PHASE-1LIST OF DRAWINGS FOR PHASE-1 BUILDINGS

MASTER PLANBOYS SCHOOL (ONE UNIT)GIRLS SCHOOL (ONE UNIT)STUDENTS HOSTEL (BOYS ONE UNIT + GIRLS ONE UNIT) DRAWINGS ARE THE SAME FOR GIRLS HOSTELBACHELOR STAFF RESIDENCE (ONE UNIT BOYS + ONE UNIT GIRLS)PRINCIPAL's RESIDENCE (ONE UNIT BOYS + ONE UNIT GIRLS)MARRIED STAFF RESIDENCE (FOUR UNITS BOYS + FOUR UNITS GIRLS)ARCHITECHTURAL MP-01 TOPOGRAPHIC PLAN MP-02 BUILDINGS & ROADS LAYOUT PLAN MP-03 GRID LAYOUT PLAN ARCHITECHTURAL A-01 WORKING PLAN GROUND FLOOR A-02 WORKING PLAN FIRST FLOOR A-03 ROOF PLAN PLAN A-04 WORKING ELEVATIONS A-05 WORKING SECTIONSARCHITECHTURAL A-01 WORKING PLAN GROUND FLOOR A-02 WORKING PLAN FIRST FLOOR A-03 ROOF PLAN PLAN A-04 WORKING ELEVATIONS A-05 WORKING SECTIONSARCHITECHTURAL A-01 WORKING PLAN GROUND FLOOR A-02 WORKING PLAN FIRST FLOOR A-03 ROOF PLAN A-04 WORKING ELEVATIONS A-05 WORKING SECTIONSARCHITECHTURAL A-01 WORKING PLANS (G.F + F.F + ROOF) A-02 WORKING ELEVATIONS & SECTIONS ARCHITECHTURAL A-01 WORKING PLANS (G.F + F.F + ROOF) A-02 WORKING ELEVATIONS & SECTIONS ARCHITECHTURAL A-01 WORKING PLANS , ELEVATIONS & SECTIONS TOTAL NO. OF DRAWINGS = 03TOTAL NO. OF DRAWINGS = 05TOTAL NO. OF DRAWINGS = 05TOTAL NO. OF DRAWINGS = 05TOTAL NO. OF DRAWINGS = 02TOTAL NO. OF DRAWINGS = 02TOTAL NO. OF DRAWINGS = 01STRUCTURAL S-01 GENERAL NOTES & DETAILS S-02 FOOTING LAYOUT PLAN S-03 SLAB & BEAM DETAILS GROUND FLOOR S-04 SLAB & BEAM DETAILS FIRST FLOORSTRUCTURAL S-01 GENERAL NOTES & DETAILS S-02 FOOTING LAYOUT PLAN S-03 SLAB & BEAM DETAILS GROUND FLOOR S-04 SLAB & BEAM DETAILS FIRST FLOORSTRUCTURAL S-01 GENERAL NOTES & DETAILS S-02 FOOTING LAYOUT PLAN S-03 SLAB & BEAM DETAILS GROUND FLOOR S-04 SLAB & BEAM DETAILS FIRST FLOORSTRUCTURAL S-01 FOOTING LAYOUT & SLABS STRUCTURAL S-01 FOOTING LAYOUT & SLABS STRUCTURAL S-01 FOOTING LAYOUT, SLABS & BEAMS TOTAL NO. OF DRAWINGS = 04TOTAL NO. OF DRAWINGS = 04TOTAL NO. OF DRAWINGS = 04TOTAL NO. OF DRAWINGS = 01TOTAL NO. OF DRAWINGS = 01TOTAL NO. OF DRAWINGS = 01PUBLIC HEALTH PH-01 GENERAL NOTES & LEGENDS PH-02 WATER SUPPLY & GAS SYSTEM G.F PH-03 WATER SUPPLY & GAS SYSTEM F.F PH-04 DRAINAGE SYSTEM GROUND FLOOR PH-05 DRAINAGE SYSTEM FIRST FLOOR PH-06 ROOF DRAINAGE SYSTEMPUBLIC HEALTH PH-01 GENERAL NOTES & LEGENDS PH-02 WATER SUPPLY & GAS SYSTEM G.F PH-03 WATER SUPPLY & GAS SYSTEM F.F PH-04 DRAINAGE SYSTEM GROUND FLOOR PH-05 DRAINAGE SYSTEM FIRST FLOOR PH-06 ROOF DRAINAGE SYSTEMPUBLIC HEALTH PH-01 GENERAL NOTES & LEGENDS PH-02 WATER SUPPLY & GAS SYSTEM G.F PH-03 WATER SUPPLY & GAS SYSTEM F.F PH-04 DRAINAGE SYSTEM GROUND FLOOR PH-05 DRAINAGE SYSTEM FIRST FLOOR PH-06 ROOF DRAINAGE SYSTEMPUBLIC HEALTH PH-01 WATER SUPPLY & GAS SYSTEM G.F + F.F PH-02 DRAINAGE SYSTEM G.F + F.F + ROOF PUBLIC HEALTH PH-01 WATER SUPPLY & GAS SYSTEM PH-02 DRAINAGE SYSTEM PH-03 DRAINAGE SYSTEM ROOF PUBLIC HEALTH PH-01 WATER SUPPLY & GAS SYSTEM G.F + F.F TOTAL NO. OF DRAWINGS = 06TOTAL NO. OF DRAWINGS = 06TOTAL NO. OF DRAWINGS = 06TOTAL NO. OF DRAWINGS = 02TOTAL NO. OF DRAWINGS = 03TOTAL NO. OF DRAWINGS = 01ELECTRICAL E-01 LIGHTING SYSTEM GROUND FLOOR E-02 LIGHTING SYSTEM FIRST FLOOR E-05 POWER DISTRIBUTION SYSTEM G.F E-06 POWER DISTRIBUTION SYSTEM F.FELECTRICAL E-01 LIGHTING SYSTEM GROUND FLOOR E-02 LIGHTING SYSTEM FIRST FLOOR E-05 POWER DISTRIBUTION SYSTEM G.F E-06 POWER DISTRIBUTION SYSTEM F.FELECTRICAL E-01 LIGHTING SYSTEM GROUND FLOOR E-02 LIGHTING SYSTEM FIRST FLOOR E-05 POWER DISTRIBUTION SYSTEM G.F E-06 POWER DISTRIBUTION SYSTEM F.FELECTRICAL E-01 LIGHTING SYSTEM LAYOUT A/C & POWER SYSTEM ELECTRICAL E-01 LIGHTING SYSTEM LAYOUT A/C & POWER SYSTEM ELECTRICAL E-01 LIGHTING SYSTEM LAYOUT A/C & POWER SYSTEM TOTAL NO. OF DRAWINGS = 04TOTAL NO. OF DRAWINGS = 04TOTAL NO. OF DRAWINGS = 04TOTAL NO. OF DRAWINGS = 01TOTAL NO. OF DRAWINGS = 01TOTAL NO. OF DRAWINGS = 01

as builtLIST OF DRAWINGS FOR PHASE-1 BUILDINGS AS BUILTGIRLS SCHOOL (ONE UNIT)STUDENTS HOSTEL -2 (BOYS ONE UNIT + GIRLS ONE UNIT) DRAWINGS ARE THE SAME FOR GIRLS HOSTELSTUDENTS HOSTEL (BOYS ONE UNIT + GIRLS ONE UNIT) DRAWINGS ARE THE SAME FOR GIRLS HOSTELBACHELOR's STAFF RESIDENCE (ONE UNIT BOYS + ONE UNIT GIRLS)PRINCIPAL's RESIDENCE (ONE UNIT BOYS + ONE UNIT GIRLS)MARRIED STAFF RESIDENCE (FOUR UNITS BOYS + FOUR UNITS GIRLS)ARCHITECHTURAL A-01 WORKING PLAN GROUND FLOOR A-02 WORKING PLAN FIRST FLOOR A-03 ROOF PLAN A-04 WORKING ELEVATIONS A-01 WORKING PLAN GROUND FLOOR (SUPERCEDED) A-04 WORKING ELEVATIONS (SUPERCEDED) ARCHITECHTURAL A-01 WORKING PLAN GROUND FLOOR A-02 WORKING PLAN FIRST FLOOR A-03 ROOF PLAN A-04 WORKING ELEVATIONS A-05 WORKING SECTIONSARCHITECHTURAL A-01 WORKING PLAN GROUND FLOOR A-02 WORKING PLAN FIRST FLOOR A-03 ROOF PLAN A-04 WORKING ELEVATIONS A-05 WORKING SECTIONS D-11 FLOOR PATTREN DETAIL G.F D-12 FLOOR PATTREN DETAIL F.FARCHITECHTURAL A-01 WORKING PLANS (G.F + F.F + ROOF) A-02 WORKING ELEVATIONS & SECTIONS ARCHITECHTURAL A-01 WORKING PLANS (G.F + F.F + ROOF) A-02 WORKING ELEVATIONS & SECTIONS ARCHITECHTURAL A-01 WORKING PLANS , ELEVATIONS & SECTIONS TOTAL NO. OF DRAWING = 06TOTAL NO. OF DRAWING = 05TOTAL NO. OF DRAWING = 07TOTAL NO. OF DRAWING = 02TOTAL NO. OF DRAWING = 02TOTAL NO. OF DRAWING = 01STRUCTURAL S-03 SLAB & BEAM DETAILS GROUND FLOOR S-04 SLAB & BEAM DETAILS FIRST FLOORSTRUCTURAL S-02 FOOTING LAYOUT PLAN STRUCTURAL S-01 GENERAL NOTES & DETAILS S-02 FOOTING LAYOUT PLAN S-03 SLAB & BEAM DETAILS GROUND FLOOR S-04 SLAB & BEAM DETAILS FIRST FLOORSTRUCTURAL S-01 REINFORCEMENT DETAIL ( FOOTING LAYOUT ,COLUMN,BEAMS & SLAB DETAIL) STRUCTURAL S-01 REINFORCEMENT DETAIL STRUCTURAL S-01 REINFORCEMENT DETAIL TOTAL NO. OF DRAWINGS = 02TOTAL NO. OF DRAWING = 01TOTAL NO. OF DRAWING = 04TOTAL NO. OF DRAWING = 01TOTAL NO. OF DRAWING = 01TOTAL NO. OF DRAWING = 01PUBLIC HEALTH PH-01 GENERAL NOTES & LEGENDS PH-02 WATER SUPPLY & GAS SYSTEM G.F PH-03 WATER SUPPLY SYSTEM F.F PH-04 DRAINAGE SYSTEM GROUND FLOOR PH-05 DRAINAGE SYSTEM FIRST FLOOR PH-06 DRAINAGE SYSTEM ROOF PLAN PH-02 WATER SUPPLY & GAS SYSTEM G.F (SUPERCEDED) PH-04 DRAINAGE SYSTEM GROUND FLOOR(SUPERCEDED) PH-06 DRAINAGE SYSTEM ROOF PLAN (SUPERCEDED)PUBLIC HEALTH PH-02 WATER SUPPLY SYSTEM G.F PH-03 WATER SUPPLY SYSTEM F.F PH-04 DRAINAGE SYSTEM GROUND FLOOR PH-05 DRAINAGE SYSTEM FIRST FLOOR PUBLIC HEALTH PH-01 GENERAL NOTES & LEGENDS PH-02 WATER SUPPLY SYSTEM G.F PH-03 WATER SUPPLY SYSTEM F.F PH-04 DRAINAGE SYSTEM GROUND FLOOR PH-05 DRAINAGE SYSTEM FIRST FLOOR PH-06 DRAINAGE SYSTEM ROOF PLANPUBLIC HEALTH PH-01 WATER SUPPLY & GAS SYSTEM G.F + F.F + ROOF PH-02 DRAINAGE SYSTEM G.F + F.F + ROOF PUBLIC HEALTH PH-01 WATER SUPPLY & GAS SYSTEM PH-02 DRAINAGE SYSTEM G.F PH-03 DRAINAGE SYSTEM ROOF PUBLIC HEALTH PH-01 WATER SUPPLY &DRAINAGE SYSTEMTOTAL NO. OF DRAWINGS = 09TOTAL NO. OF DRAWING = 04TOTAL NO. OF DRAWING = 06TOTAL NO. OF DRAWING = 02TOTAL NO. OF DRAWING = 03TOTAL NO. OF DRAWING = 01ELECTRICAL E-01 LIGHTING SYSTEM GROUND FLOOR E-02 LIGHTING SYSTEM FIRST FLOOR E-05 POWER DISTRIBUTION SYSTEM G.F E-06 POWER DISTRIBUTION SYSTEM F.F E-02 LIGHTING SYSTEM FIRST FLOOR (SUPERCEDED) E-05 POWER DISTRIBUTION SYSTEM G.F (SUPERCEDED)ELECTRICAL E-01 LIGHTING SYSTEM LAYOUT G.F E-02 LIGHTING SYSTEMLAYOUT F.F E-05 POWER DISTRIBUTION SYSTEM G.F E-06 POWER DISTRIBUTION SYSTEM F.FELECTRICAL E-01 LIGHTING SYSTEM LAYOUT G.F E-02 LIGHTING SYSTEM LAYOUT F.F E-05 POWER DISTRIBUTION SYSTEM G.F E-06 POWER DISTRIBUTION SYSTEM F.FELECTRICAL E-01 LIGHTING SYSTEM LAYOUT A/C & POWER SYSTEM G.F + F.F ELECTRICAL E-01 LIGHTING SYSTEM LAYOUT & POWER SYSTEM ELECTRICAL E-01 LIGHTING SYSTEM LAYOUT A/C & POWER SYSTEM TOTAL NO. OF DRAWINGS = 06TOTAL NO. OF DRAWINGS = 04TOTAL NO. OF DRAWINGS = 04TOTAL NO. OF DRAWINGS = 01TOTAL NO. OF DRAWINGS = 01TOTAL NO. OF DRAWINGS = 01TOTAL = 23TOTAL =14TOTAL = 21TOTAL = 17TOTAL NO. OF DRAWINGS = 75

PKG-5LIST OF TENDER DRAWINGS PACKAGE-5GIRLS CAMPUSMP-01 MASTER PLAN PHASE-1ARCHITECHURALPUBLIC HEALTHA-01 WORKING PLAN G.F PH-01 GENERAL NOTES & LEGENDSA-02 WORKING PLAN F.F PH-02 WATER SUPPLY SYSTEM G.FA-03 WORKING PLAN ROOF PH-03 WATER SUPPLY SYSTEM F.FA-04 WORKING ELEVATIONS PH-05 DRAINAGE SYSTEM G.FA-05 WORKING SECTIONS PH-05 DRAINAGE SYSTEM G.F(REVISED)PH-06 DRAINAGE SYSTEM ROOF PLANSTRUCTURALELECTRICALS-01 GENERAL NOTESE-01 LIGHTING SYSTEM LAYOUT G.FS-02 FOOTING LAYOUT PLANE-02 LIGHTING SYSTEM LAYOUT F.FS-03 SLAB & BEAM DETAILS G.FE-05 POWER DISTRIBUTION SYSTEM G.FS-04 SLAB & BEAMS DETAILS F.FE-06 POWER DISTRIBUTION SYSTEM F.FS-05 FOOTING SECTION & WALL DETAIL

JUNIOR STAFF RESIDENCEARCHITECHURALPUBLIC HEALTHA-01 WORKING PLANS ELEVATIONS & SECTIONS PH-01 WATER SUPPLY & DRAINAGE SYSTEM

STRUCTURALELECTRICALS-01 REINFORCEMENT DETAILSE-01 LIGHTING & POWER SYSTEM LAYOUT

STAFF BARRACKSARCHITECHURALPUBLIC HEALTHA-01 WORKING PLANS ELEVATIONS & SECTIONS PH-01 WATER SUPPLY & DRAINAGE SYSTEM

ELECTRICALE-01 LIGHTING & POWER SYSTEM LAYOUT

BOUNDARY WALLARCHITECHURALSTRUCTURALA-01 WORKING DRAWING(SOLID) S-01 REINFORCEMENT DETAILSA-02 WORKING DRAWING (BARBED) A-03 WORKING DRAWING (PRECAST) MAIN GATE HOUSEARCHITECHURALSTRUCTURALA-01 WORKING PLANS ELEVATIONS & SECTIONS S-01 REINFORCEMENT DETAILSELECTRICALE-01 LIGHTING SYSTEM LAYOUT TOTAL NO. OF DRAWINGS = 34

PAKG-6LIST OF TENDER DRAWINGS PACKAGE-6

BOYS CAMPUSMP-01 MASTER PLAN PHASE-1ARCHITECHURALPUBLIC HEALTHA-01 WORKING PLAN G.F PH-01 GENERAL NOTES & LEGENDSA-02 WORKING PLAN F.F PH-02 WATER SUPPLY SYSTEM G.FA-03 WORKING PLAN ROOF PH-03 WATER SUPPLY SYSTEM F.FA-04 WORKING ELEVATIONS PH-04 DRAINAGE SYSTEM G.FA-05 WORKING SECTIONS PH-05 DRAINAGE SYSTEM F.FPH-06 DRAINAGE SYSTEM ROOF PLAN

STRUCTURALELECTRICALS-01 GENERAL NOTESE-01 LIGHTING SYSTEM LAYPOUT G.FS-02 FOOTING LAYOUT PLANE-02 LIGHTING SYSTEM LAYPOUT F.FS-03 SLAB & BEAM DETAILS G.FE-05 POWER DISTRIBUTION SYSTEM G.FS-04 SLAB & BEAMS DETAILS F.FE-06 POWER DISTRIBUTION SYSTEM F.FS-05 FOOTING SECTION & WALL DETAIL

JUNIOR STAFF RESIDENCEARCHITECHURALPUBLIC HEALTHA-01 WORKING PLANS ELEVATIONS & SECTIONS PH-01 WATER SUPPLY & DRAINAGE SYSTEM

STRUCTURALELECTRICALS-01 REINFORCEMENT DETAILSE-01 LIGHTING & POWER SYSTEM LAYOUT

STAFF BARRACKSARCHITECHURALPUBLIC HEALTHA-01 WORKING PLANS ELEVATIONS & SECTIONS PH-01 WATER SUPPLY & DRAINAGE SYSTEM

STRUCTURALELECTRICALS-01 REINFORCEMENT DETAILSE-01 LIGHTING & POWER SYSTEM LAYOUT

BOUNDARY WALLARCHITECHURALSTRUCTURALA-01 WORKING DRAWING(SOLID) S-01 REINFORCEMENT DETAILSA-02 WORKING DRAWING (BARBED) A-03 WORKING DRAWING (PRECAST) TOTAL NO. OF DRAWINGS = 33