Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
LIST OF ANNEXURE
Annexure No. Description
I. Aerial View
II. Site Location Plan
III. Contour Level Plan
IV. Master Plan
V. Refuge Area Statement & Ground Coverage Statement
VI. Parking & Traffic Management Plan
VII. Water Balance Statement
VIII. Seismic Zoning Map Of India
IX. Rain water Harvesting & Storm Water Management Plan
X. UGT & OHT Capacity
XI. Sewage Treatment Plant-Schematic Plan & Details
XII. Solid waste Management :Organic Waste Composter Process
XIII. Landscape Plan & List Of Trees
XIV. Electrical Calculations, D.G Chart & Location
XV. Swimming pool details
XVI. Fire Fighting Layout
XVII. Environment Management Plan
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE I
AERIAL VIEW
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE II
SITE LOCATION MAP
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE III
CONTOUR LEVEL PLAN
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE IV
MASTER LAYOUT
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
AREA STATEMENT
Sr. No Area Statement Area in SQM
1 Area of Plot 23400.00
2 Deduction
18.00 M Wide D. P. Road 343.95
24.00 M Wide D. P. Road 2558.04
Reservation (PG 38) 21.00
Reservation (PS 119) Including Amenity Space 2787.06
3 Balance Plot Area 17689.95
4 Deduction
Open Space 10% 1789.99
Transformer Area 100.00
5 Net Plot Area 15820.96
6 Addition
18.00 M Wide D.P.Road 343.95
24.00 M Wide D.P.Road 2558.04
Reservation (PG 38) 21.00
Reservation (PS 119) Including Amenity Space 2787.06
Transformer Area 100.00
T.D.R (40%) (6328.38-21.00-2787.06) 3520.32
T.D.R (20%) 3164.19
7 Total Permissible F.S.I 28315.52
8 Total Proposed F.S.I 28312.73
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
TOTAL CONSTRUCTION AREA
Sr. No Description Area in m2
1. F.S.I. Area 28312.73
2. Non F.S.I
Balcony 4246.05
Passage 3135.31
Staircase 2528.14
Lift & Lift Machine Room 581.63
Terrace 7456.59
Refuge Area 241.13
OHT Area 690.64
UGT Area 235.15
OWC Area 50.00
STP Area 99.50
Transformer Room 115.43
Pump Room 35.12
Clubhouse 320.75
Gas Bank 29.00
Covered Parking 7723.38
Swimming Pool 121.45
Gate way 44.70
Total Non F.S.I. 27653.51
Construction Built Up Area Total F.S.I. Area
+ Total Non F.S.I. 55966.24
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
TENEMENT STATEMENT
Sr. No. Building Floors Height in
m
Type Of Flat Tenement
(Nos.)
Population
2
BHK
3
BHK
A Residential
1 Building A P+13 42.15 52 52 260
2 Building B P+13 42.15 52 52 260
3 Building C P+13 42.15 52 52 260
4 Building D P+13 42.15 52 52 260
5 Building E P+13 42.15 52 52 260
6 Building F P+13 42.15 52 52 260
7 Building G G+13 42.46 52 52 260
8 Building H P+06 18.15 12 12 60
Total 156 220 376 1880
B Commercial area – 278.03 m2
92
C Total Population (Residential + Commercial) = 1880+92=1972
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE V
REFUGE AREA STATEMENT AND GROUND AREA
STATEMENT
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
REFUGE AREA STATEMENT
WING AREA IN SQM
A 31.75
B 31.75
C 31.75
D 36.47
E 36.47
F 36.47
G 36.47
TOTAL 241.13
GROUND COVERAGE AREA STATEMENT
WING AREA IN SQM
A 1529.54
B 1529.54
C 1529.54
D 621.66
E 621.66
F 621.66
G 621.66
H 366.77
TOTAL 4382.95
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE VI
PARKING & TRAFFIC
MANAGEMENT PLAN
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
PARKING STATEMENT
Parking Requirement As per
Rule
No of
Tenements
Provided Parking
Car Scooter Cycle
Commercial area= 222.42 m2
9 27 9
For every 2 tenement having carpet
area 40-80 m2 sanction 223 112 446 446
For every 2 tenement having carpet area 40-80 m2 new rule
153 153 306 153
Total No. of Parking Required
274 779 608
Total No. of Parking provided
280 779 608
No. of Vehicles for open
6 779 608
Parking area required for open
Parking in m2
6x25 =
150
779x 3 =
2337
608x 1.4
=851.2
No. of Vehicles for Covered Parking
274 -- --
Parking area required for Covered
Parking in m2
274x 30
=8220 -- --
Parking Area required in m2 (open
+ covered ) 11408.2 m2
Parking Area provided in m2 (open
+ covered ) 11558.2 m2
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE VII
WATER BALANCE STATEMENT
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
WATER REQUIREMENT – DRY SEASON
No of Tenements= 376 No of Residential Population:1880
No of Commercial User=92
Sr. No. Description
Water
requirement
(m3/Day)
Loss
(m3/Day)
Sewage
generation
(m3/Day)
Water use
(m3/Day)
Fresh Recycled
1 Domestic for residential ( @ 90
LPCD ) no. of. Person 1880 169.2 16.92 152.28 169.2 -
2 Flushing for residential ( @ 45
LPCD ) no. of. Person 1880 84.6 8.46 76.14 - 84.6
3 Domestic for Commercial ( @ 15 LPCD ) no. of. Person 92
1.4 0.14 1.26 1.4 -
4 Flushing for Commercial ( @
30 LPCD ) no. of. Person 92 2.8 0.28 2.52 - 2.8
5 Swimming pool 5 5
5
6 Landscape irrigation (TOTAL
Landscape Area: 3400.56 m2) 20 20 -- -- 20
TOTAL 283 50.80 232.2 175.6 107.4
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
WATER BALANCE FLOW CHART FOR DRY SEASON
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
WATER REQUIREMENT – WET SEASON
No of Tenements= 376 No of Residential Population:1880
No of Commercial User=92
Sr. No. Description
Water
requirement
(m3/Day)
Loss
(m3/Day)
Sewage
generation
(m3/Day)
Water use
(m3/Day)
Fresh Recycled
1 Domestic for residential ( @ 90
LPCD ) no. of. Person 1880 169.2 16.92 152.28 169.2 -
2 Flushing for residential ( @ 45
LPCD ) no. of. Person 1880 84.6 8.46 76.14 - 84.6
3 Domestic for Commercial ( @
15 LPCD ) no. of. Person 92 1.4 0.14 1.26 1.4 -
4 Flushing for Commercial ( @
30 LPCD ) no. of. Person 92 2.8 0.28 2.52 - 2.8
5 Swimming pool 2 2
2
6 Landscape irrigation (TOTAL
Landscape Area: 3400.56 m2)
TOTAL 260 27.80 232.2 172.6 87.4
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
WATER BALANCE FLOW CHART FOR WET SEASON
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE VIII
SEISMIC ZONING MAP OF INDIA
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE IX
RAIN WATER HARVESTING & STORM WATER
MANAGEMENT PLAN
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
RUN OFF CALCULATION
Sr.
No Type of Area
Area in
M2
Run of
Coefficient Flow in M3/min
Flow in
M3/min
I Flow prior to
commencement of Project
A Area of Plot 23400 0.75 23400 x 55 x 0.75
1000 x 60 16.08 (A)
II Flow after Implementation
of Project
a For Terrace (Roof) Area 7456.59 0.95
7456.59 x 55 x
0.95
1000 x 60
6.49
b For Road Area 7395.19 0.90 7395.19 x 55 x 0.9
1000 x 60 6.10
c For Green (lawn) Area 3400.56 0.10 3400.56 x 55 x 0.1
1000 x 60 0.31
d For open paved Area 5147.66 0.90 5147.66 x 55 x 0.9
1000 x 60 4.24
Total 23400
17.14 (B)
Incremental Increase in
Discharge of Storm water [B - A] [17.14 – 16.08] 1.06
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE X
UGT LOCATION & CAPACITY
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
LOCATION OF UGT
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
UNDERGROUND WATER TANK CAPACITY
Sr. No. Description Total Water
Demand in m3
1 For Domestic 256
2 For Flushing 63
3 For Fire Fighting 400
Total Requirement of water for UGT 719
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE XI
SEWAGE TREATMENT PLANT & SCHEMATIC PLAN
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
STP LOCATION PLAN
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
STP PLAN
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
STP SECTION
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
PROCESS DESCRIPTION:
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
WASTEWATER CHARACTERISTICS
Sr.
No Parameter At Inlet At Outlet Unit
1 PH 7 to 8.5 6.5 to 7.5 ----
2 C.O.D. 300 - 400 < 30 mg/Lit
3 B.O.D. 250 - 300 < 10 mg/Lit
4 S .S. 350 - 450 < 5 mg/Lit
5 Oil & Grease 10 < 5 mg/Lit
6 TDS < 1000 mg/Lit
7 Total Nitrogen 40-50 ≤ 10 mg/Lit as
N
8 Ammonical Nitrogen as
Nitrogen ≤ 1 mg/Lit
9 Total Phosphate 5-7 ≤ 2 mg/Lit
10 Faecal Coliform 10^6/100 N.D. MPN/
100ml
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE XII
SOLID WASTE MANAGEMENT:
ORGANIC WASTE COMPOSTER
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
OWC LOCATION
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
SOLID WASTE MANAGEMENT
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
OWC PROCESS
• First check whether all switches except emergency switch are in “OFF” position. Start
Main connection for OWC.
• Check the running of the machine by pressing ON/OFF switch off the machine for
chopper and main motor. During ON the green lights will „GLOW‟. During this
checking the selector switch must be on „hand‟ mode.
• Switch off the chopper and process knobs.
• Bring timer switch to “Auto” Mode.
• Set the time on the timer for 5 minutes.
• Place the empty crate in the trolley.
• Open the feeding lid of the machine.
• Check the bottom lid lever. It must be in closed position.
• Feed the organic waste by volume @ 10 Ltrs x 2 buckets of food waste.
• Run machine for five Minutes.
• Feed Sawdust @ 20 to 25% by weight of the food waste. This quantity will depend on
the moisture content in the waste (sogginess of the waste)
• Add BIOCULUM @ 1 gm/Kg. of waste. (For bad smelling waste, the dosage required
will be 1.5 gm/Kg.)
• Bring the selector of the machine to Auto Mode. Close the lid. Start the processor and
chopper switch.
• Again machine run for 5 minutes. After 5 minutes the machine will automatically stop
and will make indicating noise.
• Bring the selector to “hand” mode. Start the machine. Open the bottom drain valve by
operating lever to “open” position.
• Collect the treated organic waste in the crate placed in the trolley.
• Place the crates in the treatment area.
• Repeat the batches until the organic waste is finished.
• Every day spray 750 ml of water on the crate with Herbal sanitizer.
• Stop spraying water from 8th day. Allow 2 days for drying the material in the crate.
• After 10th day put the material in the waste converter. Operate the machine for 2 minutes and unload the material in the crate
• Transfer the material from the crate into the storage bag or mix the material in soil (3:1
ratio) proportion and sow the viable seeds of leafy vegetable like Spinach, Methi,
Coriander and check the germination. If got 75-100% germination, it would be ready manure for application to the crops or garden.
• After 15 days use the same material as absorbent in suitable proportion (preferably 10:4
ratio).
• Clean and wash the machine and surrounding of curing system with the help of Herbal
Sanitizer every day.
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
COMPOST REPORT
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE XIII
LANDSCAPE PLAN & LIST OF TREES
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
LANDSCAPE LAYOUT
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
LIST OF TREES
Sr. No Botanical
Name
Common
Name Qty Ecological Importance
1. MimusopsEleng
i Bakul 08
-Fragrant Flowers or Leaves
-Attracts Birds/Bees - Evergreen Tree/ Creates Shade
2. Cassia Fistula Bahava 27 -Auspicious -Attracts Birds/ Bees/ Butterflies
-Hanging or Weeping Growth
3. Neolamarckia
Cadamba Kadamb 14
-Fragrant Flowers or Leaves
-Attracts Bees/ Butterflies
- Quick Growing/ Create Shade
4. Azadirachta
Indica Neem 10
-Fragrant Flowers or Leaves
-Plant for Pooja /Evergreen
- Quick Growing/ Insect Repellent
5. Lagerstromia
Speciosa Taman 18
- Create Shade
- Attracts Birds/ Butterflies/ Bees
- Good for Screening
6. Michelia
Champaka
PivalaChaf
a 14
-Fragrant Flowers or Leaves
-Attracts Birds/Butterflies/Bees
- Evergreen Tree
7. Bauhinia
Purpurea
RaktKanch
an 25
-Fragrant Flowers or Leaves
- Plant for Pooja
- Evergreen Tree
8. SaracaAsoca SitaAshoka 11 -Fragrant Flowers or Leaves
-Attracts Birds/Butterflies/Bees
-Deep Green, Shiny Foliage
9. Plumeria Alba Chafa 09 -Fragrant Flowers or Leaves
-Attracts Birds/Butterflies/Bees
-Quick Growing/For Pooja
10. Millingtonia
Hortensis
Buch 16 -Fragrant Flowers or Leaves
-Plant For Pooja -Evergreen Tree
11. Putranjiva
Roxburghii Putranjiva 15 -Dark Green Shiny Leaves
-Pendant Branches
-Moderate Sized-Evergreen Tree
12. Caryota Urens Fish Tail Palm
13 -Fragrant Flowers or Leaves -Attracts Birds/Butterflies/Bees
-Evergreen Tree
13. Butea
Monosperma
Palas 14 -Fragrant Flowers or Leaves
-Flowers covering the entire crown -Plant for Pooja
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
14. Mangifera
Indica Mango 15
-Fruit Plant
-Fragrant Flowers or leaves - Attracts Birds/Butterflies/Bees
15. Erythrina
Indica
Indian
Coral Tree 11
-Fragrant Flowers or leaves
-Attracts Birds/Butterflies/Bees
-Quick Growing Tree
TOTAL 220
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE XIV
ELECTRICAL CALCULATIONS, D.G. CHART &
LOCATION
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
TRANSFORMER SUBSTATION & D.G.SET LOCATION PLAN
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
POWER REQUIREMENT AND SUPPLY
S. No. POWER REQUIREMENT
1 Source of power supply : MSEDCL. (Maharashtra State Of Electricity Distribution
Company Ltd.)
2 During Construction Phase a) Total demanded load –20 KW b) D.G. Set –1 x 165KVA
3 During Operation Phase
a) Total Connected Load –1430 KVA
b) Maximum Demanded Load –571.76 KVA
c) Transformer – 2 x 630 KVA
4 DG set as Power Back – up
during operation 1 x 160 KVA
5. Fuel Consumption / hr. 1 x 160 KVA= 1500L/per month
6. Total Annual Saving 65.38%
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
POWER CONSUMPTION
Description
Power Consumption
Savings in KWH per
Year
% Saving Conventional Equipments
Power consumption in
KWH per year
Energy Efficient
equipments power
consumption in
KWH per year
Common area lighting with
CFL Lamps 25696 17987.2 7708.8 30
All Lights will be soft starting65700 31536 31536 52
Energy Efficient Pumping 6424 4309 2115 33
High Efficiency LED / CFL
light for street light in place of Metal Halide
16060 7194.88 8865.12 55
Solar water heating system
will be provided 144248 25688 118650 82.19
Annual Savings with Energy
Efficient equipments. 258128 86715.08 168874.92 65.38
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
DG SET CALCULATION
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
SOLAR ENERGY CALCULATION
Sr. No Description BUILDING
A B C D E F G
1 Type of flats 2
BHK 2BHK 3BHK
2
BHK 2 BHK 2 BHK 2BHK
2 Number of flats 52 52 52 52 52 52 52
3 Hot water requirement/flat/dayL(in liters) 50 50 50 50 50 50 50
4
Solar hot water provided per bldg./day)
liters)
2600 2600 2600 2600 2600 2600 2600
5 Total solar hot water required per day
for all buildings (ltrs)
15600
6
Solar system cost per liters (Aprox.) in
Rs.
100
7 Total solar system cost(Aprox.) Rs.
1560000
8
Energy required for heating 1 liters water
in watt
38
9 Energy saved per day in KW
592.8
10 Energy saved/year(Aprox. 300 sunny days)KWH
177840
11 Energy cost /KWH(Aprox.)
6
12 Per year saving in Rs.
1067040
13
Running cost of solar system @ 2% of
system cost
21340.8
14 Estimated payback period in year
1.5
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE XV
SWIMMING POOL DETAILS
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
LOCATION OF SWIMMING POOL
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
DETAILS OF SWIMMING POOL
Recirculation Period 4.5 hours
Shape of the Pool As per Drawing
Filtration System Sand filter will be used using
chlorination system
Water Requirement For Summer Season 5000 liter per day
Water Requirement For Winter & Rainy Season 2000 liters per day
Capital Cost Rs 30 Lakh
O & M Cost Rs 1.2 Lakh/Year (Electricity Cost
not included)
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE XVI
FIRE FIGHTING LAYOUT
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
FIRE TENDER MOVEMENT PLAN
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ANNEXURE XVII
ENVIRONMENT MANAGEMENT PLAN
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
ENVIRONMENTAL MANAGEMENT PLAN
An Environmental Management Plan is prepared for construction phase, post construction phase
(commissioning & operation) and for post project phase. The environmental management plan
is prepared to minimize the impact of atmospheric emissions, liquid effluents, solid wastes and
noise generation on the surrounding environment.
PART A: During Construction phase
Air Environment:
� During Construction ready mix concrete in enclosed container shall be used.
� We will take appropriate measures to minimize the generation of dust as a result of
construction works. Such measures include frequent spraying during low rainfall periods or
by other means approved by the CEO or Site Manager
� Dust dispersion from construction activities, unsurfaced roads, spoil dumps and other
construction locations shall be limited and suppressed to the maximum extent practical.
� The purpose of the fenced areas is to control construction and personal activity within the
designated areas, and limit unauthorized access. Barricades will be provided along with the
periphery of the site.
� If fencing is removed temporarily for the execution of work, we shall reinstate it as soon as
practicable. Until re-instatement, we will demarcate the working area by surrounding it
with danger – tape marking.
� Dust covers will be provided on trucks that would be used for transportation
� DG as per CPCB norms.
� Ambient air quality monitoring for the parameters So2, Nox, PM10, PM2.5 will be done
regularly.
� PUC certified vehicles would be allowed in the campus.
Water Environment:
� All latrines provided will be efficient, sanitary and no offensive. A minimum of one toilet
shall be provided per 10 persons at each working area such as the construction camp.
� The latrines will be serviced on regular basis to avoid overflowing.
� Treated water will be used in construction works.
� We will dispose of all refuse generated by the staff on a weekly basis at a registered
Domestic Waste Disposal Site or through packaged STP.
� Water analysis shall be done as per IS: 10500.
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Land Environment:
� Temporary storage of construction waste will be limited within the site and Separate storage
of Construction material will be done in areas designated by CEO.
Noise Environment:
� Ear plugs will be provided to all Labors.
� High noise generating construction activities would be carried out only during day time.
� Proper lubrication and servicing of machineries on regular intervals will carried out as a
part of Preventive maintenance of machines.
� Acoustic enclosures will be provided for DG sets for noise reduction.
� Noise monitoring will be carried out on site at regular intervals.
Biological Environment:
� Plantation of 220 nos. of trees will start in mid of construction phase.
� There will be no impact on biological environment during construction phase.
Socio-Economical Environment:
� Constant supply of potable water for human consumption and other domestic use on site
will be provided.
� Chemical testing of water samples on a monthly basis, or more frequently if suspected by
the CEO, will be carried out.
� 15 Nos. of toilets for 150 workers are provided for toilet and bathing facilities
� Proposed project will require manpower during construction phase thereby creating job
opportunities.
� Proper training will be provided regarding fire fighting equipments, maintenance of Health,
� Personal protective and safety equipments will be provided. Approved safety helmets and
other protective clothing shall be worn where deemed necessary by the Supervisor
� First aid facility will be provided for adequate first aid services.
PART B: During Operation Phase
Air environment:
� Green Belt with 220 Nos. of trees around the site will be provided.
� Use of indigenous plants will be insisted.
� The air quality surveillance program may be strengthened keeping in view the combined
maximum impacts from post-project activities particularly in critical downwind directions.
� DG sets 160 KVA – 1 No. will be installed with acoustic measures as per CPCB norms and
Generator exhaust will be taken above top level of building as per CPCB norms.
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
� Acoustical Enclosures for DG set will be provided to reduce noise intensity in the
surrounding area.
� Proper parking facilities and demarcated areas will be allotted on site to Smoothen traffic
flow inside the campus.
� Ambient air quality monitoring for the parameters So2, Nox, PM10, PM2.5 will be done on
regular intervals.
� PUC certified vehicles for flat owners will be insisted.
Water Environment:
� The sewage will be treated in full fledged sewage treatment plant 240 m3/day and sewage
shall be reused for flushing and landscaping. (107.4 m3/day)
� The storm water management will be implemented on site to avoid run-off.
� 12 No of recharge pits will be provided for rain water harvesting on site.
� During operation phase no waste water stream or solid/hazardous waste will be discharged
to any water body.
Land Environment:
� Proper disposal of waste through well managed Solid waste Management team.
� 591.9 Kg/day Dry waste will be given to Authorized Vendor.
� 394.6 Kg/day Wet garbage will be composted using Organic Waste Composter.
� The processed waste will be used as Manure.
Noise Environment:
� Adequate tree plantation and Compound wall will be to act as noise buffer.
� DG set will be provided, it should have acoustic enclosures for effective noise reduction of
25 dB (A).
� Noise suppression measures such as enclosures, and/ or protective measures should be
provided (wherever noise level is more than 90dB (A).
� Extensive oiling, lubrication and preventive maintenance will be carried out of the
machineries and equipments to reduce noise generation.
� Monitoring of noise levels is essential to assess the efficacy of maintenance schedules
undertaken to reduce noise levels and noise protection measures.
� The sources of intermittent noise generating equipment (pumps for lifts or water pumping,
DG sets etc) will be provided with appropriate acoustic barriers so that the noise level
within 100m of these facilities when in operation will be less than 70dB(A).
Biological Environment:
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
� Implementation of greenbelt development (220 Nos. of trees), landscaping, horticulture etc.
� Plant species selected based on adaptability to geographic conditions and keeping in view
the local species and their benefits to site.
� Development of green belt surrounding the project area with reference to maintain the
biological environment.
Socio-Economic Environment:
� Improvement in transport, communication facilities, lifestyle and social status etc. due to
ancillary development.
� Local skilled and laborers will have opportunities for employment directly and indirectly.
ENVIRONMENTAL MONITORING PLAN:
Environmental monitoring of critical parameters is essential to assess the changes in environmental
conditions, if any, during construction & operation of the project, to monitor the effective
implementation of mitigation measures, and to suggest for any additional mitigation measures in case
of significant deterioration of environmental quality.
It is supposed to monitor essential parameters for ambient air quality, ambient noise quality, ground
water quality, and waste water quality both during construction and operation phases of the project.
A.DURING CONSTRUCTION PHASE:
Component Parameters Location Frequency Duration
Ambient air
quality PM10
, PM 2.5
, SO2,
NOx,
At the identified
stations near the
dust generating
sources.
Once in a
fortnight (24 Hrs sampling )
Noise level Leq day, Leq night,
dB(A) Daily
Day Time (6 AM to 10
PM) and Night Time
(10 PM to 6 AM)
Effluent
Analysis Physical- chemical
PH, TSS, COD & BOD, TKN,
Ammonical-N,
PO4
-p Oil and
Grease, Faecal
Coliform
Once in a
fortnight
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Surface Water
analysis All the parameters
for surface water
bodies basing on
the classification as
per their utilization
pattern
Once in a three
month
Ground
WAter As per IS: 10500
Once in a three
month
Soil Quality
Texture, pH,
Electrical conductivity,
Alkalinity SAR, Permeability, Water
holding capacity, Porosity
At 1 location (HSD storage
area/parking
area)
At the start and end of
construction
activity
--
Health All relevant parameters
including HIV
Regular check
ups
Every Month
B: DURING OPERATION PHASE:
Component Parameters Location Frequency Duration
Ambient air
quality SO2, NOx, CO,
HC,PM10
,PM 2.5
,
Pb, Benzene, NH3,
Ozone
At the identified
stations near the
dust generating
sources.
Once in a
fortnight 24 hrs sampling
Noise
level Leq day, Leq night,
dB(A)
Once in a
fortnight
Day Time (6 AM to 10
PM) and Night Time
(10 PM to 6 AM)
Source
Emissions Particulates, SO2,
NOx, CO, HC
Each stack – for
flue gas
Once in a
Quarter
As per the
recommendations of
MPCB
Waste Water
quality Physical-chemical
parameters, pH,
BOD, COD, TSS,
TKN, Ammonical-
N, PO4-P, O & G,
Faecal Coliform
Inlet and outlet
of each STP unit
Once in a
fortnight
Composite flow-
weighted sampling
Form 1 & 1A for project “Shantiban” by M/s Surana Bhansali Developers at S. No. 65A/1, 65B/1,
65C/1(P) & 66/6 (P) at Kondhwa (BK), Haveli, Pune
Solid waste Parameters: pH,
Moisture content,
Organic Carbon,
Nitrogen Content,
Phosphorus content,
C:N ratio, Bulk
Density, Potash,
Particle Size, Color,
Odour
Solid waste
disposal
location
Once during
each season. One time sample