list of idcol approved solar irrigation...

24
List of IDCOL Approved Solar Irrigation Pumps Sl. Location Division Project Water flow (m3/day) EPC Contractor Equipment Supplier Pump Capacity (kW) Pump Head (meter) PV capacity (kWp) Project Cost (BDT) 1 Shapahar, Naogaon Rajshahi GS 300 Nahean Enterprise Nahean Enterprise 7.50 35.00 11.90 5,250,052 2 Fatiqchari, Chittagong Chittagong RCNSL 128 MREL Nahean Enterprise 3.50 12.80 1.68 1,025,000 3 Sadar, Bogra Rajshahi NUSRA 394 RREL RREL 3.50 15.93 5.04 3,500,000 4 Dhamrai, Dhaka Dhaka NUSRA 381 MREL MREL 7.50 17.30 8.40 3,500,000 5 Kaharole, Dinajpur Rangpur NUSRA 430 RREL RREL 3.50 12.20 4.20 3,500,000 6 Shailkupa, Jhenaidah Khulna NUSRA 430 MREL MREL 7.50 15.30 8.40 3,500,000 7 Kumarkhali, Kushtia Khulna NUSRA 383 MREL MREL 7.50 17.60 8.40 3,500,000 8 Sadar, Thakurgaon Rangpur 4SL 468 RREL RREL 3.50 12.50 5.76 2,704,029 9 Ranisongkoil, Thakurgaon Rangpur 4SL 468 RREL RREL 3.50 12.20 5.76 2,704,029 10 Baliadangi, Thakurgaon Rangpur 4SL 468 RREL RREL 3.50 12.20 5.76 2,704,029 11 Birgonj, Dinajpur Rangpur 4SL 504 EELL EELL 5.50 13.60 6.48 3,060,800 12 Sadar, Panchagar Rangpur 4SL 504 EELL EELL 5.50 12.60 6.48 3,060,800 13 Autuary, Panchagar Rangpur 4SL 504 EELL EELL 5.50 12.60 6.48 3,060,800 14 Debiganj, Panchagar Rangpur 4SL 504 EELL EELL 5.50 12.60 6.48 3,060,800 15 Tetulia, Panchagar Rangpur 4SL 504 EELL EELL 5.50 12.60 6.48 3,060,800 16 Pirganj, Thakurgaon Rangpur 4SL 504 EELL EELL 5.50 13.20 6.48 3,060,800 17 Haripur, Thakurgaon Rangpur 4SL 504 EELL EELL 5.50 13.30 6.48 3,060,800

Upload: nguyenduong

Post on 27-May-2018

261 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

List of IDCOL Approved Solar Irrigation Pumps

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

1 Shapahar, Naogaon Rajshahi GS 300 Nahean

Enterprise Nahean

Enterprise 7.50 35.00 11.90 5,250,052

2 Fatiqchari, Chittagong Chittagong RCNSL 128 MREL Nahean

Enterprise 3.50 12.80 1.68 1,025,000

3 Sadar, Bogra Rajshahi NUSRA 394 RREL RREL 3.50 15.93 5.04 3,500,000

4 Dhamrai, Dhaka Dhaka NUSRA 381 MREL MREL 7.50 17.30 8.40 3,500,000

5 Kaharole, Dinajpur Rangpur NUSRA 430 RREL RREL 3.50 12.20 4.20 3,500,000

6 Shailkupa, Jhenaidah Khulna NUSRA 430 MREL MREL 7.50 15.30 8.40 3,500,000

7 Kumarkhali, Kushtia Khulna NUSRA 383 MREL MREL 7.50 17.60 8.40 3,500,000

8 Sadar, Thakurgaon Rangpur 4SL 468 RREL RREL 3.50 12.50 5.76 2,704,029

9 Ranisongkoil, Thakurgaon Rangpur 4SL 468 RREL RREL 3.50 12.20 5.76 2,704,029

10 Baliadangi, Thakurgaon Rangpur 4SL 468 RREL RREL 3.50 12.20 5.76 2,704,029

11 Birgonj, Dinajpur Rangpur 4SL 504 EELL EELL 5.50 13.60 6.48 3,060,800

12 Sadar, Panchagar Rangpur 4SL 504 EELL EELL 5.50 12.60 6.48 3,060,800

13 Autuary, Panchagar Rangpur 4SL 504 EELL EELL 5.50 12.60 6.48 3,060,800

14 Debiganj, Panchagar Rangpur 4SL 504 EELL EELL 5.50 12.60 6.48 3,060,800

15 Tetulia, Panchagar Rangpur 4SL 504 EELL EELL 5.50 12.60 6.48 3,060,800

16 Pirganj, Thakurgaon Rangpur 4SL 504 EELL EELL 5.50 13.20 6.48 3,060,800

17 Haripur, Thakurgaon Rangpur 4SL 504 EELL EELL 5.50 13.30 6.48 3,060,800

Page 2: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

18 Gabtali, Bogra Rajshahi GHEL 420 RREL RREL 3.50 13.10 5.92 2,587,000

19 Dhunat, Bogra Rajshahi GHEL 443 RREL RREL 3.50 12.40 5.92 2,607,000

20 Sonatola, Bogra Rajshahi GHEL 420 RREL RREL 3.50 13.00 5.92 2,587,000

21 Shibganj, Bogra Rajshahi GHEL 350 MREL MREL 3.50 16.50 4.90 2,347,752

22 Sherpur, Bogra Rajshahi GHEL 350 MREL MREL 3.50 16.10 4.90 2,347,752

23 Shajahanpur, Bogra Rajshahi GHEL 350 MREL MREL 3.50 16.50 4.90 2,347,752

24 Fokirmara , Gabtoli, Bogra Rajshahi GHEL-2 595 RREL RREL 7.50 13.19 10.03 2,517,125

25 Tayerhat, Gabtoli, Bogra Rajshahi GHEL-2 595 RREL RREL 7.50 13.19 10.03 2,517,125

26 Bagmara (Maddho Digholkandi),

Sonatala, Bogra Rajshahi GHEL-2 579 RREL RREL 7.50 13.72 10.03 2,369,950

27 Chorgodagari, Sariakandi, Bogra Rajshahi GHEL-2 558 RREL RREL 7.50 14.33 10.03 2,369,950

28 Gonokpara Chudar vita, Sariakandi,

Bogra Rajshahi GHEL-2 558 RREL RREL 7.50 14.33 10.03 2,369,950

29 Kukurmari Math, Shaghata,

Gaibandha Rangpur GHEL-2 545 RREL RREL 11.00 14.87 10.03 2,341,500

30 Kachua, Shaghata, Gaibandha Rangpur GHEL-2 545 RREL RREL 11.00 14.87 10.03 2,341,500

31 Poschim Pugail, Gobindoganj,

Gaibandha Rangpur GHEL-2 600 RREL RREL 7.50 10.98 9.44 2,501,100

32 Purbo Pugail, Gobindoganj,

Gaibandha Rangpur GHEL-2 600 RREL RREL 7.50 10.98 9.44 2,501,100

33 Chor Balua, Gobindoganj,

Gaibandha Rangpur GHEL-2 600 RREL RREL 7.50 10.98 9.44 2,501,100

34 (Dolashingra Uchapara ),

Nandigram, Bogra Rajshahi GHEL-2 566 ESPL ESPL 7.50 15.23 9.92 2,458,754

35 (Dolashingra Namapara),

Nandigram, Bogra Rajshahi GHEL-2 567 ESPL ESPL 7.50 15.23 9.92 2,458,755

36 Muradpur (Purbo Dokkhin Para),

Nandigram, Bogra Rajshahi GHEL-2 566 ESPL ESPL 7.50 15.23 9.92 2,458,754

Page 3: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

37 Dola Shingra, Nandigram, Bogra Rajshahi GHEL-2 566 ESPL ESPL 7.50 15.23 9.92 2,458,754

38 Chokorampur, Nandigram, Bogra Rajshahi GHEL-2 566 ESPL ESPL 7.50 15.23 9.92 2,458,754

39 Uzzal Singh, Satiani, Dhunat, Bogra Rajshahi GHEL-3 943 RREL RREL 11.00 13.30 16.82 3,470,775

40 Jabaripara, Satiani, Dhunat, Bogra Rajshahi GHEL-3 943 RREL RREL 11.00 13.30 16.82 3,470,775

41 Balarbari, Mohisura, Dhunat, Bogra Rajshahi GHEL-3 964 RREL RREL 11.00 12.30 15.93 3,449,550

42 Chak Mehedi, Mohisura, Dhunat,

Bogra Rajshahi GHEL-3 943 RREL RREL 11.00 13.30 16.82 3,470,775

43 Dighalkandi, Islampur, Choukibari,

Dhunat, Bogra Rajshahi GHEL-3 964 RREL RREL 11.00 12.30 15.93 3,449,550

44 Satpakia, Choukibari, Dhunat, Bogra Rajshahi GHEL-3 964 RREL RREL 11.00 12.30 15.93 3,449,550

45 Oela, Pirhati, Dhunat, Bogra Rajshahi GHEL-3 964 RREL RREL 11.00 12.30 15.93 3,449,550

46 Palason-1, Bishalpur, Sherpur, Bogra Rajshahi GHEL-3 662 GHEL GHEL 11.00 17.04 14.25 2,771,000

47 Palason-2, Bishalpur, Sherpur, Bogra Rajshahi GHEL-3 662 GHEL GHEL 11.00 17.04 14.25 2,771,000

48 Shamnagar, Sherpur, Bogra Rajshahi GHEL-3 662 GHEL GHEL 11.00 17.04 14.25 2,771,000

49 Koerpara, Kundarhat, Nandigram,

Bogra Rajshahi GHEL-3 636 GHEL GHEL 11.00 17.84 14.25 2,799,800

50 Biswa, Sherpur, Bogra Rajshahi GHEL-3 662 GHEL GHEL 11.00 17.04 14.25 2,771,000

51 Dolasingra, Uchapara, Birpoli,

Nandigram, Bogra Rajshahi GHEL-3 636 GHEL GHEL 11.00 17.84 14.25 2,799,800

52 Talpukura, Kichok, Shibganj, Bogra Rajshahi GHEL-3 746 ESPL ESPL 11.00 16.03 15.30 3,063,450

53 Berpatair, Dokkhinpara, Kichok,

Shibganj, Bogra Rajshahi GHEL-3 746 ESPL ESPL 11.00 16.03 15.30 3,063,450

54 Berpatair, Uttarpara, Kichok,

Shibganj, Bogra Rajshahi GHEL-3 746 ESPL ESPL 11.00 16.03 15.30 3,063,450

55 Bahadurpur, Shibganj, Bogra Rajshahi GHEL-3 746 ESPL ESPL 11.00 16.03 15.30 3,063,450

Page 4: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

56 Beltoli, Bagbari, Gabtoli, Bogra Rajshahi GHEL-3 1033 ESPL ESPL 15.00 11.67 19.20 3,520,465

57 Garakol, Panitola, Gobindoganj,

Gaibandha Rangpur GHEL-3 617 BTEL BTEL 7.50 16.22 12.24 2,580,000

58 Dugharia, Panitola, Gobindoganj,

Gaibandha Rangpur GHEL-3 617 BTEL BTEL 7.50 16.22 12.24 2,580,000

59 Pub Pugail Dokkhinpara, Nakai,

Gobindoganj, Gaibandha Rangpur GHEL-3 617 BTEL BTEL 7.50 16.22 12.24 2,580,000

60 Dewri Pub Pugail, Nakai, Gobindoganj, Gaibandha

Rangpur GHEL-3 617 BTEL BTEL 7.50 16.22 12.24 2,580,000

61 Khalaihat, Rajpur, Lalmonirhat

Sadar Rangpur GHEL-3 930 BTEL BTEL 7.50 11.30 14.31 3,164,000

62 Joydeb Hayat, Kanua, Razarhat,

Kurigram Rangpur GHEL-3 930 BTEL BTEL 7.50 12.30 14.31 3,164,000

63 Muradpur, Nandigram, Bogra Rajshahi GHEL-3 500 ESPL ESPL 5.00 17.84 19.20 2,753,470

64 Pirganj, Rangpur Rangpur AVA 664 RREL RREL 7.50 14.85 11.84 3,139,537

65 Birol, Dinajpur Rangpur AVA 679 ESPL ESPL 7.50 17.46 14.40 3,322,940

66 Sadamahal, Setabganj, Dinajpur Rangpur AVA 664 RREL RREL 7.50 14.76 11.84 3,139,537

67 Boro Balia, Sadar, Thakurgaon Rangpur AVA 613 EELL EELL 5.50 12.46 8.00 2,720,000

68 Ghagrapara,Sadar, Panchagarh Rangpur AVA 594 RREL RREL 7.50 12.61 8.88 2,663,600

69 Sadullahpur, Gaibandha Rangpur AVA 588 RREL RREL 7.50 13.46 9.44 2,685,904

70 Parbotipur, Dinajpur Rangpur RREL 576 RREL RREL 11.00 18.71 11.84 3,836,338

71 Boda, Panchagar Rangpur RREL 594 RREL RREL 7.50 12.51 8.88 3,101,712

72 Mithapukur-1, Rangpur Rangpur RREL 666 RREL RREL 7.50 14.47 11.84 3,539,105

73 Chirirbandor, Dinajpur Rangpur RREL 645 RREL RREL 11.00 14.57 11.84 3,891,024

74 Panchagar, Sadar-1 Rangpur RREL 666 RREL RREL 7.50 14.27 11.84 3,539,105

Page 5: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

75 Panchagar, Sadar-2 Rangpur RREL 645 RREL RREL 11.00 15.19 11.84 3,891,024

76 Mithapukur-2, Rangpur Rangpur RREL 645 RREL RREL 11.00 15.19 11.84 3,891,024

77 Mirpur, Kushtia Khulna RREL 591 RREL RREL 11.00 17.25 11.84 3,891,024

78 Panchagar, Sadar-3 Rangpur RREL 645 RREL RREL 11.00 15.41 11.84 3,891,024

79 Mithapukur-3, Rangpur Rangpur RREL 666 RREL RREL 7.50 13.86 11.84 3,539,105

80 Badarganj, Rangpur Rangpur GRAM 373 GRAM GRAM 4.00 10.25 7.56 1,789,830

81 Badarganj, Rangpur Rangpur GRAM 373 GRAM GRAM 4.00 9.71 7.56 1,789,831

82 Badarganj, Rangpur Rangpur GRAM 373 GRAM GRAM 4.00 10.91 7.56 1,789,832

83 Badarganj, Rangpur Rangpur GRAM 373 GRAM GRAM 4.00 10.71 7.56 1,789,833

84 Badarganj, Rangpur Rangpur GRAM 373 GRAM GRAM 4.00 10.71 7.56 1,789,834

85 Dangapara, Mondolpara, Badarganj-

1, Rangpur Rangpur GRAM-2

849 Solargao Solargao 3.75

14.15 28.04 2,546,152 86

Dangapara, Mondolpara, Badarganj-2, Rangpur

Rangpur GRAM-2 2.20

87 Dalua(Paschimpara)-02, Badarganj-

1, Rangpur Rangpur GRAM-2

849 Solargao Solargao 3.75

14.15 29.04 2,546,152

88 Dalua(Paschimpara)-02, Badarganj-

2, Rangpur Rangpur GRAM-2 2.20

89 Purbo Dalua-01, Badarganj-1,

Rangpur Rangpur GRAM-2

849 Solargao Solargao 3.75

14.15 30.04 2,546,152 90

Purbo Dalua-01, Badarganj-2, Rangpur

Rangpur GRAM-2 2.20

91 Uttor Bauchondi(Kachuapara),

Badarganj-1, Rangpur Rangpur GRAM-2

849 Solargao Solargao 3.75

14.15 31.04 2,546,152 92

Uttor Bauchondi(Kachuapara), Badarganj-2, Rangpur

Rangpur GRAM-2 2.20

93 Bujruk Bagbar(Janpara), Badarganj-

1, Rangpur Rangpur GRAM-2 849 Solargao Solargao 3.75 14.15 32.04 2,546,152

Page 6: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

94 Bujruk Bagbar(Janpara), Badarganj-

2, Rangpur Rangpur GRAM-2 2.20

95 Choker Danga,

Mondolpara,Badarganj-1,Rangpur Rangpur GRAM-2

849 Solargao Solargao 3.75

14.15 33.04 2,546,152 96

Choker Danga, Mondolpara,Badarganj-2,Rangpur

Rangpur GRAM-2 2.20

97 Barirdanga, Kalupara,Badarganj-

1,Rangpur Rangpur GRAM-2

849 Solargao Solargao 3.75

14.15 34.04 2,546,152 98

Barirdanga, Kalupara,Badarganj-2,Rangpur

Rangpur GRAM-2 2.20

99 Dokhin bauchondi (Feskipara),

Badarganj-1 Rangpur GRAM-2

849 Solargao Solargao 3.75

14.15 35.04 2,546,152 100

Dokhin bauchondi (Feskipara), Badarganj-2

Rangpur GRAM-2 2.20

101 Dekultari, Lohanipara,Badarganj-

1,Rangpur Rangpur GRAM-2

849 Solargao Solargao 3.75

14.15 36.04 2,546,152 102

Dekultari, Lohanipara,Badarganj-2,Rangpur

Rangpur GRAM-2 2.20

103 Chowgacha, Jessore Khulna ARS-BD 709 RREL RREL 7.50 12.71 11.84 2,795,892

104 Chowgacha, Jessore Khulna ARS-BD 709 RREL RREL 7.50 12.71 11.84 2,795,892

105 Chowgacha, Jessore Khulna ARS-BD 709 RREL RREL 7.50 12.71 11.84 2,795,892

106 Chowgacha, Jessore Khulna ARS-BD 709 RREL RREL 7.50 12.71 11.84 2,795,892

107 Chowgacha, Jessore Khulna ARS-BD 709 RREL RREL 7.50 12.71 11.84 2,795,892

108 Chowgacha, Jessore Khulna ARS-BD 740 ESPL ESPL 7.50 16.01 13.26 2,923,962

109 Chowgacha, Jessore Khulna ARS-BD 740 ESPL ESPL 7.50 16.01 13.26 2,923,962

110 Bashabari, Gangni, Meherpur Khulna RDF 605 Sherpa Sherpa 7.50 12.86 9.28 2,622,794

111 Saharbati-Project A, Gangni,

Meherpur Khulna RDF 605 Sherpa Sherpa 7.50 12.86 9.28 2,622,794

Page 7: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

112 Saharbati-Project B, Gangni,

Meherpur Khulna RDF 660 Sherpa Sherpa 7.50 12.86 10.08 2,820,520

113 Saharbati-Project C, Gangni,

Meherpur Khulna RDF 550 Sherpa Sherpa 5.50 12.86 8.40 2,485,018

114 Habatgari, Chitolia, Mirpur, Kushtia Khulna RDF 726 Sherpa Sherpa 7.50 16.25 12.80 3,352,440

115 Golapitola, Chitolia, Mirpur,

Kushtia Khulna RDF 660 Sherpa Sherpa 7.50 16.25 13.92 3,042,880

116 Naopara, Mirpur, Kushtia Khulna RDF 726 Sherpa Sherpa 7.50 16.25 13.92 3,352,440

117 Buripara-1, Buripara, Mirpur,

Kushtia Khulna RDF-2 1325 ESPL ESPL 15.00 16.50 33.60 5,043,816

118 Buripara-2, Buripara, Mirpur,

Kushtia Khulna RDF-2 1325 ESPL ESPL 15.00 16.50 33.60 5,043,816

119 Jhutiyadanga-1, Aburi, Mirpur,

Kushtia Khulna RDF-2 1250 Sherpa Sherpa 13.00 16.50 18.60 4,834,840

120 Jhutiyadanga-2, Aburi, Mirpur,

Kushtia Khulna RDF-2 1250 Sherpa Sherpa 13.00 16.50 18.60 4,834,840

121 Noudagopalpur, Talbariya, Mirpur,

Kushtia Khulna RDF-2 1325 ESPL ESPL 15.00 16.50 33.60 5,043,816

122 Shutail-1, Paikpara, Mirpur, Kushtia Khulna RDF-2 1325 ESPL ESPL 15.00 16.50 33.60 5,043,816

123 Bathanpara, Chandpur, Gangni,

Meherpur Khulna RDF-2 980 BTEL BTEL 7.50 14.00 15.75 3,818,400

124 Aamtoli, Manikdiya, Gangni,

Meherpur Khulna RDF-2 1275 Sherpa Sherpa 13.00 14.00 18.60 4,932,940

125 Chadpur-1, Chadpur, Gangni,

Meherpur Khulna RDF-2 980 BTEL BTEL 7.50 14.00 15.75 3,818,400

126 Ruyerkandi-1, Manikdiya, Gangni,

Meherpur Khulna RDF-2 1275 Sherpa Sherpa 13.00 14.00 18.60 4,932,940

127 Ruyerkandi-2, Manikdiya, Gangni,

Meherpur Khulna RDF-2 1275 Sherpa Sherpa 13.00 14.00 18.60 4,932,940

128 Manikdiya-1, Manikdiya, Gangni,

Meherpur Khulna RDF-2 1275 Sherpa Sherpa 13.00 14.00 18.60 4,932,940

Page 8: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

129 Manikdiya-3, Manikdiya, Gangni,

Meherpur Khulna RDF-2 1275 Sherpa Sherpa 13.00 14.00 18.60 4,932,940

130 Manikdiya-5, Manikdiya, Gangni,

Meherpur Khulna RDF-2 1275 Sherpa Sherpa 13.00 14.00 18.60 4,932,940

131 Buripara-1, Buripara, Mirpur,

Kushtia Khulna RDF-2 1325 ESPL ESPL 15.00 16.50 33.60 5,043,816

132 Boroboalia -08 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

133 Boroboalia -02 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

134 Boroboalia -07 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

135 Boroboalia -03 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

136 Hatuvanga Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

137 Boroboalia-1 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

138 Dhigal Danga -01 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

139 Jadabpur Math-01 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

140 Pochavita -01 Khulna RDF 3 1250 BTEL BTEL 9.20 15.00 19.00 4,290,000

141 Laxmipur (Khoyerpur-3) Khulna RDF 3 1250 BTEL BTEL 9.20 15.00 19.00 4,290,000

142 Pochavita -02 Khulna RDF 3 1250 BTEL BTEL 9.20 15.00 19.00 4,290,000

143 Borobagan -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

144 Talbagan -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

145 Khorer Math -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

146 Shaharbati -04 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

147 Quar Bil -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

148 Manikdia-01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

Page 9: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

149 Hijolbaria -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

150 Khorermath Vomordaho Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

151 Kunjanagar -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

152 Kumaridanga -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

153 Jhingar Danga -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

154 Shelagari -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

155 Charatola -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

156 Kanapukuria -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

157 Katagari 01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

158 Maguru -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

159 Kumaridanga -02 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

160 Hijolbaria 02 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

161 Chakrar Math -01 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

162 Koilashakundi-02 Khulna RDF 3 1232 JSF JSF 13.00 14.00 21.96 4,256,302

163 Baliar Shishir -01 Khulna RDF 3 1200 JSF JSF 13.00 15.00 21.96 4,256,302

164 Vatan Shishi -01 Khulna RDF 3 1200 JSF JSF 13.00 15.00 21.96 4,256,302

165 Bele Danga-01 Khulna RDF 3 1200 JSF JSF 13.00 15.00 21.96 4,256,302

166 Chator -01 Khulna RDF 3 1200 JSF JSF 13.00 15.00 21.96 4,256,302

167 Chator -02 Khulna RDF 3 1200 JSF JSF 13.00 15.00 21.96 4,256,302

168 Kajlakandi -02 Khulna RDF 3 1200 JSF JSF 13.00 15.00 21.96 4,256,302

169 Nigutbua -01 Khulna RDF 3 1200 JSF JSF 13.00 15.00 21.96 4,256,302

Page 10: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

170 Khalerpar -01 Khulna RDF 3 1250 JSF JSF 9.20 15.00 19.00 4,290,000

171 Kajlakandi -01 Khulna RDF 3 1200 JSF JSF 13.00 15.00 21.96 4,256,302

172 Khalerpar -02 Khulna RDF 3 1250 JSF JSF 9.20 15.00 19.00 4,290,000

173 Khatakhal -01 Khulna RDF 3 1200 JSF JSF 13.00 15.00 21.96 4,256,302

174 Chitolia -04 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

175 Dhuboil -01 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

176 Chitolia -05 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

177 Dhuboil -02 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

178 Chitolia -06 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

179 Jhutiadanga -06 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

180 Chitolia -03 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

181 Mallik Para-02 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

182 Asan Nagar-3 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

183 Mallik Para -03 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

184 Jhutiadanga -04 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

185 Char Pragpur Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

186 Kuripole -01 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

187 Aburi Mathpara -07 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

188 Jhutiadanga Math-3 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

189 Chitolia -07 Khulna RDF 3 1166 JSF JSF 13.00 16.00 21.96 4,256,302

190 Dohorer math, Alamdanga Khulna RDF 4 1191 JSF JSF 13.00 16.00 21.96 4,236,626

Page 11: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

191 Budurgari, Borogangni, Alamdanga Khulna RDF 4 1191 JSF JSF 13.00 16.00 21.96 4,251,534

192 Sonadoa, Nagarboalia, Alamdanga Khulna RDF 4 1191 JSF JSF 13.00 16.00 21.96 4,251,534

193 Solagari math, Lakkhinarayanpur,

Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

194 Hijoltolir math, Lakkhinarayanpur,

Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

195 Jhorpara-1, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

196 Jhorpara-2, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

197 Minapara, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

198 Chaklir ghat, Chadpur, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

199 Kultolar math, Bildhola, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

200 Aangari-1, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

201 Doarparer math, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

202 Vobanipur (Durgotola math),

Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

203 Hemayetpur, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

204 Gorer math, Eloji, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

205 Khorer math-1, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

206 Chutna math-1, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

207 Baut chorer math-1, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

208 Dighir par, Gangni Khulna RDF 4 1247 JSF JSF 13.00 14.00 21.96 4,251,534

209 Vedagari, Pirojpur, Meherpur Sadar Khulna RDF 4 1215 JSF JSF 13.00 15.00 21.96 4,240,315

210 Chokh bojar math, Pirojpur,

Meherpur Sadar Khulna RDF 4 1215 JSF JSF 13.00 15.00 21.96 4,240,315

Page 12: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

211 Mayamari, Pirojpur, Meherpur Sadar Khulna RDF 4 1215 JSF JSF 13.00 15.00 21.96 4,240,315

212 Jhutiyadanga Farazipara math,

Mirpur Khulna RDF 4 1191 JSF JSF 13.00 16.00 21.96 4,237,830

213 Sartiyar math, Mirpur Khulna RDF 4 1191 JSF JSF 13.00 16.00 21.96 4,237,830

214 Naodapara, Mirpur Khulna RDF 4 1191 JSF JSF 13.00 16.00 21.96 4,237,830

215 Hinagar para,

Sadullapur, Gaibandha Rangpur SDRS 585 ESPL ESPL 5.50 13.90 9.75 2,227,500

216 Sadar para,

Sadullapur, Gaibandha Rangpur SDRS 585 ESPL ESPL 5.50 13.90 9.75 2,227,500

217 Islampur,

Sadullapur, Gaibandha Rangpur SDRS 585 ESPL ESPL 5.50 13.90 9.75 2,227,500

218 Khalia-1, Bandhbil, Bagharpara Khulna MCL 1435 Solar E Solar E 15.00 13.85 20.00 4,966,750

219 Batalpara, Shandara, Bagharpara Khulna MCL 1435 Solar E Solar E 15.00 13.85 20.00 4,966,750

220 Toulokup (Mojorsala), Johurpur,

Bagharpara Khulna MCL 1435 Solar E Solar E 15.00 13.85 20.00 5,066,750

221 Enayetpour, Gouronogor,

Sadarthana Khulna MCL 1435 Solar E Solar E 15.00 12.17 20.00 5,066,750

222 Domedurpur 1, Domedurpur,

Kaliganj Khulna MCL 1435 Solar E Solar E 15.00 15.08 20.00 5,066,750

223 Khalia-2, Bandhbil, Bagharpara Khulna MCL-2 1435 Solar E Solar E 15.00 13.85 20.00 5,066,750

224 Khalia-3, Bandhbil, Bagharpara Khulna MCL-2 1435 Solar E Solar E 15.00 13.85 20.00 4,966,750

225 Toulokup (Boroitolabil), Johurpur,

Bagharpara Khulna MCL-2 1435 Solar E Solar E 15.00 13.85 20.00 4,966,750

226 Domuderpur (Purbopara),

Domuderpur, Kaliganj Khulna MCL-2 1404 Solar E Solar E 15.00 15.08 20.00 4,966,750

227 Chototalian, Natuapara, Kaliganj Khulna MCL-2 1404 Solar E Solar E 15.00 15.08 20.00 5,066,750

228 Sholakurer math Khulna MCL -3 1547 Solar E Solar E 15.00 14.36 20.00 5,170,100

229 Dewadangarmath Khulna MCL -3 1547 Solar E Solar E 15.00 14.36 20.00 5,170,100

Page 13: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

230 Andolkota Taltolamath Khulna MCL -3 1534 Solar E Solar E 15.00 14.68 20.00 5,353,900

231 Joradaha (Amtolar math) Khulna MCL -3 1534 Solar E Solar E 15.00 14.68 20.00 5,353,900

232 Hingerpara Dokkhinmath Khulna MCL -3 1558 Solar E Solar E 15.00 14.04 20.00 5,128,500

233 Vogbanpurmath Khulna MCL -3 1558 Solar E Solar E 15.00 14.04 20.00 5,278,500

234 Betalpara (Arakhal) Khulna MCL -3 1558 Solar E Solar E 15.00 14.04 20.00 5,278,500

235 Fulbari (Silpotarmath) Khulna MCL -3 1524 Solar E Solar E 15.00 15.13 20.00 5,576,000

236 Chotokulirmath Khulna MCL -3 1524 Solar E Solar E 15.00 15.13 20.00 5,576,000

237 Fulbaria (dokhinmath) Khulna MCL -3 1524 Solar E Solar E 15.00 15.13 20.00 5,426,000

238 Betalpara (Arakhal) Khulna MCL-3 1558 Solar E Solar E 15.00 14.04 20.00 5,278,500

239 Kalupara Kochirerpara, Kalupara 1 Rangpur Solargao 1 900 Solargao Solargao

3.75 14.50 11.04 2,558,437

240 Kalupara Kochirerpara, Kalupara 2 Rangpur 2.20

241 Sankarpur ,Sarkarpara, Kalupara 1 Rangpur Solargao 1 900 Solargao Solargao

3.75 14.50 12.04 2,558,437

242 Sankarpur ,Sarkarpara, Kalupara 2 Rangpur 2.20

243 Sankarpur, Kalamertol, Kalupara 1 Rangpur Solargao 1 900 Solargao Solargao

3.75 14.50 13.04 2,558,437

244 Sankarpur, Kalamertol, Kalupara 2 Rangpur 2.20

245 Boraibari, Kalupara 1 Rangpur Solargao 1 900 Solargao Solargao

3.75 14.50 14.04 2,558,437

246 Boraibari, Kalupara 2 Rangpur 2.20

247 Ghoradubir Math(Kalupara

Kachirarpara) 1 Rangpur

Solargao 1 900 Solargao Solargao 3.75

14.50 15.04 2,558,437 248

Ghoradubir Math(Kalupara Kachirarpara) 2

Rangpur 2.20

249 Sadorerpara, Badarganj, Rangpur-1 Rangpur Solargao 1 900 Solargao Solargao

3.75 14.50 16.04 2,558,437

250 Sadorerpara, Badarganj, Rangpur-2 Rangpur 2.20

Page 14: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

251 Kalupara Verkapara, Badarganj,

Rangpur-1 Rangpur

Solargao 1 900 Solargao Solargao 3.75

14.50 17.04 2,558,437 252

Kalupara Verkapara, Badarganj, Rangpur-2

Rangpur 2.20

253 Shankarpur Boraibari, Badarganj,

Rangpur-1 Rangpur

Solargao 1 900 Solargao Solargao 3.75

14.50 18.04 2,558,437 254

Shankarpur Boraibari, Badarganj, Rangpur-2

Rangpur 2.20

255 Moszider Danga, Badarganj,

Rangpur-1 Rangpur

Solargao 1 900 Solargao Solargao 3.75

14.50 19.04 2,558,437 256

Moszider Danga, Badarganj, Rangpur-2

Rangpur 2.20

257 Sankarpur ,Puyamari, Badarganj,

Rangpur-1 Rangpur

Solargao 1 900 Solargao Solargao 3.75

14.50 20.04 2,558,437 258

Sankarpur ,Puyamari, Badarganj, Rangpur-2

Rangpur 2.20

259 Gasuwapara Bajrukbagbar,

Badarganj, Rangpur-1 Rangpur

Solargao 1 680 Solargao Solargao 3.75

14.50 21.04 2,558,438 260

Gasuwapara Bajrukbagbar, Badarganj, Rangpur-2

Rangpur 2.20

261 Songkorpur(Gonirpara), Badarganj,

Rangpur-1 Rangpur

Solargao 1 900 Solargao Solargao 3.75

14.50 22.04 2,558,437 262

Songkorpur(Gonirpara), Badarganj, Rangpur-2

Rangpur 2.20

263 Poshim Duluwa(Kodmabil),

Badarganj, Rangpur-1 Rangpur

Solargao 1 900 Solargao Solargao 3.75

14.50 23.04 2,558,437 264

Poshim Duluwa(Kodmabil), Badarganj, Rangpur-2

Rangpur 2.20

265 Rustamabad(Fokirpara), Badarganj,

Rangpur-1 Rangpur

Solargao 1 900 Solargao Solargao 3.75

14.50 24.04 2,558,437 266

Rustamabad(Fokirpara), Badarganj, Rangpur-2

Rangpur 2.20

267 Kochirerpara Uttorpara-1,

Badarganj, Rangpur-1 Rangpur Solargao 1 900 Solargao Solargao 3.75 14.50 25.04 2,558,437

Page 15: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

268 Kochirerpara Uttorpara-1,

Badarganj, Rangpur-2 Rangpur 2.20

269 Kochirerpara Uttorpara-1,

Badarganj, Rangpur-1 Rangpur

Solargao 1 900 Solargao Solargao 3.75

14.50 11.04 2,558,437 270

Kochirerpara Uttorpara-1, Badarganj, Rangpur-2

Rangpur 2.20

271 Musulmari, Badarganj, Rangpur-1 Rangpur Solargao 1 900 Solargao Solargao

3.75 14.50 11.04 2,558,437

272 Musulmari, Badarganj, Rangpur-2 Rangpur 2.20

273 Choker Danga, Badarganj, Rangpur-

1 Rangpur

Solargao 2 900 Solargao Solargao 3.75

14.15 11.04 2,546,152 274

Choker Danga, Badarganj, Rangpur-2

Rangpur 2.20

275 Haji Para, Badarganj, Rangpur-1 Rangpur Solargao 2 591 Solargao Solargao

3.75 14.15 11.04 2,546,152

276 Haji Para, Badarganj, Rangpur-2 Rangpur 2.20

277 Dokkhin Baochondi (Bottola),

Badarganj, Rangpur-1 Rangpur

Solargao 2 591 Solargao Solargao 3.75

14.15 11.04 2,546,152 278

Dokkhin Baochondi (Bottola), Badarganj, Rangpur-2

Rangpur 2.20

279 Radhanagar Patowari para,

Badarganj 1 Rangpur

Solargao 2 900 Solargao Solargao 3.75

14.15 26.04 2,546,152

280 Radhanagar Patowari para,

Badarganj 2 Rangpur 2.20

281 Danga Para, Badarganj, Rangpur-1 Rangpur Solargao 2 900 Solargao Solargao

3.75 14.15 27.04 2,546,152

282 Danga Para, Badarganj, Rangpur-2 Rangpur 2.20

283 Chapripara,Korahati-Project 1,

Sadar, Jhenaidah Khulna AID 971 ESPL ESPL 11.00 14.10 19.20 3,176,723

284 Chapripara,Korahati-Project 2,

Sadar, Jhenaidah Khulna AID 971 ESPL ESPL 11.00 14.10 19.20 3,096,723

285 Hordebpur,Bolrampur-Project 1,

Kaliganj, Jhenaidah Khulna AID 1217 EELL EELL 13.00 15.10 18.63 3,851,280

Page 16: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

286 Hordebpur,Bolrampur-Project 1,

Kaliganj, Jhenaidah Khulna AID 1217 EELL EELL 13.00 15.10 18.63 3,771,280

287 Vitosshor,Noldanga-Project 1 Khulna AID-2 961 EELL EELL 9.20 14.08 19.20 3,004,834

288 Vitosshor,Noldanga-Project 2 Khulna AID-2 961 EELL EELL 9.20 14.08 19.20 3,004,834

289 Lebutola,Bagmara,Noghorbatal-

Project 1 Khulna AID-2 961 EELL EELL 9.20 14.08 19.20 3,004,834

290 Lebutola,Bagmara,Noghorbatal-

Project 2 Khulna AID-2 961 EELL EELL 9.20 14.08 19.20 3,004,834

291 Baliadanga,Hakbakua-Project 1 Khulna AID-2 961 EELL EELL 9.20 14.08 19.20 3,004,834

292 Baliadanga,Hakbakua-Project 2 Khulna AID-2 961 EELL EELL 9.20 14.08 19.20 3,004,834

293 Bomrail,Kodraigram-Project 1 Khulna AID-2 1313 EELL EELL 13.00 15.06 19.20 3,998,290

294 Bomrail,Kodraigram-Project 2 Khulna AID-2 1313 EELL EELL 13.00 15.06 19.20 3,858,290

295 Gutiyani,Noldanga Rajbari-Project 1 Khulna AID-2 1313 EELL EELL 13.00 15.06 19.20 3,998,290

296 Nijtola-Project 1 Khulna AID-2 984 BTEL BTEL 7.50 12.29 14.25 3,253,500

297 Nijtola-Project 2 Khulna AID-2 984 BTEL BTEL 7.50 12.29 14.25 3,113,500

298 Kongshi-1 Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,746,199

299 Kongshi-2 Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,746,199

300 Kongshi-3 (purbo para 2) Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,764,950

301 Kongshi-4(purbo para 2) Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,764,950

302 Chapri-1 Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,746,199

303 Chapri-2 Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,746,199

304 Chapri-3 Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,746,199

305 Rupda-1 (Dokkhin math) Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,746,199

Page 17: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

306 Rupda-2(Dokkhin math) Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,746,199

307 Rupda-3(Khorer math) Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,764,950

308 Rupda-4(Khorer math) Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,764,950

309 Ganna Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,755,770

310 Paschim maath Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,746,199

311 Kalicharanpur Khulna AID-3 1485 RREL RREL 18.50 15.40 27.00 4,764,950

312 Hordebpur-1 (Purbopara) Khulna AID-3 1529 EELL EELL 13.00 15.10 25.00 4,843,968

313 Hordebpur-2 Khulna AID-3 1529 EELL EELL 13.00 15.10 25.00 4,843,968

314 Gopalpur-1 (Uttormath) Khulna AID-3 1529 EELL EELL 13.00 15.10 25.00 4,843,968

315 Gopalpur-2 (Dorirmath) Khulna AID-3 1529 EELL EELL 13.00 15.10 25.00 4,843,968

316 Toilkup Khulna AID-3 1529 EELL EELL 13.00 15.10 25.00 4,843,968

317 Dudhrajpur Khulna AID-3 1529 EELL EELL 13.00 15.10 25.00 4,843,968

318 Jalalpur Khulna AID-3 1696 ESPL ESPL 22.00 13.41 29.76 5,228,227

319 Harvanga-1 Khulna AID-3 1696 ESPL ESPL 22.00 13.41 29.76 5,219,047

320 Harvanga-2 Khulna AID-3 1696 ESPL ESPL 22.00 13.41 29.76 5,219,047

321 Harvanga-3 Khulna AID-3 1696 ESPL ESPL 22.00 13.41 29.76 5,219,047

322 Monohorpur Khulna AID-3 1660 ESPL ESPL 22.00 14.40 29.76 5,177,959

323 Adarsha Andulia-1 Khulna AID-3 1660 ESPL ESPL 22.00 14.40 29.76 5,177,959

324 Adarsha Andulia-2 Khulna AID-3 1660 ESPL ESPL 22.00 14.40 29.76 5,177,959

325 Matiranga, Khagrachari Chittagong Alinur 580 EELL EELL 7.50 18.00 12.50 3,025,760

326 Ramnathpur1 ,Mirpur,Kushtia Khulna BGEF 1512 EELL EELL 13.00 16.50 18.56 4,471,565

Page 18: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

327 Ramnathpur2 ,Mirpur,Kushtia Khulna BGEF 1512 EELL EELL 13.00 16.50 18.56 4,471,565

328 Ramnathpur3 ,Mirpur,Kushtia Khulna BGEF 1512 EELL EELL 13.00 16.50 18.56 4,471,565

329 Kalinathpur-1,Mirpur Khulna BGEF -2 1495 EELL EELL 13.00 16.50 26.00 4,782,583

330 Kalinathpur-2,Mirpur Khulna BGEF -2 1495 EELL EELL 13.00 16.50 26.00 4,774,305

331 Kalinathpur-3,Mirpur Khulna BGEF -2 1495 EELL EELL 13.00 16.50 26.00 4,774,305

332 Singpur-1, Dhubail, Mirpur Khulna BGEF -2 1495 EELL EELL 13.00 16.50 26.00 4,774,305

333 Singpur-2, Dhubail, Mirpur Khulna BGEF -2 1495 EELL EELL 13.00 16.50 26.00 4,774,305

334 Singpur-3, Dhubail, Mirpur Khulna BGEF -2 1495 EELL EELL 13.00 16.50 26.00 4,774,305

335 Khamarer math, Teghoria, Mirpur Khulna BGEF -2 1495 EELL EELL 13.00 16.50 26.00 4,774,305

336 Kaporpura, Daulatpur Khulna BGEF -2 1501 EELL EELL 13.00 14.10 21.00 4,647,405

337 Habatgari, Horingacha, Doulatpur Khulna BGEF -2 1501 EELL EELL 13.00 14.10 21.00 4,647,405

338 Gacher math, Horingacha,

Doulatpur Khulna BGEF -2 1501 EELL EELL 13.00 14.10 21.00 4,647,405

339 Kukilakandor, Birganj Rangpur BGEF -2 1420 RREL RREL 18.50 12.80 20.40 4,245,134

340 Sonakandor, Birganj Rangpur BGEF -2 1420 RREL RREL 18.50 12.80 20.40 4,249,210

341 Jotorghu Sardarpara, Birganj Rangpur BGEF -2 1420 RREL RREL 18.50 12.80 20.40 4,273,177

342 Ringpurkur Sarkerpara, Birganj Rangpur BGEF -2 1420 RREL RREL 18.50 12.80 20.40 4,250,017

343 Jotorghu Taltala, Birganj Rangpur BGEF -2 1420 RREL RREL 18.50 12.80 20.40 4,222,800

344 Borohat, Napitpara, Birganj Rangpur BGEF -2 1420 RREL RREL 18.50 12.80 20.40 4,233,362

345 Pukurpar, Tulsipur, Birganj Rangpur BGEF -2 1420 RREL RREL 18.50 12.80 20.40 4,249,210

346 Jolapara Kandor, Birganj Rangpur BGEF -2 1420 RREL RREL 18.50 12.80 20.40 4,229,893

347 Gobindpur Vullirdanga, Khanshama Rangpur BGEF -2 1480 RREL RREL 18.50 15.80 25.50 4,631,856

Page 19: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

348 Kolia-1, Choudhury Danga,

Nagarpur, Tangail Dhaka Greenergy 575 GSEL GSEL 3.75 13.00 7.56 1,882,000

349 Kolia-2, Choudhury Danga,

Nagarpur, Tangail Dhaka Greenergy 575 GSEL GSEL 3.75 13.00 7.56 1,882,000

350 Ghiyorkol, Nagarpur, Nagarpur,

Tangail Dhaka Greenergy 575 GSEL GSEL 3.75 13.00 7.56 1,882,000

351 Dublar Math-1 (Vugail Bagadi)

(Alamdanga) Khulna Uddipan 1260 UEL UEL 11.00 13.25 20.74 4,134,141

352 Darirupormath-1(Kesobpur)

Alamdanga Khulna Uddipan 1260 UEL UEL 11.00 13.25 20.74 4,107,268

353 Bamanagar-1 (Alamdanga) Khulna Uddipan 1260 UEL UEL 11.00 13.25 20.74 4,140,713

354 Morgagni Math(Keshobpur)

Alamdanga Khulna Uddipan 1260 UEL UEL 11.00 13.25 20.74 4,107,268

355 Argoran-1 (Vogail) Alamdanga Khulna Uddipan 1260 UEL UEL 11.00 13.25 20.74 4,113,135

356 Gopaldeyarmath (Alamdanga) Khulna Uddipan 1260 UEL UEL 11.00 13.25 20.74 4,137,920

357 Vogail-1 (Alamdanga) Khulna Uddipan 1260 UEL UEL 11.00 13.25 20.74 4,146,198

358 Duarmath-1 (bashbaria)

(Alamdanaga) Khulna Uddipan 1260 UEL UEL 11.00 13.25 20.74 4,206,947

359 Khamar math(Vangraria)

(Alamdanaga) Khulna Uddipan 1260 UEL UEL 11.00 13.25 20.74 4,145,293

360 Lokkhikola Paschimmath

(Doulotpur) Khulna Uddipan 1250 BTEL BTEL 13.00 14.00 19.00 4,164,000

361 Bengari-1(Elangi) (Gangni) Khulna Uddipan 1250 UEL UEL 11.00 14.00 20.74 4,102,314

362 Naopara(Bishalgar1) (Gangni) Khulna Uddipan 1250 UEL UEL 11.00 14.00 20.74 4,140,713

363 Manikdia(Sutanermath-1) (Gangni) Khulna Uddipan 1250 UEL UEL 11.00 14.00 20.74 4,129,325

364 Sajanogram, Lohanipara 1 Rangpur Gazi 1100 Solargao Solargao

3.75 16.70 15.00 3,136,580

365 Sajanogram, Lohanipara 2 Rangpur 3.75

366 Roirampur Mondolpara, Kalupara-1 Rangpur Gazi 1100 Solargao Solargao 3.75 16.70 15.00 3,136,580

Page 20: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

367 Roirampur Mondolpara, Kalupara-2 Rangpur 3.75

368 Sajanogram, Lohanipara-1 Rangpur Gazi 1100 Solargao Solargao

3.75 16.70 15.00 3,136,580

369 Sajanogram, Lohanipara-2 Rangpur 3.75

370 Barobigha Mostokapur,

Shekherhaat-1 Rangpur

Gazi 1100 Solargao Solargao 3.75

16.70 15.00 3,136,580 371

Barobigha Mostokapur, Shekherhaat-2

Rangpur 3.75

372 Moddhopara, Kalupara -1 Rangpur Gazi 1100 Solargao Solargao

3.75 16.70 15.00 3,136,580

373 Moddhopara, Kalupara -2 Rangpur 3.75

374 Khamar Shukan Pukur, Kalupara -1 Rangpur Gazi 1100 Solargao Solargao

3.75 16.70 15.00 3,136,580

375 Khamar Shukan Pukur, Kalupara -2 Rangpur 3.75

376 Shonkorpur Uttorpara, Kalupara-1 Rangpur Gazi 1100 Solargao Solargao

3.75 16.70 15.00 3,136,580

377 Shonkorpur Uttorpara, Kalupara-2 Rangpur 3.75

378 Gutirdanga, Kalupara-1 Rangpur Gazi 1100 Solargao Solargao

3.75 16.70 15.00 3,136,580

379 Gutirdanga, Kalupara-2 Rangpur 3.75

380 Gopalpur-2, Shempur-1 Rangpur Gazi 1100 Solargao Solargao

3.75 16.70 15.00 3,136,580

381 Gopalpur-2, Shempur-2 Rangpur 3.75

382 Shondhoyardanga Miskinpara,

Lohanipara-1 Rangpur

Gazi 1100 Solargao Solargao 3.75

16.70 15.00 3,136,580 383

Shondhoyardanga Miskinpara, Lohanipara-2

Rangpur 3.75

384 Dangapara Jhaarpara,

Burirpukurhaat-1 Rangpur

Gazi 1100 Solargao Solargao 3.75

16.70 15.00 3,136,580 385

Dangapara Jhaarpara, Burirpukurhaat-2

Rangpur 3.75

Page 21: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

386 Dangirpar Radhanagar,

Mondolpara-1 Rangpur

Gazi 1100 Solargao Solargao 3.75

16.70 15.00 3,136,580 387

Dangirpar Radhanagar, Mondolpara-2

Rangpur 3.75

388 Janerpaar, Gopalpur (Noyapara),

Shyampur-1 Rangpur

Gazi 1100 Solargao Solargao 3.75

16.70 15.00 3,136,580 389

Janerpaar, Gopalpur (Noyapara), Shyampur-2

Rangpur 3.75

390 Modhupur Hazipara, Kazirhaat-1 Rangpur Gazi 1100 Solargao Solargao

3.75 16.70 15.00 3,136,580

391 Modhupur Hazipara, Kazirhaat-2 Rangpur 3.75

392 Netardola, Gopalpur (Noyapara),

Shyampur-1 Rangpur

Gazi 1100 Solargao Solargao 3.75

16.70 15.00 3,136,580 393

Netardola, Gopalpur (Noyapara), Shyampur-2

Rangpur 3.75

394 Nelpirpathar,Dangapara,Lohanipara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

395 Sholagaripathar,Shandwarpara,Loha

nipara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

396 Jhoriardanga,Uttor

Mohodipur,Lohanipara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

397 Vangamallirmath,Osmanpur,Bishnu

pur Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

398 Uttormadaikhamar,Lohanipara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

399 Poshchimpathar,Kachabari poschimpara,Lohanipara

Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

400 Khiyarparamath,Shondip,Nataram Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

401 Polirpathar,Aimari,Nataram Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

402 Laljan,Rostomabad,Nataram Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

403 Pakorertol,Kutubpur,Oronneca Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

Page 22: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

404 Chandamarirdola,Boirampur,Kalupa

ra Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

405 Kaliartal,Boirampur,Kalupara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

406 Uttorerdola,Kachirerpara,Kalupara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

407 Polermukha,Boirampur,Kalupara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

408 Boirampurerdanga,Boirampur,Kalup

ara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

409 Shimuljhuri,Lohanipara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

410 Boterdola,Chokpara,Kalupara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

411 Gokirdoba,kodaldhowa,Lohanipara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

412 Khelerpathar,Uttormadaikhamar,Lo

hanipara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

413 Chotomatial,Mostofapur,Shokerhat Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

414 Chorayerpatathar,Kachabari,Lohani

para Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

415 Baghdograrpathar,Shokorpur,Kalup

ara Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

416 Dabridolamath,Dokkhinbouchondi,

Nataram Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

417 Kheyarpara,Dokkhinbouchondi,Nat

aram Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

418 Burardibimath,Dokkhinbouchondi,

Nataram Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

419 Battola,Dokkhin

bouchondi,Nataram Rangpur Solargao -3 1100 Solargao Solargao 7.50 14.20 15.75 3,134,253

420 Kabirajpara, Badarganj-1, Rangpur Rangpur InGen

564 Solargao Solargao 3.75 14.15 11.04 2,546,152

421 Kabirajpara, Badarganj-2, Rangpur Rangpur 284 Solargao Solargao 2.20

422 Mokorerpara, Badarganj-1, Rangpur Rangpur InGen 564 Solargao Solargao 3.75 14.15 11.04 2,546,152

Page 23: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

423 Mokorerpara, Badarganj-2, Rangpur Rangpur 284 Solargao Solargao 2.20

424 Chadurapara, Badarganj-1, Rangpur Rangpur InGen

564 Solargao Solargao 3.75 14.15 11.04 2,546,152

425 Chadurapara, Badarganj-2, Rangpur Rangpur 284 Solargao Solargao 2.20

426 Dokkhin Baochondi (Noapara)-1,

Badarganj-1, Rangpur Rangpur

InGen 564 Solargao Solargao 3.75

14.15 11.04 2,546,152 427

Dokkhin Baochondi (Noapara)-1, Badarganj-2, Rangpur

Rangpur 284 Solargao Solargao 2.20

428 Dokkhin Baochondi (Noapara)-2,

Badarganj-1, Rangpur Rangpur

InGen 564 Solargao Solargao 3.75

14.15 11.04 2,546,152 429

Dokkhin Baochondi (Noapara)-2, Badarganj-2, Rangpur

Rangpur 284 Solargao Solargao 2.20

430 Dariarpaar, Badarganj-1, Rangpur Rangpur InGen

564 Solargao Solargao 3.75 14.15 11.04 2,546,152

431 Dariarpaar, Badarganj-2, Rangpur Rangpur 284 Solargao Solargao 2.20

432 Hazipara, Badarganj-1, Rangpur Rangpur InGen

564 Solargao Solargao 3.75 14.15 11.04 2,546,152

433 Hazipara, Badarganj-2, Rangpur Rangpur 284 Solargao Solargao 2.20

434 Shaalbaari Khatiyadighi, Birganj-1,

Dinajpur Rangpur

InGen 589 Solargao Solargao 3.75

12.81 11.04 2,546,152 435

Shaalbaari Khatiyadighi, Birganj-2, Dinajpur

Rangpur 312 Solargao Solargao 2.20

436 Khatiyadighi Purbopara, Birganj-1,

Dinajpur Rangpur

InGen 589 Solargao Solargao 3.75

12.81 11.04 2,546,152 437

Khatiyadighi Purbopara, Birganj-2, Dinajpur

Rangpur 312 Solargao Solargao 2.20

438 Daktarpara Shukhdebpur,

Setabganj-1, Dinajpur Rangpur

InGen 589 Solargao Solargao 3.75

14.23 11.04 2,546,152 439

Daktarpara Shukhdebpur, Setabganj-2, Dinajpur

Rangpur 312 Solargao Solargao 2.20

440 Kadihaat Patagara Mothadanga,

Rani Sankail-1, Thakurgaon Rangpur InGen 589 Solargao Solargao 3.75 12.21 11.04 2,546,152

Page 24: List of IDCOL Approved Solar Irrigation Pumpsidcol.org/download/7395f0f8bf51e95555dda03d7d04f216.pdf · List of IDCOL Approved Solar Irrigation Pumps ... (m3/day) EPC Contractor Equipment

Sl. Location Division Project Water flow

(m3/day)

EPC Contractor

Equipment Supplier

Pump Capacity

(kW)

Pump Head

(meter)

PV capacity (kWp)

Project Cost (BDT)

441 Kadihaat Patagara Mothadanga,

Rani Sankail-2, Thakurgaon Rangpur 312 Solargao Solargao 2.20

442 Ramdebpur Moddhopara, Pirganj-1,

Thakurgaon Rangpur

InGen 589 Solargao Solargao 3.75

13.45 11.04 2,546,152 443

Ramdebpur Moddhopara, Pirganj-2, Thakurgaon

Rangpur 312 Solargao Solargao 2.20

444 Uttorbochapukur Bhetkadanga

Futanibazar, Sadar-1, Thakurgaon Rangpur

InGen 589 Solargao Solargao 3.75

12.02 11.04 2,546,152 445

Uttorbochapukur Bhetkadanga Futanibazar, Sadar-2, Thakurgaon

Rangpur 312 Solargao Solargao 2.20

446 Bainapukur Maath-1,

Sreerampur,Kotchadpur,Jhenaidah Khulna

RHECO-1

1350 NREL NREL 15.00 13.41 20.74 4,532,716

447 Bainapukur Maath-2,

Sreerampur,Kotchadpur,Jhenaidah Khulna 1350 NREL NREL 15.00 13.41 20.74 4,530,778

448 Beleatir Maath-1,

Beleati,Moheshpur,Jhenaidah Khulna 1320 Sherpa Sherpa 15.00 14.47 21.96 4,312,392

449 Beleatir Maath-2,

Beleati,Moheshpur,Jhenaidah Khulna 1320 Sherpa Sherpa 15.00 14.47 21.96 4,312,392