilling with Construction of 2 units

    Communal Toilet

    Sanitary Toilets 1 276 2 unit 300,000.00 177,000.00 477,000.00 26-Feb-14 30-May-14 Completed

    IV-A Quezon Buenavista Hagonghong PAMANA-2014 4 Water Well Drilling of 9 Sites Water System 1 100 1 system 300,000.00 51,458.00 351,458.00 15-Dec-14 04-Mar-15 Completed

    IV-A Quezon Buenavista Hagonghong PAMANA-2015 5 Construction of Solar Streetlights Electrification 1 142 8 units 330,000.00 15,000.00 345,000.00 07-Apr-16 10-Apr-16 Completed

    IV-A Quezon Buenavista Ibabang Wasay PAMANA-2015 5 Construction of Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 214 0.113 kms 300,000.00 13,750.00 313,750.00 25-May-16 15-Jun-16 Completed

    IV-A Quezon Buenavista Ilayang Wasay PAMANA-2015 5 Water Well Drilling of 6 Sites Water System 1 70 6 sites 300,000.00 8,250.00 308,250.00 19-May-16 On-going

    IV-A Quezon Buenavista Lilukin PAMANA-2013 3 Construction of 1.384 km Level II Gravity-Fed Water

    Supply System

    Water System 1 129 1 system 300,000.00 177,000.00 477,000.00 04-Feb-14 30-Mar-14 Completed

    IV-A Quezon Buenavista Lilukin PAMANA-2014 4 Concreting of 93 Lm Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 279 93 ln.m 303,858.20 122,341.80 426,200.00 20-Jan-15 15-Feb-15 Completed

    IV-A Quezon Buenavista Lilukin PAMANA-2015 5 Concreting of Critical Slope FMR with Line Canal Road Concreting 1 302 0.103 kms 300,000.00 154,000.00 454,000.00 11-Apr-16 11-Jun-16 Completed

    IV-A Quezon Buenavista Mabini PAMANA-2013 3 Construction of Day Care Center with Window Grills and

    Screen

    Day Care Center 1 23 48 sq.m 300,000.00 452,000.00 752,000.00 03-Mar-14 20-May-14 Completed

    IV-A Quezon Buenavista Mabini PAMANA-2014 4 Concreting of 110Ln Critical Slope FMR Road Concreting 1 100 0.11 kms 300,000.00 64,000.00 364,000.00 05-Feb-15 08-May-15 Completed

    IV-A Quezon Buenavista Mabini PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 72 0.092 kms 300,000.00 5,000.00 305,000.00 17-Jun-16 On-going

    IV-A Quezon Buenavista Mabutag PAMANA-2013 3 Construction of Learning Center Training Center / Facility 1 158 48 sq. m 300,000.00 90,000.00 390,000.00 10-Mar-14 15-May-14 Completed

    IV-A Quezon Buenavista Mabutag PAMANA-2014 4 Concreting of 171L. M. Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 168 171 ln.m 300,000.00 152,000.00 452,000.00 04-Feb-15 30-Apr-15 Completed

    IV-A Quezon Buenavista Mabutag PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 148 0.09 kms 300,000.00 35,000.00 335,000.00 13-Jun-16 On-going

    IV-A Quezon Buenavista Magallanes PAMANA-2013 3 Extension of 0.64km On-Grid Power Line Electrification 1 22 0.64 km 300,000.00 149,200.00 449,200.00 10-Mar-14 09-May-14 Completed

    IV-A Quezon Buenavista Magallanes PAMANA-2014 4 Water Well Drilling of 13 Sites Water System 1 126 13 units 330,000.00 74,000.00 404,000.00 13-Mar-15 27-Jun-15 Completed

    IV-A Quezon Buenavista Magallanes PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 123 0.106 kms 333,000.00 5,000.00 338,000.00 30-May-16 On-going

    IV-A Quezon Buenavista Maligaya PAMANA-2013 3 Extension of 0.735km On Grid Powerline Electrification 1 24 0.74 km 300,000.00 273,996.00 573,996.00 05-Feb-14 30-Mar-14 Completed

    IV-A Quezon Buenavista Maligaya PAMANA-2014 4 Concreting of 113lm Critical Slope FMR Road Concreting 1 178 0.113 kms 330,000.00 79,000.00 409,000.00 04-Feb-15 30-Apr-15 Completed

    IV-A Quezon Buenavista Maligaya PAMANA-2015 5 Concreting of Critical Section FMR with RCPC Road Concreting 1 190 0.061 kms 333,000.00 55,000.00 388,000.00 02-Jun-16 05-Jul-16 Completed

    IV-A Quezon Buenavista Manlana PAMANA-2013 3 Concreting of 135lm Critical Section FMR Road Concreting 1 151 135 lm 300,000.00 157,000.00 457,000.00 14-Dec-13 04-Mar-14 Completed

    IV-A Quezon Buenavista Manlana PAMANA-2014 4 Concreting of 95 L. M. Critical Section FMR Riprap Wall / Slope Protection / Erosion Control 1 143 95 ln.m 305,239.00 64,761.00 370,000.00 13-Jan-15 15-Feb-15 Completed

    IV-A Quezon Buenavista Manlana PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 153 0.08 kms 300,000.00 19,000.00 319,000.00 19-May-16 15-Jun-16 Completed

    IV-A Quezon Buenavista Masaya PAMANA-2013 3 Concreting of 135lm Critical Slope FMR Road Concreting 1 53 135 lm 300,000.00 156,000.00 456,000.00 28-Jan-14 01-Mar-14 Completed

    IV-A Quezon Buenavista Masaya PAMANA-2014 4 Concreting of 117 lm Critical Section FMR Road Concreting 1 102 0.117 kms 300,000.00 139,000.00 439,000.00 10-Dec-14 15-Feb-15 Completed

    IV-A Quezon Buenavista Masaya PAMANA-2015 5 Construction of Concrete Pathway with RCPC Footpath / Foot Trail / Access Trail/Pathway 1 103 0.137 kms 330,000.00 90,000.00 420,000.00 29-May-16 On-going

    IV-A Quezon Buenavista Pinamasagan PAMANA-2013 3 Construction of 533lm Level Water Supply System Water System 1 60 1 system 300,000.00 65,000.00 365,000.00 14-Jan-14 30-Mar-14 Completed

    IV-A Quezon Buenavista Pinamasagan PAMANA-2014 4 Construction of 108 L. M. Line Canal w/ Foot Bridge Box Culvert / Drainage Canal 1 73 108 ln.m 330,000.00 59,000.00 389,000.00 05-Feb-15 22-Mar-15 Completed

    IV-A Quezon Buenavista Pinamasagan PAMANA-2015 5 Construction of Stone Masonry Line Canal Box Culvert / Drainage Canal 1 80 72 ln.m 300,000.00 35,000.00 335,000.00 25-Apr-16 24-Jun-16 Completed

    IV-A Quezon Buenavista Poblacion PAMANA-2013 3 Construction of 160 lm Concrete Pathway w/ Masonry

    Line Canal & 3.50 lm RC Footbridge

    Footpath / Foot Trail / Access Trail/Pathway 1 397 0.16 km 300,000.00 52,000.00 352,000.00 13-Jan-14 20-Mar-14 Completed

    IV-A Quezon Buenavista Poblacion PAMANA-2014 4 Concreting of 75lm Road Critical Section with 50 lm Line

    canal

    Road Concreting 1 112 0.075 kms 300,000.00 39,000.00 339,000.00 05-Jan-15 30-Mar-15 Completed

    IV-A Quezon Buenavista Poblacion PAMANA-2015 5 Construction of Line Canal Box Culvert / Drainage Canal 1 420 81.1 ln.m 300,000.00 10,000.00 310,000.00 11-Apr-16 13-May-16 Completed

    IV-A Quezon Buenavista Rizal PAMANA-2013 3 Construction of Day Care Center Day Care Center 1 62 48 sq.m 300,000.00 296,000.00 596,000.00 21-Jan-14 15-Mar-14 Completed

    IV-A Quezon Buenavista Rizal PAMANA-2014 4 Construction of 115 lm Concrete Pathway with 60 Lm

    Line Canal

    Footpath / Foot Trail / Access Trail/Pathway 1 69 0.115 kms 300,000.00 175,000.00 475,000.00 10-Dec-14 31-Jan-16 Completed

    IV-A Quezon Buenavista Rizal PAMANA-2015 5 Improvement of Level II Gravity Fed Water System Water System 1 77 1 system 300,000.00 69,000.00 369,000.00 11-Apr-16 On-going

    IV-A Quezon Buenavista Sabang Piris PAMANA-2013 3 Construction of 1.68 km Level II Gravity Fed Water

    Supply System

    Water System 1 50 1 system 300,000.00 135,000.00 435,000.00 09-Jan-14 15-Mar-14 Completed

    IV-A Quezon Buenavista Sabang Piris PAMANA-2014 4 Concreting of 125 LM Critical Section FMR Riprap Wall / Slope Protection / Erosion Control 1 125 125 ln.m 300,000.00 59,000.00 359,000.00 05-Feb-15 31-Jan-16 Completed

    IV-A Quezon Buenavista Sabang Piris PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 134 0.078 kms 300,000.00 7,000.00 307,000.00 13-Apr-16 15-Jun-16 Completed

    IV-A Quezon Buenavista San Diego PAMANA- 2&3 Installlation of 1.785 ln.m. Power Line Extension Electrification 1 38 1 HH 600,000.00 58,500.00 658,500.00 23-Oct-13 01-Feb-14 Completed

    IV-A Quezon Buenavista San Diego PAMANA-2014 4 Construction of Level II Gravity FED Water System w/ I

    Unit Toilet

    Water System 1 54 1 system 360,000.00 143,444.70 503,444.70 19-Jan-15 05-Mar-15 Completed

    IV-A Quezon Buenavista San Isidro Ibaba PAMANA-2013 3 Construction of 190 lm Concrete Pathway with 4lm

    RCPC

    Footpath / Foot Trail / Access Trail/Pathway 1 123 0.19 kms 300,000.00 142,000.00 442,000.00 10-Feb-14 15-Mar-14 Completed

    IV-A Quezon Buenavista San Isidro Ibaba PAMANA-2014 4 Construction of 10 L. M. Concrete Footbridge w/ 25 C. M.

    Stone Masonry

    Bridge / Bridge Construction 1 107 10 ln.m 300,000.00 134,000.00 434,000.00 02-Feb-15 24-Mar-15 Completed

    IV-A Quezon Buenavista San Isidro Ibaba PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 102 0.145 kms 300,000.00 100,000.00 400,000.00 09-Jun-16 On-going

    IV-A Quezon Buenavista San Isidro Ilaya PAMANA-2013 3 Extension of .739 km On-Grid Power Line Electrification 1 27 0.74 km 300,000.00 202,000.00 502,000.00 05-Mar-14 07-Apr-14 Completed

    IV-A Quezon Buenavista San Isidro Ilaya PAMANA-2014 4 Construction of 134 Lm Pathway Footpath / Foot Trail / Access Trail/Pathway 1 104 0.134 kms 330,000.00 68,000.00 398,000.00 17-Mar-15 30-Apr-15 Completed

    IV-A Quezon Buenavista San Isidro Ilaya PAMANA-2015 5 Concreting of Pathway Footpath / Foot Trail / Access Trail/Pathway 1 106 0.125 kms 333,000.00 17,000.00 350,000.00 07-Jun-16 On-going

    IV-A Quezon Buenavista San Pablo PAMANA-2013 3 Extension of 1 km On-Grid Power-Line Electrification 1 36 1 km 300,000.00 370,000.00 670,000.00 07-Mar-14 07-May-14 Completed

    IV-A Quezon Buenavista San Pablo PAMANA-2014 4 Concreting of 116lm slope FMR Road Concreting 1 117 0.116 kms 330,000.00 124,600.00 454,600.00 01-Dec-14 30-Apr-15 Completed

    IV-A Quezon Buenavista San Pablo PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 120 0.071 kms 300,000.00 10,000.00 310,000.00 19-May-16 15-Jun-16 Completed

    IV-A Quezon Buenavista San Pedro PAMANA- 2&3 Construction of 550 lm Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 38 0.55 kms 600,000.00 97,000.00 697,000.00 18-Jan-14 05-Mar-14 Completed

    IV-A Quezon Buenavista San Pedro PAMANA-2014 4 Construction of 240 L. M. Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 156 0.24 kms 300,000.00 69,000.00 369,000.00 09-Feb-15 30-Apr-15 Completed

    IV-A Quezon Buenavista San Vicente PAMANA-2013 3 Extension of .89km On-Grid Power Line Electrification 1 33 0.9 HH 300,000.00 364,200.00 664,200.00 12-Mar-14 05-Apr-14 Completed

    IV-A Quezon Buenavista San Vicente PAMANA-2014 4 Construction of Learning Center Training Center / Facility 1 324 48 sq. m 330,000.00 364,000.00 694,000.00 15-Dec-14 30-Apr-15 Completed

    IV-A Quezon Buenavista San Vicente PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 288 0.097 kms 300,000.00 60,000.00 360,000.00 02-May-16 On-going

    IV-A Quezon Buenavista Siain PAMANA-2013 3 Concreting of 392 sq.m. Post Harvest Pavement w/

    Pavement w/ 45 lm Line Canal

    Post Harvest Facilities 1 75 392 sq.m 300,000.00 180,535.00 480,535.00 13-Jan-14 15-Feb-14 Completed

    IV-A Quezon Buenavista Siain PAMANA-2014 4 Concreting of 109lm Critical Slope FMR Road Concreting 1 83 0.19 kms 316,301.00 63,999.00 380,300.00 20-Jan-15 20-May-15 Completed

    IV-A Quezon Buenavista Siain PAMANA-2015 5 Construction of Concrete Pathway with Stone Masonry

    Line Canal and Cross Drain

    Footpath / Foot Trail / Access Trail/Pathway 1 83 0.167 kms 300,000.00 75,000.00 375,000.00 26-May-16 On-going

    IV-A Quezon Buenavista Villa Aurora PAMANA-2013 3 Construction of Barangay Health Station Health Station 1 53 51.4 sq.m 300,000.00 185,800.00 485,800.00 02-Apr-14 25-May-14 Completed

    IV-A Quezon Buenavista Villa Aurora PAMANA-2014 4 Concreting of176Lm Critical Section FMR Road Rehabilitation/Improvement 1 189 0.176 kms 300,000.00 144,000.00 444,000.00 12-Dec-14 05-Mar-15 Completed

    IV-A Quezon Buenavista Villa Aurora PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 189 0.113 kms 300,000.00 25,000.00 325,000.00 04-Jun-16 On-going

    IV-A Quezon Buenavista Villa Batabat PAMANA-2013 3 Concreting of 82 lm Critical Slope & Construction of

    82lm Line Canal

    Road Concreting 1 162 0.082 kms 300,000.00 10,000.00 310,000.00 27-Dec-13 02-Mar-14 Completed

    IV-A Quezon Buenavista Villa Batabat PAMANA-2014 4 Concreting of 75 Lm Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 53 75 ln.m 300,000.00 74,000.00 374,000.00 15-Dec-14 30-Mar-15 Completed

    IV-A Quezon Buenavista Villa Batabat PAMANA-2015 5 Concreting of Critical Slope FMR Road Concreting 1 147 0.106 kms 302,580.00 15,000.00 317,580.00 11-Apr-16 On-going

    IV-A Quezon Buenavista Villa Magsaysay PAMANA-2013 3 Concreting of 200 LM Critical Slope FMR Road Concreting 1 146 200 kms 300,000.00 292,300.00 592,300.00 23-Jan-14 25-Apr-14 Completed

    IV-A Quezon Buenavista Villa Magsaysay PAMANA-2014 4 Concreting of 135 L. M. Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 135 135 ln.m 300,000.00 124,000.00 424,000.00 10-Feb-15 30-Apr-15 Completed

    IV-A Quezon Buenavista Villa Magsaysay PAMANA-2015 5 Concreting of Critical Section FMR Road Concreting 1 159 0.12 kms 300,000.00 110,000.00 410,000.00 13-Jun-16 13-Jul-16 Completed

    IV-A Quezon Buenavista Villa Veronica PAMANA-2013 3 Construction of 130lm Concrete Pathway with Spillway Footpath / Foot Trail / Access Trail/Pathway 1 130 130 lm 300,000.00 104,500.00 404,500.00 30-Jan-14 08-Mar-14 Completed

    IV-A Quezon Buenavista Villa Veronica PAMANA-2014 4 Concreting of 240LM Critical Slope FMR Road Concreting 1 113 0.24 kms 300,000.00 249,000.00 549,000.00 15-Dec-14 30-Apr-15 Completed

    IV-A Quezon Buenavista Villa Veronica PAMANA-2015 5 Concreting of 135LM Critical Section FMR Road Concreting 1 110 0.135 kms 330,000.00 159,000.00 489,000.00 27-May-16 On-going

    IV-A Quezon Buenavista Wasay Ibaba PAMANA-2013 3 Construction of 180lm Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 161 180 lm 300,000.00 149,200.00 449,200.00 11-Jan-14 15-Mar-14 Completed

    IV-A Quezon Buenavista Wasay Ibaba PAMANA-2014 4 Construction of 170lm Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 191 0.17 kms 300,000.00 138,000.00 438,000.00 15-Dec-14 11-May-15 Completed

    IV-A Quezon Buenavista Wasay Ilaya PAMANA-2013 3 Concreting of 165lm Critical Slope FMR Road Concreting 1 98 0.165 kms 300,000.00 96,600.00 396,600.00 06-Feb-14 15-Mar-14 Completed

    IV-A Quezon Buenavista Wasay Ilaya PAMANA-2014 4 Construction of Level II Gravity Fed Water System Water System 1 57 1 system 300,000.00 72,828.00 372,828.00 15-Jan-15 30-Apr-15 Completed

    IV-A Quezon Catanauan Ajos PAMANA-2013 3 Improvement of Barangay Health Station Health Station 1 355 45.92 sq.m 300,000.00 30,000.00 330,000.00 10-Feb-14 15-Apr-14 Completed

    IV-A Quezon Catanauan Ajos PAMANA-2014 4 Construction of 785 LM FMR with 20 LM Cross Drain Riprap Wall / Slope Protection / Erosion Control 1 314 785 ln.m 300,000.00 89,000.00 389,000.00 04-Dec-14 30-Apr-15 Completed

    IV-A Quezon Catanauan Ajos PAMANA-2015 5 Construction of Streetlights Electrification 1 314 19 units 330,000.00 12,000.00 342,000.00 17-Jun-16 On-going

    IV-A Quezon Catanauan Anusan PAMANA-2012 2 Construction of 630LM FMR Road Concreting 1 40 630 lm 300,000.00 185,000.00 485,000.00 01-Jul-13 30-Oct-13 Completed

    IV-A Quezon Catanauan Anusan PAMANA-2013 3 Concreting of 55lm Critical Slope FMR & Construction of

    50lm Line Canal

    Road Concreting 1 165 0.55 kms 300,000.00 9,000.00 309,000.00 06-Jan-14 26-Jan-14 Completed

    IV-A Quezon Catanauan Anusan PAMANA-2014 4 Concreting of 100 LM Critical Slope Section FMR Riprap Wall / Slope Protection / Erosion Control 1 168 0.1 kms 319,850.09 17,549.91 337,400.00 10-Dec-14 16-Feb-16 Completed

    IV-A Quezon Catanauan Bolo PAMANA-2013 3 Concreting of 50 lm Critical Slope and Construction of

    95 lm Line Canal with 5 lm Pipe Culverts

    Road Concreting 1 92 50 lm 300,000.00 55,000.00 355,000.00 13-Nov-13 17-Dec-13 Completed

    IV-A Quezon Catanauan Bolo PAMANA-2014 4 Concreting of 60LM Critical Slope with 70LM Stone

    Masonry Line Canal and 5LM Pipe Culverts

    Road Concreting 1 272 0.06 kms 300,000.00 29,440.00 329,440.00 01-Nov-14 18-Dec-14 Completed

    IV-A Quezon Catanauan Bolo PAMANA-2015 5 Concreting of FMR Critical Section with Pipe Culvert Road Concreting 1 283 0.285 kms 317,256.00 28,744.00 346,000.00 27-May-16 On-going

    IV-A Quezon Catanauan Bulagsong PAMANA-2013 3 Improvement of Irrigation System Construction of Small Scale Irrigation 1 74 86 lm 300,000.00 5,000.00 305,000.00 18-Feb-14 28-Mar-14 Completed

    IV-A Quezon Catanauan Bulagsong PAMANA-2014 4 Extension of 0.58km On-Grid Power Line Electrification 1 25 0.58 kms 315,142.00 104,858.00 420,000.00 01-Nov-14 28-Nov-14 Completed

    IV-A Quezon Catanauan Bulagsong PAMANA-2015 5 Improvement of Irrigation System (238LM) Construction of Small Scale Irrigation 1 54 238 lm 312,568.29 21,731.71 334,300.00 16-Jul-16 On-going

    IV-A Quezon Catanauan Camandiison PAMANA-2013 3 Improvement of 500lm Farm to Market Road with 225

    lm Line Canal

    Road Rehabilitation/Improvement 1 257 0.5 kms 300,000.00 148,000.00 448,000.00 13-Dec-13 10-Jan-14 Completed

    IV-A Quezon Catanauan Camandiison PAMANA-2014 4 Concreting of 70 LM Critical Slope FMR w/ Construction

    of 50 LM Line Canal

    Riprap Wall / Slope Protection / Erosion Control 1 264 0.07 kms 300,000.00 24,300.00 324,300.00 21-Oct-14 30-Nov-14 Completed

    IV-A Quezon Catanauan Camandiison PAMANA-2015 5 Concreting of FMR Critical Slope with Line Canal (65LM) Road Concreting 1 257 0.065 kms 300,000.00 43,000.00 343,000.00 07-Mar-16 30-May-16 Completed

    IV-A Quezon Catanauan Canculajao PAMANA-2013 3 Skills Training for Out-of-School Youth Capability Building / Training 1 16 16 hh 300,000.00 38,000.00 338,000.00 29-Mar-14 30-Jun-14 Completed

    IV-A Quezon Catanauan Canculajao PAMANA-2014 4 Construction of 150LM Concrete Pathway Footpath / Foot Trail / Access Trail/Pathway 1 299 0.15 kms 330,000.00 35,000.00 365,000.00 04-Nov-14 24-Jan-16 Completed

    IV-A Quezon Catanauan Canculajao PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 357 0.232 kms 310,155.00 19,845.00 330,000.00 14-Jun-16 15-Jul-16 Completed

    IV-A Quezon Catanauan Catumbo PAMANA-2013 3 Construction of 18 unit Street Lights Electrification 1 206 18 HH 300,000.00 29,000.00 329,000.00 02-Dec-13 28-Dec-13 Completed

    IV-A Quezon Catanauan Catumbo PAMANA-2014 4 Concreting of 50 LM Critical Slope FMR w/ 70 LM Stone

    Masonry Canal & 16 LM Pipe Culverts

    Riprap Wall / Slope Protection / Erosion Control 1 193 50 ln.m 307,462.00 30,538.00 338,000.00 23-Feb-15 30-Apr-15 Completed

    IV-A Quezon Catanauan Catumbo PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 185 0.258 kms 306,086.02 21,913.98 328,000.00 01-May-16 On-going

    IV-A Quezon Catanauan Cawayanin Ibaba PAMANA-2013 3 Installation of 0.51km On-Grid Power Line Canal

    Extension with 7 units Street Lights

    Electrification 1 30 7 HH 300,000.00 111,000.00 411,000.00 30-Jan-14 22-Apr-14 Completed

    IV-A Quezon Catanauan Cawayanin Ibaba PAMANA-2014 4 Construction of 205 LM Elevated Pathway Footpath / Foot Trail / Access Trail/Pathway 1 81 0.205 kms 330,000.00 37,300.00 367,300.00 03-Feb-15 26-Apr-15 Completed

    IV-A Quezon Catanauan Cawayanin Ibaba PAMANA-2015 5 Construction of Wharf (30LM) Construction of Miniport/Wharf 1 223 30 ln.m 300,000.00 23,000.00 323,000.00 23-May-16 On-going

    IV-A Quezon Catanauan Cawayanin Ilaya PAMANA-2013 3 Concreting of 94 lm Critical Slope FMR and Construction

    of 50 lm Line Canal

    Road Concreting 1 152 94 lm 300,000.00 25,000.00 325,000.00 24-Dec-13 28-Feb-14 Completed

    IV-A Quezon Catanauan Cawayanin Ilaya PAMANA-2014 4 Concreting of 65 LM Critical Slope FMR and Construction

    of 85 LM Line Canal

    Riprap Wall / Slope Protection / Erosion Control 1 99 65 ln.m 304,739.00 22,261.00 327,000.00 03-Feb-15 13-Mar-15 Completed

    IV-A Quezon Catanauan Cawayanin Ilaya PAMANA-2015 5 Concreting of FMR Critical Slope with Line Canal Road Concreting 1 152 0.12 kms 309,989.00 20,011.00 330,000.00 11-Mar-16 01-Jun-16 Completed

    IV-A Quezon Catanauan Cutcutan PAMANA-2013 3 Construction of 4LM Double Barrel Box Culvert Box Culvert / Drainage Canal 1 312 4 ln.m 300,000.00 53,000.00 353,000.00 16-Dec-13 27-Jan-14 Completed

    IV-A Quezon Catanauan Cutcutan PAMANA-2014 4 Construction of 500 Lm FMR with 90 Lm Stone Masonry

    Canal

    Road Construction 1 250 0.5 kms 300,000.00 69,300.00 369,300.00 12-Jan-15 05-Jun-15 Completed

    IV-A Quezon Catanauan Cutcutan PAMANA-2015 5 Construction of Retaining Wall Riprap Wall / Slope Protection / Erosion Control 1 317 32 ln.m 330,000.00 14,000.00 344,000.00 19-Jul-16 On-going

    IV-A Quezon Catanauan Dahican PAMANA-2013 3 Construction of 18 units Street Lights Electrification 1 201 18 HH 300,000.00 28,000.00 328,000.00 03-Dec-13 25-Jan-14 Completed

    IV-A Quezon Catanauan Dahican PAMANA-2014 4 Improvement / Installation of Distribution Pipe Water

    System Level II

    Water System 1 185 1 system 300,618.99 29,181.01 329,800.00 02-Mar-15 16-Feb-16 Completed

    IV-A Quezon Catanauan Dahican PAMANA-2015 5 Construction of Elevated Water Tank Water System 1 185 1 system 330,061.90 8,938.10 339,000.00 06-Jun-16 01-Jul-16 Completed

    IV-A Quezon Catanauan Doongan Ibaba PAMANA-2013 3 Construction of 700 LM FMR Road Construction 1 88 700 ln m 300,000.00 101,000.00 401,000.00 30-Jan-14 31-Mar-14 Completed

    IV-A Quezon Catanauan Doongan Ibaba PAMANA-2014 4 Concreting of 100LM Critical Section FMR Road Concreting 1 188 0.1 kms 300,000.00 16,400.00 316,400.00 26-Oct-14 15-Nov-14 Completed

    IV-A Quezon Catanauan Doongan Ibaba PAMANA-2015 5 Concreting of FMR Critical Section Road Concreting 1 192 0.246 kms 305,154.00 16,846.00 322,000.00 17-May-16 29-Jun-16 Completed

    IV-A Quezon Catanauan Doongan Ilaya PAMANA-2012 2 Construction of 420LM Farm to Market Road Road Construction 1 47 420 lm 300,000.00 20,000.00 320,000.00 26-Apr-13 31-Jul-13 Completed

    IV-A Quezon Catanauan Doongan Ilaya PAMANA-2013 3 Construction of 310 lm Pathway w/ 3 lm Pipe Culvert Footpath / Foot Trail / Access Trail/Pathway 1 457 310 ln m 300,000.00 29,000.00 329,000.00 26-Nov-13 28-Feb-14 Completed

    IV-A Quezon Catanauan Doongan Ilaya PAMANA-2014 4 Concreting of 120LM Pathway with Construction of

    30LM Line Canal

    Footpath / Foot Trail / Access Trail/Pathway 1 489 0.12 kms 322,065.00 12,935.00 335,000.00 28-Oct-14 31-Jan-16 Completed

    IV-A Quezon Catanauan Gatasan PAMANA-2013 3 Concreting of 60 lm Critical Slope FMR & Construction of

    60lm Line Canal

    Road Concreting 1 161 60 ln m 300,000.00 15,000.00 315,000.00 12-Dec-13 04-Jan-14 Completed

    IV-A Quezon Catanauan Gatasan PAMANA-2014 4 Concreting of 65LM Critical Slope FMR with 50LM Stone

    Masonry Line Canal

    Road Concreting 1 177 0.065 kms 318,269.50 15,230.50 333,500.00 22-Oct-14 03-Dec-14 Completed

    IV-A Quezon Catanauan Gatasan PAMANA-2015 5 Construction of Elevated Water Tank Water System 1 50 1 system 319,606.50 8,549.00 328,155.50 08-Aug-16 On-going

    IV-A Quezon Catanauan Macpac PAMANA-2013 3 Concreting od 70lm Critical Slope FMR & Construction of

    50 lm Line Canal

    Road Concreting 1 116 70 ln m 300,000.00 26,000.00 326,000.00 27-Nov-13 21-Dec-13 Completed

    IV-A Quezon Catanauan Macpac PAMANA-2014 4 Concreting of 65LM Critical Slope with 50LM Stone

    Masonry Line Canal

    Road Concreting 1 117 0.065 kms 300,000.00 17,600.00 317,600.00 17-Nov-14 15-Jan-15 Completed

    IV-A Quezon Catanauan Macpac PAMANA-2015 5 Concreting of FMR Critical Section Road Concreting 1 113 0.18 kms 321,504.00 7,496.00 329,000.00 16-Jun-16 On-going

    IV-A Quezon Catanauan Madulao PAMANA- 3&4 Improvement of 800 LM FMR Road Rehabilitation/Improvement 1 0 0.8 kms 600,000.00 5,000.00 605,000.00 12-Feb-15 26-Feb-15 Completed

    IV-A Quezon Catanauan Madulao PAMANA-2015 5 Construction of Stone Masonry Line Canal Box Culvert / Drainage Canal 1 180 63 ln.m 360,000.00 11,000.00 371,000.00 15-Aug-16 On-going

    IV-A Quezon Catanauan Matandang Sabang Kanluran PAMANA-2013 3 Concreting of 250 lm Tire Path Footpath / Foot Trail / Access Trail/Pathway 1 30 250 kms 300,000.00 33,000.00 333,000.00 16-Nov-13 21-Feb-14 Completed

    IV-A Quezon Catanauan Matandang Sabang Kanluran PAMANA-2014 4 Improvement of 680LM Farm To Market Road Road Rehabilitation/Improvement 1 166 0.68 kms 301,344.60 64,655.40 366,000.00 29-Oct-14 13-Jun-15 Completed

    IV-A Quezon Catanauan Matandang Sabang Kanluran PAMANA-2015 5 Construction of Streetlights Electrification 1 419 18 units 300,000.00 19,700.00 319,700.00 13-May-16 09-Jun-16 Completed

    IV-A Quezon Catanauan Matandang Sabang Silangan PAMANA-2013 3 Construction of 16 units Streetlights Electrification 1 362 16 HH 300,000.00 30,000.00 330,000.00 02-Dec-13 17-Feb-14 Completed

    IV-A Quezon Catanauan Matandang Sabang Silangan PAMANA-2014 4 Construction 16 unit Streetlights Electrification 1 186 16 units 300,000.00 15,800.00 315,800.00 29-Oct-14 16-Mar-15 Completed

    IV-A Quezon Catanauan Matandang Sabang Silangan PAMANA-2015 5 Construction of Comfort Room Sanitary Toilets 1 66 66 units 330,000.00 52,000.00 382,000.00 06-Jun-16 20-Jul-16 Completed

    IV-A Quezon Catanauan Milagrosa PAMANA-2013 3 Concreting of 50 lm Critical Slope FMR and Construction

    of 120 lm Line Canal with 5 lm Pipe Culverts

    Road Concreting 1 168 50 lm 300,000.00 58,000.00 358,000.00 09-Dec-13 05-Mar-14 Completed

    IV-A Quezon Catanauan Milagrosa PAMANA-2014 4 Concreting of 95 LM Critical Section FMR Road Concreting 1 176 0.095 kms 304,931.00 20,069.00 325,000.00 10-Nov-14 16-Dec-14 Completed

    IV-A Quezon Catanauan Milagrosa PAMANA-2015 5 Improvement of FMR with Pipe Culvert Road Rehabilitation/Improvement 1 181 0.6 kms 309,822.00 223,178.00 533,000.00 10-Jun-16 On-going

    IV-A Quezon Catanauan Navitas PAMANA-2012 2 Improvement of 565 Meters FMR Road Rehabilitation/Improvement 1 97 565 kms 300,000.00 8,000.00 308,000.00 29-Apr-13 16-Aug-13 Completed

    IV-A Quezon Catanauan Navitas PAMANA-2013 3 Concreting of 70lm Critical Slope FMR and Construction

    of 90lm Line Canal w/ 5lm Pipe Culverts

    Road Concreting 1 176 70 lm 300,000.00 40,000.00 340,000.00 02-Dec-13 24-Jan-14 Completed

    IV-A Quezon Catanauan Navitas PAMANA-2014 4 Construction of 145 LM Elevated Pathway w/ 2LM Pipe

    Culvert

    Footpath / Foot Trail / Access Trail/Pathway 1 233 0.145 kms 330,000.00 23,900.00 353,900.00 21-Oct-14 30-Mar-15 Completed

    IV-A Quezon Catanauan Pacabit PAMANA-2013 3 Construction of Day Care Center Day Care Center 1 88 48 sq.m 300,000.00 402,000.00 702,000.00 21-Nov-13 16-Feb-14 Completed

    IV-A Quezon Catanauan Pacabit PAMANA-2014 4 Concreting of 193LM Critical Slope Section FMR Road Concreting 1 362 0.193 kms 300,000.00 230,000.00 530,000.00 13-Nov-14 13-Mar-15 Completed

    IV-A Quezon Catanauan Pacabit PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 410 0.261 kms 300,000.00 19,000.00 319,000.00 04-Mar-16 10-May-16 Completed

    IV-A Quezon Catanauan Poblacion 01 PAMANA-2013 3 Construction of 100 lm Elevated Pathway with Railings Footpath / Foot Trail / Access Trail/Pathway 1 240 0.1 kms 300,000.00 9,000.00 309,000.00 16-Jan-14 08-Feb-14 Completed

    IV-A Quezon Catanauan Poblacion 02 PAMANA-2013 3 Construction of 128 Lm Line Canal, 116 Lm Curb &

    Gutter, 14 Lm Cross Drain

    Box Culvert / Drainage Canal 1 163 128 ln.m 300,000.00 64,000.00 364,000.00 04-Feb-14 11-Mar-14 Completed

  • Updated as of July 2016

    IV-A Quezon Catanauan Poblacion 03 PAMANA-2013 3 Construction of 205 lm Elevated Pathway Footpath / Foot Trail / Access Trail/Pathway 1 60 0.205 kms 300,000.00 46,000.00 346,000.00 19-Dec-13 21-Mar-14 Completed

    IV-A Quezon Catanauan Poblacion 04 PAMANA-2013 3 Concreting of 230 lm Pathway w/ 3 lm Pipe Culvert Footpath / Foot Trail / Access Trail/Pathway 1 218 0.23 kms 300,000.00 44,000.00 344,000.00 04-Feb-14 06-Mar-14 Completed

    IV-A Quezon Catanauan Poblacion 05 PAMANA-2013 3 Installation of 100 lm Seawall Railings Seawall 1 169 100 ln.m 300,000.00 13,000.00 313,000.00 15-Jan-14 15-Mar-14 Completed

    IV-A Quezon Catanauan Poblacion 06 PAMANA-2013 3 Improvement of Line Canal Box Culvert / Drainage Canal 1 105 90 ln.m 300,000.00 15,000.00 315,000.00 26-Feb-14 25-Apr-14 Completed

    IV-A Quezon Catanauan Poblacion 07 PAMANA-2013 3 Construction of 182 lm Drainage System Box Culvert / Drainage Canal 1 90 182 ln.m 300,000.00 28,000.00 328,000.00 22-Nov-13 28-Feb-14 Completed

    IV-A Quezon Catanauan Poblacion 08 PAMANA-2013 3 Concreting of Critical Section Road Concreting 1 98 0.093 kms 300,000.00 68,000.00 368,000.00 29-Nov-13 16-Dec-13 Completed

    IV-A Quezon Catanauan Poblacion 09 PAMANA-2013 3 Construction of 101 lm Masonary Line Canal & 4 lm

    Cross Drain

    Box Culvert / Drainage Canal 1 30 101 ln.m 300,000.00 12,000.00 312,000.00 20-Jan-14 13-Mar-14 Completed

    IV-A Quezon Catanauan Poblacion 1 PAMANA-2014 4 Construction of 180 Lm Drainage Canal Box Culvert / Drainage Canal 1 321 180 ln.m 300,000.00 38,000.00 338,000.00 16-Dec-14 30-Jan-15 Completed

    IV-A Quezon Catanauan Poblacion 1 PAMANA-2015 5 Construction of Wharf Construction of Miniport/Wharf 1 117 30 ln.m 330,000.00 15,000.00 345,000.00 27-Jul-16 On-going

    IV-A Quezon Catanauan Poblacion 10 PAMANA-2013 3 Concreting of Pathway Footpath / Foot Trail / Access Trail/Pathway 1 270 0.39 kms 300,000.00 27,000.00 327,000.00 27-Nov-13 13-Feb-14 Completed

    IV-A Quezon Catanauan Poblacion 10 PAMANA-2014 4 Construction of 200 LM Pathway w/ 70 LM Line Canal Footpath / Foot Trail / Access Trail/Pathway 1 270 0.2 kms 300,000.00 20,000.00 320,000.00 21-Oct-14 21-Nov-14 Completed

    IV-A Quezon Catanauan Poblacion 10 PAMANA-2015 5 Construction of Pathway with Line Canal (270LM) Footpath / Foot Trail / Access Trail/Pathway 1 648 0.27 kms 320,230.00 19,770.00 340,000.00 22-Mar-16 27-Apr-16 Completed

    IV-A Quezon Catanauan Poblacion 2 PAMANA-2014 4 Construction of 200 LM Drainage Canal Box Culvert / Drainage Canal 1 153 0.2 kms 300,000.00 42,400.00 342,400.00 21-Oct-14 27-Dec-14 Completed

    IV-A Quezon Catanauan Poblacion 2 PAMANA-2015 5 Construction of Drainage Canal Box Culvert / Drainage Canal 1 153 0.162 ln.m 300,000.00 4,000.00 304,000.00 22-Jun-16 23-Aug-16 Completed

    IV-A Quezon Catanauan Poblacion 3 PAMANA-2014 4 Improvement of 190 Lm Drainage Canal with Extension

    100 Lm Pathway

    Box Culvert / Drainage Canal 1 86 190 ln.m 300,000.00 18,000.00 318,000.00 03-Nov-14 15-Jan-15 Completed

    IV-A Quezon Catanauan Poblacion 3 PAMANA-2015 5 Installation of Railings on Elevated Pathway with

    Improvement of Line Canal

    Footpath / Foot Trail / Access Trail/Pathway 1 75 0.14 kms 330,000.00 19,000.00 349,000.00 27-Apr-16 On-going

    IV-A Quezon Catanauan Poblacion 4 PAMANA-2014 4 Construction of 270LM Drainage Canal Box Culvert / Drainage Canal 1 188 0.27 ln.m 318,520.00 16,480.00 335,000.00 17-Nov-14 18-Dec-14 Completed

    IV-A Quezon Catanauan Poblacion 4 PAMANA-2015 5 Construction of Drainage Canal Box Culvert / Drainage Canal 1 230 175 ln.m 331,852.00 16,148.00 348,000.00 04-Jun-16 On-going

    IV-A Quezon Catanauan Poblacion 5 PAMANA-2014 4 Construction of 1 unit Communal Toilet w/ Water

    Supply System

    Sanitary Toilets 1 85 1 unit 318,326.66 12,673.34 331,000.00 14-Jul-15 16-Feb-16 Completed

    IV-A Quezon Catanauan Poblacion 5 PAMANA-2015 5 Installation of Lamp Post along Seawall Electrification 1 110 7 units 300,000.00 8,000.00 308,000.00 02-Jun-16 20-Jul-16 Completed

    IV-A Quezon Catanauan Poblacion 6 PAMANA-2014 4 Construction of Manpower Development Center Training Center / Facility 1 96 54.34 sq. m 330,000.00 615,000.00 945,000.00 01-May-16 On-going

    IV-A Quezon Catanauan Poblacion 6 PAMANA-2015 5 Construction of Streetlights Electrification 1 93 7 units 300,000.00 11,000.00 311,000.00 28-Mar-16 On-going

    IV-A Quezon Catanauan Poblacion 7 PAMANA-2014 4 Construction of Box Culvert with 112sq.m. Concreting of

    and 100LM Masonry Line Canal

    Box Culvert / Drainage Canal 1 460 100 ln.m 300,000.00 47,000.00 347,000.00 23-Oct-14 30-Mar-15 Completed

    IV-A Quezon Catanauan Poblacion 7 PAMANA-2015 5 Construction of Concrete Canal Cover Box Culvert / Drainage Canal 1 455 210 ln.m 303,719.00 7,281.00 311,000.00 04-Apr-16 On-going

    IV-A Quezon Catanauan Poblacion 8 PAMANA-2014 4 Concreting of 98lm Critical Section FMR Road Concreting 1 398 0.098 kms 330,000.00 65,000.00 395,000.00 19-Jan-15 12-Dec-15 Completed

    IV-A Quezon Catanauan Poblacion 8 PAMANA-2015 5 Improvement of Drainage Canal with Top Cover Box Culvert / Drainage Canal 1 398 150 ln.m 306,546.00 18,454.00 325,000.00 01-Mar-16 On-going

    IV-A Quezon Catanauan Poblacion 9 PAMANA-2014 4 Construction of 90 LM Line Canal with 50 LM Pipe

    Culvert

    Box Culvert / Drainage Canal 1 50 90 ln.m 300,000.00 26,000.00 326,000.00 01-Dec-14 13-Dec-15 Completed

    IV-A Quezon Catanauan Poblacion 9 PAMANA-2015 5 Construction of Drainage Canal with Cover Box Culvert / Drainage Canal 1 144 143 ln.m 313,039.11 10,960.89 324,000.00 22-Mar-16 On-going

    IV-A Quezon Catanauan San Antonio Magcopa PAMANA-2013 3 Concreting of 65 lm Critical Slope FMR & Construction of

    50 lm Line Canal

    Road Concreting 1 152 65 lm 300,000.00 12,000.00 312,000.00 05-Dec-13 04-Apr-14 Completed

    IV-A Quezon Catanauan San Antonio Magcopa PAMANA-2014 4 Concreting of 90LM Critical Section FMRwith 15LM Line

    Canal

    Road Concreting 1 75 0.09 kms 304,478.00 12,622.00 317,100.00 05-Nov-14 22-Apr-15 Completed

    IV-A Quezon Catanauan San Antonio Magcopa PAMANA-2015 5 Concreting of FMR Critical Section with Line Ditch &

    Pipe Culverts

    Road Concreting 1 193 0.21 kms 300,000.00 28,169.01 328,169.01 14-Jul-16 On-going

    IV-A Quezon Catanauan San Antonio Pala PAMANA-2013 3 Construction of 310 lm Line Canal Box Culvert / Drainage Canal 1 285 310 ln.m 300,000.00 20,000.00 320,000.00 27-Nov-13 31-Jan-14 Completed

    IV-A Quezon Catanauan San Antonio Pala PAMANA-2014 4 Construction of 30 LM Retaining Wall Riprap Wall / Slope Protection / Erosion Control 1 285 30 ln.m 318,020.00 12,980.00 331,000.00 26-Jan-15 13-Mar-15 Completed

    IV-A Quezon Catanauan San Antonio Pala PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 285 0.083 kms 300,000.00 8,000.00 308,000.00 22-Jun-16 23-Jul-16 Completed

    IV-A Quezon Catanauan San Isidro PAMANA-2012 2 Construction of 1.025KM FMR Road Concreting 1 751 1.025 km 300,000.00 157,000.00 457,000.00 18-Mar-13 16-Jul-13 Completed

    IV-A Quezon Catanauan San Isidro PAMANA-2013 3 Concreting of 140 lm Critical Section Road Concreting 1 220 140 lm 300,000.00 32,000.00 332,000.00 11-Nov-13 19-Feb-14 Completed

    IV-A Quezon Catanauan San Isidro PAMANA-2014 4 Improvement of 85LM Sitio Bayanan 1-A Road Road Rehabilitation/Improvement 1 706 0.085 kms 300,000.00 17,000.00 317,000.00 21-Oct-14 03-Nov-14 Completed

    IV-A Quezon Catanauan San Jose Anyao PAMANA-2012 2 Construction of Box Culvert Box Culvert / Drainage Canal 1 156 1.8 m 300,000.00 50,056.00 350,056.00 18-Apr-13 01-Jun-13 Completed

    IV-A Quezon Catanauan San Jose Anyao PAMANA-2013 3 Construction of 7.5lm Footbridge & 80 lm Pathway Bridge / Bridge Construction 1 212 7.5 ln.m 300,000.00 64,000.00 364,000.00 16-Jan-14 21-Feb-14 Completed

    IV-A Quezon Catanauan San Jose Anyao PAMANA-2014 4 Construction of 900 LM FMR with 50 LM PCCP Road Rehabilitation/Improvement 1 212 0.9 kms 300,000.00 409,400.00 709,400.00 15-Dec-14 31-Jan-16 Completed

    IV-A Quezon Catanauan San Pablo Suha PAMANA-2012 2 Construction of 770LM FMR Road Construction 1 73 770 lm 300,000.00 140,034.00 440,034.00 23-Sep-13 30-Nov-13 Completed

    IV-A Quezon Catanauan San Pablo Suha PAMANA-2013 3 Concreting of 55lm Critical Slope FMR & Constructio of

    50lm Line Canal

    Road Concreting 1 100 0.055 kms 300,000.00 10,000.00 310,000.00 05-Feb-14 23-May-14 Completed

    IV-A Quezon Catanauan San Pablo Suha PAMANA-2014 4 Concreting of 86LM Critical Section FMR Road Concreting 1 100 0.086 kms 303,549.87 16,250.13 319,800.00 13-Nov-14 16-Dec-14 Completed

    IV-A Quezon Catanauan San Roque PAMANA-2014 4 Construction of 550 LM FMR with 12 LM Pipe Culvert Road Rehabilitation/Improvement 1 50 0.55 kms 303,915.00 90,885.00 394,800.00 16-Feb-15 21-May-15 Completed

    IV-A Quezon Catanauan San Roque Agro PAMANA-2013 3 Improvement of 550 lm Farm to Market Road with 110

    lm Line Canal

    Road Rehabilitation/Improvement 1 432 0.55 kms 300,000.00 76,000.00 376,000.00 01-Mar-14 17-Mar-14 Completed

    IV-A Quezon Catanauan San Roque Agro PAMANA-2015 5 Concreting of FMR Critical Section (130LM) Road Concreting 1 708 0.13 kms 330,391.50 117,608.50 448,000.00 29-Apr-16 02-May-16 Completed

    IV-A Quezon Catanauan San Vicente Kanluran PAMANA-2012 2 Cooperative Development Cum Capacity Enhancement

    for Farmers & OSY

    Capability Building / Training 1 99 99 HH 300,000.00 124,767.69 424,767.69 18-Feb-13 15-Oct-13 Completed

    IV-A Quezon Catanauan San Vicente Kanluran PAMANA-2013 3 Concreting of 60lm Critical Slope FMR & Construction of

    60lm Line Canal

    Road Concreting 1 57 60 lm 300,000.00 46,000.00 346,000.00 20-Dec-13 28-Jan-14 Completed

    IV-A Quezon Catanauan San Vicente Kanluran PAMANA-2014 4 Concreting of 100 LM Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 366 0.1 kms 310,992.00 36,008.00 347,000.00 01-Dec-14 19-Dec-15 Completed

    IV-A Quezon Catanauan San Vicente Silangan PAMANA-2012 2 Construction of 1.640KM FMR Road Construction 1 182 1.64 km 300,000.00 550,000.00 850,000.00 25-Feb-13 19-Jul-13 Completed

    IV-A Quezon Catanauan San Vicente Silangan PAMANA-2013 3 Concreting of 95 lm Critical Slope FMR & Construction of

    50 lm Line Canal

    Road Concreting 1 182 95 lm 300,000.00 35,000.00 335,000.00 26-Nov-13 17-Feb-14 Completed

    IV-A Quezon Catanauan San Vicente Silangan PAMANA-2014 4 Concreting of 70 LM Critical Section FMR & Construction

    of 70 LM Line Canal

    Box Culvert / Drainage Canal 1 182 70 ln.m 330,000.00 17,000.00 347,000.00 04-Feb-15 22-Dec-15 Completed

    IV-A Quezon Catanauan Sta. Maria Dao PAMANA-2012 2 Improvement of Barangay Health Station Building Health Station 1 218 45.6 sq.m 300,000.00 165,000.00 465,000.00 18-Jun-13 30-Oct-13 Completed

    IV-A Quezon Catanauan Sta. Maria Dao PAMANA-2013 3 Improvement of Barangay Health Station Health Station 1 217 51.4 sq.m 300,000.00 26,000.00 326,000.00 06-Mar-14 29-Apr-14 Completed

    IV-A Quezon Catanauan Sta. Maria Dao PAMANA-2014 4 Construction of 230 LM Pathway Footpath / Foot Trail / Access Trail/Pathway 1 218 0.23 kms 307,394.26 19,605.74 327,000.00 01-Dec-14 15-Mar-16 Completed

    IV-A Quezon Catanauan Tagabas Ibaba PAMANA-2013 3 Construction of 10 lm Spillway Spillway / Overflow Bridge 1 358 10 ln.m 300,000.00 83,000.00 383,000.00 08-Jan-14 16-Feb-14 Completed

    IV-A Quezon Catanauan Tagabas Ibaba PAMANA-2014 4 Concreting of 60LM Crirical Slope FMR with 50LM

    Masonry Line Canal

    Road Concreting 1 358 0.06 kms 300,000.00 15,000.00 315,000.00 03-Dec-14 15-Feb-16 Completed

    IV-A Quezon Catanauan Tagabas Ibaba PAMANA-2015 5 Concreting of FMR Critical Section with Line Canal

    (60LM)

    Road Concreting 1 409 0.06 kms 315,535.09 13,464.91 329,000.00 12-May-16 On-going

    IV-A Quezon Catanauan Tagabas Ilaya PAMANA-2012 2 Improvement of 530LM FMR Road Rehabilitation/Improvement 1 70 530 kms 300,000.00 2,000.00 302,000.00 18-Apr-13 27-Jul-13 Completed

    IV-A Quezon Catanauan Tagabas Ilaya PAMANA-2013 3 Concreting of 65 lm Critical Slope FMR & Construction of

    50 lm Line Canal

    Road Concreting 1 103 65 lm 300,000.00 27,000.00 327,000.00 11-Nov-13 14-Dec-13 Completed

    IV-A Quezon Catanauan Tagabas Ilaya PAMANA-2014 4 Concreting of 69LM Critical Slope FMR with

    Construction of 50LM Line Canal

    Road Concreting 1 22 0.069 kms 300,000.00 20,000.00 320,000.00 17-Nov-14 23-Nov-15 Completed

    IV-A Quezon Catanauan Tagbacan Ibaba PAMANA-2013 3 Improvement of 600 LM FMR w/ 120 LM Line Canal Road Rehabilitation/Improvement 1 440 600 kms 300,000.00 112,000.00 412,000.00 04-Nov-13 09-Feb-14 Completed

    IV-A Quezon Catanauan Tagbacan Ibaba PAMANA-2014 4 Construction of 500 LM FMR w/ 5 LM RCPC & 150 LM

    Line Canal

    Road Rehabilitation/Improvement 1 440 0.5 kms 300,000.00 83,000.00 383,000.00 01-Nov-14 04-Dec-14 Completed

    IV-A Quezon Catanauan Tagbacan Ibaba PAMANA-2015 5 Concreting of FMR Critical Section Road Concreting 1 440 0.3 kms 315,443.00 7,557.00 323,000.00 19-Apr-16 14-Jul-16 Completed

    IV-A Quezon Catanauan Tagbacan Ilaya PAMANA-2012 2 Improvement of 920 L.M. Existing Farm to Market Road Road Rehabilitation/Improvement 1 47 920 lm 300,000.00 211,800.00 511,800.00 08-Apr-13 27-Apr-13 Completed

    IV-A Quezon Catanauan Tagbacan Ilaya PAMANA-2013 3 Improvement of 1 unit 1 CL Highschool Building School Building 1 383 63 sq. m 300,000.00 91,000.00 391,000.00 19-Nov-13 05-Mar-14 Completed

    IV-A Quezon Catanauan Tagbacan Ilaya PAMANA-2014 4 Construction of 700LM FMR with 25LM RCPC and 80LM

    Line Canal

    Road Construction 1 145 0.7 kms 311,761.00 86,339.00 398,100.00 15-Oct-14 26-Nov-14 Completed

    IV-A Quezon Catanauan Tagbacan Silangan PAMANA-2013 3 Improvement of 820 LM FMR w/ 5 LM Pipe Culverts Road Rehabilitation/Improvement 1 49 820 kms 300,000.00 120,000.00 420,000.00 18-Nov-13 08-Jan-14 Completed

    IV-A Quezon Catanauan Tagbacan Silangan PAMANA-2014 4 Construction of 650LM FMR with 55LM Line Canal and

    5LM Pipe Culverts

    Road Construction 1 264 0.65 kms 300,000.00 94,000.00 394,000.00 15-Oct-14 18-Nov-14 Completed

    IV-A Quezon Catanauan Tagbacan Silangan PAMANA-2015 5 Construction of FMR Road Construction 1 70 0.465 kms 315,430.00 80,000.00 395,430.00 16-Apr-16 02-May-16 Completed

    IV-A Quezon Catanauan Tuhian PAMANA-2013 3 Construction of 1 unit Communal Toilet with 4 units

    Water Well Drilling

    Sanitary Toilets 1 202 1 unit 300,000.00 23,000.00 323,000.00 04-Apr-14 09-May-14 Completed

    IV-A Quezon Catanauan Tuhian PAMANA-2014 4 Construction of 10 units Water Well Drilling Water System 1 100 10 system 300,000.00 30,000.00 330,000.00 16-Mar-15 01-Jun-15 Completed

    IV-A Quezon Catanauan Tuhian PAMANA-2015 5 Concreting of FMR Critical Section Road Concreting 1 527 0.27 kms 315,160.00 25,840.00 341,000.00 12-Jun-16 25-Jun-16 Completed

    IV-A Quezon Mulanay Ajos (Sto. Nino) PAMANA-2014 4 Construction of 163 LM Concrete Pathway with 8LM

    Cross Drain

    Footpath / Foot Trail / Access Trail/Pathway 1 30 0.163 kms 319,799.50 85,000.50 404,800.00 23-Oct-14 08-Feb-15 Completed

    IV-A Quezon Mulanay Ajos (Sto. Niño) PAMANA-2013 3 Construction of 1,210 lm Level II Gravity Fed Water

    Supply System

    Water System 1 43 1 system 300,000.00 79,500.00 379,500.00 25-Feb-14 06-May-14 Completed

    IV-A Quezon Mulanay Amuguis PAMANA-2012 2 Construction of Water System Level II Water System 1 30 1400 lm 300,000.00 111,089.00 411,089.00 08-Jun-13 10-Aug-13 Completed

    IV-A Quezon Mulanay Amuguis PAMANA-2013 3 Construction of 1,100 ln m Level 2 Gravity Fed Water

    Supply System

    Water System 1 30 1 system 300,000.00 81,000.00 381,000.00 25-Feb-14 10-May-14 Completed

    IV-A Quezon Mulanay Amuguis PAMANA-2014 4 Construction of 9.10 lm Rc Footbridge with 60 Lm

    Concrete Pathway

    Bridge / Bridge Construction 1 30 0.06 ln.m 330,000.00 37,300.00 367,300.00 17-Nov-14 15-Feb-15 Completed

    IV-A Quezon Mulanay Anonang PAMANA-2012 2 Concreting of 2m x 82lm Critical Slope Road Concreting 1 226 82 lm 300,000.00 47,350.00 347,350.00 22-Mar-13 12-Apr-13 Completed

    IV-A Quezon Mulanay Anonang PAMANA-2013 3 Concreting of 120LM Critical Slope FMR Road Concreting 1 250 120 lm 300,000.00 91,000.00 391,000.00 09-Dec-13 04-Jan-14 Completed

    IV-A Quezon Mulanay Anonang PAMANA-2014 4 Concreting of 120 LM Critiical Slope FMR Road Concreting 1 209 0.12 kms 300,000.00 67,625.00 367,625.00 22-Oct-14 26-Feb-15 Completed

    IV-A Quezon Mulanay Bagong Silang PAMANA-2013 3 Concreting of 115 LM Critical Slope FMR Road Concreting 1 63 115 ln m 300,000.00 80,000.00 380,000.00 09-Dec-13 23-Jan-14 Completed

    IV-A Quezon Mulanay Bagong Silang PAMANA-2014 4 Installation of 700 m on Grid Power Line Extension Electrification 1 34 9 post 300,000.00 227,373.00 527,373.00 06-Jan-15 13-Feb-15 Completed

    IV-A Quezon Mulanay Bagong Silang PAMANA-2015 5 Construction of Level II Pump Driven Water Supply

    System

    Water System 1 71 1 system 309,071.23 149,928.77 459,000.00 29-Feb-16 On-going

    IV-A Quezon Mulanay Bagupaye PAMANA-2012 2 Construction of Mini Market Public Market/Trading Post/Food Terminal 1 24 72 sq.m 300,000.00 298,454.00 598,454.00 05-Aug-13 30-Oct-13 Completed

    IV-A Quezon Mulanay Bagupaye PAMANA-2013 3 Concreting of 120 lm Swampy Section FMR Road Concreting 1 626 0.12 kms 300,000.00 90,000.00 390,000.00 06-Dec-13 05-Jan-14 Completed

    IV-A Quezon Mulanay Bagupaye PAMANA-2014 4 Concreting of 115 lm Critical Section FMR Road Concreting 1 580 0.115 kms 330,000.00 69,000.00 399,000.00 24-Nov-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Bolo PAMANA-2012 2 Improvement of 100lm FMR with concreting and Line

    Canal

    Road Concreting 1 177 100 lm 300,000.00 135,350.00 435,350.00 13-Mar-13 09-Oct-13 Completed

    IV-A Quezon Mulanay Bolo PAMANA-2013 3 Concreting of 130 LM Critical Slope FMR Road Concreting 1 177 130 ln m 300,000.00 128,000.00 428,000.00 09-Dec-13 14-Jan-14 Completed

    IV-A Quezon Mulanay Bolo PAMANA-2014 4 Concreting of 118 linear Meter Critical Slope FMR Riprap Wall / Slope Protection / Erosion Control 1 117 118 ln.m 300,000.00 83,450.00 383,450.00 24-Nov-14 27-Feb-15 Completed

    IV-A Quezon Mulanay Buenavista PAMANA-2012 2 Concreting of 2m x 120lm Critical Slope Road Concreting 1 134 120 lm 300,000.00 96,000.00 396,000.00 08-Feb-13 12-Apr-13 Completed

    IV-A Quezon Mulanay Buenavista PAMANA-2013 3 Construction of 300 ln m FMR Road Rehabilitation/Improvement 1 211 0.3 kms 300,000.00 420,000.00 720,000.00 11-Mar-14 30-May-14 Completed

    IV-A Quezon Mulanay Buenavista PAMANA-2014 4 Concreting of 135 LM Critical Slope FMR w/ 135 LM Line

    Ditch

    Road Concreting 1 211 0.135 kms 300,000.00 94,075.00 394,075.00 05-Nov-14 05-Feb-15 Completed

    IV-A Quezon Mulanay Burgos PAMANA-2012 2 Concreting of 2m x 100lm Critical Slope Road Concreting 1 282 100 lm 300,000.00 98,200.00 398,200.00 20-Mar-13 13-Sep-13 Completed

    IV-A Quezon Mulanay Burgos PAMANA-2013 3 Concreting of 115lm Critical Slope FMR Road Concreting 1 282 0.115 kms 300,000.00 80,000.00 380,000.00 13-Jan-14 19-Jan-14 Completed

    IV-A Quezon Mulanay Burgos PAMANA-2014 4 Concreting of 105 LM Critical Slope FMR w/ 120 cu.m.

    Embankment and 3LM RCPC 610 mm dia.

    Road Concreting 1 275 0.1 kms 300,000.00 153,000.00 453,000.00 29-Oct-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Butanyog PAMANA-2013 3 Concreting of Critical Slope Farm to Market Road Road Concreting 1 194 0.12 kms 300,000.00 133,000.00 433,000.00 17-Dec-13 12-Feb-14 Completed

    IV-A Quezon Mulanay Butanyog PAMANA-2014 4 Concreting of 125 Lm Critical Slope FMR with 125 Lm

    Line Canal

    Road Concreting 1 85 0.125 kms 308,947.00 53,250.00 362,197.00 04-Nov-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Butanyog PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 323 0.12 kms 301,200.30 42,299.70 343,500.00 27-Feb-16 15-Apr-16 Completed

    IV-A Quezon Mulanay Cambuga PAMANA-2012 2 Skills Training on Peanut Products Capability Building / Training 1 60 30 HH 300,000.00 30,000.00 330,000.00 12-Aug-13 01-Oct-13 Completed

    IV-A Quezon Mulanay Cambuga PAMANA-2013 3 Concreting of 120LM Critical Slope FMR Road Concreting 1 127 120 lm 300,000.00 88,000.00 388,000.00 15-Jan-14 05-Mar-14 Completed

    IV-A Quezon Mulanay Cambuga PAMANA-2014 4 Concreting of 140 Lm Slope FMR Road Concreting 1 145 0.14 kms 330,000.00 81,975.00 411,975.00 24-Nov-14 20-Feb-15 Completed

    IV-A Quezon Mulanay Canuyep PAMANA-2013 3 Concreting of 92 lm Critical Slope FMR & Installation of

    12 lm Cross Drain

    Road Concreting 1 387 0.92 kms 300,000.00 74,000.00 374,000.00 13-Jan-14 04-Mar-14 Completed

    IV-A Quezon Mulanay Canuyep PAMANA-2014 4 Concreting of 130 LM Crititcal Slope Road Concreting 1 387 0.13 kms 303,476.00 79,524.00 383,000.00 05-Nov-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Canuyep PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 410 0.145 kms 307,767.00 83,233.00 391,000.00 05-Mar-16 04-Jun-16 Completed

    IV-A Quezon Mulanay F. Nanadiego PAMANA-2014 4 Construction of 580.50 LM Level II Pump Driven Water

    Supply

    Water System 1 50 1 system 313,696.00 226,678.00 540,374.00 27-Dec-14 03-Mar-16 Completed

    IV-A Quezon Mulanay F. Nanadiego PAMANA-2015 5 Construction of Tire Path Footpath / Foot Trail / Access Trail/Pathway 1 418 0.161 kms 300,000.00 38,000.00 338,000.00 21-Mar-16 15-Jul-16 Completed

    IV-A Quezon Mulanay F. Nañadiego PAMANA-2013 3 Water Well Drilling Water System 1 115 1 system 300,000.00 14,000.00 314,000.00 16-Mar-14 27-Jun-14 Completed

    IV-A Quezon Mulanay Ibabang Yuni PAMANA-2013 3 Extension of 1 km On-Grid Power Line Electrification 1 34 HH 300,000.00 297,500.00 597,500.00 29-Jan-14 28-Feb-14 Completed

    IV-A Quezon Mulanay Ibabang Yuni PAMANA-2014 4 Concreting of 162 LM Crititcal Slope Road Concreting 1 445 0.162 kms 330,000.00 112,000.00 442,000.00 10-Nov-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Ibabang Yuni PAMANA-2015 5 Concreting of FMR Critical Section Road Concreting 1 497 0.11 kms 300,000.00 205,250.00 505,250.00 21-Mar-16 04-Jun-16 Completed

    IV-A Quezon Mulanay Ilayang Yuni PAMANA-2013 3 10 units Water Well Drilling Water System 1 100 10 system 300,000.00 10,000.00 310,000.00 15-Jan-14 27-Jun-14 Completed

    IV-A Quezon Mulanay Ilayang Yuni PAMANA-2014 4 Concreting of 124 LM Crititcal Slope Road Concreting 1 179 0.124 kms 330,000.00 80,225.00 410,225.00 21-Oct-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Ilayang Yuni PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 902 0.18 kms 309,884.50 152,115.50 462,000.00 18-Mar-16 04-Jun-16 Completed

    IV-A Quezon Mulanay Latangan PAMANA-2012 2 Capability Building on Post-Production Techniques with

    Provision of Post Harvest Equipments

    Capability Building / Training 1 57 57 HH 300,000.00 23,400.00 323,400.00 01-Jul-13 10-Aug-13 Completed

    IV-A Quezon Mulanay Latangan PAMANA-2013 3 Construction of 210 lm Line Canal Box Culvert / Drainage Canal 1 123 210 ln.m 300,000.00 170,000.00 470,000.00 09-Dec-13 25-Feb-14 Completed

    IV-A Quezon Mulanay Latangan PAMANA-2014 4 Construction of 221 LM Open Line Canal Box Culvert / Drainage Canal 1 248 221 ln.m 300,000.00 130,550.00 430,550.00 29-Sep-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Mabini PAMANA-2012 2 Improvement of 550LM FMR Road Rehabilitation/Improvement 1 166 550 kms 300,000.00 67,500.00 367,500.00 11-Feb-13 07-Oct-13 Completed

    IV-A Quezon Mulanay Mabini PAMANA-2013 3 Concreting of 120 lm Critical Slope FMR & Installation of

    8lm Pipe Culverts

    Road Concreting 1 60 0.12 kms 300,000.00 100,000.00 400,000.00 17-Jan-14 01-Mar-14 Completed

    IV-A Quezon Mulanay Mabini PAMANA-2014 4 Concreting of 130 lm Critical Slope FMR Road Concreting 1 166 0.13 kms 302,367.00 90,475.00 392,842.00 20-Nov-14 30-Apr-15 Completed

    IV-A Quezon Mulanay Magsaysay PAMANA-2012 2 Construction of Water System Level II Water System 1 51 700 system 300,000.00 124,000.00 424,000.00 31-Aug-13 18-Oct-13 Completed

    IV-A Quezon Mulanay Magsaysay PAMANA-2013 3 Concreting of 480 sq.m Post Harvest Pavement and

    Construction of 30 lm CHB Line Canal

    Post Harvest Facilities 1 184 480 sq.m 300,000.00 84,000.00 384,000.00 25-Jan-14 21-Feb-14 Completed

    IV-A Quezon Mulanay Magsaysay PAMANA-2014 4 Installation of 1 km On grid Power Line Extension Electrification 1 27 1 kms 316,383.50 275,616.50 592,000.00 07-Jan-15 13-Feb-15 Completed

    IV-A Quezon Mulanay Matataja PAMANA-2013 3 Concreting of Critical Slope Road Concreting 1 370 0.12 kms 300,000.00 89,000.00 389,000.00 06-Jan-14 28-Feb-14 Completed

    IV-A Quezon Mulanay Matataja PAMANA-2014 4 Concreting of 130lm Critical Slope FMR Road Concreting 1 360 0.13 kms 300,000.00 86,000.00 386,000.00 17-Nov-14 21-Feb-15 Completed

    IV-A Quezon Mulanay Matataja PAMANA-2015 5 Concreting of Critical Section FMR with Stone Masonry

    Line Canal

    Road Concreting 1 354 0.134 kms 300,000.00 162,700.00 462,700.00 25-Feb-16 06-May-16 Completed

    IV-A Quezon Mulanay Pakiing PAMANA-2013 3 Concreting of 88 LM Critical Slope FMR Road Concreting 1 306 0.088 kms 300,000.00 55,000.00 355,000.00 02-Dec-13 28-Feb-14 Completed

    IV-A Quezon Mulanay Pakiing PAMANA-2014 4 Concreting of 110 Lm Critical Slope FMR Road Concreting 1 350 0.11 kms 301,329.00 63,671.00 365,000.00 17-Nov-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Pakiing PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 739 0.124 kms 300,000.00 73,500.00 373,500.00 18-Mar-16 23-Jun-16 Completed

    IV-A Quezon Mulanay Patabog PAMANA-2013 3 Concreting of 118 LM Critical Slope FMR Road Concreting 1 400 118 ln m 300,000.00 118,000.00 418,000.00 13-Jan-14 28-Feb-14 Completed

    IV-A Quezon Mulanay Patabog PAMANA-2014 4 Concreting of 101 LM Crititcal Slope Road Concreting 1 658 0.101 kms 300,000.00 55,000.00 355,000.00 05-Nov-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Patabog PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 714 0.142 kms 300,000.00 117,000.00 417,000.00 15-Mar-16 23-May-16 Completed

    IV-A Quezon Mulanay Poblacion 1 PAMANA-2013 3 Construction of 120 LM Concrete Line Canal Box Culvert / Drainage Canal 1 304 120 ln.m 300,000.00 122,300.00 422,300.00 18-Nov-13 01-Mar-14 Completed

    IV-A Quezon Mulanay Poblacion 1 PAMANA-2014 4 Construction of 102 LM Covered Line Canal Box Culvert / Drainage Canal 1 304 102 ln.m 303,518.50 53,625.50 357,144.00 22-Sep-14 01-Nov-14 Completed

    IV-A Quezon Mulanay Poblacion 1 PAMANA-2015 5 Construction of Covered Line Canal Box Culvert / Drainage Canal 1 306 102 ln.m 300,000.00 47,000.00 347,000.00 07-Mar-16 On-going

    IV-A Quezon Mulanay Poblacion 2 PAMANA-2014 4 Construction of 192 LM Line Canal & 76 Pipe Culvert

    with 8 Units Manhole

    Box Culvert / Drainage Canal 1 100 192 ln.m 300,000.00 288,325.00 588,325.00 12-Nov-14 13-Feb-15 Completed

    IV-A Quezon Mulanay Poblacion 2 PAMANA-2015 5 Construction of Pathway with Covered Line Canal Box Culvert / Drainage Canal 1 737 118 ln.m 300,000.00 143,750.00 443,750.00 15-Feb-16 27-Aug-16 Completed

    IV-A Quezon Mulanay Poblacion 3 PAMANA-2014 4 Construction of 189 LM Open Line Canal Box Culvert / Drainage Canal 1 30 0.189 kms 300,000.00 137,100.00 437,100.00 06-Oct-14 15-Jan-15 Completed

    IV-A Quezon Mulanay Poblacion 3 PAMANA-2015 5 Construction of Open Line Canal Box Culvert / Drainage Canal 1 279 197 ln.m 300,000.00 124,250.00 424,250.00 19-Mar-16 28-May-16 Completed

    IV-A Quezon Mulanay Poblacion 4 PAMANA-2014 4 Construction of 61 Linear Meter Perimeter Fence School Perimeter Fence 1 56 61 Ln.m 330,000.00 42,475.00 372,475.00 12-Dec-14 30-Apr-15 Completed

    IV-A Quezon Mulanay Poblacion 4 PAMANA-2015 5 Construction of Perimeter Fence School Perimeter Fence 1 194 61 Ln.m 300,000.00 62,000.00 362,000.00 04-Mar-16 23-May-16 Completed

    IV-A Quezon Mulanay Poblacion II PAMANA-2013 3 Concreting of 105 lm Pathway with Covered Line Canal Footpath / Foot Trail / Access Trail/Pathway 1 100 0.105 kms 300,000.00 171,000.00 471,000.00 11-Jan-14 01-Mar-14 Completed

    IV-A Quezon Mulanay Poblacion III PAMANA-2013 3 Construction of 242 lm Line Canal Box Culvert / Drainage Canal 1 25 242 ln.m 300,000.00 246,000.00 546,000.00 18-Nov-13 20-Jan-14 Completed

    IV-A Quezon Mulanay Poblacion IV PAMANA-2013 3 Embankment of 907 Sq. M. Riverbank Area Seawall 1 50 907 sq. m 300,000.00 85,000.00 385,000.00 06-Feb-14 01-Mar-14 Completed

    IV-A Quezon Mulanay Sagongon PAMANA-2013 3 Concreting of Critical Slope Farm to Market Road Road Concreting 1 90 0.12 kms 300,000.00 86,500.00 386,500.00 09-Jan-14 04-Feb-14 Completed

    IV-A Quezon Mulanay Sagongon PAMANA-2014 4 Concreting of 133 Lm Critical slope FMR Road Concreting 1 120 0.133 kms 330,000.00 81,500.00 411,500.00 07-Nov-14 27-Feb-15 Completed

    IV-A Quezon Mulanay Sagongon PAMANA-2015 5 Concreting of FMR Critical Slope Road Concreting 1 93 0.144 kms 300,000.00 81,700.00 381,700.00 04-Mar-16 23-May-16 Completed

    IV-A Quezon Mulanay San Isidro PAMANA-2013 3 Concreting of 118 lm Critical Section FMR Road Concreting 1 155 0.118 kms 300,000.00 88,000.00 388,000.00 22-Jan-14 04-Mar-14 Completed

    IV-A Quezon Mulanay San Isidro PAMANA-2014 4 Improvement of Helath Station Health Station 1 214 69 sq.m 300,241.00 107,501.00 407,742.00 19-Nov-14 19-May-15 Completed

    IV-A Quezon Mulanay San Isidro PAMANA-2015 5 Concreting of Post-Harvest Pavement with Line Canal Post Harvest Facilities 1 315 464 sq.m 302,646.00 68,854.00 371,500.00 21-Mar-16 15-Jul-16 Completed

    IV-A Quezon Mulanay San Pedro PAMANA-2012 2 Extension of 250lm FMR Road Concreting 1 132 250 lm 300,000.00 175,000.00 475,000.00 19-Mar-13 30-Oct-13 Completed

    IV-A Quezon Mulanay San Pedro PAMANA-2013 3 Concreting of 120 ln m Critical Section Road Concreting 1 212 0.12 kms 300,000.00 92,900.00 392,900.00 14-Jan-14 22-Feb-14 Completed

    IV-A Quezon Mulanay San Pedro PAMANA-2014 4 Concreting of 87l.m. Critical Section FMR with 87l.m.

    Stone Masonry Line Canal

    Riprap Wall / Slope Protection / Erosion Control 1 236 174 ln.m 300,000.00 125,625.00 425,625.00 18-Nov-14 21-Feb-15 Completed

    IV-A Quezon Mulanay Sta. Rosa PAMANA-2013 3 Construction of 1,360 LM Level 2 Gravity Fed Water

    Supply System

    Water System 1 50 1 system 300,000.00 188,565.00 488,565.00 06-Feb-14 09-May-14 Completed

    IV-A Quezon Mulanay Sta. Rosa PAMANA-2014 4 Construction of 150 LM Pathway w/ 150 LM Line Ditch Footpath / Foot Trail / Access Trail/Pathway 1 66 0.15 kms 300,000.00 66,290.00 366,290.00 05-Nov-14 13-Feb-15 Completed

    IV-A Quezon Mulanay Sta. Rosa PAMANA-2015 5 Concreting of Access Road with Covered Line Canal Footpath / Foot Trail / Access Trail/Pathway 1 692 0.15 kms 300,000.00 126,500.00 426,500.00 21-Mar-16 21-Jun-16 Completed

    IV-A Quezon Mulanay Sto. Nino Ajos PAMANA-2012 2 Concreting of Multi-Purpose Pavement Multi-Purpose Building 1 335 435 sq.m 300,000.00 87,800.00 387,800.00 05-Feb-13 12-Apr-13 Completed

    IV-A Quezon San Narciso Abuyon PAMANA- 2&3 Construction of Barangay Health Station Health Station 1 1065 51.4 sq.m 600,000.00 147,000.00 747,000.00 09-Sep-13 13-Feb-14 Completed

    IV-A Quezon San Narciso Abuyon PAMANA-2014 4 Concreting of 65 L. M. Critical Section Riprap Wall / Slope Protection / Erosion Control 1 80 65 ln.m 300,000.00 11,000.00 311,000.00 17-Feb-15 01-Jul-15 Completed

    IV-A Quezon San Narciso Andres Bonifacio PAMANA-2013 3 Construction of 250 lm Line Canal w/ 6 lm Cross Drain Box Culvert / Drainage Canal 1 203 250 ln.m 300,000.00 15,000.00 315,000.00 25-Nov-13 02-Jan-14 Completed

    IV-A Quezon San Narciso Andres Bonifacio PAMANA-2014 4 Construction of 2 units Communal toilets Sanitary Toilets 1 72 2 unit 300,000.00 14,000.00 314,000.00 09-Mar-15 31-May-15 Completed

    IV-A Quezon San Narciso Andres Bonifacio PAMANA-2015 5 Construction of Pathway Footpath / Foot Trail / Access Trail/Pathway 1 102 0.361 kms 301,035.00 - 301,035.00 15-Apr-16 On-going

    IV-A Quezon San Narciso Bani PAMANA-

    2012&2013

    2&3 Concreting of 200 ln.m Critical Slope and Construction

    of 230 ln.m. Line Canal

    Road Concreting 1 244 200 kms 600,000.00 21,000.00 621,000.00 14-Sep-13 17-Mar-14 Completed

    IV-A Quezon San Narciso Bani PAMANA-2014 4 Concreting of 65L. M. FMR Critical Slope Riprap Wall / Slope Protection / Erosion Control 1 254 65 ln.m 300,000.00 9,300.00 309,300.00 02-Feb-15 15-Jan-16 Completed

    IV-A Quezon San Narciso Bayanihan PAMANA-2013 3 Construction of 2 unit Communal Toilet Sanitary Toilets 1 71 2 unit 300,000.00 10,000.00 310,000.00 25-Mar-14 14-Jun-14 Completed

    IV-A Quezon San Narciso Bayanihan PAMANA-2014 4 Construction of 180 L.m. Line Canal Box Culvert / Drainage Canal 1 40 180 ln.m 300,000.00 27,100.00 327,100.00 26-Jan-15 16-Feb-15 Completed

    IV-A Quezon San Narciso Bayanihan PAMANA-2015 5 Construction of Line Canal Box Culvert / Drainage Canal 1 52 245 ln.m 330,000.00 - 330,000.00 25-Apr-16 30-May-16 Completed

    IV-A Quezon San Narciso Binay PAMANA-2013 3 Concreting of 170lm Critical Section with 6lm Cross

    Drain

    Road Concreting 1 615 170 lm 300,000.00 10,000.00 310,000.00 25-Nov-13 02-Jan-14 Completed

    IV-A Quezon San Narciso Binay PAMANA-2014 4 Construction of 400 sq. m Post Harvest Pavement Post Harvest Facilities 1 277 400 sq.m 300,000.00 8,400.00 308,400.00 16-Dec-14 03-Feb-15 Completed

    IV-A Quezon San Narciso Binay PAMANA-2015 5 Construction of Pathway Footpath / Foot Trail / Access Trail/Pathway 1 28 0.175 kms 330,000.00 - 330,000.00 18-Apr-16 28-May-16 Completed

    IV-A Quezon San Narciso Buenavista PAMANA- 2&3 Construction of Level II Water Supply System Water System 1 415 1 system 600,000.00 19,000.00 619,000.00 10-Sep-13 30-Oct-14 Completed

    IV-A Quezon San Narciso Busok Busokan PAMANA-2013 3 Concreting of 450 sq.m. Post Harvest Pavement Post Harvest Facilities 1 356 4