List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 1
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
A - Works in Progress
1 (i) Extension of CSR of BEP down Loop by 27M to DF(3) 2,23,58 86,89 23,00 1,13,69
extend it from 688M to 715M.(ii) Extension of
CSR of FTP L.No.5 by 45M to extend it from 670M to
715M.(iii) Extension of CSR of CHK down Loop by
31M to extend it from 684M to 715M
2 Morena: Provision of full rake goods siding for DF(3) 3,02,87 2,06,81 1 96,05
handling full rake.
3 Chunar Yard: Removal of permanent speed DF(3) 1,26,32 84,67 1 41,64
restriction on DN main line.
4 Chiksana: Provision of additional loop line at DF(3) 2,48,81 1,95,51 30,00 23,30
Chiksana.
5 SUBEDARGANJ:- Provision of FOB at Subedarganj DF(3) 1,06,40 1,05,06 1,34 ..
station.
6 IDGAH-Provision of signals on line number -7. DF(3) 97,04 72,23 24,81 ..
7 Khajuraho: Provision of First FOB. DF(3) 99,34 .. 20,00 79,34
8 Allahabad Division- Linking of Line No 8 of DF(3) 99,29 .. 10,00 89,29
Mirzapur to point No 213 towards East End by
providing extra track of about 200 metres.
9 Mathura Jn- Palwal:- Extention of FOB on 3rd DF(3) 86,65 .. 40,74 45,91
line yard at Vrndaban Road station.
10 DHOLPUR: Jhansi Division- Provision of extension Cap. 92,03 .. 10,75 81,28
of shunting neck at Dn side at AGC end to
accomodate full Goods train.
11 Hodal: Provision of goods loop line near 2nd loop DF(1) 94,56 93,04 1,52 ..
of 3rd line with 700Mx15M rail level goods
platform, approach road and other facilities.
12 Gaipura: Extension of CSR of UP loop line by 47M DF(3) 77,31 44,88 2,92 29,51
to increase CSR from 668m to 715m.
13 Bheerpur: Extension of CSR of UP loop line by 31m DF(3) 85,69 22,05 1 63,63
to increase CSR from 684m to 715m.
14 Banda: Additional room at Banda running room. DF(3) 95,55 77,74 1,00 16,81
15 Manikpur-Badausa: Provision of tokenless block DF(4) 99,34 74,82 19,25 5,27
instruments in place of Ball token type block
instrument.
16 Khairar-Badausa: Provision of Tokenless block DF(4) 95,34 74,78 10,00 10,56
instruments in place of Ball token type block
instrument.
06.01.16.14.3.
50.001
06.03.16.14.6.
52.001
06.02.16.15.3.
51.001
06.01.16.15.3.
50.002
06.03.16.15.3.
52.001
06.01.16.10.3.
50.001
TRAFFIC FACILITIES
06.02.16.11.2.
51.001
06.03.16.08.2.
52.001
06.02.16.09.2.
51.001
06.01.16.10.2.
50.001
06.02.16.13.6.
11.001
06.02.16.10.3.
51.004
06.02.16.10.3.
51.003
06.03.16.10.3.
52.001
06.03.16.10.3.
52.005
06.03.16.10.3.
52.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 2
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
17 Rairu : Shifting of station building. DF(3) 1,68,66 42,20 20,00 1,06,46
18 Allahabad Division. Extension of UP loop of DF(3) 98,61 60,09 1 38,51
Bamrauli station by 30 metres to make it 715
metres.
19 RAGUAL: Extension of loop line upto 715 meter. DF(3) 99,08 3,19 35,00 60,89
20 Harpalpur: Extention of loop line from 445 m to DF(3) 96,08 11,67 35,00 49,41
575 m at Harpalpur (HPP) station to accomodate 24
coach train length and regrading of yard to ease
the gradient.
21 Allahabad Division : Provision of shunting neck of DF(3) 98,00 .. 1 97,99
100 m at Subedarganj east end south side.
22 IDGAH- Provision of additional loop line . DRF 95,94 8,33 57,95 29,66
23 Kanpur Central: Shifting of existing point 342A & DF(3) 98,98 .. 76,30 22,68
342B between North & South line from East end to
west end of hamirpur sub-way named P342 just
ahead of Signal no.18 at Km 1025/19-27.
24 Tundla : Provision of High Level Platform on line DF(3) 98,70 69,45 26,00 3,25
no. 9
25 Runkuta - Provision of FOB. DF(3) 98,00 .. 10,00 88,00
26 Kitham - Provision of FOB at station. DF(3) 98,00 .. 10,00 88,00
27 Farah station- Provision of FOB. DF(3) 98,00 .. 10,00 88,00
28 JHANSI DIV:IRADATGANJ: Provision of crossover in DF(3) 99,80 .. 12,68 87,12
Manikpur end in line No. 4 & 5.
29 Kanpur: Modification in layout of track along DF(3) 98,32 .. 29,00 69,32
platform no. 2 & 3 to accomodate 24 coaches length
trains.
30 Kanpur: Electrification of washing line No. 1 & 2. DF(3) 83,74 .. 29,00 54,74
31 Works costing below DRM's Power Cap. 3,15 .. 3,15 ..
DRF 29,05 .. 29,05 ..
DF(1) 11,19 .. 11,19 ..
DF(3) 2,40,61 .. 2,40,61 ..
DF(4) 15,75 .. 15,75 ..
TRAFFIC FACILITIES
06.02.16.13.6.
51.002
06.02.16.13.6.
30.003
06.01.16.14.6.
50.001
06.01.16.14.6.
50.002
06.01.16.14.6.
50.003
06.03.16.15.6.
52.001
06.03.16.11.3.
30.001
06.02.16.12.3.
51.002
06.03.16.12.3.
52.002
06.03.16.12.3.
52.001
06.02.16.13.3.
51.001
06.01.16.13.3.
50.001
06.02.16.15.6.
51.001
06.02.16.15.6.
51.002
06.00.16.16.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 3
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
TOTAL-WORKS IN PROGRESS Cap. .. .. 13,90 ..
DRF .. .. 87,00 ..
DF(1) .. .. 12,71 ..
DF(3) .. .. 6,87,45 ..
DF(4) .. .. 45,00 ..
B - New Works
32 Kanpur: Improvement of damaged drain/Nala in CPC DF(1) 2,40,00 .. 5,00 2,35,00
goods shed kanpur.
33 IRADATGANJ: Direct reception and despatch facility DF(3) 97,35 .. 5,00 92,35
in Line no 5 goods line
34 Works costing below DRM's Power Cap. 5,00 .. 5,00 ..
DRF 5,00 .. 5,00 ..
DF(1) 5,00 .. 5,00 ..
DF(3) 5,00 .. 5,00 ..
TOTAL-NEW WORKS Cap. .. .. 5,00 ..
DRF .. .. 5,00 ..
DF(1) .. .. 10,00 ..
DF(3) .. .. 10,00 ..
TOTAL-Traffic Facilities Cap. .. .. 18,90 ..
DRF .. .. 92,00 ..
DF(1) .. .. 22,71 ..
DF(3) .. .. 6,97,45 ..
DF(4) .. .. 45,00 ..
A - Works in Progress
35 Proposal for procurement of equipments of PRS and DF(1) 63,13 57,98 50 4,65
UTS consisting of Thin Client with Keyboard for
PRS, Thin Client with Keyboard for UTS, Ticket
Printers for PRS and UTS and Report Printers etc.
for installation of additonal Booking and
36 Jhansi Division-Provision of 40 nos. of 16 port DF(1) 14,24 .. 1,00 13,24
Terminal Servers for JTBS locations.
37 NCR/HQ - Procurement of 597 nos. of UTS ticket DRF 97,93 78,34 19,59 ..
printers and 232 nos. of UTS Report printers for
replacement of the same over Allahabad, Jhansi and
Agra Divisions over North Central Railway for UTS
phase-III equipment.
38 North Central Railway - Unification of passenger DF(1) 1,62,59 60,00 50 1,02,09
reservation system & unreserved ticketing system
network and creation of zonal network hubs
39 Jhansi Division - Replacement of 41nos. of DRF 79,19 44,58 34,61 ..
Terminal Servers, 202 nos. of UTS Thin Clients
with monitor and keyboards, 42 nos. of PRS Dumb
Terminals with keyboards and 27 nos. of Automatic
Printer switch.
40 Allahabad Division-Replacement of Terminal DRF 6,39 .. 6,39 ..
Management System (TMS) equipment.
41 Jhansi Division: Replacement of Terminal DRF 19,34 .. 19,34 ..
Management System (TMS).
06.02.17.14.3.
13.001
06.03.17.14.3.
13.002
COMPUTERISATION
06.02.17.12.2.
13.001
06.03.17.13.5.
13.001
06.00.17.14.2.
13.001
06.00.17.06.2.
13.001
06.03.17.14.3.
13.001
06.02.16.16.2.
51.001
06.03.16.16.3.
52.001
06.00.16.16.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 4
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
42 NCR/HQ - Procurement of 10 nos. Personal Computers DRF 3,68 .. 3,68 ..
(monitor, CPU, Keyboard and mouse) on replacement
account earlier supplied by CRIS for FOIS project.
43 Agra Division - Repl. of UTS and PRS equipment (90 DRF 39,06 21,79 17,27 ..
Thin Client sets, 29 PRS Dumb Terminals with
keyboards, 29 PRS ticket printers and 19 Terminal
Server)
44 Allahabad Division - Replacement of 198 nos. of DRF 54,62 43,70 10,92 ..
thin Client installed during UTS phase-III.
45 North Central Railway. Replacement of UTS and PRS DRF 42,08 18,96 13,25 9,87
equipment which have outlived their codal life.
46 Replacement of CMS equipments provided with breath DRF 15,58 .. .. 15,58
analyser and biometric device placed at lobbies of
Agra division
TOTAL-WORKS IN PROGRESS DRF .. .. 1,25,05 ..
DF(1) .. .. 2,00 ..
B - New Works
47 JHS Divn - Replacement of 72 nos. of PRS Dumb DRF 39,45 .. 28,00 11,45
terminals with Key Boards, 144 nos. of PRS
printers, 26 nos. of PRS charting printers and 03
nos. of PRS line printers
48 JHS Divn - Replacement of 152 nos. of UTS Thin DRF 46,56 .. 30,00 16,56
Clients and 61 nos. of UTS Ticket printers
49 AGC Divn - Repl. of 28 nos. of UTS Dumb Terminal DRF 45,97 .. 32,00 13,97
with key boards, 71 nos. UTS Thin Clients with
keyboards, 94 nos. of UTS Ticket printers, 29 nos.
of PRS ticket printers and 03 nos. of PRS Line
printers.
50 Allahabad Divn.- Repl. of 20 nos. of PRS ticket DRF 44,63 .. 29,00 15,63
Printer, 06 nos. of PRS Line printer, 157 nos. of
UTS ticket printer and 41 nos. of Terminal Server
of Phase-1 & Phase-2.
51 ALD Divn. - Replacement of 95 nos. UTS Thin DRF 47,25 .. 31,00 16,25
Clients, 02 nos. of PRS line Printers, 71 nos. of
PRS Dumb Terminals with Key Boards.
TOTAL-NEW WORKS DRF .. .. 1,50,00 ..
COMPUTERISATION
06.00.17.14.3.
13.001
06.01.17.14.3.
13.001
06.02.17.14.3.
13.002
06.02.17.16.3.
13.002
06.00.17.12.3.
13.001
06.01.17.15.3.
13.001
06.03.17.16.3.
13.001
06.03.17.16.3.
13.002
06.01.17.16.3.
13.001
06.02.17.16.3.
13.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 5
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
TOTAL-Computerisation DRF .. .. 2,75,05 ..
DF(1) .. .. 2,00 ..
A - Works in Progress
52 Jhansi division :- Provision of sliding boom S.Fund 2,38,83 .. 5,00 2,33,83
arrangement at interlocked level crossing gates
53 Gwalior-Bhind section:-Provision of diversion road S.Fund 2,23,72 59,99 7,00 1,56,73
for closing of level crossing no. 5B, 9, 11, 13 &
19 by merger with nearby level crossings.
54 North Central Railway: Electrification of 131 nos. S.Fund 2,16,20 1,09,38 10 1,06,72
L-xing gates. (JHS-78, AGC-53)
55 Bina-Agra section: Proposed of 28 nos. gate lodge. S.Fund 1,15,80 59,69 3,00 53,11
56 Agra Division: Interlocking of 6 nos. LC gates. S.Fund 2,35,98 1,59,15 .. 76,83
57 Tundla-Ghaziabad: Construction of new Gate Lodges S.Fund 2,00,00 91,94 2,50 1,05,56
( 21 Nos.)
58 Alahabad-Kanpur: Imp. to Road surface at S.Fund 70,03 .. 5,00 65,03
identified Level Crossings by fiber reinforced
precast RCC blocks .
59 Bhimsen- Ingota section:-Provision of diversion S.Fund 51,33 .. 3,15 48,18
road for closing of level crossing no. S-36 by
merger with nearby level crossings No. S-37.
60 Jhansi-Kanpur section:-Improvement to level S.Fund 50,74 21,83 2,50 26,41
crossing surface between Jhansi-Kanpur section
under ADEN -CNB sub division.
61 Mathura -Achnera section -Provision of diversion S.Fund 51,00 22,16 2,50 26,34
roads for closure of LC nos. 364,370 and 374
62 Bhimsen-Ignota section:-Improvement to level S.Fund 51,29 .. 3,00 48,29
cossing road surface Bhimsen-Ignota section
63 Lalitpur sub Division:Provision of fibre S.Fund 58,66 .. 4,00 54,66
reinforced precast RCC blocks at L-Xings.
64 Jhansi-Sithouli sec:Improvement to approaches of S.Fund 94,00 .. 3,50 90,50
Level crossings, Provision of fencing and various
safety sign boards in 21 No level crossings.
65 Bina-Jhansi section:Improvement to approaches of S.Fund 67,00 .. 2,00 65,00
Level crossings, Provision of fencing and various
safety sign boards in various level crossings.(15
level crossings)
66 JHS-CNB,MBA-KURJ & MKP-NYN:- Provision of sliding S.Fund 51,69 31,90 2,00 17,79
boom arrangements at inter locked trafic level
crossing gates at panel stations in 'B' & 'D'
routes of jhansi division.
06.01.29.09.2.
50.001
06.02.29.09.2.
51.001
06.02.29.14.3.
51.001
06.03.29.15.6.
52.001
06.03.29.15.6.
52.005
06.01.29.13.3.
50.001
ROAD SAFETY - LEVEL CROSSINGS
06.03.29.15.2.
52.001
06.03.29.15.2.
52.002
06.03.29.07.2.
52.002
06.03.29.07.2.
52.001
06.03.29.15.6.
52.002
06.03.29.14.3.
52.001
06.03.29.15.6.
52.004
06.03.29.15.6.
52.003
06.03.29.13.3.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 6
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
67 Provision of sliding boom in Agra Cantt – Mathura S.Fund 97,75 40,03 5,50 52,22
Jn, Mathura Jn - Palwal & Mathura Jn - Alwar &
Tundla - Bandikui section in Agra Division.
68 Mughalsarai-Allahabad: Imp. to Road surface at S.Fund 70,03 42,75 4,00 23,28
identified Level Crossings by fiber reinforced
precast RCC blocks .
69 Jhansi: Provision of solar based lights at Manned S.Fund 95,72 74,73 2 20,97
eligible Level Crossing Gates (80 nos.).
70 Bina-Jhansi: Provision of power operated booms on S.Fund 87,48 87,48 .. ..
15 interlocked gates in place of mechanical type
lifting barriers at LC gate
Nos.316,327,332,335,339, 394,400,407,415,434, 456,
461, 462,471&477.
71 Etmadpur: Shifting of LC gate no. 2AB out side the S.Fund 54,92 22,92 3 31,97
starter signals.
72 Barhan-Etah section: Improvement to 20 Nos. S.Fund 59,83 2,82 20 56,81
unmanned level crossing.
73 Gwalior: Improvement to basic infrastructure at S.Fund 79,94 57,39 50 22,05
identified LCs & Provision of sturdy height gauge
under ADEN/Gwalior sub division.
74 JHS Division: Electrification of 85 Nos. S.Fund 58,09 56,55 1 1,53
nonelectrified manned level crossing gates by
providing Solar power pack system.
75 Aligarh-Ghaziabad: Improvement to level crossing S.Fund 75,56 9,14 1,00 65,42
road surface, fencing & safety boards (16 Nos.).
76 Tundla-Aligarh: Improvement to level crossing road S.Fund 66,11 15,50 1,50 49,11
surface, fencing & safety boards (14 Nos.).
77 Jhansi Divn. : provision of height gauge at S.Fund 89,52 29,40 2,00 58,12
L-xing No. 407, 394, 384, 386, 369, 371, 426, 427,
442, 449, and 448-c.
78 ADEN/DHO Sub division:- Provision of sturdy height S.Fund 59,31 .. 1,00 58,31
gauge (5Nos.) L-Xing numbers 464, 479, 482, 484,
490
79 Replacement of 2x25 Sqmm cable by 2x70 Sqmm XLPE S.Fund 56,85 45,78 1,00 10,07
cable at LC Gates for signalling power supply
80 Improvement in lighting by providing 85 Watt CFL S.Fund 59,30 40,41 50 18,39
fitting at L-xing gates.
81 Provision sliding boom at busy interlocked gates S.Fund 99,40 71,55 2,50 25,35
in Agra Division.
82 JHS DIVN : - Provision of sliding boom arrangement S.Fund 59,94 13,95 4,00 41,99
at interlocked LC gates .
ROAD SAFETY - LEVEL CROSSINGS
06.03.29.10.3.
52.002
06.03.29.10.3.
52.005
06.02.29.10.3.
51.001
06.02.29.10.3.
51.010
06.03.29.10.3.
52.003
06.03.29.11.3.
52.001
06.01.29.15.3.
50.001
06.02.29.14.3.
51.002
06.03.29.09.3.
52.007
06.03.29.09.3.
52.003
06.01.29.09.3.
50.002
06.02.29.10.3.
51.004
06.02.29.12.3.
51.004
06.02.29.12.3.
51.006
06.01.29.12.3.
50.001
06.03.29.12.3.
52.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 7
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
83 Jhansi division:- Provision of modified boom S.Fund 53,46 .. 80 52,66
locking arrangements at power operated interlocked
LC gates .
84 Works costing below DRM's Power S.Fund 37,59 .. 37,59 ..
TOTAL-WORKS IN PROGRESS S.Fund .. .. 1,07,40 ..
B - New Works
85 Agra Division.-Provision of Automatic Banner flag S.Fund 95,83 .. 50,00 45,83
on manned non-interlocked Level crossings.
86 Works costing below DRM's Power S.Fund 50,00 .. 50,00 ..
TOTAL-NEW WORKS S.Fund .. .. 1,00,00 ..
TOTAL-Road Safety - Level S.Fund .. .. 2,07,40 ..
Crossings
A - Works in Progress
87 BRN-ETH Section : Construction of LHS in place of S.Fund 1,81,81 26,24 42,00 1,13,57
manned level crossing No.57-C in BRN-ETH section
by pushing method.
88 Provision of subway in lieu of level crossing S.Fund 1,14,00 .. 20,00 94,00
No.368 in between BSA-PRK at Km.366/10-11 in
MTJ-AH Section.
89 Gwalior - Bhind Section -provision of Normal S.Fund 2,33,59 .. 10 2,33,49
Height Subway in lieu of level crossing no. 40 at
km 1283/5-6.
90 Mughalsarai-Allahabad: Provision of grade S.Fund 2,49,72 .. 50 2,49,22
seperater at Level crossing no. 113 at km.
677/11-13 in between Bloock Hut-K-Jeonathpur
stations.
91 Bhind - Etawah section:- Elimination of Level S.Fund 1,73,44 .. 10 1,73,34
Crossings no. 77 between Bhind and Phoop stations
by provision of Sub way.
92 Bhind - Etawah section:- Elimination of Level S.Fund 2,18,47 .. 10 2,18,37
Crossings no. 82 between Phoop and Udi stations by
provision of Sub way.
93 Bhind - Etawah section:- Elimination of Level S.Fund 2,13,34 .. 50 2,12,84
Crossings no. 88 between Phoop and Udi stations by
provision of Sub way.
94 Bhind - Etawah section:- Elimination of Level S.Fund 1,90,70 .. 50 1,90,20
Crossings no. 91 between Phoop and Udi stations by
provision of Sub way.
95 Agra Division: Construction of subway in lieu of S.Fund 2,36,17 .. 8,00 2,28,17
level crossings no. 29 & 30 in IDH-BKI section
under jurisdiction of ADEN/Line/Agra
06.03.30.13.3.
52.002
06.02.30.14.3.
11.007
06.03.30.14.3.
30.081
06.03.30.14.3.
30.013
06.03.30.14.3.
30.022
06.03.30.14.3.
30.023
06.00.29.16.3.
00.999
06.01.29.16.3.
50.001
06.00.29.16.3.
00.999
ROAD SAFETY - ROB/RUB
06.02.30.11.3.
51.001
06.01.30.12.3.
11.001
ROAD SAFETY - LEVEL CROSSINGS
06.03.29.12.3.
52.002
06.01.30.15.3.
50.006
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 8
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
96 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,39,82 .. 5,00 2,34,82
Level no.121 at km 1136/5-6 between
Mustra-Garamah stations.
97 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 5,00 2,36,85
Level no.122 at km 1137/9-10 between
Mustra-Garamah stations.
98 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 5,00 2,36,85
Level no.124 at km 1142/3-4 between Garamau-
Parichha stations.
99 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,87 .. 15,00 2,26,87
Level no.126 at km 1145/5-6 between Garamau-
Parichha stations.
100 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 10,00 2,31,85
Level no.127 at km 1147/9-0 between Garamau
-Parichha stations.
101 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 5,00 2,36,85
Level no.170 at km 1218/5-6 between Ait-Bhua
stations.
102 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 8,00 2,33,85
Level no.172 at km 1223/2-3 between Ait-Bhua
stations.
103 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 15,00 2,26,85
Level no.175 at km 1228/1-2 between Ait-Bhua
stations.
104 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 5,00 2,36,85
Level no.199 at km 1281/4-5 between Chaunrah-
Pukhrayan stations.
105 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 10,00 2,31,85
Level no. 201 at km 1285/1-2 between Chaunrah-
Pukhrayan stations.
106 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 5,00 2,36,85
Level no. 203 at km 1287/2-3 between Chaunrah-
Pukhrayan stations.
107 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,87 .. 5,00 2,36,87
Level no. 204 at km 1288/1-2 between Chaunrah-
Pukhrayan stations.
108 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 10,00 2,31,85
Level no. 206 at km 1290/7-8 between
Pukhrayan-Malasa stations.
109 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 10,00 2,31,85
Level no. 207 at km 1292/2-3between
Pukhrayan-Malasa stations.
06.03.30.15.3.
52.007
06.03.30.15.3.
52.008
06.03.30.15.3.
52.010
06.03.30.15.3.
52.013
06.03.30.15.3.
52.016
06.03.30.15.3.
52.002
06.03.30.15.3.
52.003
06.03.30.15.3.
52.004
06.03.30.15.3.
52.005
06.03.30.15.3.
52.006
ROAD SAFETY - ROB/RUB
06.03.30.15.3.
52.009
06.03.30.15.3.
52.011
06.03.30.15.3.
52.012
06.03.30.15.3.
52.015
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 9
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
110 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,85 .. 5,00 2,36,85
Level no. 208 at km 1293/3-4 between
Pukhrayan-Malasa stations.
111 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,87 .. 10,00 2,31,87
Level no. 209 at km 1295/0-1 between
Pukhrayan-Malasa stations.
112 Jhansi-Kanpur ;-Provision of subways in lieu of S.Fund 2,41,87 .. 10,00 2,31,87
Level no. 210 at km 1297/2-3 between
Pukhrayan-Malasa stations.
113 BRN-ETH section: Construction of LHS in place of S.Fund 1,39,18 1,35,29 10 3,79
Unmanned level crossing No.63-C at Km 50/07-08 by
pushing method.
114 Provision of subway in lieu of level crossing S.Fund 1,14,00 .. 20,00 94,00
No.375 in between PRK-AH at Km.377/9-10 in MTJ-AH
Section.
115 Gwalior - Bhind Section -provision of Normal S.Fund 2,41,64 .. 10 2,41,54
Height Subway in lieu of level crossing no. 50 at
km 1305/9-1306/0 .
116 Mughalsarai-Allahabad :Provision of Heavy duty S.Fund 95,03 50,98 2 44,03
height gauge at various RUB's .
117 Agra Division: Construction of subway in lieu of S.Fund 1,18,08 .. 6,00 1,12,08
level crossings no. 34 in IDH-BKI section under
jurisdiction of ADEN/Line/Agra
118 BRN-ETH section: Construction of LHS in place of S.Fund 1,81,94 40,00 41,83 1,00,11
Unmanned level crossing No.61-C by pushing method
119 Provision of subway in lieu of level crossing S.Fund 1,38,00 94,96 1,58 41,46
No.17 at km 0022/8-9 between RAI-AH in IDH-BKI
section.
120 Gwalior - Bhind Section -provision of Limited S.Fund 2,33,99 .. 10 2,33,89
Height Subway in lieu of L-Xing no. 16 at km
1244/3-4 and L-Xing no. 28 at km 1259/4-5 .
121 Jhansi-Gwalior Section -provision of Limited S.Fund 2,18,74 .. 7,00 2,11,74
Height Subway in lieu of L-Xing no. 375 at km
1143/24-26 between Karari & Datia stations.
122 Jhansi-Gwalior Section -provision of Subway in S.Fund 2,48,13 .. 7,00 2,41,13
lieu of L-Xing no. 393 at km 1179/8-10 between
Dabra &Kotra stations.
123 Provision of subway in lieu of level crossing S.Fund 2,36,17 .. 12,62 2,23,55
no.44 & 47 in between FTS - KLB at KM.0050/7-8 &
0052/10-11 in IDH- BXN section.
124 Yamuna Bridge - Tundla: Construction of Subway in S.Fund 1,99,89 1,99,89 .. ..
lieu of LC No. 2AB at ETUE in JAB-TDL section .
ROAD SAFETY - ROB/RUB
06.03.30.15.3.
52.014
06.01.30.15.3.
50.001
06.01.30.11.3.
50.015
06.01.30.15.3.
50.003
06.02.30.11.3.
51.002
06.01.30.12.3.
11.003
06.03.30.13.3.
52.003
06.03.30.14.3.
52.021
06.03.30.14.3.
52.072
06.03.30.15.3.
52.017
06.03.30.15.3.
52.001
06.02.30.11.3.
51.003
06.01.30.12.3.
11.002
06.03.30.13.3.
52.001
06.02.30.14.3.
51.006
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 10
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
125 Provision of subway in lieu of level crossing S.Fund 1,10,00 69,15 5,00 35,85
No.75 at km 0108/0-1 between KL-GOS in IDH-BKI
section.
126 Manikpur- Allahabad section- Proposed construction S.Fund 1,71,37 .. 5,00 1,66,37
of limited height subway to eliminate 'D' class
cattle crossing no. 420 at km 1328/4-5.
127 Provision of subway in lieu of level crossing S.Fund 2,36,26 .. 15,00 2,21,26
no.48 & 49 in between FTS - KLB at KM.0053/16-
54/1 & 0054/13-14 in IDH- BXN section.
128 Yamuna Bridge- Chalesar Sec. :Construction of S.Fund 1,98,46 1,98,45 1 ..
Limited height Subway at Km. 87/29-30 in between
JAB-CHLR section towards CHLR end under
Jurisdiction of ADEN/HQ/Agra.
129 Provision of subway in lieu of level crossing S.Fund 1,10,00 62,23 5,00 42,77
No.76 at km 0109/9-110/0 between KL-GOS in IDH-BKI
section.
130 Mahoba- Khajuraho Section:- :- Provision of S.Fund 2,20,47 .. 7,00 2,13,47
limited height Sub way with covered approaches in
lieu of Level crossings No. 1
131 Jhansi- Manikpur Section:- :- Provision of Sub S.Fund 2,48,87 .. 7,90 2,40,97
way in lieu of Level crossings No. 500 at km
1395/8-9
132 Jhansi- Manikpur Section:- :- Provision of Sub S.Fund 2,48,87 .. 5,00 2,43,87
way in lieu of Level crossings No. 479 at km
1356/9-10
133 Provision of subway in lieu of level crossing S.Fund 2,36,17 .. 12,62 2,23,55
no.50 & 51 in between FTS - KLB at KM.0055/11-12
& 0057/07-08 in IDH- BXN section.
134 AGC-PWL section: Provision of subway in lieu of S.Fund 1,88,38 .. 1 1,88,37
level crossing No.508 at Km. 1359/13-15 between
RNKA-KXM.
135 Provision of subway in lieu of level crossing No. S.Fund 1,29,81 .. 13,40 1,16,41
09 at km 1409/09-10 between MORA-GDO in MTJ-AWR
section.
136 AGC-PWL section: Provision of subway in lieu of S.Fund 1,90,13 .. 1 1,90,12
level crossing No.510 at Km. 1361/13-15 between
RNKA-KXM.
137 Provision of subway in lieu of level crossing S.Fund 1,23,86 .. 15,00 1,08,86
No.15 at Km 1416/14-15 between BTSR-GDO in MTJ-AWR
section.
138 AGC-PWL sectionProvision of subway in lieu of S.Fund 1,90,13 .. 1 1,90,12
level crossing No.512 at Km. 1364/26-65/2 between
RNKA-KXM.
ROAD SAFETY - ROB/RUB
06.01.30.12.3.
11.004
06.03.30.14.3.
52.058
06.01.30.15.3.
50.002
06.01.30.11.3.
30.002
06.01.30.12.3.
50.006
06.01.30.11.3.
30.004
06.01.30.12.3.
50.007
06.01.30.11.3.
30.005
06.01.30.11.3.
50.016
06.01.30.12.3.
11.005
06.03.30.14.3.
52.028
06.03.30.14.3.
52.001
06.03.30.14.3.
52.005
06.01.30.15.3.
50.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 11
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
139 Provision of subway in lieu of level crossing S.Fund 1,23,86 .. 63 1,23,23
No.26 at Km 1426/5-6 between GDO-DEEG in MTJ-AWR
section.
140 AGC-PWL sectionProvision of subway in lieu of S.Fund 1,90,13 .. 1 1,90,12
level crossing No.514 at Km. 1368/5-7 between
KXM-FAR..
141 Provision of subway in lieu of level crossing S.Fund 1,23,86 69,56 16 54,14
No.61B at Km 1464/13-14 between BINR-GVH in
MTJ-AWR section.
142 Bhimsen-Ingohta;-Provision of Limited height S.Fund 2,04,99 .. 10,00 1,94,99
subways in lieu of Level Xings no. S-30 at km
1353/1-2 between Ingohta-Bharwasumerpur stations.
143 Bhimsen-Ingohta;-Provision of Limited height S.Fund 2,04,99 .. 15,00 1,89,99
subways in lieu of Level Xings no. S-33 at km
1357/2-3 between -Bharwasumerpur-Jamunasouth bank
stations.
144 Bhimsen-Ingohta;-Provision of Limited height S.Fund 2,04,99 .. 15,00 1,89,99
subways in lieu of Level Xings no. S-34 at km
1358/4-5 between -Bharwasumerpur-Jamunasouth bank
stations.
145 Bhimsen-Ingohta;-Provision of Limited height S.Fund 2,04,99 .. 10,00 1,94,99
subways in lieu of Level Xings no. S-38at km
1362/1-2 between -Bharwasumerpur-Jamunasouth bank
stations. with cover.
146 Bhimsen-Ingohta;-Provision of Limited height S.Fund 2,04,99 .. 10,00 1,94,99
subways in lieu of Level Xings no. S-63at km
1396/4-5 between -Ghatampur patara stations. with
cover.
147 Bhimsen-Ingohta;-Provision of Limited height S.Fund 2,04,99 .. 10,00 1,94,99
subways in lieu of Level Xings no. S-65at km
1398/7-8 between -Ghatampur patara stations. with
cover.
148 Bhimsen-Ingohta;-Provision of Limited height S.Fund 2,04,99 .. 5,00 1,99,99
subways in lieu of Level Xings no. S-68Aat km
1402/6-7 between -Ghatampur patara stations. with
cover.
149 Ait-Konch;-Provision of Limited height subways in S.Fund 2,04,46 .. 12,00 1,92,46
lieu of Level Xings with cover (no. 169B)at km
1219/3-4,between AIT KONCH Stations
150 Ait-Konch;-Provision of Limited height subways in S.Fund 2,04,46 .. 15,00 1,89,46
lieu of Level Xings with cover (no. 169C)at km
1219/3-4,between AIT KONCH Stations
151 Ait-Konch;-Provision of Limited height subways in S.Fund 2,04,46 .. 12,50 1,91,96
lieu of Level Xings with cover (no. 169D)at km
1224/1-2,between AIT KONCH Stations
06.01.30.12.3.
50.008
06.01.30.11.3.
30.006
06.01.30.12.3.
50.009
06.03.30.14.3.
52.025
06.03.30.14.3.
52.026
06.03.30.14.3.
52.027
ROAD SAFETY - ROB/RUB
06.03.30.14.3.
11.073
06.03.30.14.3.
52.029
06.03.30.14.3.
52.032
06.03.30.14.3.
52.033
06.03.30.14.3.
52.056
06.03.30.14.3.
11.070
06.03.30.14.3.
11.071
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 12
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
152 Ait-Konch;-Provision of Limited height subways in S.Fund 2,04,46 .. 12,00 1,92,46
lieu of Level Xings with cover (no. 169E)at km
1225/8-9,between AIT KONCH Stations
153 Ait-Konch;-Provision of Limited height subways in S.Fund 2,04,46 .. 12,00 1,92,46
lieu of Level Xings with cover (no. 169F)at km
1226/12-13,between AIT KONCH Stations
154 Ait-Konch;-Provision of Limited height subways in S.Fund 2,04,46 .. 12,00 1,92,46
lieu of Level Xings with cover (no. 169H)at km
1229/2-3,between AIT KONCH Stations
155 Ait-Konch;-Provision of Limited height subways in S.Fund 2,04,46 .. 5,00 1,99,46
lieu of Level Xings with cover (no. 169I)at km
1224/12-13,between AIT KONCH Stations
156 AGC-PWL section:Provision of subway in lieu of S.Fund 1,90,13 .. 1 1,90,12
level crossing No.515 at Km. 1370/19-21 between
KXM-FAR.
157 Provision of subway in lieu of level crossing S.Fund 1,28,82 69,58 3,00 56,24
No.63 at Km 1466/16-1467/1 between BINR-GVH in
MTJ-AWR section.
158 Bhind - Etawah section:- Elimination of Level S.Fund 1,57,01 .. 10 1,56,91
Crossings no. 69 between Bhind and Phoop stations
by provision of Sub way.
159 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No.374
at km 1147/1-2
160 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 10,00 2,19,25
height Sub way in lieu of Level crossings No.425A
at km 1260/4-5
161 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No.425
at km 1259/9-10
162 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No.424
at km 1257/6-7
163 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No.420
at km 1251/4-5
164 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No. 416
at km 1245/9-10
165 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No. 415
at km 1244/9-10
06.01.30.11.3.
30.003
06.01.30.12.3.
50.010
06.03.30.14.3.
30.057
06.03.30.14.3.
11.030
06.03.30.14.3.
11.037
06.03.30.14.3.
11.038
ROAD SAFETY - ROB/RUB
06.03.30.14.3.
11.074
06.03.30.14.3.
11.075
06.03.30.14.3.
11.076
06.03.30.14.3.
11.079
06.03.30.14.3.
11.039
06.03.30.14.3.
11.040
06.03.30.14.3.
11.041
06.03.30.14.3.
11.042
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 13
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
166 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No.413
at km 1242/9-10
167 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No.411
at km 1239/8-9
168 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 10,00 2,19,25
height Sub way in lieu of Level crossings No.437at
km 1279/7-8
169 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No.434
at km 1275/3-4
170 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No.433at
km 1274/4-5
171 Khairar- Bharwa sumerpur Section:- :- Provision of S.Fund 2,29,25 37,70 5,00 1,86,55
limited height Sub way in lieu of Level crossings
No.S-26 at km 1345/9-0
172 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,29,25 .. 5,00 2,24,25
height Sub way in lieu of Level crossings No.478
at km 1355/7-8
173 Jhansi-Gwalior Section:- Provision of limited S.Fund 83,98 39,31 5,00 39,67
height sub way in lieu of L-xing No. 411 at Km.
1206/31-29 between Antri-Sandalpur stations.
174 Provision of subway in lieu of level crossing S.Fund 1,28,82 1,02,21 8,67 17,94
No.65 at Km 1468/3-4 between BINR-GVH in MTJ-AWR
section.
175 Bhind - Etawah section:- Elimination of Level S.Fund 2,17,26 .. 10 2,17,16
Crossings no. 70 between Bhind and Phoop stations
by provision of Sub way.
176 Agra-Etawah section Provision of subway in lieu of S.Fund 1,92,94 48,11 45,00 99,83
level crossing no. 60 at CH:104473 in new
Agra-Etawah B.G. Rail Line.
177 Agra-Etawah section Provision of subway in lieu of S.Fund 2,01,15 .. 10 2,01,05
Tress Passing at CH:49650 in new Agra-Etawah B.G.
Rail Line.
178 Agra-Etawah section Provision of subway in lieu of S.Fund 2,01,15 .. 50 2,00,65
Tress Passing at CH:24250 in new Agra-Etawah B.G.
Rail Line.
179 Agra-Etawah section:- Provision of subways in lieu S.Fund 2,49,83 38,57 50 2,10,76
of Tress Passing at CH:40600 & 55200 in new
Agra-Etawah B.G. Rail Line.
06.03.30.11.3.
11.019
06.01.30.12.3.
50.011
06.03.30.14.3.
30.078
06.03.30.14.3.
30.031
06.03.30.14.3.
30.034
06.03.30.14.3.
30.035
06.03.30.14.3.
11.044
06.03.30.14.3.
11.052
06.03.30.14.3.
11.053
06.03.30.14.3.
11.054
06.03.30.14.3.
11.055
06.03.30.14.3.
11.068
ROAD SAFETY - ROB/RUB
06.03.30.14.3.
11.043
06.03.30.14.3.
30.036
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 14
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
180 Agra-Etawah section Provision of subway in lieu of S.Fund 2,03,11 .. 10 2,03,01
Tress Passing at CH:32250 in new Agra-Etawah B.G.
Rail Line.
181 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,06,85 .. 50,00 1,56,85
of level crossing no. 31 at CH:52819 in new
Agra-Etawah B.G. Rail Line.
182 Agra-Etawah section:- Provision of subway in lieu S.Fund 1,94,91 9,97 40,00 1,44,94
of level crossing no. 51 at CH:88934 in new
Agra-Etawah B.G. Rail Line.
183 Agra-Etawah section:- Provision of subway in lieu S.Fund 1,93,31 47,58 40,00 1,05,73
of level crossing no. 58 at CH:101633 in new
Agra-Etawah B.G. Rail Line.
184 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,13,27 .. 30,00 1,83,27
of level crossing no. 44 at CH:73446 in new
Agra-Etawah B.G. Rail Line.
185 Agra-Etawah section:- Provision of subway in lieu S.Fund 1,97,22 .. 50,00 1,47,22
of level crossing no. 30 at CH:51685 in new
Agra-Etawah B.G. Rail Line.
186 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,48,93 48,37 35,00 1,65,56
of level crossing no. 34 & 54 at CH:60084 & 95137
in new Agra-Etawah B.G. Rail Line.
187 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,14,12 50,00 20,00 1,44,12
of level crossing no. 61 at CH:105544 in new
Agra-Etawah B.G. Rail Line.
188 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,19,51 .. .. 2,19,51
of level crossing no. 33 at CH:57008 in new
Agra-Etawah B.G. Rail Line.
189 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,02,13 50,01 50,00 1,02,12
of level crossing no. 29 at CH:50399 in new
Agra-Etawah B.G. Rail Line.
190 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,10,33 .. 30,00 1,80,33
of level crossing no. 42 at CH:71638 in new
Agra-Etawah B.G. Rail Line.
191 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,10,33 .. 35,00 1,75,33
of level crossing no. 43 at CH:72000 in new
Agra-Etawah B.G. Rail Line.
192 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,29,59 .. 55,00 1,74,59
of level crossing no. 32 at CH:55688 in new
Agra-Etawah B.G. Rail Line.
193 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,29,89 .. 30,50 1,99,39
of level crossing no. 41 at CH:70804 in new
Agra-Etawah B.G. Rail Line.
06.03.30.14.3.
30.064
06.03.30.14.3.
30.065
06.03.30.14.3.
30.066
06.03.30.14.3.
30.067
06.03.30.14.3.
30.049
06.03.30.14.3.
30.050
06.03.30.14.3.
30.051
06.03.30.14.3.
30.059
06.03.30.14.3.
30.062
06.03.30.14.3.
30.063
ROAD SAFETY - ROB/RUB
06.03.30.14.3.
30.045
06.03.30.14.3.
30.046
06.03.30.14.3.
30.047
06.03.30.14.3.
30.048
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 15
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
194 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,29,89 .. 5,00 2,24,89
of level crossing no. 40 at CH:69957 in new
Agra-Etawah B.G. Rail Line.
195 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,01,49 1,37,49 20,00 44,00
of level crossing no. 56 at CH:98440 in new
Agra-Etawah B.G. Rail Line.
196 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,20,05 .. 10 2,19,95
of level crossing no. 20 at CH:29367 in new
Agra-Etawah B.G. Rail Line.
197 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,20,94 .. .. 2,20,94
of level crossing no. 16 at CH:23790 in new
Agra-Etawah B.G. Rail Line.
198 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,20,94 .. 10 2,20,84
of level crossing no. 8 at CH:13060 in new
Agra-Etawah B.G. Rail Line.
199 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,15,14 20,00 50,00 1,45,14
of level crossing no. 10 at CH:14110 in new
Agra-Etawah B.G. Rail Line.
200 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,48,93 .. .. 2,48,93
of level crossing no. 2 & 21 at CH:4840 & 31196 in
new Agra-Etawah B.G. Rail Line.
201 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,06,67 .. 10 2,06,57
of level crossing no. 6 at CH:11150 in new
Agra-Etawah B.G. Rail Line.
202 Agra-Etawah section:- Provision of subway in lieu S.Fund 1,82,15 .. .. 1,82,15
of level crossing no. 3 at CH:7214 in new
Agra-Etawah B.G. Rail Line.
203 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,24,42 1,33,36 15,00 76,06
of level crossing no. 55A at CH:96331 in new
Agra-Etawah B.G. Rail Line.
204 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,13,36 34,21 50,00 1,29,15
of level crossing no. 24 at CH:39044 in new
Agra-Etawah B.G. Rail Line.
205 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,14,25 .. .. 2,14,25
of level crossing no. 19 at CH:28140 in new
Agra-Etawah B.G. Rail Line.
206 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,01,23 5,00 50,00 1,46,23
of level crossing no. 14 at CH:21150 in new
Agra-Etawah B.G. Rail Line.
207 Agra-Etawah section:- Provision of subway in lieu S.Fund 1,60,41 .. 50,00 1,10,41
of level crossing no. 11 at CH:15447 in new
Agra-Etawah B.G. Rail Line.
ROAD SAFETY - ROB/RUB
06.03.30.14.3.
30.077
06.03.30.14.3.
30.015
06.03.30.14.3.
30.008
06.03.30.14.3.
30.009
06.03.30.14.3.
30.010
06.03.30.14.3.
30.011
06.03.30.14.3.
30.012
06.03.30.14.3.
30.014
06.03.30.14.3.
30.080
06.03.30.14.3.
30.002
06.03.30.14.3.
30.003
06.03.30.14.3.
30.004
06.03.30.14.3.
30.006
06.03.30.14.3.
30.007
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 16
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
208 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,23,70 6,00 .. 2,17,70
of level crossing no. 27A at CH:46770 in new
Agra-Etawah B.G. Rail Line.
209 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,06,85 1,66,28 40,00 57
of level crossing no. 28 at CH:48229 in new
Agra-Etawah B.G. Rail Line.
210 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,49,37 83,32 55,00 1,11,05
of level crossing no. 13 & 25 at CH:18833 & 39976
in new Agra-Etawah B.G. Rail Line.
211 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,49,83 .. 10 2,49,73
of level crossing no. 22 & 27 at CH:36295 & 43985
in new Agra-Etawah B.G. Rail Line.
212 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,02,13 .. .. 2,02,13
of level crossing no. 15 at CH:22766 in new
Agra-Etawah B.G. Rail Line.
213 Agra-Etawah section:- Provision of subway in lieu S.Fund 2,06,85 .. 40,00 1,66,85
of level crossing no. 5 at CH:10307 in new
Agra-Etawah B.G. Rail Line.
214 Bina-Jhansi Section:- Provision of limited height S.Fund 1,19,73 6,11 5,00 1,08,62
sub way in lieu of L-xing No. 314 at Km.
989/22-24 between Agasod-Karoda stations.
215 Provision of subway in lieu of level crossing S.Fund 1,35,81 1,17,51 16 18,14
No.66 at Km 1470/1-2 between BINR-GVH in MTJ-AWR
section.
216 Bhind - Etawah section:- Elimination of Level S.Fund 2,46,39 .. 50 2,45,89
Crossings no. 71 between Bhind and Phoop stations
by provision of Subway.
217 BIN-JHS section: Provision of limited height sub S.Fund 1,16,13 3,90 7,00 1,05,23
way in lieu of L-xing No. 321 at Km. 1014/8-10
between Dhaura-Jakhlaun stations.
218 Provision of subway in lieu of level crossing S.Fund 1,38,73 1,29,48 16 9,09
No.68 at Km 1473/3-4 between BINR-GVH in MTJ-AWR
section.
219 Bhind - Etawah section:- Elimination of Level S.Fund 1,91,35 .. .. 1,91,35
Crossings no. 72-A between Bhind and Phoop
stations by provision of Sub way.
220 Gwalior-Agra Section:- Provision of limited height S.Fund 1,73,60 20,09 5,00 1,48,51
sub way in lieu of L-xing No. 484 at Km.
1327/20-22 between Jajau-Bhandai stations.
221 Provision of subway in lieu of level crossing S.Fund 1,35,81 98,29 1,58 35,94
No.75 at Km 1479/3-4 between GVH-JBS in MTJ-AWR
section.
ROAD SAFETY - ROB/RUB
06.03.30.14.3.
30.016
06.03.30.14.3.
30.017
06.03.30.14.3.
30.018
06.03.30.14.3.
30.019
06.01.30.12.3.
50.013
06.03.30.14.3.
30.060
06.03.30.11.3.
11.017
06.01.30.12.3.
50.014
06.03.30.14.3.
30.020
06.03.30.14.3.
30.024
06.03.30.11.3.
11.005
06.01.30.12.3.
50.012
06.03.30.14.3.
30.069
06.03.30.11.3.
11.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 17
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
222 Bhind - Etawah section:- Elimination of Level S.Fund 1,55,55 .. 50 1,55,05
Crossings no. 75 between Bhind and Phoop stations
by provision of Sub way.
223 Gwalior-Agra Section:- Provision of limited height S.Fund 1,63,64 42,26 5,00 1,16,38
sub way in lieu of L-xing No. 479 at Km.
1322/20-22 between Jajau-Bhandai stations
224 Provision of subway in lieu of level crossing S.Fund 1,35,81 1,02,65 2,37 30,79
No.77 at Km 1480/14-15 between GVH-JBS in MTJ-AWR
section.
225 Jhansi-Kanpur:-Replacement of LC No. 125(M) S.Fund 70,86 58,50 1,52 10,84
betweenGarhmau-Parichha Stns Km 1144/8-9 of
JHS-CNB Sec by Provision of LHS.
226 Provision of subway in lieu of level crossing S.Fund 1,18,91 45,29 1,10 72,52
No.80 at Km 1483/0-1 between GVH-JBS in MTJ-AWR
section.
227 Jhansi-Kanpur:-Replacement of LC No. 200 (M) S.Fund 70,86 69,95 91 ..
between CNH-PHN Stns Km 1283/0-1 of JHS-CNB Sec by
Provision of LHS.
228 Provision of subway in lieu of level crissing S.Fund 1,09,00 45,29 2,37 61,34
No.81 at Km 1483/14-15 between GVH-JBS in MTJ-AWR
section.
229 Jhansi-Kanpur:-Replacement of LC No. 229(M) S.Fund 70,86 44,13 5,00 21,73
between PMN-BZM Stns Km 1324/5-6 by Provision of
LHS.
230 CAR-CPU: Provision of LHS with RCC box in lieu of S.Fund 2,30,10 22,22 55,00 1,52,88
un manned Level Crossing no. 22 C in CAR-CPU
section under ADEN/CAR
231 Khairar-Bhimsen Sec:-Replacement of LC S.Fund 70,86 70,86 .. ..
No.S71A(M)Km1406/1-2 between PTRE-KTRR Stns by
Provision of LHS.
232 Construction of limited height subway in place of S.Fund 1,37,96 1,33,41 4,55 ..
Unmanned L-Xing No.28-C in BRN-ETH section
233 Khairar-Bhimsen Sec:-Replacement of LC No.S42(M) S.Fund 70,86 65,32 10 5,44
Km1370/5-6between JSB-DPSR Stns by Provision of
LHS.
234 Construction of limited height subway in place of S.Fund 1,32,65 .. .. 1,32,65
Unmanned L-Xing No.38-C in BRN-ETH section
235 Manikpur-Allahabad Section:- Provision of limited S.Fund 87,82 83,35 50 3,97
height sub way in liew of L-xing No. 409 at Km.
1291/2-3 between Kataiya Dandi-Bargarh stations.
236 Construction of limited height subway in place of S.Fund 1,32,65 1,23,89 23 8,53
Unmanned L-Xing No.66-C in BRN-ETH section
06.03.30.11.3.
11.018
06.01.30.12.3.
50.015
06.03.30.11.3.
52.030
06.01.30.12.3.
50.016
06.03.30.11.3.
52.028
06.01.30.12.3.
50.017
ROAD SAFETY - ROB/RUB
06.03.30.14.3.
30.061
06.03.30.11.3.
52.002
06.02.30.12.3.
51.004
06.03.30.11.3.
52.029
06.02.30.12.3.
51.001
06.03.30.11.3.
52.034
06.02.30.12.3.
51.002
06.03.30.11.3.
52.033
06.02.30.12.3.
51.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 18
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
237 Jhansi-Manikpur Section:- Provision of limited S.Fund 70,86 69,00 50 1,36
height sub way in liew of L-xing No. 470 at Km.
1341/1-2 between Khurhand -Atarra stations.
238 Construction of limited height subway in place of S.Fund 1,17,78 1,17,78 .. ..
Unmanned L-Xing No.15-C in BRN-ETH section
239 Jhansi-Manikpur Section:- Provision of limited S.Fund 70,86 67,83 .. 3,03
height sub way in liew of L-xing No. 407at Km.
1233/1-2 betweenGhutai-Belatal stations.
240 Construction of limited height subway in place of S.Fund 1,37,96 .. .. 1,37,96
Unmanned L-Xing No.29-C in BRN-ETH section
241 Bina-Jhansi Section:-Provision of Limited height S.Fund 1,22,58 9,00 5,00 1,08,58
sub ways in lieu of L-xing No. 340 at km
1069/30-32 between Bijrautha-Daulta statios.
242 Jhansi-Manikpur Sec:-Provision of Limited Height S.Fund 65,05 15,75 75 48,55
Subway in lieu of LC No.399(U/M)Km1214/6-7
betweenHPP-GTI Stns.
243 Bina-Jhansi Section:-Provision of limited height S.Fund 1,58,24 7,96 10,00 1,40,28
sub way in lieu of L-xing No. 331 at Km.
1042/18-20 between Lalitpur-Dailwara stations.
244 Provision of subway in lieu of level crossing S.Fund 1,13,96 41,32 3,15 69,49
No.82 at Km 1484/4-5 between GVH-JBS in MTJ-AWR
section.
245 Jhansi-Gwalior Section:-Provision of Limited S.Fund 1,41,68 37,48 5,00 99,20
height sub way in lieu of L-xing No. 406 at km
1200/22-24 between Anantpaith-Antri stations.
246 Provision of subway in lieu of level crossing S.Fund 1,38,73 15,26 16 1,23,31
No.101 at Km 1499/8-9 between RAH-OTD in MTJ-AWR
section.
247 Bina-Jhansi Section:- Provision of limited height S.Fund 1,20,90 5,00 5,00 1,10,90
sub way in lieu of L-xing No. 312 at Km.
985/12-14 between Agasod-Karoda stations.
248 Provision of subway in lieu of level crossing S.Fund 1,18,91 15,26 6,31 97,34
No.105 at Km 1508/11-12 between OTD-AWR in MTJ-AWR
section.
249 Bina-Jhansi Section:-Provision of limited height S.Fund 1,11,98 12,75 5,00 94,23
sub way in lieu of L-xing No. 333 at Km.
1049/26-28 between Dailwara-Jakhaura stations.
250 Provision of subway in lieu of level crossing S.Fund 1,35,81 47,32 7,89 80,60
No.72 at Km 1476/9-10 between GVH-JBS in MTJ-AWR
section.
251 JHS-GWL Section:-Provision of Limited height sub S.Fund 1,86,47 65,78 8,00 1,12,69
ways in lieu of L-xing No. 387 at km 1164/26-28
near Sonagir station.
06.02.30.12.3.
51.006
06.03.30.11.3.
11.010
06.03.30.12.3.
52.001
06.03.30.11.3.
11.016
06.01.30.12.3.
50.018
06.03.30.11.3.
11.021
ROAD SAFETY - ROB/RUB
06.03.30.11.3.
52.001
06.02.30.12.3.
51.005
06.03.30.11.3.
52.031
06.01.30.12.3.
50.019
06.03.30.11.3.
11.004
06.01.30.12.3.
50.020
06.03.30.11.3.
11.011
06.01.30.12.3.
50.021
06.03.30.11.3.
11.032
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 19
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
252 Provision of subway in lieu of level crossing S.Fund 1,35,27 94,32 2,37 38,58
No.74 at Km 1478/11-12 between GVH-JBS in MTJ-AWR
section.
253 MTJ-AWR section: Provision of restricted height S.Fund 1,49,02 96,68 17,35 34,99
subway in lieu of level crossing No. 21 at Km
1420/6-7 between BTSR-GDO.
254 Provision of subway in lieu of level crossing S.Fund 1,35,27 1,12,92 16 22,19
No.76 at Km 1480/2-3 between GVH-JBS in MTJ-AWR
section.
255 MTJ-AWR section: Provision of restricted height S.Fund 1,51,76 82,11 5,00 64,65
subway in lieu of level crossing No.39 at Km.
1436/13-14 in block section GDO-DEEG.
256 Provision of subway in lieu of level crossing S.Fund 1,14,00 .. 5,00 1,09,00
No.363 at Km 363/6-7 between BSA-PRK in MTJ-AH
section.
257 MTJ-AWR section: Provision of restricted height S.Fund 1,48,27 1,25,45 1,50 21,32
subway in lieu of level crossing No.78 at Km.
1482/2-3 in block section GVH-JBS.
258 Provision of subway in lieu of level crossing S.Fund 1,14,00 .. 18,92 95,08
No.365 at Km 364/15-16 between BSA-PRK in MTJ-AH
section.
259 MTJ-AWR section: Provision of restricted height S.Fund 1,51,76 45,21 10,00 96,55
subway at level crossing No.86 at Km. 1487/6-7 in
block section JBS-RAH.
260 Provision of subway in lieu of level crossing No. S.Fund 1,13,96 .. 9,46 1,04,50
29 at Km 1428/5-6 between GDO-DEEG in MTJ-AWR
section.
261 Jhansi-Kanpur Sec:-Provision of Limited Height S.Fund 70,86 44,25 50 26,11
Subway in lieu of L-Xing no.152 (U/M) at
Km1185/6-7between MH-ERC Stns .
262 Provision of subway in lieu of level crossing S.Fund 1,33,77 89,34 16 44,27
No.34 at Km 1432/6-7 between GDO-DEEG in MTJ-AWR
section.
263 Bina-Jhansi Section:-Provision of Limited height S.Fund 2,42,90 1,12,43 12,00 1,18,47
sub ways in lieu of L-xing No. 350 at km 1088/3-4
near Basai station.
264 Provision of subway in lieu of level crossing S.Fund 1,14,00 .. 40,00 74,00
No.376 in between PRK -AH at Km.379/6-7 in MTJ-AH
Section.
265 MTJ-AWR section: Provision of restricted height S.Fund 1,51,76 15,26 10,00 1,26,50
subway in lieu of level crossing No. 91 at Km.
1489/13-14 between JBS-RAH .
06.01.30.11.3.
50.014
06.01.30.12.3.
11.025
06.01.30.11.3.
50.012
06.01.30.12.3.
50.026
06.03.30.11.3.
52.027
06.01.30.12.3.
50.027
ROAD SAFETY - ROB/RUB
06.01.30.12.3.
50.022
06.01.30.11.3.
50.007
06.01.30.12.3.
50.023
06.01.30.11.3.
50.008
06.01.30.12.3.
11.024
06.03.30.11.3.
11.013
06.01.30.12.3.
11.028
06.01.30.11.3.
50.009
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 20
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
266 Provision of subway in lieu of level crossing S.Fund 1,23,86 .. 15,00 1,08,86
No.377 in between PRK-AH at Km.380/8-9 in MTJ-AH
Section.
267 MTJ-AWR section: Provision of restricted height S.Fund 1,75,28 15,26 10,00 1,50,02
subway in lieu of level crossing No.110 at Km.
1512/8-9 between OTD-AWR .
268 Provision of subway in lieu of level crossing No. S.Fund 1,23,86 1,17,08 16 6,62
41 at Km1439/8-9 between DEEG-BEDM in MTJ-AWR
section.
269 MTJ-AWR section: Provision of restricted height S.Fund 1,75,28 .. 20,50 1,54,78
subway in lieu of level crossing No.12 at Km.
1413/3-4 between BTSR-GDO .
270 Provision of subway in lieu of level crossing S.Fund 1,52,27 .. 16 1,52,11
No.68 at km 0098/3-4 between NBI-KL in IDH-BKI
section.
271 Bina-Jhansi Section:-Provision of Limited height S.Fund 1,64,67 7,85 12,00 1,44,82
sub ways in lieu of L-xing No. 348 at km 1087/6-7
between Matatila-Basai stations.
272 Provision of subway in level crossing No.47 at Km S.Fund 1,28,82 50,43 2,37 76,02
1446/5-6 between DEEG-BEDM in MTJ-AWR section.
273 Jhansi-Gwalior Section:-Provision of Limited S.Fund 99,92 5,75 5,00 89,17
height sub way in lieu of L-xing No. 409 at km
1205/13-15 between Antri-Sandalpur stations.
274 Provision of subway in lieu of level crossing No. S.Fund 1,13,96 43,70 16 70,10
52 at Km 1454/10-11 between BEDM-BINR in MTJ-AWR
section.
275 Jhansi-Gwalior Section:-Provision of Limited S.Fund 1,53,51 49,31 5,00 99,20
height sub ways in lieu of L-Xing No. 376 at km
1145/0-2 between Karari-Datia stations.
276 Provision of subway in lieu of level crossing No. S.Fund 1,18,91 31,90 35,00 52,01
77 at km 0110/9 - 111/0 between KL-GOS in IDH-BKI
section.
277 MTJ-AWR section:Provision of restricted height S.Fund 1,75,28 .. 26,81 1,48,47
subway at level crossing No.17 at Km. 1418/9-10
between BTSR-GDO.
278 Provision of subway in lieu of level crossing S.Fund 1,18,91 53,42 8,67 56,82
No.86 at km 0125/3-4 between MURD-KPO in IDH-BKI
section.
279 Provision of subway in lieu of level crossing S.Fund 1,10,00 54,85 20,00 35,15
No.87 at km 125/9-126/0 between MURD-KPO in
IDH-BKI section.
06.01.30.12.3.
50.033
06.03.30.11.3.
11.024
06.01.30.12.3.
11.034
06.01.30.11.3.
50.013
06.01.30.12.3.
11.035
06.01.30.12.3.
11.036
06.01.30.12.3.
50.030
06.01.30.11.3.
50.011
06.01.30.12.3.
11.031
06.03.30.11.3.
11.015
06.01.30.12.3.
50.032
06.03.30.11.3.
11.022
ROAD SAFETY - ROB/RUB
06.01.30.12.3.
11.029
06.01.30.11.3.
50.010
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 21
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
280 Jhansi-Gwalior Section:-Provision of Limited S.Fund 1,82,86 1,26,45 5,00 51,41
height sub ways in lieu of L-Xing No. 396 at km
1184/4-6 between Dabra-Anantpeth station.
281 Jhansi-Gwalior Section:-Provision of Limited S.Fund 2,20,00 40,77 5,00 1,74,23
height sub ways in lieu of L-Xing No. 398 at km
1188/12-14 between Dabra-Anantpeth station.
282 Jhansi-Gwalior Section:-Provision of Limited S.Fund 1,49,70 17,20 5,00 1,27,50
height sub way in lieu of L-xing No. 405 at km
1199/22-24 between Anantpaith-Antri stations.
283 Bina-Jhansi Section:-Provision of Limited height S.Fund 2,49,62 97,57 5,00 1,47,05
sub ways in lieu of L-xing No. 353 at km
1094/14-16 between Basai-Burhpura stations.
284 Bina-Jhansi Section:-Provision of Limited height S.Fund 2,49,83 1,42,93 5,00 1,01,90
sub ways in lieu of L-xing No. 352 at km
1091/18-20 near Basai station.
285 Bina-Jhansi Section:-Provision of limited height S.Fund 1,13,40 11,50 5,00 96,90
sub way in lieu of L-xing No. 326 at Km. 1025/6-8
between Jakhlaun-Jiron stations.
286 Bina-Jhansi Section:-Provision of limited height S.Fund 1,40,59 3,50 5,00 1,32,09
sub way in lieu of L-xing No. 336 at Km.
1059/18-20 between Jakhaura-Bijrautha stations.
287 Bina-Jhansi Section:-Provision of Limited height S.Fund 2,49,58 1,07,89 5,00 1,36,69
sub ways in lieu of L-xing No. 355 at km 1100/6-8
between Burhpura-Babina stations.
288 Jhansi-Gwalior Section:-Provision of Limited S.Fund 2,48,12 87,82 8,00 1,52,30
height sub ways in lieu of L-Xing No. 370 at km
1134/16-18 between Jhansi-Karari stations.
289 Kanpur-Tundla: Strengthening of damaged deck slabs S.Fund 1,26,97 97,49 1,40 28,08
of Br. No. 264-A(ROB) for Panki end line (For road
from Dada Nagar to Vijay Nagar area) along with
strengthening of steel members.
290 CNB-TDL: Replacement of broken/damaged deck slab , S.Fund 1,06,49 89,49 1,40 15,60
strengthening of cross girders and related works
like replacement of bearings of Raffaca ROB (Br.
No. 264-A) on roadway direction from Vijay Nager
to Dadanager area at Kanpur .
291 Hamirpur sub way : Regirdering of Bridge No. 254-A S.Fund 1,49,50 74,04 15,00 60,46
along with replacement of bearing and bed blocks.
292 NYN-ALD : Regirdering of Bridge No. 38 (RUB) 1x S.Fund 2,05,59 1,74,97 8,20 22,42
16.48 M 6/girder between NYN-ALD section.
293 Vindhyachal-Mirazapur: Replacement of existing S.Fund 84,38 60,94 8,19 15,25
steel girder of Br. No. 518 (RUB) at km. 738/19-21
by providing PSC girder.
06.02.30.05.2.
11.002
06.02.30.05.2.
11.001
06.02.30.10.3.
51.004
06.03.30.11.3.
11.006
06.03.30.11.3.
11.012
06.03.30.11.3.
11.009
06.03.30.11.3.
11.025
06.02.30.11.3.
11.005
06.02.30.11.3.
11.004
ROAD SAFETY - ROB/RUB
06.03.30.11.3.
11.023
06.03.30.11.3.
11.026
06.03.30.11.3.
11.020
06.03.30.11.3.
11.007
06.03.30.11.3.
11.014
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 22
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
294 Jhansi-Kanpur: Provision of limited height subway S.Fund 1,64,83 95,20 7,54 62,09
in liew of L-xing no. 239 at km. 1338/9-10.
295 Jhansi-Kanpur: Provision of limited height subway S.Fund 1,37,53 1,34,87 10 2,56
in liew of L-xing no. 160 at 1200/4-5.
296 Mirazapur : construction of new Road under Bridge S.Fund 2,25,14 2,16,88 10 8,16
(size 1x5.50x3.50) between Level crossing No. 8&9.
297 Provision of subway in lieu of level crossing S.Fund 1,14,54 49,64 79 64,11
no.35 in between GDO-DEEG at KM.1433/02-03 in
MTJ-AWR section.
298 Provision of subway in lieu of level crossing S.Fund 1,16,57 31,45 2,37 82,75
no.37 in between GDO -DEEG at KM. 1435/2-3 in
MTJ-AWR section.
299 Provision of subway in lieu of level crossing S.Fund 1,23,76 .. 3,15 1,20,61
no.378 in between PRK-AH at KM. 381/4-5 in AH-MTJ
section.
300 Idgah- Bandikui section:Provision of subway in S.Fund 2,42,87 .. 23,66 2,19,21
lieu of level crossing no.63 & 64 in between
Nadbai -Kherli at KM. 91/6-7 & 93/1-2.
301 Idgah- Bandikui section:Provision of subway in S.Fund 2,42,87 .. 23,66 2,19,21
lieu of level crossing no.65 & 70 in between
Idgah- Ghosrana at KM. 94/4-5 & 100/0-1.
302 Idgah- Bandikui section:Provision of subway in S.Fund 2,42,87 .. 23,66 2,19,21
lieu of level crossing no.99 & 101 in between
Biwai-Bandikui at KM. 140/3-4 & 145/6-7.
303 Mathura Jn.-Alwar section: Provision of subway in S.Fund 2,42,87 .. 23,66 2,19,21
lieu of level crossing no.11&13 in between Mora -
Govardhan at KM. 1412/5-6 &1414/05-06 .
304 Mathura Jn.-Alwar section: Provision of subway in S.Fund 2,42,87 .. 18,00 2,24,87
lieu of level crossing no.33 & 43 in between
Govardhan-Deeg-Bedham at KM. 1442/03-04.
305 Idgah- Bandikui section:Provision of subway in S.Fund 2,42,87 .. 23,66 2,19,21
lieu of level crossing no.66 & 89 in between
Nadbai-Kherli & Karanpura - Biwai at KM. 0095/8-9
& 0127/7-8.
306 Idgah- Bandikui section:Provision of subway in S.Fund 2,42,87 .. 23,66 2,19,21
lieu of level crossing no.72 &73 in between
Kherli-Ghosrana at KM. 103/ 3-4 & 0105/4-5 .
307 Mathura Jn.-Alwar section:Provision of subway in S.Fund 2,42,87 .. 15,77 2,27,10
lieu of level crossing no.61/C & 79 in between
Brij Nagar-Govindgarh - Jadali Ka Bas at KM.
1465/8-9.
ROAD SAFETY - ROB/RUB
06.03.30.10.3.
52.003
06.03.30.10.3.
52.002
06.01.30.14.3.
50.010
06.01.30.14.3.
50.001
06.01.30.14.3.
50.002
06.01.30.14.3.
50.003
06.01.30.14.3.
50.004
06.01.30.14.3.
50.005
06.02.30.10.3.
51.002
06.01.30.13.3.
50.003
06.01.30.13.3.
50.001
06.01.30.13.3.
50.002
06.01.30.14.3.
50.008
06.01.30.14.3.
50.009
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 23
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
308 Idgah- Bandikui section:Provision of subway in S.Fund 2,42,87 .. 23,66 2,19,21
lieu of level crossing no.36 & 61 in between
Ikaran-Kherli at KM. 47/4-5 & 88/7-8.
309 Mathura- Alwar section :Provision of subway in S.Fund 1,27,35 .. 12,00 1,15,35
lieu of level crossing no. 19 C in between Mora -
Goverdhan stations at KM. 1420/4-5.
310 Etawah-Mainpuri:-Construction of limited height S.Fund 2,34,73 77,66 45,00 1,12,07
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.1 &2 between Etawah & Vaidpura halt of
Etawah Mainpuri New B.G.Railway line.(Annexure-I)
311 Etawah-Mainpuri:-Construction of limited height S.Fund 2,37,67 19,04 43,80 1,74,83
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.4&5 between Etawah & Vaidpura halt of
Etawah Mainpuri New B.G.Railway
line.(Annexure-II).
312 Etawah-Mainpuri:-Construction of limited height S.Fund 2,40,03 .. 35,00 2,05,03
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.6&7 between Etawah & Vaidpura halt of
Etawah Mainpuri New B.G.Railway
line.(Annexure-III)
313 Etawah-Mainpuri:-Construction of limited height S.Fund 2,41,69 82,54 40,00 1,19,15
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.9&10 between Vaidpura hault & Saiphai
hault of Etawah Mainpuri New B.G.Railway
line.(Annexure-IV)
314 Etawah-Mainpuri:-Construction of limited height S.Fund 2,45,39 18,19 35,00 1,92,20
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.11&13 between Vaidpura hault & Karhal
station of Etawah Mainpuri New B.G.Railway
line.(Annexure-V).
315 Etawah-Mainpuri:-Construction of limited height S.Fund 2,44,59 17,93 35,00 1,91,66
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.14&15 between Saiphai hault & Karhal
station of Etawah Mainpuri New B.G.Railway
line(Annexure-VI)
316 Etawah-Mainpuri:-Construction of limited height S.Fund 2,34,73 35,26 40,00 1,59,47
subway R.C.C box size 4.50mx4.00m in lieu of
level Crossing No.17&19 between Saiphai hault &
Bujhia hault of Etawah Mainpuri New B.G.Railway
line.(same as Annexure-I)
317 Etawah-Mainpuri:-Construction of limited height S.Fund 2,41,69 69,70 40,00 1,31,99
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.20&21 between Karahal station & Bujhia
hault of Etawah Mainpuri New B.G.Railway
line.(same as Annexure-IV)
ROAD SAFETY - ROB/RUB
06.01.30.14.3.
50.006
06.01.30.14.3.
50.007
06.02.30.14.3.
30.008
06.02.30.14.3.
30.009
06.02.30.14.3.
30.010
06.02.30.14.3.
30.011
06.02.30.14.3.
30.012
06.02.30.14.3.
30.013
06.02.30.14.3.
30.014
06.02.30.14.3.
30.015
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 24
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
318 Etawah-Mainpuri:-Construction of limited height S.Fund 2,45,39 72 40,00 2,04,67
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.22&23 between Karahal station & Bujhia
hault of Etawah Mainpuri New B.G.Railway
line.(same as Annexure-V)
319 Etawah-Mainpuri:-Construction of limited height S.Fund 2,41,69 44,97 40,00 1,56,72
subway R.C.C box size 4.50mx4.00m in lieu of level
Crossing No.24&25 between Bujhia hault & Keeratpur
hault of Etawah Mainpuri New B.G.Railway
line.(same as Annexure-IV)
320 Etawah-Mainpuri:-Construction of limited height S.Fund 2,37,67 39,96 40,00 1,57,71
subway R.C.C box size 4.50mx4.00m in lieu of
level Crossing No.26&27 between Bujhia hault &
Keeratpur hault of Etawah Mainpuri New B.G.Railway
line.(same as Annexure-II)
321 Etawah-Mainpuri:-Construction of limited height S.Fund 2,40,03 .. 40,00 2,00,03
subway R.C.C box size 4.50mx4.00m in lieu of
level Crossing No.29&30 between Keeratpur hault &
Mainpuri station of Etawah Mainpuri New
B.G.Railway line.(same as Annexure-III).
322 Etawah-Mainpuri:-Construction of limited height S.Fund 2,34,73 62,90 40,00 1,31,83
subway R.C.C box size 4.50mx4.00m in lieu of
level Crossing No.32&33 between Keeratpur hault &
Mainpuri station of Etawah Mainpuri New
B.G.Railway line.(same as Annexure-I)
323 Etawah-Mainpuri:-Construction of limited height S.Fund 1,17,36 .. 30,00 87,36
subway R.C.C box size 4.50mx4.00m in lieu of
level Crossing No.34 between Keeratpur hault &
Mainpuri station of Etawah Mainpuri New
B.G.Railway line( same as Annexure-VII)
324 Provision of subway in lieu of level crossing S.Fund 2,35,91 .. 12,62 2,23,29
no.53& 56 in between FTS - KLB - MIQ at
KM.0059/2-3 & 0062/02-03 in IDH- BXN section.
325 Works costing below DRM's Power S.Fund 1,50,00 .. 1,50,00 ..
TOTAL-WORKS IN PROGRESS S.Fund .. .. 30,00,00 ..
B - New Works
326 Agra Division-Idgah-Bandikui-Construction of S.Fund 1,94,86 .. 14,50 1,80,36
subway in lieu of level crossing no. 47
327 Agra Division-Idgah-Bandikui-Construction of S.Fund 1,94,86 .. 14,50 1,80,36
subway in lieu of level crossing no. 48
328 Jhansi-Manikpur Section:- Provision of limited S.Fund 2,28,48 .. 15,50 2,12,98
height Sub way in lieu of Level crossings No.449
at km 1302/1-2
06.01.30.15.3.
50.004
06.00.30.16.3.
00.999
06.01.30.16.3.
50.007
06.01.30.16.3.
50.008
06.03.30.16.3.
52.006
06.02.30.14.3.
30.016
06.02.30.14.3.
30.001
06.02.30.14.3.
30.002
06.02.30.14.3.
30.003
06.02.30.14.3.
30.004
06.02.30.14.3.
30.005
ROAD SAFETY - ROB/RUB
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 25
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
329 Agra Division-Idgah-Bandikui-Construction of S.Fund 1,94,86 .. 14,50 1,80,36
subway in lieu of level crossing no. 52
330 Jhansi-Manikpur Section:- Provision of limited S.Fund 2,28,48 .. 15,50 2,12,98
height Sub way in lieu of Level crossings No.401
at km 1221/3-4
331 Agra Division-Idgah-Bandikui-Construction of S.Fund 1,94,86 .. 14,50 1,80,36
subway in lieu of level crossing no. 55
332 Jhansi-Manikpur Section:- Provision of limited S.Fund 2,28,48 .. 15,50 2,12,98
height Sub way in lieu of Level crossings No.402
at km 1223/2-3
333 Agra Division-Idgah-Bandikui-Construction of S.Fund 1,94,86 .. 14,50 1,80,36
subway in lieu of level crossing no. 62
334 Jhansi-Manikpur Section:- Provision of limited S.Fund 2,28,48 .. 15,50 2,12,98
height Sub way in lieu of Level crossings No.431
at km 1269/1-2
335 Agra Division-Idgah-Bandikui-Construction of S.Fund 1,94,86 .. 14,50 1,80,36
subway in lieu of level crossing no. 67
336 Jhansi-Manikpur Section:- Provision of limited S.Fund 2,28,48 .. 15,50 2,12,98
height Sub way in lieu of Level crossings No.405
at km 1229/0-1
337 Agra Division -Provision of subway in lieu of L C S.Fund 1,95,79 .. 14,50 1,81,29
no. 364 in MTJ- AH section.
338 Khairar-Bhimsen section:- Provision of limited S.Fund 2,28,48 .. 14,60 2,13,88
height Sub way in lieu of unmanned Level crossings
No.S-4 at km 1315/6-7
339 Khairar-Bhimsen section:- Provision of limited S.Fund 2,28,48 .. 14,65 2,13,83
height Sub way in lieu of Unmanned Level crossings
No.S-9 at km 1323/9-0
340 Khairar-Bhimsen section:- Provision of limited S.Fund 2,28,48 .. 14,60 2,13,88
height Sub way in lieu of Unmanned Level
crossings No.S-13 at km 1329/4-5
341 Khairar-Bhimsen section:- Provision of limited S.Fund 2,28,48 .. 14,65 2,13,83
height Sub way in lieu of Unmanned Level crossings
No.S-14 at km 1330/7-8
342 Agra Division-Mathura-Alwar- Provision of drainage S.Fund 2,44,44 .. 16,00 2,28,44
system,retaining wall,road work & height gauge at
11 subway
343 Jhansi-Manikpur Section:-Provision of limited S.Fund 2,23,79 .. 15,50 2,08,29
height Sub way in lieu of Level crossings No.387at
km 1183/7-8
ROAD SAFETY - ROB/RUB
06.03.30.16.3.
52.012
06.01.30.16.3.
50.001
06.03.30.16.3.
52.007
06.01.30.16.3.
50.006
06.03.30.16.3.
52.004
06.01.30.16.3.
50.003
06.03.30.16.3.
52.009
06.03.30.16.3.
52.010
06.03.30.16.3.
52.011
06.01.30.16.3.
50.002
06.03.30.16.3.
52.001
06.01.30.16.3.
50.004
06.03.30.16.3.
52.002
06.01.30.16.3.
50.005
06.03.30.16.3.
52.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 26
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
344 Manikpur-Allahabad Section:- :- Provision of S.Fund 2,28,48 .. 15,50 2,12,98
limited height Sub way in lieu of Level crossings
No.407 at km 1283/9-10
345 Jhansi-Manikpur Section:- :- Provision of limited S.Fund 2,28,48 .. 15,50 2,12,98
height Sub way in lieu of Level crossings No.449A
at km 1304/3-4
TOTAL-NEW WORKS S.Fund .. .. 3,00,00 ..
TOTAL-Road Safety - ROB/RUB S.Fund .. .. 33,00,00 ..
A - Works in Progress
346 MANIKPUR-NAINI Sction CTR/P-0.430 KM ON MKP-NYN DRF 67,75 .. 9,00 58,75
SECTION. R. 5,35
347 Agori - Churk : Through Weld Renewal with mobile DRF 97,01 .. 15,00 82,01
flush butt welding
348 Jhansi- TTR(P) =5 Nos.(1 in 8.5) HP19 to HP23 at DRF 70,84 39,85 .. 30,99
A. C. Loco Shed Jhansi
349 BINA-Agra: TFR = 11.281 Kms. on DN road in DRF 98,17 23,74 10,00 64,43
JHS-STLI section.
Complete Track Renewal
350 CTR (P) 1.30 Kms. with 60 Kg 90 Rails PSC-6 DRF 1,65,83 88,27 15,00 62,56
sleepers on DN Road of MKP - ALD section. R. 14,41
Complete Track Renewal
351 Agra Div.-Agra-Palwal section CTR(S) 1.00 km in DRF 1,19,15 .. 50,00 69,15
AGC & BFP yard R. 12,60
Complete Track Renewal
352 Jhansi-Manikpur: CTR ( S) 0.960 KM on Banda yard . DRF 96,24 96,24 .. ..
R. 11,40
Complete Track Renewal
353 Agra Div-CTR (P) 0.580 Km. from 1346.400 to DRF 83,64 64,49 .. 19,15
1346.980 (DN) in AGC-PWL Section R. 6,91
Complete Track Renewal
354 JHS-MKP: CTR(P) = 0.538 Kms. From km. 1128.462 to DRF 87,38 .. 10,00 77,38
1129.000 on JHS-MKP main line of Jhansi yard. R. 7,20
Complete Track Renewal
355 Agra Div- CTR(P) 0.658 km with 60 kg from DRF 99,86 46,70 10,00 43,16
1396.884 to 1397.542 on P/F no.5 in MTJ Yard in R. 7,17
AGC-PWL sectionComplete Track Renewal
356 Bina-Agra Cantt. Section: CTR(S) =0.700 on DN Loop DRF 88,04 .. .. 88,04
at DAA from Km1152.000 to Km 1152.700 R. 8,57
Complete Track Renewal
357 Kanpur (Loco) : Complete Track Renewal of Stabling DRF 81,59 .. 15,00 66,59
Line no. 1 & 2 R. 8,60
ROAD SAFETY - ROB/RUB
06.03.30.16.3.
52.005
06.03.30.16.3.
52.008
06.02.31.13.3.
51.007
06.01.31.15.2.
50.002
06.03.31.15.2.
52.001
06.01.31.12.3.
50.001
06.03.31.15.3.
52.076
06.01.31.13.3.
50.009
06.03.31.15.3.
52.077
TRACK RENEWALS
06.03.31.15.3.
52.058
06.02.31.13.3.
51.004
06.03.31.12.3.
52.009
06.03.31.13.3.
52.024
06.03.31.11.2.
52.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 27
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Complete Track Renewal
358 Bina-Agra Cantt. Section: CTR(S) =0.700 on Goods DRF 88,03 .. 10,00 78,03
Loop at DAA from Km1152.000 to Km 1152.700 R. 8,57
Complete Track Renewal
359 Panki : Complete Track reenwal ( Secoundary ) of DRF 78,51 .. 12,00 66,51
Line no. 14 R. 8,28
Complete Track Renewal
360 BIN-AGC Section : CTR(S)=0.700 Kms on DN Loop of DRF 88,03 .. 10,00 78,03
DBA yard from Km1182.400 to Km 1183.100 R. 8,57
Complete Track Renewal
361 Agra Div-CTR(S) with 52 kg 0.650 km line No.3 in DRF 63,44 .. .. 63,44
AGA Yard. R. 6,47
Complete Track Renewal
362 Jhansi Yard: CTR(P) = 0.403 Kms. From km. DRF 66,08 .. 9,38 56,70
1128.646 to 1128.875 on JHS-CNB main line and R. 5,38
from km. 1128.258 to 1128.432 on JHS-MKP main line
of Jhansi yard.
Complete Track Renewal
363 Bina-Agra Cantt. section: CTR(S) = 0.700 Kms. on DRF 88,03 .. 15,00 73,03
Goods Loop-I from km. 982.700 to 983.400 at Agasod R. 8,57
station.
Complete Track Renewal
364 Bina-Agra Cantt. section: CTR(S) = 0.700Kms. on DRF 88,05 .. 10,00 78,05
Goods Loop-II from km. 982.650 to 983.350 at R. 8,57
Agasod station.
Complete Track Renewal
365 CTR (S) = 0.560 km at Barwasagar TRT siding and DRF 77,28 33,86 .. 43,42
TRR (S) - 0.630 km at Mauranipur TRT siding R. 4,61
Complete Track Renewal
366 Chirgaon station CTR (S) of Ballast siding DRF 92,91 91,55 .. 1,36
R. 3,43
Complete Track Renewal
367 Chauah station CTR (S) of Ballast sidng DRF 91,97 58,22 .. 33,75
R. 3,98
Complete Track Renewal
368 Barwasagar station of CTR (S) of Ballast siding DRF 84,78 60,46 .. 24,32
R. 4,56
Complete Track Renewal
369 Banmore , Antri CTR (S) of Ballast siding DRF 84,63 30,00 .. 54,63
Complete Track Renewal
370 CTR (S) of Ballast siding at Fatehpur Sikri DRF 96,23 .. 30,00 66,23
R. 55
Complete Track Renewal
371 Agra Fort- CTR (P) - 0.650 km from km 84.00 to DRF 73,31 56,98 .. 16,33
84.650 km R. 3,61
TRACK RENEWALS
06.03.31.15.3.
52.078
06.02.31.13.3.
51.022
06.03.31.15.3.
52.008
06.01.31.13.3.
50.006
06.03.31.10.3.
52.005
06.03.31.10.3.
52.004
06.01.31.10.3.
50.008
06.01.31.10.3.
50.005
06.03.31.15.3.
52.007
06.03.31.15.3.
52.004
06.03.31.15.3.
52.015
06.03.31.10.3.
52.010
06.03.31.10.3.
52.009
06.03.31.10.3.
52.008
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 28
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Complete Track Renewal
372 Achanera Yard - CTR (S) - of Ballast siding DRF 80,73 .. 30,00 50,73
R. 51
Complete Track Renewal
373 Govindgarh Yard - CTR (S) - of Ballast siding DRF 99,39 26,54 27,00 45,85
R. 55
Complete Track Renewal
374 CTR (S) of Ballast Derot siding at Chunar DRF 90,76 57,79 2,00 30,97
Complete Track Renewal
375 Tundla - CTR (S) of Ballast siding DRF 50,57 5,81 4,00 40,76
Complete Track Renewal
376 Manda road - CTR (S) of Ballast siding DRF 62,04 1,68 5,00 55,36
Complete Track Renewal
377 Khurja- CTR (S) of Ballast siding DRF 92,57 15,16 2,00 75,41
Complete Track Renewal
378 AGC Div-CTR (P) 0.496 from Km.1344.904 to 1345.400 DRF 72,44 61,67 .. 10,77
(DN) in AGC-PWL Section R. 5,91
Complete Track Renewal
379 Juhi Yard : Complete Track renewal ( Secoundary )= DRF 73,25 .. 10,00 63,25
0 .737 km. of Line no. 22 R. 7,72
Through Rail Renewal
380 Agra-Palwal section- TRR (P) 0.90 KM & Yamuna DRF 1,62,81 1,08,89 20,00 33,92
Bridge - Tundla Section TRR (P) 0.775 km
Through Rail Renewal
381 Agra Fort-Bandikui section-TRR (P) with 60 kg DRF 1,31,47 1,14,61 .. 16,86
=2.90 KM from Km.3.100 -6.00 (SL)
Through Rail Renewal
382 TRR(P) with 60kg km 1.522 UP&DN Road in AGC- PWL DRF 1,64,70 1,45,66 19,04 ..
section
Through Rail Renewal
383 Agra Div.-Idgah-Bandikui section TRR(P) 1.40 km DRF 1,66,93 .. 35,00 1,31,93
Through Rail Renewal
384 Allahabad Division Naini-Manikpur Sec. TRR(P)- DRF 1,71,90 1,70,54 98 38
2.80 Km
Through Rail Renewal
385 Bayana-Yamuna Bridge Sec. TRR (P) - 2.106 Km DRF 1,76,58 1,61,11 .. 15,47
Through Rail Renewal
386 Allahabad division :-Through rail renewal DRF 81,96 .. 4,00 77,96
(Primary)of 0.80 Km. lines in the section of ADEN
/ Line / CNBThrough Rail Renewal
387 Allahabad-Kanpur: Through Rail Renewal( Primary) DRF 95,87 .. 60,00 35,87
1.00 Km. of UP Line in CNBi-CNB Diversion
06.01.31.10.3.
50.010
06.02.31.10.3.
51.009
06.02.31.10.3.
51.019
06.02.31.10.3.
51.015
06.02.31.10.3.
51.012
06.01.31.12.3.
50.004
TRACK RENEWALS
06.01.31.10.3.
50.001
06.01.31.10.2.
50.002
06.02.31.11.3.
51.001
06.02.31.14.3.
51.001
06.02.31.13.3.
51.019
06.01.31.12.2.
50.001
06.01.31.13.2.
50.002
06.01.31.14.2.
50.001
06.01.31.15.2.
50.001
06.02.31.07.2.
51.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 29
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Through Rail Renewal
388 Bina- Agra UP Road section TRR(P) = 0.900 km from DRF 96,80 .. 15,00 81,80
Km 1287.100 to Km 1288.00.
Through Rail Renewal
389 Casual Rail Renewal (Primary) From Km. 1151.00 to DRF 64,81 .. 8,00 56,81
Km. 1151.70 on UP Line in CNB - TDL Section
Through Rail Renewal
390 Allahabad Division :-Through rail renewal DRF 62,59 .. 8,00 54,59
(Primary) on Major bridges in the section of Sr.
DEN / IV / ALD
Through Rail Renewal
391 Allahabad - kanpur : Through Rail Renewal DRF 95,87 4,67 12,00 79,20
(Primary) : Km.1018-1019 of DN line in CNBI - CNB
Diversion
Through Rail Renewal
392 Bina- Agra UP Road section TRR(P) = 0.9 km from Km DRF 92,19 .. 10,00 82,19
1298.100 to Km 1299.00.
Through Rail Renewal
393 Agra Div-TRR(P) with 60kg km=0.800 km from 1341.00 DRF 80,79 45,79 .. 35,00
to 1341.80 in AGC-PWL section (DN Rd.)
Through Rail Renewal
394 Bina- Agra : TRR(P) 1 km from Km 1219.800 to Km DRF 99,79 .. 10,00 89,79
1220.800 KM on DN Road on BIN-AGC section .
Through Rail Renewal
395 Bina- Agra UP Road section TRR(P) = 0.8 km from Km DRF 94,63 .. 10,00 84,63
1283.540 to Km 1284.340.
Through Rail Renewal
396 Agra Div-TRR(P) with 60kg km=0.700 km from 1341.00 DRF 71,30 41,30 .. 30,00
to 1341.70 in AGC-PWL section (UP Rd.)
Through Rail Renewal
397 Bina- Agra : TRR(P) = 1 km from Km 1222.000 to Km DRF 97,19 .. 10,00 87,19
1223.000 on DN Road .
Through Rail Renewal
398 Bina- Agra UP Road section TRR(P) = 0.6 km from Km DRF 71,71 .. 12,00 59,71
1284.400 to Km 1285.00.
Through Rail Renewal
399 Agra Div-TRR(P) with 52 kg km=0.904 km from DRF 80,61 62,06 .. 18,55
1344.00 to 1344.904 in AGC-PWL section (UP Rd.)Through Rail Renewal
400 Bina- Agra UP Road section TRR(P) = 1 km from Km DRF 97,19 .. 10,00 87,19
1265.00 to Km 1266.00.
Through Rail Renewal
401 Bina- Agra UP Road section TRR(P) = 1 km from Km DRF 99,28 .. 10,00 89,28
1268.00 to Km 1269.00.
06.02.31.12.3.
51.001
06.02.31.14.3.
51.002
06.03.31.15.3.
50.075
06.01.31.12.3.
50.002
06.03.31.14.3.
52.003
06.03.31.15.3.
52.073
TRACK RENEWALS
06.03.31.15.3.
52.071
06.02.31.12.3.
51.003
06.01.31.12.3.
50.003
06.03.31.14.3.
52.001
06.03.31.15.3.
52.080
06.01.31.12.3.
50.005
06.03.31.14.3.
52.002
06.03.31.14.3.
52.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 30
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Through Rail Renewal
402 BINA-AGC Section : TRR(P) = 0.800 Kms on UP road DRF 87,06 .. 10,00 77,06
from Km 1212.00 to Km 1212.80
Through Rail Renewal
403 Bina- Agra UP Road section TRR(P) = 1 km from Km DRF 96,68 .. 10,00 86,68
1270.00 to Km 1271.00.
Through Rail Renewal
404 BINA-AGC Section: TRR(P) = 0.900 Kms on UP road DRF 1,05,32 .. 15,00 90,32
from Km 1173.60 to Km 1174.00 & on DN road from Km
1207.80 to Km 1208.30
Through Rail Renewal
405 BINA-AGC Section: TRR(P) = 0.500 Kms on UP road DRF 59,50 .. 8,00 51,50
from Km 1129.000 to Km 1129.500
Through Rail Renewal
406 BINA-AGC Section: TRR(P) = 0.800 Kms on UP road DRF 93,89 .. 10,00 83,89
from Km 1145.000 to Km 1145.800
Through Rail Renewal
407 Jhansi - Kanpur Section: TRR of existing 52 kg. DRF 72,56 40,00 5,00 27,56
rail on imp. & Major bridge and bridge approach by
26 m rolled rail at bridge no: 1301/1, km:
1301.200 to 1301.500 and 1325/1, km 1325.00 to
1325.300.
Through Rail Renewal
408 Jhansi - Kanpur Section: TRR of existing 52 kg. DRF 93,37 69,39 12,00 11,98
rail on imp. & Major bridge and bridge approach by
26 m rolled rail at bridge no. 1275/2, km; 1275.45
to 1276.45.
Through Rail Renewal
409 Agra-Div-TRR(P) with 52 kg 0.800 km from km 1.000 DRF 70,94 25,00 .. 45,94
to 1.800 in AF-BKI Section
Through Rail Renewal
410 BIN-AGC Section : TRR(S) = 1.175 Kms on washing DRF 96,43 .. 12,00 84,43
pit lines of CNB Sdg & MKP Sdg in JHS Yard.
Through Rail Renewal
411 Agra Div.- AGC-MTJ Section-TRR(S) 1.538 km with DRF 99,61 .. 15,00 84,61
52kg for goods line no. 4 & 6 in AGC yard
Through Rail Renewal
412 Agra Div.- AGC-MTJ Section-TRR(S) 0.835 km with DRF 67,00 .. 8,00 59,00
52kg for goods line no. 5 in AGC yard
Through Rail Renewal
413 Agra Div.- AGC-MTJ Section-TRR(S) 0.856 km with DRF 68,64 .. 8,00 60,64
52kg for goods line no. 7 in AGC yardThrough Rail Renewal
414 Agra Div.- AGC-MTJ Section-TRR(S) 1.54 km with DRF 99,74 .. 10,00 89,74
52kg for goods line no. 8 & 9 in AGC yard
06.03.31.15.3.
52.009
06.03.31.15.3.
52.016
06.01.31.13.3.
50.008
06.03.31.15.3.
52.011
06.01.31.15.3.
50.005
06.01.31.15.3.
50.006
TRACK RENEWALS
06.03.31.15.3.
52.005
06.03.31.14.3.
52.004
06.03.31.15.3.
52.069
06.03.31.15.3.
52.006
06.03.31.15.3.
52.060
06.01.31.15.3.
50.007
06.01.31.15.3.
50.008
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 31
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Through Rail Renewal
415 Agra Div.- JAB-TDL Section-TRR(S) 1.4 km with 52kg DRF 99,74 .. 20,00 79,74
for dispatch goods line no. 1 & 2 in JAB yard
Through Rail Renewal
416 Agra Div.- JAB-TDL Section-TRR(S) 1.51 km with 52 DRF 98,99 .. 20,00 78,99
kg for goods line no. 5 & 6 in JAB yard
Through Rail Renewal
417 Agra Div.- JAB-TDL Section-TRR(S) 1.5 km with 52 DRF 98,19 .. 20,00 78,19
kg for goods line no. 7 in JAB yard & DN loop line
no.1 in KBP yard
Through Rail Renewal
418 Agra Div.- JAB-TDL Section-TRR(S) 1.524 km with DRF 99,82 .. 15,00 84,82
52 kg for DN Loop line no.1 in CHLR yard & Line
no. 4 in ETUE yard
Through Rail Renewal
419 Dhaulpur Jn.:Sirmuttra section. TRR (S) 6.33 Kms. DRF 48,01 28,01 .. 20,00
(NG) SRSF 1 39,63 39,63 .. ..
Through Rail Renewal
420 Agra Fort - Yamuna Bridge - TRR (P) - 0.960 km DRF 74,30 55,00 .. 19,30
from km 81.800 to 82.500 (IDH yard ) & km 84.600
to 84.860 km ( AF - JAB )
Through Rail Renewal
421 BINA-Agra Section- TRR(P) 01 Kms. from Km 1337.500 DRF 92,65 35,00 .. 57,65
to Km 1338.500 on DN Road section.
Through Rail Renewal
422 BINA-AGRA SECTION :- Through Rail Renewal (P) = DRF 83,78 19,00 .. 64,78
0.900 Tkms from Km 1338.700 to Km 1339.600 on DN
road .
Through Rail Renewal
423 BINA-AGRA SECTION : - Through Rail Renewal (P) = DRF 91,79 20,00 .. 71,79
1.00 Tkms from Km 1340.00 to Km 1341.00 on DN
road.
Through Rail Renewal
424 Allahabad Division:- Through rail renewal DRF 90,68 63,24 4,00 23,44
(Primary) on Major bridges in the section of Sr.
DEN / VI / ALD
Through Rail Renewal
425 Gwaliar-Agra section TRR(P)- 1.0 Tr. Kms between DRF 92,45 60,00 .. 32,45
Km 1295.00 to km 1296.00 on UP Road.Through Rail Renewal
426 Gwaliar-Agra section TRR(P)- 0.9 Tr. Kms between DRF 85,63 50,00 .. 35,63
Km 1296.100 to km 1297.00 on UP Road.
Through Rail Renewal
427 Agra-Div-TRR(P) with 52 kg 0.700 km from km 0.300 DRF 63,10 48,81 .. 14,29
to 1.00 in AF-BKI Section
06.02.31.11.3.
51.002
06.03.31.12.6.
50.002
06.03.31.12.6.
50.003
06.01.31.13.3.
50.007
06.01.31.15.3.
50.003
06.04.31.01.2.
52.001
06.01.31.10.3.
50.003
06.03.31.11.3.
50.005
06.03.31.11.3.
50.004
06.03.31.11.3.
50.003
TRACK RENEWALS
06.01.31.15.3.
50.010
06.01.31.15.3.
50.011
06.01.31.15.3.
50.021
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 32
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Through Rail Renewal
428 Agra-Div-TRR(P) with 52 kg 0.800 km from km DRF 67,06 48,93 18,00 13
122.400 to 123.200 in AF-BKI Section
Through Rail Renewal
429 Bina- Agra DN Road section TRR(P) = 1 km from Km DRF 95,15 81,58 1,00 12,57
1262.650 to Km 1263.650.
Through Rail Renewal
430 Bina- Agra UP Road section TRR(P) = 1 km from Km DRF 95,15 79,70 2,00 13,45
1264.00 to to Km 1265.00.
Through Rail Renewal
431 Bina- Agra UP Road section TRR(P) = 1 km from Km DRF 95,80 75,32 5,00 15,48
1272.00 to to Km 1273.00.
Through Rail Renewal
432 Bina- Agra UP Road section TRR(P) =1 km from Km DRF 95,80 82,42 5,00 8,38
1266.500 to Km 1267.500.
Through Rail Renewal
433 Bina- Agra UP Road section TRR(P) = 1 km from Km DRF 93,40 82,38 8,00 3,02
1266.100 to 1266.400 & km 1288.800 to to Km
1289.500.
Through Rail Renewal
434 Naini - Allahabad : Scattered Rail Renewal ( DRF 99,45 27,99 7,00 64,46
Primary ) between Km. 820.50 - Km. 822.50 on UP
Line.
Through Rail Renewal
435 Allahabad - Naini : Scattered Rail Renewal ( DRF 99,45 26,18 10,00 63,27
Primary ) between Km. 820.40 - Km. 822.40 on DN
Line.
Through Sleeper Renewal
436 Chunar-Chopan Section TSR(S)- 5 Km DRF 1,72,38 1,71,28 .. 1,10
R. 47,09
Through Sleeper Renewal
437 Bina- Agra UP Road section TSR(P) =1 km from Km DRF 62,65 .. 12,00 50,65
1266.00 to Km 1267.00. R. 14,16
Through Sleeper Renewal
438 Bina- Agra UP Road section TSR(P) =0.950 km from DRF 59,51 .. 12,00 47,51
Km 1267.050 to Km 1268.00. R. 13,44
Through Sleeper Renewal
439 BINA-Agra: TSR = 1.57Kms. on DN road bet. km. DRF 78,63 .. 10,00 68,63
990.50 – 991.64 and. 992.07 – 992.50 in BINA-JHS R. 17,32
section.
Through Sleeper Renewal
440 Casual Sleeper Renewal (Primary) for Km.1276 (DN) DRF 78,28 .. 12,00 66,28
and Km. 1277 (DN) in TDL - GZB Section R. 15,44
TRACK RENEWALS
06.01.31.13.3.
50.005
06.02.31.13.3.
51.020
06.02.31.09.2.
51.001
06.03.31.15.3.
52.081
06.03.31.15.3.
52.082
06.03.31.13.3.
52.031
06.02.31.15.3.
51.001
06.03.31.13.3.
52.020
06.03.31.13.3.
52.021
06.03.31.13.3.
52.025
06.03.31.13.3.
52.026
06.03.31.13.3.
52.018
06.02.31.13.3.
51.014
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 33
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Through Sleeper Renewal
441 Casual Sleeper Renewal (Primary) for Km.1278 (DN) DRF 78,28 .. 12,00 66,28
and Km. 1279 (DN) in TDL - GZB Section R. 15,44
Through Sleeper Renewal
442 Casual Sleeper Renewal (Primary) for Km.1280 (DN) DRF 73,86 .. 10,00 63,86
and Km. 1281 (DN) in TDL - GZB Section R. 14,57
Through Sleeper Renewal
443 Casual Sleeper Renewal (Primary) for Km.1282 (DN) DRF 75,75 .. 15,00 60,75
and Km. 1283 (DN) in TDL - GZB Section R. 14,94
Through Sleeper Renewal
444 Casual Sleeper Renewal (Primary) for Km.1284 (DN) DRF 80,17 .. 15,00 65,17
and Km. 1285 (DN) in TDL - GZB Section R. 15,81
Through Sleeper Renewal
445 Casual Sleeper Renewal (Primary) for Km.1286 (DN) DRF 75,75 .. 15,00 60,75
and Km. 1287 (DN) in TDL - GZB Section R. 14,94
Through Sleeper Renewal
446 Casual Sleeper Renewal (Primary) for Km.1288 (DN) DRF 79,54 .. 15,00 64,54
and Km. 1289 (DN) in TDL - GZB Section R. 15,69
Through Sleeper Renewal
447 Casual Sleeper Renewal (Primary) for Km.1290 (DN) DRF 78,91 .. 15,00 63,91
and Km. 1291 (DN) in TDL - GZB Section R. 15,56
Through Sleeper Renewal
448 Casual Sleeper Renewal (Primary) for Km.1292 (DN) DRF 61,86 .. 10,00 51,86
in TDL - GZB Section R. 12,20
Through Sleeper Renewal
449 Casual Sleeper Renewal (Primary) for Km.1293 (DN) DRF 59,34 .. 8,00 51,34
in TDL - GZB Section R. 11,70
Through Sleeper Renewal
450 Tundla - Ghaziabad : Scatterred Sleeper Renewal DRF 82,06 .. 10,00 72,06
(Primary) on UP Line in ADEN / ALJN Section R. 16,18
Through Sleeper Renewal
451 Tundla - Ghaziabad : Scatterred Sleeper Renewal DRF 72,59 .. 10,00 62,59
(Primary) on DN Line in ADEN / ALJN Section R. 14,32
Through Sleeper Renewal
452 Through sleeper renewal of Points & Crossings on DRF 90,46 73 4,00 85,73
main line in ALD - CNB Section
Through Sleeper Renewal
453 Jhansi Division :-TSR (S) 1.540 Kms. with S/H PSC DRF 56,25 34,58 .. 21,67
sleepers from Km. 1229.000 to 1230.540 on AIT-KNH R. 1,38
section
Through Sleeper Renewal
454 TSR (S) 2.400 Kms. with S/H PSC sleepers from Km. DRF 84,35 76,41 .. 7,94
1217.000 to 1219.400 on AIT-KNH section R. 2,15
TRACK RENEWALS
06.02.31.15.3.
51.002
06.02.31.15.3.
51.003
06.02.31.15.3.
51.004
06.02.31.15.3.
51.069
06.02.31.15.3.
51.074
06.02.31.11.3.
51.006
06.03.31.11.3.
52.013
06.03.31.11.3.
52.016
06.02.31.15.3.
51.070
06.02.31.15.3.
51.071
06.02.31.15.3.
51.072
06.02.31.15.3.
51.073
06.02.31.15.3.
51.054
06.02.31.15.3.
51.055
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 34
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Through Sleeper Renewal
455 TSR (S) 2.400 Kms. with S/H PSC sleepers from Km. DRF 84,35 83,92 .. 43
1219.400 to 1221.800 on AIT-KNH section R. 2,15
Through Sleeper Renewal
456 Gwalior-Sheopur Kalan NG section TSR(S) = 2.95 DRF 84,82 63,18 15,00 6,64
Tkms from Km 1372.100 to km 1375.050. R. 12,25
Ballast
457 TBR from km 53.25 to 59.72,77.32 to 79, 81.20 to DRF 1,03,49 63,51 .. 39,98
88.49=14.140 Km BXN- JAB (S/L) section( - Bridge R. 1,38,58
& P/F appron=1.30)
Ballast
458 Allahabad Division :-Through ballast renewal of DRF 42,02 .. 8,00 34,02
loop lines and T/outs in the section of Sr. DEN / R. 46,36
IV / ALD
Ballast
459 Through ballast renewal of loop lines and T/outs DRF 35,26 .. 5,00 30,26
in the section of Sr. DEN / V / ALD R. 39,78
Ballast
460 Through Ballast Renewal of UP Main Line from Km. DRF 42,89 .. 6,00 36,89
732.00 to 736.50 in MGS - ALD Section R. 48,38
Ballast
461 Through Ballast Renewal of UP Main Line from Km. DRF 38,12 .. 5,00 33,12
727.00 to 731.00in MGS - ALD Section R. 43,00
Ballast
462 Through Ballast renewal of Main Line in different DRF 46,75 .. 8,00 38,75
yards in MGS - ALD Section R. 53,03
Ballast
463 BINA-AGRA : Raising cushion of loop lines of AGD, DRF 28,59 15,00 .. 13,59
KOA, DUA, JLN, JRO, & LAR R. 32,25
Ballast
464 Mughalsarai-Allahabad : Through Fitting Renewal of DRF 96,30 .. 15,00 81,30
Girder Bridge no. 10
Ballast
465 BINA-Agra: TBR =2.977 kms. on DN & UP road at DRF 29,10 3,37 7,00 18,73
platform between BINA - LAR. R. 37,59
Ballast
466 Mughalsarai-Allahabad : Through Fitting Renewal of DRF 75,33 .. 15,00 60,33
Girder Bridges in the Section of ADEN/CAR
Ballast
467 Mughalsarai-Allahabad : Through Fitting Renewal of DRF 86,14 .. 10,00 76,14
Girder Bridge no. 487, 503, 514, 518a & 530
Ballast
468 Mughalsarai-Allahabad : Through Fitting Renewal of DRF 98,98 .. 15,00 83,98
Girder Bridge no. 5
06.01.31.11.1.
50.003
06.02.31.12.3.
51.012
06.02.31.12.3.
51.007
06.02.31.12.3.
51.008
06.02.31.12.3.
51.010
06.02.31.12.3.
51.011
TRACK RENEWALS
06.03.31.11.3.
52.008
06.03.31.12.6.
52.001
06.03.31.12.3.
52.012
06.02.31.15.3.
51.067
06.03.31.13.3.
52.030
06.02.31.15.3.
51.066
06.02.31.15.3.
51.076
06.02.31.15.3.
51.075
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 35
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Ballast
469 Allahabad-Kanpur : Through Fitting Renewal of DRF 77,25 .. 15,00 62,25
Girder Bridges
Ballast
470 Chunar-Chopan : Through Fitting Renewal of Girder DRF 76,18 .. 8,00 68,18
Bridge no. 131,2,28,35,40,403,46,48 & 81
Ballast
471 Chunar-Chopan : Through Fitting Renewal of Girder DRF 98,98 .. 15,00 83,98
Bridge no. 399
Ballast
472 Shikohabad - Farrukhabad : Through Fitting Renewal DRF 99,30 .. 20,00 79,30
of Girder Bridges
Ballast
473 Mughalsarai- Allahabad : Deepscreening of Loop DRF 29,09 .. 10,00 19,09
Lines at Jigna & Manda Road Station R. 32,06
Ballast
474 Mughalsarai- Allahabad : Deepscreening of Loop DRF 42,25 .. 10,00 32,25
Lines at Mirzapur Station R. 46,56
Ballast
475 Mughalsarai- Allahabad : Deepscreening of Loop DRF 40,33 .. 10,00 30,33
Lines at Jhigura, Vindhyachal & Berohi Station R. 44,44
Ballast
476 Mughalsarai- Allahabad : Deepscreening of Loop DRF 30,70 .. 10,00 20,70
Lines at Meja Road & Uchdih Station R. 33,84
Ballast
477 Allahabad - Kanpur : Deepscreening of Loop Lines DRF 45,60 .. 12,00 33,60
at Subedarganj, Bamhrauli, & Manoharganj Station R. 50,26
Ballast
478 Allahabad - Kanpur : Deepscreening of Loop Lines DRF 43,56 .. 15,00 28,56
at Manauri & Bharwari Station R. 48,00
Ballast
479 Allahabad - Kanpur : Deepscreening of Loop Lines DRF 37,56 .. 10,00 27,56
at Sujatpur & Saiyadsarawan Station R. 41,39
Ballast
480 Allahabad - Kanpur : Deepscreening of Loop Lines DRF 39,12 .. 15,00 24,12
at Kanwar & Katoghan Station R. 43,11
Ballast
481 Allahabad - Kanpur : Deepscreening of Loop Lines DRF 42,63 .. 10,00 32,63
at Sirathu & Khaga Station R. 46,98
Ballast
482 Allahabad - Kanpur : Deepscreening of Loop Lines DRF 38,69 .. 8,00 30,69
at Satnaraini & Sarsaul Station R. 42,64
06.02.31.15.3.
51.006
06.02.31.15.3.
51.005
06.02.31.15.3.
51.009
06.02.31.15.3.
51.010
06.02.31.15.3.
51.011
06.02.31.15.3.
51.012
TRACK RENEWALS
06.02.31.15.3.
51.065
06.02.31.15.3.
51.078
06.02.31.15.3.
51.077
06.02.31.15.3.
51.064
06.02.31.15.3.
51.007
06.02.31.15.3.
51.015
06.02.31.15.3.
51.087
06.02.31.15.3.
51.088
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 36
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Ballast
483 Kanpur-Tundla : Deepscreening of Loop Lines at DRF 38,98 .. 12,00 26,98
Balrai and Bhadan Station R. 42,96
Ballast
484 Kanpur-Tundla : Deepscreening of Loop Lines at DRF 46,50 .. 20,00 26,50
Jaswantnagar and Kaurara Station R. 51,24
Ballast
485 Kanpur-Tundla : Deepscreening of Loop Lines at DRF 39,76 .. 15,00 24,76
Sarai Bhoopat & Shamoh R. 43,82
Ballast
486 Tundla - Ghaziabad : Deepscreening of Loop Lines DRF 33,11 .. 8,00 25,11
at Mitawali & Jalesar Road Station R. 36,49
Ballast
487 Tundla - Ghaziabad : Deepscreening of Loop Lines DRF 37,20 .. 10,00 27,20
at Ajaibpur, Chola, Danwar & Khurja Station R. 41,00
Ballast
488 Tundla - Ghaziabad : Deepscreening of Loop Lines DRF 45,83 .. 15,00 30,83
at Sikandarpur, Somna, Wair & Maripat Station R. 50,51
Ballast
489 Tundla - Ghaziabad : Deepscreening of Loop Lines DRF 32,32 .. 10,00 22,32
at Dadri & Dankaur Station R. 35,62
Ballast
490 Shikohabad - Farrukhabad : Deepscreening of Loop DRF 28,30 .. 10,00 18,30
Lines at Nibkarori, Mota and Mainpuri Station R. 31,19
Ballast
491 Bina-Agra Cantt. Section: TBR =3.125 kms. of Goods DRF 35,59 .. 10,00 25,59
line 1 to3 and MKP siding 2 to 5 in Jhansi Yard R. 42,56
Ballast
492 Bina-Agra Cantt. Section: TBR =3.517 kms. of DRF 40,04 .. 8,00 32,04
Marshlling line no. 1 to 6 in Jhansi Yard R. 47,90
Ballast
493 Bina-Agra Cantt. Section: TBR =3.315 kms. of DRF 37,75 .. 10,00 27,75
Marshlling line no. 7 to 11, Dead End sdg and Fuel R. 45,15
Sdg. in Jhansi Yard
Ballast
494 Bina-Agra Cantt. Section: TBR =3.83 kms. of UP DRF 43,57 .. 15,00 28,57
Dep.1 ,UP Dep.2 , UP Dep.3, DN Dep.1 & DN Dep.2 R. 52,16
Lines in Jhansi Yard.Ballast
495 Jhansi yard - TBR in busy loop line of 5.5 Trkm DRF 32,62 27,00 5,62 ..
length R. 51,21
Ballast
496 Through ballast renewal of loop lines and T/outs DRF 89,94 86,07 3,87 ..
in the section of Sr. DEN / I / ALD
06.03.31.15.3.
52.012
06.03.31.15.3.
52.013
06.03.31.15.3.
52.014
06.03.31.15.3.
52.079
06.03.31.10.3.
52.019
06.02.31.11.3.
51.003
06.02.31.15.3.
51.016
06.02.31.15.3.
51.053
06.02.31.15.3.
51.057
06.02.31.15.3.
51.059
06.02.31.15.3.
51.063
06.02.31.15.3.
51.086
TRACK RENEWALS
06.02.31.15.3.
51.013
06.02.31.15.3.
51.014
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 37
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Ballast
497 Through ballast renewal of loop lines and T/outs DRF 80,68 13 4,00 76,55
in the section of Sr. DEN / II / ALD
Ballast
498 Through ballast renewal of loop lines and T/outs DRF 74,55 .. 4,13 70,42
in the section of Sr. DEN / VI / ALD
Ballast
499 AIT-KONCH Section: TBR = 8.340 Kms from DRF 91,26 30,00 .. 61,26
Kms.1222.200 To1230.540. R. 7,62
Ballast
500 BINA-AGC: Raising cushion of loop lines of DWA, DRF 68,68 .. 10,00 58,68
JHA, BJA, TBT, MZX, BZY, BAB, KHJ & BJI on R. 29,53
BINA-JHS section.
Ballast
501 BINA-Agra: Raising cushion of loop lines of KRQ, DRF 68,68 14,18 10,00 44,50
DAA, SOR, KTRA, DBA, AEH & ARI on JHS-GWL section. R. 29,53
Ballast
502 BINA-Agra: : TBR = 4.139 kms. on DN & UP road at DRF 40,47 .. 10,00 30,47
platform between LAR - JHS. R. 52,26
Ballast
503 BINA-Agra: TBR = 4.856 kms. on DN & UP road at DRF 46,46 .. 10,00 36,46
platform between JHS - STLI. R. 52,91
Ballast
504 Jhansi: TBR =2.90 kms. of UP Middle Line, DN DRF 28,36 .. 10,00 18,36
Middle Line, CNB Line & MKP LInein Jhansi Yard R. 36,62
Ballast
505 Jhansi: TBR =3.6 kms. of BP-1, BP-2, BP--3, RD-1 & DRF 35,19 .. 10,00 25,19
RD-2 Lines in Jhansi Yard R. 45,45
Points & Crossings
506 Agra Div.-Agra-Palwal section Replacement of DRF 3,21,70 1,00,00 70,96 1,50,74
turnout 1 in 12 (22 nos.)& 1 in 8.5 (13 nos.)with R. ..
60kg
Points & Crossings
507 Jamuna Bridge-Agra Fort Section TTR 12 Nos (1 in DRF 1,31,89 17,32 .. 1,14,57
12=6 Nos & 1 in 8.5 = 6 Nos) R. 6,46
Points & Crossings
508 Tundla - Agra Sec. TTR - 15 Nos DRF 2,19,67 1,08,49 .. 1,11,18
R. 5,98
Points & Crossings
509 KID-BZM SECTION-CTR(P)=0.530 Kms. on KID-BZM DRF 77,31 .. 8,00 69,31
SECTION R. 6,60
Points & Crossings
510 BINA-Agra: TTR(CS)=38 Nos, 60 Kg. on BINA-STLI DRF 65,31 .. 15,00 50,31
section.
06.01.31.10.2.
50.003
06.03.31.15.3.
52.063
06.03.31.13.3.
52.016
06.03.31.13.3.
52.013
06.03.31.13.3.
52.015
06.03.31.13.3.
52.027
06.03.31.13.3.
52.028
06.01.31.15.2.
50.003
06.01.31.07.2.
50.002
TRACK RENEWALS
06.02.31.11.3.
51.004
06.02.31.11.3.
51.005
06.03.31.11.3.
52.002
06.03.31.13.3.
52.022
06.03.31.13.3.
52.023
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 38
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Points & Crossings
511 Jhansi - Kanpur Section: Through Replacement of 47 DRF 97,14 .. .. 97,14
nos 1:12 & 5 nos 1:8.5 Switches of T/Out.
Points & Crossings
512 Jhansi - Kanpur Section: Through Replacement of of DRF 88,27 12,03 7,00 69,24
28 nos 1:12 & 2 nos 1:8.5 CMS crossings of T/Out .
Points & Crossings
513 Khairar - Bhimsen - TTR - 03 nos at GTM, PTRM & DRF 69,33 31,64 .. 37,69
KTRR & through Deralng Switch Renewal - 05 nos. R. 6,46
at BSZ, GTM,PTRM & KTRR inconnection with 30 kmph
speed on loop line
Points & Crossings
514 Khairar - Bhimsen - TTR - 05 nos. 1 in 8.5 at BSZ DRF 69,52 52,21 .. 17,31
yard inconnection with 30 kmph speed of loop line R. 4,89
Points & Crossings
515 Khairar - Bhimsen - TTR- 05 nos. 1 in 8.5 at JSB , DRF 95,00 94,68 .. 32
HAR , GTM yard inconnection with 30 kmph speed of R. 4,89
loop line.
Points & Crossings
516 Khairar - Bhimsen - TTR - 05 nos. 1 in 8.5 at BSZ, DRF 69,52 29,56 .. 39,96
KTRR, & PTREyard inconnection with 30 kmph speed R. 4,89
of loop line.
Points & Crossings
517 Mathura yard - Enhancing speed of first direction DRF 93,64 .. .. 93,64
loop of passenger line by 30 kmph by replacement R. 2,73
of existing 1 in 8.5 Turn out by 1 in 12 (03 nos )
Points & Crossings
518 JHS Defence yard:-TTR(P) = 01 no. Scissors cross DRF 63,33 22,98 .. 40,35
over 1 in 8.5.
Points & Crossings
519 Birla Nagar- Bhind section of Jhansi Division : DRF 75,47 15,00 10,00 50,47
Through Turn out / Derailing Switch Renewal at R. 4,40
Bhind & Gohad Road Yards . (Bhind Yard : - 1 in
12 T/out =2 no., 1 in 8.5 T/out = 1 nos. & D.
switch = 1 no. Gohad Road yard :- Derailing
Points & Crossings
520 TTR (P) = 01 no. Scissors cross over 1 in 8.5 at DRF 63,33 22,83 .. 40,50
BAB Defence yard
Points & Crossings
521 Jhansi :- TTR (P)=05 nos. (1 in 8.5) HP-24 to DRF 69,68 14,00 .. 55,68
HP-26 and HP-27 and 28 (DSS) at A.C. loco shed
JhansiPoints & Crossings
522 Jhansi Division Through Turnout Renewal (TTR) of DRF 70,39 34,42 .. 35,97
Scissor cross over point no. 128 A & B, 129 A & B R. 5,59
at Gwalior Yard.
TRACK RENEWALS
06.03.31.15.3.
52.003
06.03.31.15.3.
52.002
06.03.31.11.3.
52.006
06.03.31.11.3.
52.017
06.03.31.11.3.
52.007
06.03.31.11.3.
52.011
06.03.31.10.3.
52.021
06.03.31.10.3.
52.020
06.03.31.10.3.
52.023
06.03.31.10.3.
52.022
06.01.31.10.3.
50.015
06.03.31.11.3.
52.014
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 39
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Points & Crossings
523 TTR(P) =6 Nos.(1 in 8.5) HP13 to HP18 at A. C. DRF 68,55 22,05 .. 46,50
Loco Shed Jhansi R. 2,29
Others
524 Bina-Agra section- TFR 20.3 Tr.kms on UP road. DRF 1,75,22 1,38,77 31,00 5,45
Others
525 Idgah-Bayana section-TWR 47.966 km (2159 Joints) DRF 3,21,19 2,35,01 50,00 36,18
Others
526 Jhansi - Agra cantt. DN TFR - 17.12 kms, Jhansi DRF 2,30,22 87,40 .. 1,42,82
- Manikpur section. TFR - 36.94 kms.
Others
527 Bina-Agra Sec. TFR- 26.50 Km, Jhansi-Kanpur TFR- DRF 2,42,12 1,47,56 .. 94,56
7,32 Km. Jhansi-Manikpur TFR-1.2 Km &
Manikpur-Allahabad TFR- 8.58 Km.
Others
528 Manikpur-Allahabad Sec. TTR- 04 Nos, TFR- 13.85 Km DRF 1,49,39 71,98 .. 77,41
& TBR- 1.56 Km R. 7,73
Others
529 Manikpur-Naini- Casual renewal of kinky weld 31 Km DRF 98,10 78,19 .. 19,91
from km 1294.00 to 1301, 1311.00 to 1312.00,
1315.00 to 1338.00
Others
530 Mughalsarai-Allahabad : Through Fitting Renewal of DRF 96,14 56,84 10,00 29,30
Steel Channel Sleepers of DN Line at Yamuna Bridge
No. 30.
Others
531 TWR of 1300 Nos. Kinky /Cupped /Misalign Weld DRF 97,50 80,23 17,00 27
Joints with Mobile Flash Butt Welding on JHS-CNB
Sections
Others
532 TWR= 8.70 Km on MKP-DBR section . DRF 97,88 97,00 .. 88
Others
533 Through fitting renewal of Points & Crossings on DRF 87,49 .. 8,00 79,49
main line in CNB - TDL Section
Others
534 Through fitting renewal of Points & Crossings on DRF 85,90 2,31 8,00 75,59
main line in TDL - GZB Section
Others
535 Through Fitting renewal of steel channel sleeper DRF 98,81 78,70 8,00 12,11
on Yamuna Bridge No. 30 in MGS - ALD SectionOthers
536 Bina -Agra Cantt Section : TRR(P) = 0.620 Kms on DRF 68,16 .. 7,00 61,16
UP road from Km 1143.720 to Km 1144.340
06.03.31.13.2.
52.001
06.01.31.13.2.
50.001
06.03.31.03.2.
52.001
06.03.31.06.2.
52.001
06.03.31.08.2.
52.003
06.03.31.12.3.
52.013
TRACK RENEWALS
06.03.31.12.3.
52.008
06.03.31.15.3.
52.053
06.02.31.14.3.
51.003
06.03.31.12.3.
52.014
06.03.31.12.3.
52.015
06.02.31.12.3.
51.004
06.02.31.12.3.
51.006
06.02.31.12.3.
51.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 40
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Others
537 Agra Div.-AGC-MTJ Section-SEJ(Modified) 30 Nos. DRF 99,53 70,00 10,00 19,53
Renewal & Glued Joints 45 Nos.Renewal in UP & DN
Road
Others
538 Agra Div.-MTJ-PWL Section-SEJ(Modified) 30 Nos. DRF 99,53 70,00 10,00 19,53
Renewal & Glued Joints 45 Nos.Renewal in UP & DN
Road
Others
539 Agra Div.-AGC-PWL Section-Replacement of 281 Nos. DRF 71,39 .. 10,00 61,39
channel sleeper
Others
540 Bina-Agra cantt section: TBTR=347 Nos.- DRF 74,30 .. 10,00 64,30
Replacement of existing steel channel sleepers
with new steel channel sleepers over Br. No.
1217/1 of UP & DN road and 1218/1A of UP & DN
road between Sithouli-Gwalior stations.
Others
541 Bina-Agra Cantt. Section: TBTR Channel(Fittings) = DRF 59,13 .. 7,00 52,13
719 Nos.Through Channel Fittings Renewal on
various bridges of DN road OF BINA-AGC section.
Others
542 Bina-Agra Cantt. Section: TBTR Channel(Fittings) = DRF 62,59 .. 8,00 54,59
750 Nos.Through Channel Fittings Renewal on
various bridges of UP road of BINA-AGC section.
Others
543 Chopan - Agori : Through Weld Renewal with mobile DRF 97,01 .. 15,00 82,01
flush butt welding
Others
544 Rasulabad- Chandari (RUB-CNBI):- Scatter sleeper DRF 64,63 .. 10,00 54,63
renewal of broken sleeper with new one in the R. 13,62
section of ADEN/Fatehpur.
Others
545 Rasulabad- Chandari (RUB-CNBI):- Standardization DRF 92,70 1,63 15,00 76,07
of cess from Km. 921.00 to Km. 1015 in the section
of ADEN/Fatehpur. (UP-80.00 km & DN-80.00 km)
Others
546 Standarization of cess from Km. 1066.00 to DRF 98,50 26,26 10,00 62,24
Km.1170.00 in the section of ADEN / Etawah
(UP-85.00 km & DN-85.00 km)
Others
547 Tundla - Ghaziabad from Km. 1246.50 to Km. 1324.00 DRF 98,50 .. 15,00 83,50
and Barhan - Etah from Km. 0.00 to Km. 59.00 :
Standarization of Cess as per LWR profile under
ADEN / T/TDL
06.03.31.15.3.
52.052
06.03.31.15.3.
52.055
06.02.31.13.3.
51.021
06.02.31.13.3.
51.018
06.02.31.13.3.
51.016
06.02.31.13.3.
51.015
TRACK RENEWALS
06.01.31.15.3.
50.020
06.01.31.15.3.
50.016
06.01.31.15.3.
50.018
06.03.31.15.3.
52.054
06.02.31.13.3.
51.013
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 41
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Others
548 Birlanagar- Bhind Sec.: Conversion of SWR into LWR DRF 99,64 30,00 10,00 59,64
alongwith TWR of SKV Welds by Mobile Flash Butt
Welding from Kms. 1283.525 to km 1291.525.
Others
549 TWR Work from km 1264.400 -1267.000 DN road, DRF 64,42 .. 5,00 59,42
1268.000 -1268.800 Dnroad on MKP-NYN section
Others
550 Agra Div.-AF-BKI Section-SEJ(Modified) 30 Nos. DRF 98,40 .. 20,00 78,40
Renewal & Glued Joints 50 Nos.Renewal
Others
551 Agra Div.-IDH-TDL Section- SEJ (Modified) Renewal DRF 97,03 70,00 15,00 12,03
45Nos.
Others
552 Agra Div.-AGC-MTJ Section- TBR 3.36 km DRF 38,24 .. 15,00 23,24
R. 45,14
Others
553 Agra Div.-MTJ-PWL Section- TBR 4.063 km DRF 45,79 .. 25,00 20,79
R. 54,04
Others
554 Agra Div.-MTJ-PWL Section- TBR 3.514 km DRF 39,99 .. 20,00 19,99
R. 47,21
Others
555 BIN-AGC Section: TFR = 9.091 Kms on DN M/L from Km DRF 83,08 .. 10,00 73,08
1193.100 to Km 1212.191
Others
556 BINA-AGC Section: TFR = 8.69 Kms on UP M/L from DRF 79,42 .. 8,00 71,42
1207.450 to Km1211.300 and from Km 1211B.900 to Km
1215.600.
Others
557 BINA-AGC Section: TFR = 8.300 Kms on DN M/L from DRF 75,91 .. 10,00 65,91
Km 993.700 to Km 1002.000
Others
558 BINA-AGC Section: TFR = 9.000 Kms on DN M/L from DRF 82,28 .. 10,00 72,28
Km 1002.000 to Km 1011.000
Others
559 BINA-AGC Section: TFR = 7.000 Kms on DN M/L from DRF 63,99 29,40 5,00 29,59
Km 1075.000 to Km 1082.000
Others
560 BINA-AGC Section: TFR = 8.800 Kms on DN M/L from DRF 80,45 .. 10,00 70,45
Km 1066.200 to Km 1075.000
Others
561 BINA-AGC Section: TFR = 8.940 Kms on UP M/L from DRF 81,75 .. 8,00 73,75
Km 1000.060 to Km 1009.000
06.03.31.15.3.
52.061
06.03.31.15.3.
52.062
06.03.31.15.3.
52.059
06.03.31.15.3.
52.050
06.01.31.15.3.
50.009
06.01.31.15.3.
50.013
06.01.31.15.3.
50.012
06.03.31.15.3.
52.070
06.03.31.15.3.
52.074
06.03.31.15.3.
52.072
TRACK RENEWALS
06.03.31.13.3.
52.029
06.03.31.15.3.
52.068
06.01.31.15.3.
50.017
06.01.31.15.3.
50.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 42
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Others
562 BINA-AGC Section: TFR = 9.000 Kms on DN M/L from DRF 82,28 43,68 5,00 33,60
Km 1090.000 to Km 1099.000
Others
563 BINA-AGC Section: TFR = 9.000 Kms on DN M/L from DRF 82,28 45,03 5,00 32,25
Km 1099.000 to Km 1108.000
Others
564 BINA-AGC Section: TFR = 9.000 Kms on UP M/L from DRF 82,28 .. 10,00 72,28
Km 1009.000 to Km 1018.000.
Others
565 BINA-AGC Section: TFR = 9.500 Kms on DN M/L from DRF 86,88 .. 7,00 79,88
Km 1108.000 to Km 1117.500
Others
566 BINA-AGC Section: TFR = 9.500 Kms on DN M/L from DRF 86,88 .. 7,00 79,88
Km 1117.500 to Km 1127.000
Others
567 Bina-Agra Cantt. Section: TFR = 6.330 Kms on UP DRF 57,89 .. 7,00 50,89
M/L from Km 1076.670 to Km 1083.000
Others
568 Bina-Agra Cantt. Section: TFR = 9.200 Kms on UP DRF 84,11 .. 8,00 76,11
M/L from Km 1018.000 to Km 1027.200
Others
569 Mughalsarai-Allahabad : Conversion of fishplated DRF 72,51 .. 10,00 62,51
track into LWR of Loop Lines at Jhigura, Mirzapur,
Vindyachal, Berohi, Gaipura & Jigna Station
Others
570 Mughalsarai-Allahabad : Conversion of fishplated DRF 67,79 .. 10,00 57,79
track into LWR of Loop Lines at Mandha, Uchdih,
Meja, Bheerpur, Karchana, Chheoki & Naini Station
Others
571 Allahabad-Kanpur : Conversion of fishplated track DRF 72,88 .. 10,00 62,88
into LWR of Loop Lines at Bamhrauli, Manauri,
Saiydsarawan, Manoharganj, Bharwari, Bidanpur &
Sujatpur Stations
Others
572 Allahabad-Kanpur : Conversion of fishplated track DRF 74,25 .. 10,00 64,25
into LWR of Loop Lines at Sirathu, Athsarai,
Kanwar, Kathoghan, Khaga & Sathnraini Stations
Others
573 Allahabad-Kanpur : Conversion of fishplated track DRF 89,88 .. 15,00 74,88
into LWR of Loop Lines at Rasulabad, Fazullapur,
Ramva, Fatehpur, Kurastikalan, Malwan & Kanspur
Gugauli Stations
TRACK RENEWALS
06.03.31.15.3.
52.064
06.02.31.15.3.
51.079
06.02.31.15.3.
51.080
06.02.31.15.3.
51.081
06.02.31.15.3.
51.082
06.02.31.15.3.
51.083
06.03.31.15.3.
52.065
06.03.31.15.3.
52.051
06.03.31.15.3.
52.066
06.03.31.15.3.
52.067
06.03.31.15.3.
52.057
06.03.31.15.3.
52.056
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 43
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Others
574 Kanpur-Tundla : Conversion of fishplated track DRF 72,74 .. 10,00 62,74
into LWR of Loop Lines at Ambiapur, Jinjhak,
Kanchausi, Phaphund, Pata & Achldha Stations
Others
575 Kanpur-Tundla : Conversion of fishplated track DRF 54,72 .. 8,00 46,72
into LWR of Loop Lines at Samohan, Bharthana,
Ekdil, Etawah & Sarai Bhoopat Stations
Others
576 Tundla-Ghaziabad : Conversion of fishplated track DRF 88,90 .. 8,00 80,90
into LWR of Loop Lines at Mitawali, Chamraula,
Jalesar, Pora, Sasni, Mandrak, Daudkhan & Hathras
Stations
Others
577 Standarization of Cess in the section of DRF 72,47 .. 12,00 60,47
SSE/P.Way/ Firozabad under ADEN/ Firozabad.
Others
578 Through SEJ renewal in the section of DRF 86,42 .. 10,00 76,42
ADEN/Line/Kanpur
Others
579 Through SEJ renewal in the section of ADEN/Etawah DRF 86,42 .. 5,00 81,42
Others
580 Through SEJ renewal in the section of DRF 86,42 .. 12,00 74,42
ADEN/Firozabad
Others
581 Through SEJ renewal in the section of ADEN/Track DRF 86,42 .. 12,00 74,42
Tundla
Others
582 Through SEJ renewal in the section of ADEN/Aligarh DRF 86,42 .. 12,00 74,42
Others
583 Bina-Agra Cantt. Section: TBTR Channel(Fittings) DRF 69,97 .. 7,00 62,97
= 856 Nos.Through Channel Fittings Renewal on
various bridges of UP & DN road OF BINA-AGC
section.
Others
584 Bina-Agra cantt section: TBTR=360 Nos.- DRF 77,24 .. 10,00 67,24
Replacement of existing steel channel sleepers
with new steel channel sleepers over Br. No.
1282/1 of DN road between Hetampur-Dholpur
stations.Others
585 Agra Div.-MTJ-PWL Section- TBR 3.9 km DRF 44,39 .. 25,00 19,39
R. 52,39
Others
586 Agra Div.-MTJ-PWL Section- TBR 3.96 km DRF 45,07 .. 25,00 20,07
R. 53,20
06.02.31.15.3.
51.084
06.02.31.15.3.
51.085
06.02.31.15.3.
51.068
06.02.31.15.3.
51.008
06.02.31.15.3.
51.056
06.02.31.15.3.
51.058
TRACK RENEWALS
06.01.31.15.3.
50.015
06.02.31.15.3.
51.060
06.02.31.15.3.
51.061
06.02.31.15.3.
51.062
06.03.31.15.3.
52.001
06.03.31.15.3.
52.010
06.01.31.15.3.
50.014
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 44
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Others
587 Agra Div.-MTJ-PWL Section- TBR 3.62 km DRF 41,21 .. 20,00 21,21
R. 48,63
Others
588 Agra Div.-MTJ-PWL Section- TBR 3.88 km DRF 44,17 .. 15,00 29,17
R. 52,12
Others
589 Agra Div.-MTJ-PWL Section- TBR 3.84km DRF 43,71 .. 15,00 28,71
R. 51,59
Others
590 Bina - Agra - Through SEJ Renewal on Mania, DRF 88,82 29,44 17,00 42,38
Hatempur & Bhandai station.
Others
591 Bina - Agra - Through Glued joint Renewal on DRF 92,24 22,00 25,00 45,24
Hetempur & Bhandai station.
Others
592 Manikpur - Allahabad- Scattered Renewal of wheel DRF 87,19 15,00 .. 72,19
burn rail
Others
593 Jhansi Division - casual Renewal of Rail at wheel DRF 86,04 25,00 .. 61,04
burn location & replacement of 72 UTS rail adjoing
of point and crossing in length1.0 Track kms
Others
594 Jhansi Divisioon - Conversion 60.00 Track kms DRF 53,17 30,00 .. 23,17
through replacement of main line rubber pad
Others
595 Manikpur - Naini - Conversion of SWR/ FP Track DRF 71,14 40,00 15,00 16,14
into LWR of loop line under PWI/ MKP & SRJ section R. 23,76
excluing MKp yard inconnection with 30 kmph of
loop line between MKP - NYN section ( 11 Loops)
Others
596 Manikpur - Naini- Conversion of SWR/ FP Track into DRF 68,65 20,00 20,00 28,65
LWR of loop line under PWI/ NYN section excluing R. 24,36
NYN yard inconnection with 30 kmph of loop line
between MKP - NYN section ( 10 Loops)
Others
597 Jhansi - Kanpur Section - convertion of SWR track DRF 74,70 33,02 .. 41,68
into LWR of loop lines inconnection with 30 kmph R. 23,56
speed on loop line ( 12 loops)
Others
598 Argra Division - Welding of rail joints for DRF 98,87 78,87 10,00 10,00
conversion of SWR to LWR
Others
599 Raja ki Mandi - Arga city - Provision of ballast DRF 84,92 29,47 10,00 45,45
less track at UP track in Agra city tunnel.
06.03.31.10.3.
52.006
06.03.31.10.3.
52.025
06.03.31.10.3.
52.017
06.03.31.10.3.
52.018
06.03.31.10.3.
52.027
06.03.31.10.3.
52.026
TRACK RENEWALS
06.01.31.15.3.
50.019
06.01.31.15.3.
50.001
06.01.31.15.3.
50.002
06.03.31.10.3.
52.007
06.03.31.10.3.
52.016
06.01.31.10.3.
50.007
06.01.31.10.3.
50.017
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 45
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Others
600 Chunar - Chopan Section - Convertion of 03 Rail DRF 90,59 .. 5,00 85,59
pannel / Fish plated Track into LWR on Main line
between CAR - RBGJ station
Others
601 Chunar - Chopan Section - Convertion of 03 Rail DRF 94,47 14 2,00 92,33
pannel / Fish plated Track into LWR on Main line
between RBGJ- CAR station
Others
602 Chunar - Chopan Section - Widening of cess as per DRF 84,44 82,63 1,81 ..
LWR profile in connection with Raising of speed
Others
603 Chunar - Chopan Section - Provision of steel DRF 56,37 42,09 2,00 12,28
channel sleeper on Bridge no. - 434 & 411 in
Branch line.
Others
604 Shikohabad - Mainpuri Section - Convertion of 03 DRF 87,76 69,55 4,00 14,21
Rail pannel into LWR on Main line
Others
605 Mainpuri - Farukhabad - Welding of Rail joint DRF 90,59 84,81 5,00 78
inconnection with the Raising of speedon main
line.
Others
606 Kanpur - Ghaziabad - Conversion of 03 Rail pannel DRF 87,76 .. 2,00 85,76
into LWR on loop line.
Others
607 Shikohabad - Farrukhabad - Widening of cess as per DRF 89,97 49,98 2,76 37,23
LWR profile inconnection with Raising of speed
Others
608 Tundla - Ghaziabad - Section Casual Renewal of DRF 93,59 .. 4,00 89,59
Rail from km 1370/15 to 1371/7 & km 1380/17 to km
1380/29 up line with 60 kg Rail .
Others
609 Shikohabad - Chola - Casual Renewal of Rail on up DRF 88,91 .. 2,00 86,91
line from km 1375/35 to 1376/23 & km 1383/15 to
km 1383/23 with 60 kg Rail
Others
610 Tundla - Ghaziabad - Section - Casual Rail Renewal DRF 84,23 .. 4,00 80,23
( Primary ) from km 1384/25 to km 1385/21on up
line.
Others
611 Allahabad - Naini - Replacement of existing steel DRF 96,81 87,92 2,00 6,89
channel sleeper on Bridge no. 30 and Guard Rail
chequered plate for Gang pathway on other Bridge
06.02.31.10.3.
51.021
06.02.31.10.3.
51.016
06.02.31.10.3.
51.020
06.02.31.10.3.
51.001
06.02.31.10.3.
51.007
06.02.31.10.3.
51.006
06.02.31.10.3.
51.018
06.02.31.10.3.
51.013
06.02.31.10.3.
51.011
06.02.31.10.3.
51.017
TRACK RENEWALS
06.02.31.10.3.
51.004
06.02.31.10.3.
51.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 46
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Others
612 Barhan - Etah - Widening of cess as per LWR DRF 87,34 85,94 1,40 ..
profile inconnection with Raising of speed .
Others
613 Barhan - Etah - Conversion of 03 Rail pannel into DRF 87,78 87,75 3 ..
LWR on main line .
Others
614 Conversion of SWR/FP track in to LWR of 12 nos DRF 78,05 31,90 24,00 22,15
Loop lines under SSE (P.WAY) GHATAMPUR & SSE R. 20,89
(P.WAY) BANDA section in connection with
increasing of speed from 15 Kmph to 30 Kmph of
Loop lines between KHAIRAR-BHIMSEN section
Others
615 Conversion of SWR/FP track in to LWR of 7 nos Loop DRF 45,52 8,00 10,00 27,52
lines under SSE(P.WAY)Banda & Manikpur section R. 12,19
in connection with increasing speed from 15 Kmph
to 30 Kmph of Loop lines between
Khairar-Manikpur section.
Others
616 Conversion of SWR/FP track in to LWR of 10 nos DRF 65,04 53,88 10,00 1,16
Loop lines under SSE (P.WAY) Chitrkut Dham Karvi R. 17,41
section in connection with increasing speed from
15 Kmph to 30 Kmph of Loop lines between
Khairar-Manikpur section
Others
617 BINA-Agra: TFR = 9.90 Kms. on DN road in BINA-JHS DRF 86,19 64 10,00 75,55
section.
Others
618 BINA-Agra: Through SEJ Renewal (49 Nos, 60 Kg.)on DRF 99,23 .. 15,00 84,23
BINA-STLI section.
619 Works costing below DRM's Power DRF 2,82,46 .. 2,82,46 ..
TOTAL-WORKS IN PROGRESS DRF .. .. 28,42,44 ..
B - New Works
Complete Track Renewal
620 Bina-Sithauli section: CTR(P) = 0.500 Kms. From DRF 88,16 .. 55,99 32,17
km. 1086.100 to 1086.600 on UP main line on Betwa R. 6,99
Bridge.
Through Rail Renewal
621 Dhaulpur-Agra Cantt - Through Rail Renewal DRF 1,38,09 .. 10,00 1,28,09
(Primary) 1.166 km
Through Rail Renewal
622 AgraCantt.-Palwal-Through Rail Renewal (Primary) DRF 94,75 .. 55,76 38,99
0.800 km with 60kg
TRACK RENEWALS
06.02.31.10.3.
51.003
06.00.31.16.3.
00.999
06.03.31.16.3.
52.005
06.01.31.16.2.
50.001
06.01.31.16.3.
50.004
06.02.31.10.3.
51.002
06.03.31.11.3.
52.015
06.03.31.11.3.
52.010
06.03.31.11.3.
52.009
06.03.31.13.3.
52.017
06.03.31.13.3.
52.019
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 47
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Through Rail Renewal
623 Bina-Sithauli section: TRR(P) = 0.750 Kms on UP DRF 88,82 .. 53,20 35,62
road from Km 1208.130 to Km 1208.500 and from Km
1209.000 to Km 1209.380
Through Rail Renewal
624 Bina-Sithauli section: TRR(P) = 0.750 Kms on UP DRF 88,82 .. 52,20 36,62
road from Km 1211.900 to Km 1211A.650.
Through Rail Renewal
625 Bina-Sithauli section: TRR(P) = 0.750 Kms on UP DRF 88,82 .. 53,20 35,62
road from Km 1211A.650 to Km 1211B.400.
Through Rail Renewal
626 AgraCantt.-Mathura-Through Rail Renewal (Primary) DRF 94,75 .. 55,76 38,99
0.800 km
Through Sleeper Renewal
627 Shikohabad- Farrukhabad : Through Steel Channel DRF 97,83 .. 57,60 40,23
Sleeper Renewal on Girder Bridge no.
25,37,52,60,74,86, & 126
Through Sleeper Renewal
628 Shikohabad- Farrukhabad : Through Steel Channel DRF 86,28 .. 50,68 35,60
Sleeper Renewal on Girder Bridge no. 94, 149 & 71
Ballast
629 Bina - Dhaulpur : TFR = 27.055 kms DRF 2,44,52 .. 10,00 2,34,52
Ballast
630 Manikpur-Naini. : TBR = 5.63 Kms. DRF 84,92 .. 10,00 74,92
R. 78,67
Points & Crossings
631 Bina-Sithauli section: TTR(CMSC)=27 Nos.(1in12) DRF 87,95 .. 52,68 35,27
from station AGD to TBT on UP & DN road of Jhansi
division.
Points & Crossings
632 Bina-Sithauli section: TTR(CMSC)=27 Nos.(1in12) DRF 87,95 .. 52,68 35,27
from station JHS to ARI on UP & DN road of Jhansi
division.
Points & Crossings
633 Bina-Sithauli section: TTR(CMSC)=27 Nos.(1in12) DRF 87,95 .. 52,68 35,27
from station BZY to JHS on UP & DN road of Jhansi
division.
Others
634 TWR=3.50 km on JHS-MKP Section from km1316.500 to DRF 76,62 .. 44,74 31,88
km 1320.00=3.50 km.
Others
635 Agra fort-Bandikui-Renewal of SEJ (Modified) 28 DRF 73,58 .. 55,76 17,82
Nos & Glued Joint 10 Nos
06.03.31.16.3.
52.004
06.03.31.16.3.
52.006
06.01.31.16.3.
50.006
06.02.31.16.3.
51.002
06.02.31.16.3.
51.003
06.03.31.16.2.
52.002
TRACK RENEWALS
06.03.31.16.3.
52.001
06.03.31.16.2.
52.001
06.03.31.16.3.
52.003
06.03.31.16.3.
52.007
06.03.31.16.3.
52.008
06.03.31.16.3.
52.002
06.01.31.16.3.
50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 48
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
Others
636 Idgah-Bayana- Renewal of SEJ (Modified) 20 Nos & DRF 63,71 .. 37,16 26,55
Glued Joint 22 Nos
Others
637 Mughalsarai-Allahabad : Through Fitting Renewal of DRF 96,21 .. 56,63 39,58
Steel Channel Sleepers of UP Line at Yamuna Bridge
No. 30.
Others
638 Agra Division-Dholpur-Agracantt-Renewal of Thick DRF 92,85 .. 54,65 38,20
Web switch 8 Nos
Others
639 Agra Division-Dholpur-Agra Cantt-Reconditioning of DRF 91,21 .. 53,63 37,58
CMS X-ing
640 Works costing below DRM's Power DRF 75,00 .. 75,00 ..
TOTAL-NEW WORKS DRF .. .. 10,00,00 ..
TOTAL-Track Renewals DRF .. .. 38,42,44 ..
A - Works in Progress
641 MGS-ALD :- Strengthening of arch bridge DF(4) 1,99,97 1,32,11 30,00 37,86
no.519,520,521,522,524,525,526,531 & 533 by
jacketting/Interning .
642 Etmadpur-Kuberpur section: Strengthening of Br. DF(4) 65,05 58,71 6,00 34
No. 4 (3x9.14 m) span Arch bridge under the
jurisdiction of ADEN/HQ/ Agra.
643 Tundla-Aligarh:-Rehabilitation of various minor DRF 88,07 .. 25,00 63,07
bridges in Tundla-Aligarh section
644 Kanpur-Tundla:-Replacement of existing girder DRF 72,30 .. 6,10 66,20
Bridge No. 55 at Km 1166 / 13-15 by providing PSC
Slab .
645 Agra - Palwal sec.:- Replacement of exixting DRF 58,94 .. 28,30 30,64
girder of Bridge of span 7.62 m of bridge no.
1364/2 at KM. 1364/26-1365/2 DN road by PSC slab.
646 Gwalior -Jhansi section. Replacement of cracked DRF 58,73 .. 15,25 43,48
rail bearer of bridge no. 1157/1 & 1160/1 fly over
bridge.
647 Kanpur - Tundla : Reconstruction of Br. No. 82 at DRF 99,42 99,42 .. ..
Km 1230 / 3 - 5 by providing RCC Box sagment size
4 x 3.60 m under ADEN / NCR / FZD.
648 Pora-Hathras:Rebuilding of bridge No.111 by DRF 65,18 .. 25,00 40,18
providing RCC box on UP & DN main line in between
Pora-Hathras stations
BRIDGE WORKS
06.02.32.12.2.
51.001
06.01.32.11.3.
50.001
06.02.32.14.6.
51.003
06.02.32.14.3.
51.001
06.01.32.15.3.
50.001
TRACK RENEWALS
06.01.31.16.3.
50.002
06.02.31.16.3.
51.001
06.01.31.16.3.
50.003
06.01.31.16.3.
50.005
06.00.31.16.3.
00.999
06.03.32.15.3.
52.001
06.02.32.11.3.
51.001
06.02.32.14.6.
51.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 49
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
649 Jhansi Division: strengthing to floor system of DRF 57,56 5,32 21,25 30,99
bridge no. 1331/1 Up Rd (Jhansi-Agra) & 1275/2
(Jhansi-Kanpur).
650 Bina-Jhansi sec: Epoxy grouting and pointing of DRF 74,35 .. 19,40 54,95
old cracked piers/bed blocks of various bridges.
651 JHS-MKP: Provision of Pedestrian pathway on Open DF(4) 61,48 14,15 2 47,31
web Through girder of Bridge No 1141/1 of JHS
Division
652 Jhansi-Kanpur section- Replacement of Steel girder DRF 60,12 .. 24,35 35,77
by PSC Slab of Br. No.1338/2, Span 5x6.10M & Br.
No. 1308/3 Span 1x6.1M
653 Kanpur-Tundla:-Rebuilding of bridge No.285and 286 DRF 98,00 .. 41,67 56,33
654 Jhansi-Kanpur & Bhimsen-Ingohta Section :- DRF 75,01 .. 16,34 58,67
Replacement of steel girders by PSC slabs of
bridge No. 1305/3 (span 1/610m) ,Bridge No.
1323/2(span2/6.10m) in Jhansi-Kanpur section and
Bridge No. 1406/2( span 3/3.35m) in
655 Gwalior-Agra Section:-Jacketing of existing piers DRF 68,35 .. 41,20 27,15
of bridge no. 1282/1 DN (Chambal bridge) at km
1282/26 to 1283/42 between Hetampur and Dholpur
stations.
656 Dholpur-Hetampur Section : Stone pitching work, DF(4) 96,41 52,85 43,00 56
toe wall and other misc work for chambal bridge.
657 Manikpur-Allahabad: Repl. of crack stone slabs of DRF 58,06 57,35 1 70
span upto 3.05 mtr PSC/RCC slab on Br. No. 1306/1,
1309/2, 1284/1, 1276/2= ( 04 Br.)(CKTD).
658 Allahabad-Naini: Replacement of top flange plate & DF(4) 84,25 83,25 1,00 ..
deck plate of Br. No. 31 (RUB) UP & DN line and
Br. no. 33-A (RUB) UP & DN line .
659 Etmadpur-Agra Fort: Replecement of Arch bridge no. DF(4) 69,41 46,95 1,93 20,53
5 & 7 of 6.1 M. span by RCC box culvert.
660 Kanpur-Tundla: Rebuilding of existing girder Br. DRF 75,83 42,24 3,05 30,54
No. 48 (2x6.705m) at km 1151/15-17 by 1x12.2m
girder under UP& DN track.
661 Kanpur- Allahabad : Rehabilitation of Br. No 112 DRF 90,11 45,98 3,07 41,06
(Arch 1x6.10m) by providing RCC slab.
662 Raja-Ki-Mandi- yamuna Br: : Replacement of DRF 75,79 45,58 1 30,20
existing girders Br No. 1349/9 (1x9.14m)& 166
(1x9.14m) with PSC slab.
663 Dholpur-Hetampur Section : Earth work to provide DF(4) 95,19 52,14 43,05 ..
sub bank for ensuring stability on Chambal bridge
approach.
06.03.32.09.3.
52.003
06.02.32.09.3.
11.003
06.01.32.09.3.
50.003
06.02.32.10.3.
51.005
06.02.32.10.3.
51.003
06.01.32.10.3.
50.009
06.03.32.12.3.
52.001
06.03.32.14.3.
52.003
06.02.32.14.6.
51.002
06.03.32.15.3.
52.002
06.03.32.14.3.
52.002
06.03.32.13.3.
52.002
BRIDGE WORKS
06.03.32.14.3.
52.001
06.03.32.15.3.
52.003
06.03.32.13.3.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 50
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
664 Jhansi Division: Provision of Pedestrian Pathway DRF 85,82 .. 10,00 75,82
at Dhasan Bridge, Bridge No.1206/1 at km no
1205/8-1206/3 in Mauranipur-Harpalpur section and
at Bagain Bridge, Bridge No. 1361/1 at km no
1361/3-4 in Badausa-Bharatkoop section
665 Works costing below DRM's Power Cap. 37,25 .. 37,25 ..
DRF 1,70,00 .. 1,70,00 ..
DF(4) 75,00 .. 75,00 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 37,25 ..
DRF .. .. 4,50,00 ..
DF(4) .. .. 2,00,00 ..
B - New Works
666 Agra div.-:- Replacement of arch bridge No. DRF 1,42,43 .. 5,00 1,37,43
1458/3 of 4X0.91 m span by two box UP & DN line in
Agra-Palwal section.
667 Tundla-Ghaziabad:-Rebuilding of Syphon bridge DRF 90,00 .. 40,00 50,00
No.220 at Km.1419/25-27 in block section
Dadri-Maripat.
668 Jhansi division -Provision of pedestrian pathway DF(4) 72,51 .. 10,00 62,51
on 03 Imp & major Bridges { 1. Br No. 1086/1 UP
(18x24.4) 2.Br No 1386/1 (4x30.48) 3.Br No 1334/2
(3x30.5) in Banda-Kanpur section}
669 Agra Division-Yamuna Bridge-Raja ki Mandi- DF(4) 92,14 .. 13,00 79,14
Strengthening of 15 nos. Arches by epoxy
grouting in the approach of streachy bridge No.167
670 Allahabad - Mughalsarai:-Rebuilding of Hume pipe DRF 65,00 .. 25,00 40,00
bridge no.466 at km. 677/21-23 with RCC box.
671 Agra Division- Yamuna Bridge-Raja ki DF(4) 91,84 .. 12,00 79,84
Mandi-Strengthening of 10 nos. Arches by
jacketing in the approach of streachy bridge
No.167
672 Works costing below DRM's Power DRF 30,00 .. 30,00 ..
DF(4) 15,00 .. 15,00 ..
TOTAL-NEW WORKS DRF .. .. 1,00,00 ..
DF(4) .. .. 50,00 ..
TOTAL-Bridge Works Cap. .. .. 37,25 ..
DRF .. .. 5,50,00 ..
DF(4) .. .. 2,50,00 ..
A - Works in Progress
673 Agra Division : Upgradation of EI system from warm DF(3) 2,08,49 .. 1,00 2,07,49
standby mode to hot standby mode at 17 stations .
674 Gwalior-Bhind: Provision of track circuiting on E DF(4) 1,79,38 1,61,70 1 17,67
route.
675 Kanpur & Etawah.: Replacement of exchange. DRF 1,18,04 77,17 1 40,86
06.01.33.15.2.
50.001
06.03.33.07.2.
52.001
06.02.33.08.2.
12.002
06.03.32.16.3.
52.001
06.01.32.16.3.
50.002
06.02.32.16.3.
51.001
06.01.32.16.3.
50.001
06.00.32.16.3.
00.999
S & T WORKS
BRIDGE WORKS
06.03.32.15.3.
52.004
06.00.32.16.3.
00.999
06.01.32.16.2.
50.001
06.02.32.16.3.
51.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 51
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
676 Provision of signalling cable in connection with DF(3) 97,03 69,17 15,00 12,86
modified automatic working during foggy weather
in BAD - Palwal section of Agra Division.
677 Establishing signalling & design cell equiped with DF(4) 98,36 68,02 30,00 34
Auto CAD terminals & drawing storage facilities in
CSTE's office.
678 Agra Cantt (AGC)- Palwal(PWL) section : Provision DF(3) 99,17 57,28 12,00 29,89
of stand by fuse with alarm in AGRA Division
679 AGRA Division - Provision of isolation DF(3) 71,81 .. 1,00 70,81
transformer at IPS input power supply at all
stations.
680 Naine -:Manikpur -: Replacement of old version DRF 82,02 .. 30,00 52,02
Integrated Power Supply system at 6 stations
681 Centralised Monitoring System for various DF(3) 98,96 .. 2,50 96,46
signalling system like power supply, battery,
track feed battery charger, pt. machine health
monitoring system at six stations of Mughalsarai -
Kanpur section at divisional HQ Allahabad.
682 Idgah(IDH) Station : Shifting of cable in DF(3) 99,69 13,11 10,00 76,58
connection with provision of platform no.4.
683 Jhansi-Kanpur , Mahoba-Khajuraho, ,Manikpur - DF(4) 99,72 10 30,00 69,62
Naini:-Provision of dual Fuse monitoring alarm
system at all MACLS stations in 'B' & 'D' route of
Jhansi division.
684 Jhansi division:- Provision of Maintenance free DF(4) 84,05 .. 2,49 81,56
earthing and separate DC- DC convertors in IPS for
Axle Counters.
685 Networking of data loggers at divisional HQ & NCR DF(3) 90,84 .. 2,50 88,34
HQ as per RDSO scheme with E1 connectivity from
each station.
686 Jhansi-Agra :- Replacement of old Analog Axle DRF 98,63 .. 32,50 66,13
counters by high availibility Single section
digital Axle counters .
687 Gwalior - Agra cantt :- Replacement of old version DRF 67,80 .. 15,00 52,80
Integrated Power Supply system at 7 stations
688 Jhansi division -: Replacement of old version DRF 97,13 .. 15,00 82,13
integrated power supply systems installed at Level
crossing gates and inter mediate block sections
689 BINA – GWALIOR:- Replacement of old version DRF 73,90 .. 12,48 61,42
Integrated Power Supply system at 9 stations
690 Replacement of IPS at 7 stations in Bharatpur – DRF 66,81 4,34 35,00 27,47
Bandikui section in Agra Division.
S & T WORKS
06.01.33.11.3.
50.001
06.02.33.13.3.
51.001
06.01.33.13.3.
50.001
06.03.33.15.3.
52.001
06.02.33.15.3.
51.001
06.03.33.13.3.
52.002
06.03.33.14.3.
52.001
06.03.33.14.3.
52.002
06.03.33.13.3.
52.003
06.01.33.13.6.
50.001
06.01.33.15.3.
50.001
06.03.33.15.3.
52.002
06.02.33.15.3.
51.002
06.01.33.13.6.
50.002
06.03.33.13.6.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 52
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
691 Jhansi-Kanpur: Prov. of power operated booms on DRF 99,00 83,60 1 15,39
interlocked gates in place of mechanical type
lifting barrier at LC gate. (15 Nos)
692 Jhansi division: Provision of power operated booms DRF 83,05 78,13 1 4,91
on 10 interlocked gates in place of mechanical
type lifting barriers at 10 Nos. LC gates in
BINA-JHS- AGC section and 01 LC gate in JHS-CNB
section.
693 Allahabad-Panki: Supply, installation, testing and DF(4) 92,12 54,37 .. 37,75
commissioning of maintenance free earth with 'A'
class protection with A,B&C protection.
694 Repairing of defective Quad / PIJF Cable in ALD - DRF 93,02 1,64 42,00 49,38
PNK section of ALD division.
695 Mughalsarai – Kanpur Section: Provision of DF(4) 98,47 36,52 10,00 51,95
Dataloggers at Independent Interlocked Level
Crossing gates and New Block Huts.
696 JHANSI DIVISION:- Provision of Axle counters for DF(3) 91,03 55,14 10,00 25,89
redundancy with track circuits over PFTC at
Manikpur and Orai stations.
697 Up-gradation of Data logger in IDH-BXN & AGC-MTJ DF(3) 97,17 33,55 1,00 62,62
section.
698 Provision of additional single section digital DF(4) 98,67 39,72 30,00 28,95
axle counter for Redundancy axle counter for BPAC
in MKP-NYN sections of JHS division in 6 Block
sections.
699 BIN-JHS:- Provision of Axle counters for DF(3) 73,05 24,08 10,00 38,97
redundency with Track circuits over PFTC at
Lalitpur,Dhaura and Karonda stations on Jhansi
division.
700 Jhansi-Agra:- Provision of Axlecounters for DF(3) 87,37 48,22 10,00 29,15
redundency with Track circuits over PFTC at
Dabra,Gwalior,Dholpur and Morena stations on
jhansi division.
701 Dabra-Agra:- Augmentation of capacity & DF(4) 67,55 .. 15,00 52,55
standardisation of low capacity & old version Data
loggers installed at Panel interlocked starion.
702 BINA-KOTRA :-Augmentation of capacity and DF(4) 74,36 .. 2,50 71,86
standardiztion of low capacity & old version Data
loggers installed at panel interlocked stations.
703 Jhansi division:- Provision of Axle counters for DF(3) 99,94 30,61 10,00 59,33
redundancy with track circuits over bridges having
steel channel sleepers/PFTC over jhansi division.
S & T WORKS
06.03.33.10.3.
52.010
06.03.33.10.3.
52.009
06.02.33.10.3.
51.006
06.02.33.11.3.
51.006
06.03.33.12.3.
52.006
06.03.33.12.3.
52.007
06.03.33.12.3.
52.009
06.02.33.12.3.
51.003
06.03.33.12.3.
52.001
06.01.33.12.3.
50.002
06.03.33.12.3.
52.002
06.03.33.12.3.
52.004
06.03.33.12.3.
52.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 53
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
704 Allahabad Division: Signalling work in connection DF(4) 99,69 .. 25,00 74,69
with Rewiring of CNBI relay room with metal to
metal contact.
705 Signaling work in connection with provision of DF(4) 99,43 .. 10,00 89,43
BPAC on third line in Aligarh - Ghaziabad section.
706 Works costing below DRM's Power Cap. 2,50,00 .. 2,50,00 ..
DRF 1,17,99 .. 1,17,99 ..
DF(3) 15,00 .. 15,00 ..
DF(4) 45,00 .. 45,00 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 2,50,00 ..
DRF .. .. 3,00,00 ..
DF(3) .. .. 1,00,00 ..
DF(4) .. .. 2,00,00 ..
B - New Works
707 Mughal Sarai - Ghaziabad : Air conditioning of DF(3) 99,32 .. 28,00 71,32
Equipment/Relay Rooms at EI stations having more
than 100 routes.
708 Agra Division:Provision of MIS in Agra Division DF(3) 71,85 .. 21,50 50,35
and connectivity to MIS at CRIS through NCR HQ.
709 Allahabad station: Provision of two tail cables DF(4) 99,12 .. 7,25 91,87
for NKR, RKR of points of Allahabad RRI.
710 Jhansi, Provision of Dual Tail cable for point DF(4) 98,24 .. 7,25 90,99
machine and NKR/RKR to improve safety in Gwalior
yard.
711 Works costing below DRM's Power Cap. 1,00,00 .. 1,00,00 ..
DRF 31,49 .. 31,49 ..
DF(3) 49,50 .. 49,50 ..
DF(4) 14,50 .. 14,50 ..
TOTAL-NEW WORKS Cap. .. .. 1,00,00 ..
DRF .. .. 31,49 ..
DF(3) .. .. 99,00 ..
DF(4) .. .. 29,00 ..
TOTAL-S & T Works Cap. .. .. 3,50,00 ..
DRF .. .. 3,31,49 ..
DF(3) .. .. 1,99,00 ..
DF(4) .. .. 2,29,00 ..
A - Works in Progress
712 Jhansi:- Augmentation of 2x500 KVA substation DF(2) 1,93,41 1,11,31 70,00 12,10
outdoor type /indoor type at S/S East colony &
west colony
713 Agra Cantt: Augmentation of capacity of 33/11 KV DF(1) 1,33,55 1,32,83 .. 72
S/S with 2x3 MVA Transformers at Agra Cantt.
714 Jhansi Division:Provision of 11KV power supply DF(3) 2,18,96 59,78 20,08 1,39,10
with dedicated Railway Feeder.( 09 stns)
715 Allahabad & Kanpur: Renovation of battery charging DF(1) 61,77 16,27 12,00 33,50
facility.
06.00.33.16.3.
00.999
06.02.33.16.3.
51.001
06.01.33.16.3.
50.001
06.02.33.16.3.
51.002
06.03.33.16.3.
52.001
06.00.33.16.3.
00.999
S & T WORKS
06.02.33.14.3.
51.002
06.02.33.14.3.
51.001
OTHER ELECTRICAL WORKS
06.03.36.12.2.
52.001
06.01.36.06.2.
30.001
06.03.36.10.2.
30.001
06.02.36.14.3.
51.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 54
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
716 Jhansi division:- Rewiring of Rly.station DRF 77,43 .. 25,00 52,43
buildings and replacement of existing damaged
poles including removal and replacement of LT over
lines in circulating area by LT UG cable.(45
stations)
717 Allahabad Division: Renovation of pre-cooling DF(1) 63,82 .. 12,00 51,82
facility over Allahabad division
718 Jhansi and Gwalior -Replacement of old fabricated DRF 92,50 .. 25,00 67,50
steel towers of Yards by High Mast tower with LED
lighting arrangement.
719 Aligarh Jn.: Provision of under ground back feed DRF 66,92 11,97 50,00 4,95
supply from ALJN loco sub station to Badar bagh
colony sub station.
720 Tundla: Provision of new 11/0.4 KV sub station for DF(3) 68,36 32,29 20,00 16,07
better supply arrangement to guard running room
lobby & officer rest house, railway colony south
side.
721 North Central Railway: Use of renewable energy DF(3) 86,17 .. 5,00 81,17
sources for improving energy efficiency & energy
conservation. (Part of PB 2010-11 item No.264 of
CR)
722 Allahabad: Augmentation of 121 No. traffic colony DRF 82,03 33,96 26,00 22,07
substation by providing 2x750 Kva transformers.
723 Allahabad : provision of solar based security DF(2) 99,34 .. 10,00 89,34
light in Railgaon colony and HQ office at
subedarganj.
724 Allahabad & Kanpur: Replacement of 11KV overhead DRF 90,10 11,25 70,00 8,85
lines to improve reliability of power supply.
725 Agra cant: Provision of sub station building at DRF 72,88 5,11 55,00 12,77
AGC and replacement of LT panel at sub station
No.2,6,7 &8.
726 Allahabad Division: Provision of Automatic Power DF(1) 59,00 .. 12,00 47,00
Factor Correction Panel at Allahabad (03
locations), Kanpur (03 locations) and Tundla (03
locations) to improve power factor.
727 Works costing below DRM's Power DRF 55,00 .. 55,00 ..
DF(1) 4,00 .. 4,00 ..
DF(2) 15,00 .. 15,00 ..
DF(3) 11,50 .. 11,50 ..
06.02.36.10.3.
51.003
06.02.36.10.3.
51.002
06.02.36.10.3.
51.001
06.01.36.10.3.
50.002
06.02.36.14.3.
51.001
06.00.36.16.3.
00.999
06.03.36.14.3.
52.001
06.02.36.14.3.
51.003
06.03.36.15.3.
52.001
06.02.36.09.3.
51.001
06.02.36.09.3.
51.015
06.02.36.10.2.
51.004
OTHER ELECTRICAL WORKS
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 55
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
TOTAL-WORKS IN PROGRESS DRF .. .. 3,06,00 ..
DF(1) .. .. 40,00 ..
DF(2) .. .. 95,00 ..
DF(3) .. .. 56,58 ..
TOTAL-Other Electrical Works DRF .. .. 3,06,00 ..
DF(1) .. .. 40,00 ..
DF(2) .. .. 95,00 ..
DF(3) .. .. 56,58 ..
A - Works in Progress
728 Jhansi division: Adjustment of OHE profile by DRF 1,98,99 70,75 17,49 1,10,75
replacement of cantilever.(phase II)
729 Agra Division-Replacement of rusty cantilevers in DRF 1,52,78 66,32 15,04 71,42
Agra- Palwal section
730 Allahabad Division: Provision of Retroreflective DRF 1,61,21 .. 50,00 1,11,21
Number plates on OHE mast for high speed Trains in
Mugalsarai- Gaziabad section
731 Agra Division-Replacement of rusty cantilevers in DRF 1,63,70 .. 24,90 1,38,80
Agra- Palwal section
732 Agra Fort-Bayana: Replacement of AI catenary wire DRF 1,66,36 1,63,29 1 3,06
with cad. copper catenary in AF-BXN section(30 T
KM).
733 Mughalsarai- Kanpur: Replacement of old oil type DRF 1,08,79 77,42 1 31,36
BM by SF-6 type BM ( 33 Nos).
734 Agra Fort-BXN Section: Replacement of 15 TKM DRF 2,48,30 1,98,68 1 49,61
contract wire and 40 TKM Aluminium catenary wire
with Cad Copper catenary.
735 Mughalsarai-Ghaziabad: Replacement of contact wire DRF 1,87,00 25,23 24,99 1,36,78
(25 kms).
736 Agra-Palwal: Replacement of winch type ATD's by DRF 2,30,00 76,39 1 1,53,60
3:1 ratio 3 pulleys type ATDs in Agra-Palwal
section (500 Nos.).
737 Kanpur: Electrifiction of 25 KV OHE at ARME siding DF(3) 2,25,26 72,44 4,00 1,48,82
at Kanpur.
738 Agra Division: Replacement of 40 TKM worn out DRF 2,12,39 61,92 1 1,50,46
contact wire.
739 Jhansi-Bina Section: Provision of additional SSP Cap. 72,79 8,11 50,16 14,52
between Babina SSP to Bijauli SP in Jhansi
division.
740 Bina-Agra section: Replacement of wornout oil type DRF 77,00 59,33 10,00 7,67
BMs with SF-6 type BMs.(35 nos.)
741 Agra-Palwal: Repl. of 25 kv oil type interrupters DRF 79,35 37,00 1 42,34
& 66 kv oil type CB's at switching station by
providing SF-6 Caccume type interrupters (12 Nos.)
and CBs (02 Nos.).
06.03.36.11.3.
52.001
06.03.36.08.2.
52.001
06.01.36.09.3.
50.002
06.02.36.08.2.
51.001
06.01.36.09.1.
50.001
06.02.36.09.2.
51.001
06.01.36.10.2.
50.002
06.02.36.10.2.
30.003
06.01.36.10.2.
50.001
TRACTION DISTRIBUTION WORKS
06.03.36.12.2.
52.002
06.01.37.14.2.
50.001
06.02.37.15.2.
51.001
06.01.37.15.2.
50.001
06.01.36.06.2.
50.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 56
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
742 Agra-Bina: Replacement of wornout oil type BMs DRF 74,86 15,82 15,00 44,04
with SF-6 /vacuum type BMs.
743 Allahabad - Kanpur Section: Conversion of Chandari DRF 58,43 25,13 25,00 8,30
Gantry to Chandari SSP
744 Works costing below DRM's Power DRF 19,00 .. 19,00 ..
DF(3) 41,00 .. 41,00 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 50,16 ..
DRF .. .. 2,01,48 ..
DF(3) .. .. 45,00 ..
TOTAL-Traction Distribution Cap. .. .. 50,16 ..
Works DRF .. .. 2,01,48 ..
DF(3) .. .. 45,00 ..
A - Works in Progress
745 Jhansi-Setting up of CTRB over Hauling Section in DF(3) 2,41,09 64,49 20,00 1,56,60
Jhansi Workshop.
746 Kanpur-Provision ofcovered shed for stabling of DF(3) 1,89,29 .. 1 1,89,28
140 ton B.D. Crane at Kanpur
747 Allahabad-Extension of existing shed by size 30 x DF(3) 2,45,84 .. 1 2,45,83
15 mtrs with 10 ton EOT Crane at CPOH Workshop.
748 Jhansi: Creation of facilities for Air braked DF(3) 1,31,85 1,31,83 .. 2
goods stock at C & W depot
749 Jhansi Workshop: Provision for 20 Ton crane with DRF 1,78,55 73,61 1 1,04,93
gantry in bay no. 2 of shed 'A'.
750 Kanpur (Goods Marshalling Yard): Premium end to DF(3) 2,32,21 1,20,97 10,00 1,01,24
end examination facilities (Phase-II) (2008-09)
751 Agra Cantt.: Provision of 140 Ton Disel Crane DF(3) 1,50,00 1,34,76 15,00 24
Maintenance facilities.
752 Construction of RCC-Baundary - Wall (400 meter) in DF(3) 94,74 89,44 1 5,29
Coaching Sick Line AGC.
753 Jhansi Workshop : Remodeling of existing old scrap DRF 89,93 41,96 30,00 17,97
yard for connecting pocket yard to MLR Workshop
754 Kailahat-Design supply installation and DF(3) 64,67 .. 1 64,66
commissioning of Hot Box detector system.
755 BAAD- Augmentation of ROH Shed EOT Crane Capacity DRF 75,48 62,04 13,08 36
10 T to 15 T for BTPN stock.
756 Diesle Loco shed, Jhansi - Additional 65 x 10mt DF(3) 99,69 33,87 2 65,80
double story building for Diesel shed store depot
for storage of GM Loco items. Shifting of cycle
stand towards Mumbai end 100 meters and 4 room of
size 12x10 mtrs. For Heavy repair section for GM
TRACTION DISTRIBUTION WORKS
06.03.36.10.3.
52.001
06.02.36.11.3.
51.001
06.01.42.11.3.
50.002
06.03.42.13.3.
52.001
06.04.42.07.2.
30.001
06.02.42.08.2.
51.001
06.01.42.10.2.
50.001
06.01.42.11.3.
50.003
06.04.42.13.3.
71.001
06.02.42.15.6.
51.001
06.00.37.16.3.
00.999
WORKSHOPS INCLUDING PUS
06.03.42.11.2.
71.001
06.02.42.12.2.
51.001
06.02.42.15.2.
51.001
06.03.42.03.2.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 57
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
757 JHSW: Aug. of water storage capacity for fire DF(3) 97,90 71,22 2 26,66
fighting by Providing RCC OHT of 40000 gallon
capacity and fire-fighting system.
758 Jhansi Workshop: Setting up of new scrap yard at Cap. 95,00 94,57 43 ..
Bijauli yard.
759 RSK Sithauli: Replacement of overaged asbestos DRF 99,00 47,24 10,00 41,76
sheet by repainted GI sheet and other wired
reinforced glass and other roof material.
760 Jhansi Workshop: Replacement of old OH steel water DRF 55,00 27,70 10,01 17,29
tank near old power house by RCC tank.
761 Jhansi Workshop: Replacement of old damaged and DF(3) 60,00 43,56 1 16,43
corroded structural members & GI sheets in shed D.
762 Jhansi Workshop: Replacement of old damaged roof DF(3) 93,17 60,25 1 32,91
sheets by new GI sheets of Bay No.9, 10 & 11 in
Shed 'B'.
763 Jhansi Workshop: Replacement of valley gutter and DF(3) 59,71 58,47 1 1,23
down take pipes of shed A, B, C & D.
764 Allahabad: Supplying, designing, erection and DF(3) 98,04 64,87 1 33,16
commissioning of water recycling plant with
operational supervision & warranty for five years
on turnkey basis at coach washing line including
distribution pipe line over washing line. (OOT)
765 Diesel Shed Agra: Provision of fully furnished DF(3) 99,42 97,88 1 1,53
WDM-2 loco maintenance building (attached with
sanctioned 3 tier WDM-2 pit line) and complete
training centre for DEMU/WDM-2/WDS-4 type locos.
766 RSK/Sithouli:-Installtion,testing and DF(3) 99,41 97,70 2 1,69
commissioning of Automatic hydrant and Sprinkle
system for fire fightning.
767 Agra Cantt- DEMU Maintenance facilities in Agra DF(3) 94,02 30,01 1 64,00
Diesel Shed.
768 Allahabad- Provision of diesel loco service centre DRF 1,05,00 94,00 10,00 1,00
near old electric loco shed.
769 Kanpur-Provision of LHB Coach care Center at New DF(3) 99,04 91,34 1 7,69
coaching complex .
770 Jhs Workshop: Development of Material Storage Cap. 83,28 80,07 3,21 ..
Godowns and other storage facilities for New Coach
MLR (Mid LifeRehablitation & Repair of Coaches)
Workshop.
771 JHS WORKKSHOP: Dismantling of old delapidated DRF 72,22 71,81 1 40
offices of BNR-I/II and provision of new offices
(2 Storied) of BNR-I/II in Jhansi Workshop.
WORKSHOPS INCLUDING PUS
06.04.42.12.3.
71.002
06.04.42.10.3.
71.006
06.04.42.10.3.
71.005
06.04.42.11.3.
71.001
06.01.42.11.3.
50.001
06.02.42.11.3.
30.001
06.02.42.11.3.
51.002
06.04.42.11.3.
71.004
06.04.42.11.3.
71.002
06.04.42.10.3.
71.003
06.04.42.10.3.
71.001
06.04.42.10.3.
71.002
06.04.42.10.3.
71.004
06.02.42.10.3.
51.001
06.01.42.10.3.
50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 58
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
772 JHS WORKSHOP: Provision of stand by LT under Cap. 50,85 46,72 2,38 1,75
ground cables for important loads/Machines of
workshop including provision of SDB and earthing
arrangement to improve power supply reliability
in Jhansi Workshop
773 Gwalior - Shifting of narrow gauge sick line and DF(3) 98,63 .. .. 98,63
pit line from Gwalior (NG) to Sabalgarh
774 Works costing below DRM's Power Cap. 61,98 .. 61,98 ..
DRF 1,11,26 .. 1,11,26 ..
DF(1) 7,00 .. 7,00 ..
DF(3) 18,68 .. 18,68 ..
DF(4) 2,11 .. 2,11 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 68,00 ..
DRF .. .. 1,84,37 ..
DF(1) .. .. 7,00 ..
DF(3) .. .. 63,85 ..
B - New Works
775 Allahabad- Replacement of damaged cat walk and all DRF 2,41,50 .. 37,00 2,04,50
structure elements of washing line No 20 &21 at
Allahabad..
776 Works costing below DRM's Power Cap. 2,49 .. 2,49 ..
DRF 13,00 .. 13,00 ..
DF(3) 11,70 .. 11,70 ..
TOTAL-NEW WORKS Cap. .. .. 2,49 ..
DRF .. .. 50,00 ..
DF(3) .. .. 11,70 ..
TOTAL-Workshops including PUs Cap. .. .. 70,49 ..
DRF .. .. 2,34,37 ..
DF(1) .. .. 7,00 ..
DF(3) .. .. 75,55 ..
DF(4) .. .. 2,11 ..
A - Works in Progress
777 Rundhi -Replacement of gang qtrs to type-II qtrs DRF 1,43,85 1,42,62 1,23 ..
24 Nos at RDE.
778 Agra Cantt- : Replacement of 26 units old K Type DRF 1,41,02 .. 22,60 1,18,42
quarters by std type II quarters.
779 Bharatpur-Bandikui - Prov. of staff qtrs. RB-I 88 DRF 1,93,14 1,62,74 1 30,39
units bet BTE-BKI sec on replacement of Gang Huts
No. 17, 18, 19, 20, 22, 24, 25, 27, 28, 29 & 30.
780 Agra Cantt - Replacement of 35 Nos. old aged DRF 1,72,36 1,45,35 .. 27,01
K-Type quarters with new RB-I quarters.
781 Banda-Naini: Construction of Type-I & Type-II DRF 1,04,51 1,00,48 4,03 ..
staff Quarters on replacement ground in liew of
K,J,H & G type Ty-I & Ty-II Qtrs. (Total=32 units)
782 Jhansi-Banda & Khaiar-Ingota: Const. of type-I & DRF 1,06,16 98,43 1 7,72
type-II staff qtrs.(32 units) on repl.ground in
lieu K,J,H & G type, Type-I & type-II qtrs. at
various stns.
WORKSHOPS INCLUDING PUS
06.04.42.11.3.
71.003
06.03.42.15.6.
52.001
06.00.42.16.3.
00.999
06.02.42.16.2.
51.001
06.00.42.16.3.
00.999
06.03.51.08.2.
52.002
STAFF QUARTERS
06.01.51.12.2.
50.001
06.01.51.15.2.
50.001
06.01.51.06.2.
50.002
06.01.51.06.2.
50.001
06.03.51.08.2.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 59
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
783 Agra Cantt: Provision of 5 unit type V qtrs 5 unit Cap. 1,09,95 91,69 2,00 16,26
type IV qtrs for divisional officers.
784 Datia & Dabra:Replacement of 10 units 'k' type DRF 99,90 .. 20,00 79,90
quarters by type-II quarters at Datia & Dabra
stations.
785 Dadri: Provision of 05 units type-IV qtrs (G+2). Cap. 98,84 .. 82,29 16,55
786 Firozabad & Etawah-Repl.of 11 Nos.qtrs(Type- II DRF 98,18 96,53 1,65 ..
,10 Nos & Type-IV, 1 No.) at FZD & additional type
IV (01) no.at ETW.
787 Chata :- Provision of 12 units type II quarters DRF 66,00 .. 30,00 36,00
for gang staff in lieu of ' K' type qtr.
788 Agra Cantt-Const. of RB-I Qtrs in replacement of DRF 89,02 82,66 6,36 ..
K-type 20 Nos. on replacement ground.
789 Idgah-Replacement of old dilapated type-I Qtrs. DRF 57,61 51,50 5,50 61
into Std. RB-I Qtrs. (20 units).
790 Mathura: Replacement of 29 unit K type quarters DRF 56,11 52,65 3,46 ..
with RB I quarters.
791 Tundla: Provision of 3 nos type IV and 1 no. type Cap. 59,31 44,43 14,88 ..
V quarters in officers colony.
792 Banda-Manikpur-Chheoki section: Repl.of 18 unit DRF 96,24 69,81 5,50 20,93
old K type qtrs of gang staff by std type-II qtrs.
793 Jhansi-Banda & Khairar-Bhimsen: Replacement of 18 DRF 96,24 96,24 .. ..
unit old K type qtrs of gang staff by std type-II
qtrs.
794 Orai: Repl. of 18 unit old K type qtrs of gang DRF 98,20 37,67 20,00 40,53
staff by std type-II qtrs.
795 Talbehat: Replacement of 18 unit old K type qtrs DRF 1,11,20 48,28 3,90 59,02
of gang staff by std type-II qtrs.
796 Agasod: Replacement of 12 unit old K type qtrs of DRF 67,53 35,98 5,30 26,25
gang staff by std type-II qtrs.
797 Mathura - Palwal: provision of 16 numbers RB - II Cap. 70,00 70,00 .. ..
quarters (Bhuteshwar -4, Hodal -3, Rundhi -3,
Chhata -2, Ajhai -2, Sholaka -2) with
electrification work for Operating staff.
798 Bichpuri -Bharatpur & Mathura-Alwar: provision of Cap. 91,20 55,75 35,45 ..
10 numbers RB -IV quarters with electrification
for station Master of 10 stations.
799 Mathura- palwal: provision of 12 numbers RB -III Cap. 70,42 48,87 21,55 ..
quarters (sholaka -2, Rundhi -2, Chhata -2, Ajhai
-2, Vrindavan Rd. -2, Bhuteshwar -2)
withelectrification work for operating staff.
06.01.51.15.3.
50.001
06.01.51.05.2.
50.001
06.01.51.05.2.
50.002
06.01.51.07.2.
50.001
06.02.51.09.3.
51.001
06.03.51.10.3.
52.002
STAFF QUARTERS
06.01.51.09.2.
50.001
06.03.51.15.3.
52.001
06.02.51.15.3.
51.001
06.02.51.12.3.
51.001
06.01.51.10.3.
50.005
06.03.51.10.3.
52.003
06.03.51.10.3.
52.004
06.03.51.10.3.
52.005
06.03.51.10.3.
52.001
06.01.51.10.3.
50.004
06.01.51.10.3.
50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 60
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
800 Kanpur:- Proposed 04 unit type IV double DRF 76,55 70,39 6,16 ..
storied staff quarters in Junction North Colony in
lieu of Block No. 27,169,117&74.
801 Works costing below DRM's Power Cap. 66,93 .. 66,93 ..
DRF 58,17 .. 58,17 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 2,23,10 ..
DRF .. .. 1,93,88 ..
B - New Works
802 Agra Division.-Idgah- Replacement of police line DRF 97,89 .. 10,00 87,89
old double storey quarters by std. type II
quarters.(12 units)
803 Works costing below DRM's Power Cap. 60,00 .. 60,00 ..
DRF 10,00 .. 10,00 ..
TOTAL-NEW WORKS Cap. .. .. 60,00 ..
DRF .. .. 20,00 ..
TOTAL-Staff Quarters Cap. .. .. 2,83,10 ..
DRF .. .. 2,13,88 ..
A - Works in Progress
804 Agra Cantt Replacement of AC sheet roof by RCC DRF 1,49,35 .. 42,00 1,07,35
roof in J,G, and MA type Qtrs.( J-48 Nos., G-10
nos., & MA-37 nos. = total 95 Nos Qtrs.)
805 Kanpur: Conversion of existing Bio laterine into DRF 2,23,09 2,18,87 4,22 ..
Flush laterine & laying of sewer line in different
colonies to connect nagar nigam storm water
drainage at CNB.
806 Agra-Mathura- Replacement of tiled roof of various DRF 1,21,03 1,15,38 5,65 ..
quarters by RCC slab. (B.C.G.H.J, MA & MAP type)
807 Allahabad- Rewiring of staff quarters type I = 700 DRF 1,60,00 1,05,66 5,00 49,34
nos. type -II 700 nos. & type III = 100 nos.
808 Manikpur & Dabhaura: Replacement of existing DRF 1,47,54 1,25,43 1 22,10
steel/mosonary tank.
809 Allahabad Division: Rewiring of 1300 nos.staff DRF 1,44,96 1,37,72 .. 7,24
quarters. (Type-I-500, Type-II-500, Type-III-250,
Type-IV & above-50).
810 Jhansi division: Rewiring of staff quarters. (1500 DRF 1,93,03 1,55,85 9,00 28,18
unit).
811 Allahabad: Upgradation of Central Railway Hospital DF(2) 1,04,33 1,28 .. 1,03,05
(Phase-II).
812 Jhansi: Augmentation of water supply system of DF(2) 2,48,08 1,56,76 30 91,02
Garia Dam, Naut Ghat, Baveri pumping instalations
at Jhansi.
813 Allahabad: Seamless Operation Theatre. DF(2) 1,59,54 2,29 35,00 1,22,25
AMENITIES FOR STAFF
06.01.52.15.2.
50.001
06.02.52.05.2.
51.001
06.01.52.06.2.
50.001
06.02.52.06.2.
51.001
06.03.52.08.2.
52.003
STAFF QUARTERS
06.02.51.13.3.
51.001
06.00.51.16.3.
00.999
06.01.51.16.3.
50.001
06.00.51.16.3.
00.999
06.02.52.08.2.
51.002
06.03.52.08.2.
52.002
06.02.52.09.2.
51.001
06.03.52.10.2.
52.001
06.02.52.10.2.
30.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 61
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
814 Allahabad: Rewiring of Railway staff quarters in DRF 1,36,00 79,00 4,09 52,91
ALD Division 1000 Nos.
815 Improvement of illumination of street light of DF(2) 2,25,00 66,69 5,00 1,53,31
Jhansi division (Jhansi, Gwalior, Dholpur, Banda,
Datia, Dabra, Mahoba & Orai).
816 Jhansi:-Construction of sports complex at Jhansi. DF(2) 2,00,00 3,97 30,00 1,66,03
817 Kanpur:- Replacement of old 20000 gallon capacity DRF 60,00 .. 50,00 10,00
RCC tank by new 50000 gallon capacity RCC tank
818 Allahabad :Provision of 15 No's Automatic DF(2) 59,53 44,14 4,00 11,39
Chlorination Plants at various Pumps.
819 Dholpur station: Provision of RCC tank 2,25,000 DF(2) 69,24 .. 10 69,14
Ltr water capacity for Augmentation of water
supply
820 Jhansi: East: Augmentation of water supply and DRF 75,10 .. 49,83 25,27
replacement of corrugated pipe line in East
colony.
821 GWL:Replacement of existing water supply pipe line DF(2) 51,41 .. 10,00 41,41
for Administrative building and staff Qtrs. At
IRCAMTECH & Provision of chlorinators a various
pumps at GWL.
822 Jhansi:West: Provision of flocculator and DF(2) 60,00 .. 7,00 53,00
coagulation tank including replacement of filter
media at filter house Jhansi.
823 ALLAHABAD: Improvement to cupboard/ almirah & DF(2) 58,00 9,33 7,00 41,67
kitchen cabinet in various Type quarters
Allahabad
824 ALLAHABAD: Improvement to cupboard/ almirah & DF(2) 58,00 .. 10,50 47,50
kitchen cabinet in Type III, IV, IV Spl quarters
in Railgaon colony.
825 Agra cantt- Replacement of manglore tiles roof in DRF 96,77 .. 66,78 29,99
D & F type Qtrs.
826 Jhansi (East)- Replacement of maglore tiled roof DF(2) 94,24 .. 10,00 84,24
with R.C.C. slab / GI sheeting in C,D,E & F Type
Quarters in east Railway colony.
827 Jhansi:- Provision of G.I. sheet covering over DF(2) 98,00 .. 84,35 13,65
leaky jack arch roofs in West Railway colony.
828 Kanpur: Improvement in street lights of colonies DF(2) 54,54 15,53 10,00 29,01
of Kanpur.
829 Fatehpur - Providing & laying S.W. pipe with DF(2) 65,01 .. 15,00 50,01
chamber, pump house to malgodam / OHE office in
North colony at Fatehpur station.
AMENITIES FOR STAFF
06.03.52.15.3.
52.007
06.03.52.15.3.
52.005
06.03.52.15.3.
52.009
06.02.52.15.3.
51.008
06.02.52.15.3.
51.007
06.01.52.15.3.
50.001
06.02.52.10.2.
51.001
06.03.52.10.2.
30.002
06.03.52.12.2.
52.001
06.02.52.15.3.
51.006
06.02.52.15.3.
51.001
06.03.52.15.3.
52.001
06.03.52.15.3.
52.008
06.03.52.15.3.
52.002
06.02.52.15.3.
51.003
06.02.52.15.3.
51.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 62
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
830 Kanpur:- Replacement of sewerage net work in Goy DRF 65,00 .. 5,05 59,95
& Nirala Nagar colony.
831 Mughalsarai-Kanpur : Electrical rewiring works of DF(2) 75,00 24,16 12,00 38,84
service buildings at Allahabad, Mirzapur &
Fatehpur.
832 Shikohabad- Farukhabad: First time Electrification DF(2) 54,98 .. 12,79 42,19
of Manjoorgarhi, & Kosma railway stations and
staff quarters.
833 Jhansi:-Replacement of MH fittings of High Mast DRF 90,05 .. 50,00 40,05
Towers & Street light by LED light fittings in
railway East colony.
834 Dabra: Provision of sewerage system in Dabra DF(2) 79,27 .. 5,00 74,27
railway colony.
835 Manikpur:- Augmentation of water supply DF(2) 89,11 .. 10,00 79,11
arrangement.
836 Agra Cantt:- Improvement to staff quarters in DF(2) 98,76 .. 10,00 88,76
North & west colony.
837 Jhansi - Provision of 500 KVA DG set at Garia Dam. DF(2) 55,72 31,14 1 24,57
838 Agra Division: Rewiring of 1200 nos. staff DRF 94,36 69,64 15,00 9,72
quarters of Type-I-600, Type-II-300, Type-III-200,
Type-IV-100 nos.
839 Jhansi: Accommodation in Divisional Railway DF(2) 89,07 60,35 2,00 26,72
Hospital Jhansi for attendant of Railway patient
dormitory. (OOT)
840 Mathura: Replacement of doors with G.I. sheet DRF 95,84 89,87 5,97 ..
doors in WC, kitchen & back doors of staff
quarters under ADEN/MTJ-I .
841 Jhansi: Replacement of steel tank at over bridge DF(2) 72,93 36,81 10,00 26,12
road in west colony.
842 Jhansi division: provision of PVC tank in staff DF(2) 80,28 46,51 4,00 29,77
qtrs(800 Nos)
843 Jhansi Division: Replacement of back side doors DF(2) 92,53 32,78 10,00 49,75
bathroom/ lavatory doors with galvanised door.
(800qtrs)
844 Agra Cantt.-Improvement to sewage system in north DF(2) 76,56 70,04 2,10 4,42
& south colony by providing septic tank and
screaning.
845 Jhansi: East :Replacement of Mangalore tiled roof DRF 82,85 75,51 .. 7,34
by bamboo sheeting/galvano sheeting with false
ceiling and chainging decayed wooden members in
East colony bunglows.
06.03.52.06.2.
52.001
06.01.52.08.2.
50.001
06.03.52.09.3.
52.003
06.01.52.10.3.
50.002
06.03.52.10.3.
52.003
06.03.52.10.3.
52.001
06.02.52.15.3.
51.009
06.02.52.15.3.
51.005
06.03.52.15.3.
52.003
06.03.52.15.3.
52.006
06.03.52.15.3.
52.004
06.01.52.15.3.
50.002
AMENITIES FOR STAFF
06.02.52.15.3.
51.002
06.03.52.10.3.
52.002
06.01.52.11.3.
50.001
06.03.52.11.3.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 63
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
846 Allahabad: Supply and installation of 20 nos DF(2) 80,66 73,51 1 7,14
automatic chlorination plants for various pumps at
Allahabad under ADEN/HQ/I/ and ADEN/HQ/II/ALD
847 Jhansi: west: Replacement of old corroded pipe DRF 55,00 .. 55,00 ..
line in west colony.
848 Works costing below DRM's Power Cap. 85,20 .. 85,20 ..
DRF 1,97,95 .. 1,97,95 ..
DF(2) 1,64,87 .. 1,64,87 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 85,20 ..
DRF .. .. 5,65,55 ..
DF(2) .. .. 4,71,03 ..
B - New Works
849 Agra Cantt:- Improvement to staff quarters in DF(2) 2,01,68 .. 4,90 1,96,78
South colony.
850 Jhansi:-- Replacement of MH/CFL fittings of street DRF 1,49,72 .. 4,90 1,44,82
light by LED street light fittings in west railway
colony.
851 Works costing below DRM's Power Cap. 5,00 .. 5,00 ..
DRF 5,00 .. 5,00 ..
DF(1) 5,00 .. 5,00 ..
DF(2) 5,00 .. 5,00 ..
TOTAL-NEW WORKS Cap. .. .. 5,00 ..
DRF .. .. 9,90 ..
DF(1) .. .. 5,00 ..
DF(2) .. .. 9,90 ..
TOTAL-Amenities For Staff Cap. .. .. 90,20 ..
DRF .. .. 5,75,45 ..
DF(1) .. .. 5,00 ..
DF(2) .. .. 4,80,93 ..
A - Works in Progress
852 North Central Railway :- Augmentation of water DF(1) 2,47,45 1,60,83 1 86,61
supply arrangements at various stations. (NR, NCR,
NWR ).UMB, ALD, BKN, FZR, DLI, JU & LKO.
853 Aligarh Jn: Replacement of existing FOB along with DRF 4,30,15 4,27,15 .. 3,00
covered shed.
854 Panki: Extension of platforms to accommodte 24 DF(1) 2,29,81 1,10,12 10,00 1,09,69
coaches.
855 Jhansi division: Extension of Platforms for DF(1) 2,18,57 1,24,41 5,99 88,17
handling 23/24 coaches trains at Dhaura, Basai and
Talbehat stations.
856 Allahabad division: Raising and extension of PF at DF(1) 2,82,57 2,11,75 5,50 65,32
Sirathu, Khaga & Bharwari stations.
857 Allahabad division: Raising and extension of DF(1) 2,83,05 2,83,01 1 3
platforms at Unchdih, Manda Road and Chunar
Stations.
06.02.53.06.2.
51.001
06.02.53.09.2.
30.005
06.03.53.09.2.
52.001
06.02.53.09.2.
51.001
06.02.53.09.2.
51.002
06.00.52.16.3.
00.999
06.01.52.16.2.
50.001
06.03.52.16.2.
52.001
06.00.52.16.3.
00.999
PASSENGER AMENITIES
06.02.53.98.2.
51.001
AMENITIES FOR STAFF
06.02.52.11.3.
51.001
06.03.52.13.3.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 64
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
858 Jhansi division: Increase in level of platforms at DF(1) 2,40,00 1,02,30 .. 1,37,70
Chitrakut Dham, Karvi & Atarra station.
859 Mathura Jn: Provision of full COP on 2 PFs (PF DF(1) 2,40,00 1,43,80 3,00 93,20
No.1&2)
860 Mathura Jn: Provision for Extension of Ramp FOB DF(1) 2,14,18 1,61,51 3,00 49,67
connecting PF 2/3 & 1/6 with PF 7, 8/9.
861 Tundla: Provision of facilities for Adarsh station DF(1) 1,96,56 1,30,94 1 65,61
at Tundla.
862 Govindpuri: Provision of hydrant pipe line for DF(1) 1,80,72 3,58 2,00 1,75,14
train watering at GOY.
863 Chheoki: Provision of platform shelter at various DF(1) 1,01,00 66,90 50 33,60
platforms at Chheoki station.
864 Mathura Jn:-Provision of Washable apron and water DF(1) 1,58,00 1,10,43 3,00 44,57
hydrant on PF-5.
865 FarahTown:- Extension and raising of platforms DF(1) 1,49,85 .. 5,00 1,44,85
from Rail level to MediumLevel for 24 coaches
trains.
866 Kanpur:-Provision of Washable apron at Platform DF(1) 1,80,00 .. 4,50 1,75,50
No.3.
867 Jhansi & Lalitpur: Improvement / Correcting uneven DRF 1,27,52 4,76 1 1,22,75
level of FOB located.
868 Mathura Jn:-Provision of washable apron with DF(1) 1,95,00 1,68,45 1 26,54
hydrant pipe line on platform 8/9.
869 Jhansi :- Provision of water re-cycling plant at DF(1) 1,50,00 .. 6,00 1,44,00
Jhansi station near CNB washing siding.
870 Agra Cantt:- Extension of PF-2 with COP . DF(1) 1,49,96 .. 50 1,49,46
871 Karchana: Replacement of Existing damaged FOB. DRF 1,34,13 .. 1,00,00 34,13
872 Agra Cantt-Prov. of washable apron on PF-5. DF(1) 1,50,00 1,36,65 50 12,85
873 Manikpur: Provision of Washable Apron with DF(1) 1,99,58 .. 8,00 1,91,58
cleaning system
874 Kanpur Central Goods Shed:- Improvement of DRF 1,00,99 17,37 40,00 43,62
terminal facilities at Kanpur Central Goods Shed.
875 Cheoki: Development of circulating area and DF(1) 1,99,90 1,98,05 50 1,35
provision of stn bldg ,& other connected works at
COI station.
876 KULPAHAR: Development of Kulpahar as Adarsh DF(1) 1,36,10 .. 4,00 1,32,10
station
PASSENGER AMENITIES
06.01.53.15.3.
50.001
06.02.53.15.3.
51.012
06.01.53.12.3.
50.001
06.03.53.13.3.
52.002
06.02.53.14.3.
51.005
06.02.53.13.3.
51.002
06.01.53.14.3.
50.001
06.01.53.15.3.
50.003
06.02.53.15.3.
51.010
06.03.53.12.3.
52.001
06.01.53.13.3.
50.002
06.03.53.15.3.
52.003
06.03.53.09.2.
52.002
06.01.53.10.2.
50.001
06.01.53.10.2.
11.002
06.02.53.11.3.
51.005
06.02.53.12.3.
51.001
06.02.53.14.3.
51.001
06.03.53.15.3.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 65
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
877 Mirzapur:-Extention of PF no. 1, 2 & 3 to DF(1) 1,84,69 1,19,35 10 65,24
accommodate 24 coaches, PF shed, Platform benches,
station name board etc.
878 Fatehpur- Expansion of terminal facilities at DF(1) 1,75,02 .. 12,50 1,62,52
Fatehpur Goods shed.
879 Fatehpur: Connecting heavy duty road to level DF(1) 1,50,01 .. 12,00 1,38,01
crossing no.47 for Fathepur Goods Shed.
880 Kanpur:- Improvement to damaged Paving / road DF(1) 1,49,99 .. 3,00 1,46,99
in loading of parcel rack at CPC goods shed
Kanpur Under ADEN/HQ/I/CNB
881 JHS Div : Provision of facilities for handicapped DF(1) 1,01,00 .. 6,00 95,00
passengers at A1,A, & B category of stations as
per specification of RDSO / LKO
882 Allahabad Divn.: Supply & Installation of CCTV DF(1) 1,05,12 .. 9,50 95,62
cameras for PRS counters at medium stations
including 'A' class stations (Mirzapur,
Vindhyachal, Chheoki, Naini, Fatehpur, Kanpur
Cantt., Govindpuri, Panki, Phaphund, Etawah,
883 Idgah:-Raising/ Extension of platform No-4 . DF(1) 1,25,60 1,13,76 50 11,34
884 Agra Cantt -Improvement to Pay & Use toilets with DF(1) 2,00,00 2,00,00 .. ..
garbage bins at PF No.2/3 and improvment of cloak
room with individual locker facilities.
885 Jhansi:East: Provision of RCC ground water tank DF(1) 1,43,02 85,84 3,50 53,68
including augmentation of pipe line for carriage
watering at JHS station including buster pumps and
necessary electrical fittings.
886 Kanpur Central:- Shifting of Parcel office to City DRF 1,22,97 .. 20,00 1,02,97
side.
887 Provision of new FOB at chheoki ( COI ) station. DF(1) 1,99,84 1,82,70 3,92 13,22
888 SUBEDARGANJ: Raising of Platform to high level at DF(1) 1,98,98 1,81,74 2,10 15,14
Subedarganj station under ADEN/Line/ALD.
889 Kanpur-Tundla:Opening of a new halt sation at DF(1) 1,60,58 1,19,43 1 41,14
Km.1056.5 between Rurah & Maitha station.
890 Allahabad Division: Cheoki Station : Provision of DF(1) 1,02,12 70,88 1,00 30,24
01 No. (2.4M wide) Ramp and 01 No. Stair at FOB
(HWH end).
891 Tundla-Ghaziabad section: Provision of 3.05M new DRF 1,96,21 .. 1,00,00 96,21
FOB at Chamrola and Pora Station at ALD division.
892 Agra Fort: Provision of FOB. DF(1) 1,86,13 1,86,13 .. ..
06.02.53.13.3.
11.003
06.02.53.13.3.
51.001
06.02.53.13.3.
51.004
06.02.53.15.3.
51.006
06.02.53.15.3.
51.011
06.01.53.07.2.
50.001
06.03.53.14.3.
52.001
06.02.53.15.3.
51.005
06.01.53.13.3.
50.001
06.01.53.12.3.
50.002
06.03.53.13.3.
52.001
06.02.53.15.3.
51.001
PASSENGER AMENITIES
06.02.53.12.3.
51.002
06.02.53.15.3.
51.004
06.02.53.15.3.
51.007
06.02.53.15.3.
51.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 66
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
893 Agra Cantt: Provision of Kota stone flooring under DF(1) 1,50,40 1,37,10 10 13,20
COP.
894 Achnera & Kherli: Raising of platforms ( AH= PF 1 DF(1) 1,49,80 1,10,74 5,50 33,56
& 2/3 M/L to H/L, KL= PF 1 & 2 L/L to H/L)
895 Jhansi division: Provision/increase of PF shelter. DF(1) 1,55,32 1,38,21 60 16,51
(14 stations)
896 Gwalior: Augmentation of PF shelter on remaining DF(1) 1,03,80 1,03,80 .. ..
length on PF No. 1.
897 Lalitpur: Increase in level/ heihgt of PF No. 1 DF(1) 2,27,05 94,86 10 1,32,09
and 2/3 make HL platform and extension of PF No.1.
898 Banda: Increase in level/ height of PF No.1 and 2 DF(1) 2,36,45 2,05,60 12 30,73
to make high level PF with good surface and
extension of PF shelter of PF No. 2.
899 Mathura Jn: Provision of PF shelter on PF No. 8/9. DF(1) 1,72,03 1,10,99 1,00 60,04
900 Dhoulpur: Extension of PF No. 1 to accommodate DF(1) 1,36,17 80,54 50 55,13
24/26 coach trains and extension of FOB to
circulate area and provision of landing towards
JHS end.
901 Phaphund: Replacement of FOB. DRF 1,92,16 1,73,78 3,00 15,38
902 Mathura Jn: Provision of Escalators on PF No.1 & DF(1) 1,78,05 5,26 8,00 1,64,79
2/3.
903 Gwalior:- Replacement of broken checkered tiles DF(1) 1,96,89 1,39,94 50 56,45
and platform coping of PF No. 1, 2/3 and Provision
of Washable Apron on PF No.4.
904 Agra Cantt- Provision of washable apron on PF -3 DRF 1,50,74 1,31,43 7,00 12,31
905 Govindpuri: Development of circulating area in DF(1) 1,90,06 1,36,36 1,50 52,20
front of new station building at GOY.
906 ALLAHABAD:- Relocation of diesel loco shed in DF(1) 1,94,93 1,42,00 8,00 44,93
connection with construction of PF no.11.
907 Fatehpur: Repl. of steel tank with RCC tank 50,000 DRF 1,01,27 82,85 1,00 17,42
gallon capacity along with provision of deep tube
well & pump house and pipe line.
908 Allahabad: Provision of electric loco shed in DF(1) 2,00,00 22,92 5,00 1,72,08
connection with construction of PF no.11.
909 Kanpur-Tundla Section:- Provision of minimum DF(1) 1,14,98 17,11 4,00 93,87
passenger amenities at stations in Kanpur-Tundla
section.
910 Hathras :-Provision of 50000 gallons capacity RCC DF(1) 1,04,97 .. 5,00 99,97
over head tank along with deep tube well,pump
house & associated pipe line at Hathras.
06.01.53.11.3.
50.001
06.02.53.11.3.
51.003
06.02.53.12.3.
30.004
06.02.53.12.6.
51.001
06.02.53.12.3.
30.005
06.02.53.14.3.
51.003
06.03.53.10.3.
52.001
06.01.53.10.3.
50.002
06.03.53.10.3.
52.002
06.02.53.10.3.
11.014
06.01.53.10.3.
50.001
06.03.53.11.3.
52.001
PASSENGER AMENITIES
06.01.53.08.2.
50.001
06.01.53.09.2.
50.002
06.03.53.09.2.
52.004
06.03.53.10.3.
52.003
06.03.53.10.3.
52.009
06.02.53.14.3.
51.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 67
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
911 Jhansi Division :Provision of COP and Drinking DF(1) 1,24,98 .. 6,00 1,18,98
water taps & Hand pump as per MEA
912 Chheoki: Provision of Hydrant pipe line at DF(1) 1,50,00 1,33,57 2,00 14,43
Chheoki Station.
913 GWALIOR: Provision of Mechanised Laundry for DF(1) 1,60,00 .. 2,50 1,57,50
washing linen.
914 Rurah:- Provision for development of facilities DF(1) 1,77,10 .. 6,00 1,71,10
for Adarsh station at Rurah.
915 Jhansi:-Replacement of old AC sheet ,Valley guter DRF 1,91,00 .. 1,00,00 91,00
& down take pipes by galvino / pre painted sheet
along with damaged portion of COP (CSTM END)on
Platform No. 1& 2/3 .
916 Allahabad Division: Supply & Installation of CCTV DF(1) 1,43,07 .. 14,00 1,29,07
cameras at 08 stations (i.e . Aligarh, Tundla,
Etawah, Phanpund, Fatehpur, Naini, Vindhyachal,
Mirzapur)
917 Jhansi Division: Provision of CCTV cameras at DF(1) 1,09,32 .. 4,00 1,05,32
stations for security and monitoring of
cleanliness activity at station.(Lalitpur, Datia,
Morena, Banda, Orai & Mahoba)
918 Datia,Dabra,Babina & Talbahat:Construction of RCC DF(1) 1,49,66 .. 4,00 1,45,66
over head tank insteed of old steel tank at
Datia,Dabra,Babina & Talbahat stations.
919 Manikpur-Proposed Augmentation of Water Supply DF(1) 1,80,07 .. 4,00 1,76,07
arrangement at Manikpur by providing New borewells
& pipepline.
920 Mathura Jn.:-Extension of FOB from PF 8/9 towards DF(1) 1,09,96 95,00 8,00 6,96
3rd entry side with provision of ramp.
921 Gwalior :Replacement of Washable apron on PF no. 3 DRF 1,08,04 .. 30,00 78,04
at GWL
922 Allahabad: Setting up of Mechanized laundry at DF(1) 1,95,35 .. 19,82 1,75,53
Allahabad .
923 Tundla: Replacement of existing damaged washable DRF 1,85,22 .. 70,00 1,15,22
apron at PF No.4 at Tundla station
924 Jhansi : Provision of Ramps to 6.1 mt wide new DRF 1,19,61 .. 44,47 75,14
FOB at PF 4/5 at Jhansi station including
dismantling of old FOB (2.4 mt wide connecting PF
1, 2/3 & 4/5)
925 Agra Division:- Installation of CCTV cameras to DF(1) 71,55 .. 5,00 66,55
monitor safety, security & cleanliness (04
Stations i.e. Agra fort , Raja Ki Mandi,
Dhoplpur, & Kosi Kalan)
06.03.53.15.3.
52.004
06.02.53.15.3.
51.008
06.02.53.15.3.
51.002
06.03.53.15.3.
52.002
06.01.53.15.6.
50.001
06.03.53.15.3.
52.006
06.02.53.15.6.
51.001
06.03.53.15.6.
52.001
06.03.53.15.3.
52.005
06.03.53.15.3.
52.007
06.01.53.15.3.
50.002
PASSENGER AMENITIES
06.03.53.14.6.
52.001
06.02.53.14.3.
51.002
06.03.53.14.3.
52.002
06.02.53.15.3.
51.009
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 68
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
926 Works costing below DRM's Power DRF 3,43,65 .. 3,43,65 ..
DF(1) 1,54,28 .. 1,54,28 ..
TOTAL-WORKS IN PROGRESS DRF .. .. 8,59,13 ..
DF(1) .. .. 3,85,68 ..
B - New Works
927 Lalitpur: Provision of Washable Apron at PF No. 1 DF(1) 2,28,06 .. 10,00 2,18,06
at Lalitpur station.
928 Vindhyachal: Provision of facilities at DF(1) 1,30,07 .. 65,00 65,07
Vindhyachal station as per Adarsh Station norms.
929 Jhansi Division: Development of Khajuraho station DF(1) 1,27,34 .. 35,99 91,35
as Adarsh station.
930 Phaphund: Provision of Civil & Electrical DF(1) 1,14,20 .. 40,00 74,20
facilities at Phaphund station as per Adarsh
station norm.
931 Hathras Junction: Provision of facilities at DF(1) 1,45,85 .. 50,00 95,85
Hathras Junction station as per Adarsh station
norm.
932 Bamhrauli: Provision of facilities at Bamhrauli DF(1) 1,31,01 .. 45,00 86,01
station as per Adarsh station norm.
933 Etawah: Provision of Civil & Electrical facilities DF(1) 1,20,59 .. 40,00 80,59
at Etawah station as per Adarsh station norm.
934 Fatehpur Sikri:- Construction of 575x10 mts DF(1) 1,99,96 .. 60,00 1,39,96
PF-2 with 50x10 mts COP , toilet & other
amenities.
935 Chheoki :Extension of station building , provision DF(1) 1,84,18 .. 60,00 1,24,18
of parking & development of circulating area at
Chheoki station.
936 Jhansi Division:Replacement of train indication DRF 1,32,80 .. 70,00 62,80
board and autoannoucement system at GWL
inetgrated with coach indication and NTES with
single key functioning system.
937 Robertsganj: Provision of one additional high DF(1) 1,94,71 .. 60,00 1,34,71
level platform at Robertsganj station.
938 Kanwar: Replacement of Existing FOB with stair. DRF 1,33,84 .. 87,39 46,45
939 Works costing below DRM's Power DRF 1,57,39 .. 1,57,39 ..
DF(1) 4,65,99 .. 4,65,99 ..
PASSENGER AMENITIES
06.02.53.16.3.
51.013
06.00.53.16.3.
00.999
06.02.53.16.3.
51.010
06.02.53.16.3.
51.014
06.01.53.16.3.
50.001
06.02.53.16.3.
51.015
06.03.53.16.3.
52.004
06.02.53.16.3.
51.012
06.00.53.16.3.
00.999
06.03.53.16.2.
52.001
06.02.53.16.3.
51.009
06.03.53.16.3.
52.003
06.02.53.16.3.
51.008
06.02.53.16.3.
51.011
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 69
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
TOTAL-NEW WORKS DRF .. .. 3,14,78 ..
DF(1) .. .. 9,31,98 ..
TOTAL-Passenger Amenities DRF .. .. 11,73,91 ..
DF(1) .. .. 13,17,66 ..
A - Works in Progress
940 JHANSI:-Replacement of old damaged roof of DRM DRF 1,31,40 .. 35,69 95,71
office building.
941 Allahabad : Electric stores and sub station DF(2) 2,11,56 1,20,17 10,00 81,39
Building.
942 Tundla Jn & Kanpur - Expansion of drivers DF(3) 2,21,00 2,20,23 77 ..
running room.
943 Kanpur - Proposal for setting up of three phase DF(3) 2,47,95 87,79 1 1,60,15
locomotive trouble shooting car.
944 Jhansi: Construction of model room of 100 beds DF(3) 4,01,99 2,84,27 25,00 92,72
capacity.
945 Agra Cantt: Capacity enhancement of Running Room. Cap. 1,42,40 1,42,39 .. 1
946 Allahabad Yard: Repl. of cross drain from PF No.4 DF(3) 1,00,62 4,95 10 95,57
to main Hathi nalan ciirculating area & new main
drain along line No.3 & between line No.5&6.
947 Allahabad: Provision of 02 nos. lifts in new DF(3) 77,47 .. 50 76,97
building at Central Hospital Allahabad.
948 Allahabad: Provision of Elevators in driver & DF(3) 66,36 .. 10,00 56,36
Guard running room.
949 Jhansi Division: Construction of RPF post and Cap. 85,96 53,08 32,88 ..
outpost at Sabalgarh, Bhind and Datiya.
950 Kanpur: Replacement of old stone tiles & jack arch DRF 96,82 78,34 1 18,47
roof of CETA building.
951 Agra division: Replacement of drain with retaining DRF 96,55 83,28 1 13,26
wall to prevent fouling/trespassing along the
track under ADEN (Line) jurisdiction.
952 Jhansi: Improvement in Centralised track depot. DF(3) 1,00,56 1,00,56 .. ..
953 Gwalior: Replacement of old damaged stone slab by DRF 95,60 82,03 13,57 ..
RCC slab and other miscellaneous work at area
manager office.
954 Bina-Jhansi: Proposed stabilization of formation DF(3) 80,64 1 27,50 53,13
with lime slurry pressure injection from Km.989.00
to 991.50 & 1022.00 to 1027.00 Up & Dn M/L=15 Kms
to be carried out in summer season from 15th March
to 15th June. (OOT)
955 (A)Gwalior:- Construction of Dog kennel along with DF(1) 68,10 41,17 11,40 15,53
kitchen for 2 Dogs, rest room for handlelrs and
Provision of Malkhana at Morena, Jhansi station
Post at Orai and Gwalior.(B)Jhansi & Banda
Improvement of RPF barracks with provision of of
OTHER SPECIFIED WORKS
06.03.64.13.2.
52.001
06.02.64.12.2.
51.001
06.02.64.04.2.
30.003
06.03.64.10.3.
52.003
06.02.64.10.3.
51.005
06.01.64.10.3.
50.002
06.03.64.10.3.
52.004
06.03.64.10.3.
52.002
06.03.64.10.3.
52.001
06.02.64.06.2.
51.001
06.03.64.07.2.
52.001
06.01.64.08.2.
50.001
06.02.64.10.2.
51.001
06.02.64.09.3.
51.002
06.02.64.09.3.
51.004
06.03.64.11.3.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 70
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
956 Agra Cantt-Improvement of station and yard drain DF(3) 90,94 86,56 1,53 2,85
for disposal of waste water.
957 Kanpur:- Construction of new ward in General Store DF(3) 73,16 73,15 1 ..
Depot
958 Dadri:-Provision of RPF barrack office at Dadri. DF(2) 91,66 24,32 7,00 60,34
959 Chitrakut Dham Karvi 15 beds, Khajuraho 10 DF(2) 72,70 33,80 10,00 28,90
beds,Ghatampur 10 beds, Bhimsem 10 beds and Dabra
10 beds (Total 55 beds)Construction of new RPF
barrack, with Kitchen, recreation room, Dining
hall and Lat-bath facilities.
960 Kanpur:- Proposal for 08 rooms hostel for DF(2) 53,98 .. 26,40 27,58
accomodation of trainees in CETA at Kanpur and
repair to ground floor of ceta hostal floor by
tiles floor to aviod the dampness in rooms & other
repair work.
961 Allahabad: Providing Centralized godown facilities DF(3) 97,70 .. 41,58 56,12
for divisional store department.
962 Kanpur:- Rplacement of old stone tiles & jack arch DRF 54,94 .. 47,43 7,51
roof in CETA School building including main hall
domes
963 IRTMTC-SFG: Rehabilitation of Electrical DRF 54,56 2,74 35,00 16,82
infrastructure at IRTMTC-SFG
964 Agra Division:- Provision of RPF out post at DF(3) 55,21 .. 25,00 30,21
Kherli & Idgah station
965 Agra :- Provision of Track machine maintenance DF(3) 64,99 .. 30,00 34,99
Shed at Agra.
966 Works costing below DRM's Power Cap. 37,13 .. 37,13 ..
DRF 87,81 .. 87,81 ..
DF(1) 7,60 .. 7,60 ..
DF(2) 35,60 .. 35,60 ..
DF(3) 1,08,00 .. 1,08,00 ..
DF(4) 8,00 .. 8,00 ..
OTHER SPECIFIED WORKS
06.01.64.11.3.
50.001
06.02.64.11.3.
51.022
06.02.64.12.3.
51.001
06.03.64.12.3.
52.001
06.00.64.16.3.
00.999
06.02.64.13.3.
51.001
06.02.64.13.6.
51.001
06.02.64.14.3.
51.002
06.02.64.14.3.
51.001
06.01.64.15.3.
50.001
06.01.64.15.3.
50.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 71
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
TOTAL-WORKS IN PROGRESS Cap. .. .. 70,01 ..
DRF .. .. 2,19,52 ..
DF(1) .. .. 19,00 ..
DF(2) .. .. 89,00 ..
DF(3) .. .. 2,70,00 ..
DF(4) .. .. 8,00 ..
B - New Works
967 Gwalior-Provision of water re-cycling plant at Cap. 2,10,80 .. 1 2,10,79
Gwalior,
968 Jhansi Workshop:-Augmentation of hostel Capacity DF(3) 2,29,93 .. 5 2,29,88
in STC Jhansi.
969 Agra Fort :- Provision of 60 bedded TTEs and Sr. Cap. 2,11,83 .. 1 2,11,82
subordinate rest house .
970 Provision of Integrated Emergency Response Cap(Nirb) 2,45,00 .. 98,00 1,47,00
Management System (Video Surveillance System) at
04 railway stations viz. Agra Fort, Raja ki Mandi,
Dhaulpur & Morena
971 Provision of Integrated Emergency Response Cap(Nirb) 2,40,00 .. 96,00 1,44,00
Management System (Video Surveillance System) at
06 railway stations viz. Gwalior, Dabra, Datia,
Babina, Lalitpur & Orai.
972 Provision of Integrated Emergency Response Cap(Nirb) 2,45,00 .. 98,00 1,47,00
Management System (Video Surveillance System) at
06 railway stations viz. Banda, Manikpur,
Chitrakut , Mahoba, Khajuraho & Atarra
973 Provision of Integrated Emergency Response Cap(Nirb) 2,40,00 .. 96,00 1,44,00
Management System (Video Surveillance System) at
05 railway stations viz. Aligarh, Firozabad,
Shikohabad, Fatehpur and Phaphund.
974 Provision of Integrated Emergency Response Cap(Nirb) 2,40,00 .. 96,00 1,44,00
Management System (Video Surveillance System) at 0
4 railway stations viz. Tundla, Mirzapur,
Vindhyechal & Etawah.
975 Works costing below DRM's Power Cap. 5 .. 5 ..
DRF 5 .. 5 ..
DF(3) 10 .. 10 ..
TOTAL-NEW WORKS Cap. .. .. 7 ..
DRF .. .. 5 ..
DF(3) .. .. 15 ..
Cap(Nirb) .. .. 4,84,00 ..
06.03.64.16.2.
00.003
06.02.64.16.2.
00.002
06.02.64.16.2.
00.001
06.00.64.16.3.
00.999
06.03.64.16.2.
52.002
06.03.64.16.2.
52.001
06.01.64.16.2.
50.001
06.01.64.16.2.
00.002
06.03.64.16.2.
00.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
NORTH CENTRAL RAILWAY
Assets-Acquisition, Construction and Replacement for 2016-17
PAGE NO : 72
(Figures in thousands of rupees)
Item
No.
Project ID Particulars of Works Allo-
cation
Anticipated
Cost
Outlay
expected
to end of
2015-16
Outlay
2016-17
Balance to
complete
work
TOTAL-Other Specified Works Cap. .. .. 70,08 ..
DRF .. .. 2,19,57 ..
DF(1) .. .. 19,00 ..
DF(2) .. .. 89,00 ..
DF(3) .. .. 2,70,15 ..
DF(4) .. .. 8,00 ..
Cap(Nirb) .. .. 4,84,00 ..
TOTAL-WORKS IN PROGRESS Cap. .. .. 7,97,62 ..
DRF .. .. 63,34,42 ..
DF(1) .. .. 4,66,39 ..
DF(2) .. .. 6,55,03 ..
DF(3) .. .. 12,22,88 ..
DF(4) .. .. 4,55,11 ..
S.Fund .. .. 31,07,40 ..TOTAL - NEW WORKS Cap. .. .. 1,72,56 ..
DRF .. .. 16,81,22 ..
DF(1) .. .. 9,46,98 ..
DF(2) .. .. 9,90 ..
DF(3) .. .. 1,20,85 ..
DF(4) .. .. 79,00 ..
S.Fund .. .. 4,00,00 ..
Cap(Nirb) .. .. 4,84,00 ..GRAND TOTAL Cap. .. .. 9,70,18 ..
DRF .. .. 80,15,64 ..
DF(1) .. .. 14,13,37 ..
DF(2) .. .. 6,64,93 ..
DF(3) .. .. 13,43,73 ..
DF(4) .. .. 5,34,11 ..
S.Fund .. .. 35,07,40 ..
Cap(Nirb) .. .. 4,84,00 ..