P106654 LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT NOVEMBER 2010 Prepared by: Prepared for: Aurecon SA (Pty) Ltd. Aurecon Centre, Century Falls, Century Boulevard, Century City P O Box 494, CAPE TOWN, 8000 Tel : (021) 526 9400 Fax : (021) 526 6500 Lion’s Hill Development Company 2nd floor Sunclare Building 21 Dreyer Street, Claremont P.O. Box 23958, Claremont, 7735 Tel (021) 683 9050 Fax (086) 611 6491 © Aurecon SA (Pty) Ltd 2010 No unauthorised reproduction, copy or adaptation, in whole or in part, may be made.

Upload: vudang

Post on 01-Sep-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LION’S HILL RESIDENTIAL DEVELOPMENT …media.withtank.com/fa198e2f6c.pdf · LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT ... should

P106654

LION’S HILL RESIDENTIAL DEVELOPMENT

QUARRY HILL ROAD, TAMBOERSKLOOF

TRAFFIC IMPACT STATEMENT

NOVEMBER 2010

Prepared by: Prepared for:

Aurecon SA (Pty) Ltd. Aurecon Centre, Century Falls, Century Boulevard, Century City P O Box 494, CAPE TOWN, 8000 Tel : (021) 526 9400 Fax : (021) 526 6500

Lion’s Hill Development Company

2nd floor Sunclare Building 21 Dreyer Street, Claremont

P.O. Box 23958, Claremont, 7735 Tel (021) 683 9050 Fax (086) 611 6491

© Aurecon SA (Pty) Ltd 2010

No unauthorised reproduction, copy or adaptation, in whole or in part, may be made.

Page 2: LION’S HILL RESIDENTIAL DEVELOPMENT …media.withtank.com/fa198e2f6c.pdf · LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT ... should

Lion’s Hill, Tamboerskloof – Traffic Impact Statement

i

TABLE OF CONTENTS

Table of Contents ................................................................................................................... i

List of Figures ......................................................................................................................... i

List of Tables .......................................................................................................................... i

1. Introduction ..................................................................................................................... 1

2. Development Location .................................................................................................... 1

3. Development Proposal .................................................................................................... 1

4. On-Site Parking .............................................................................................................. 4

5. Internal Circulation and Site Access ................................................................................ 4

6. Trip Generation and Distribution ..................................................................................... 5

7. Conclusion and Recommendation .................................................................................. 7

LIST OF FIGURES

Figure 1: Lion’s Hill site and local street network. ................................................................... 2

Figure 2: Aerial view of site and local street network. ............................................................. 3

LIST OF TABLES

Table 1: Number and distribution of residential units and parking bays on development site. 4

Table 2: Trip Generation based on Unit Type......................................................................... 5

Table 3: Projected vehicle trip patterns. ................................................................................. 5

\\africon-cpt\data\ROADS\p401299\p401299-AS-LionsHill\2010Update\LionsHill_TIS_091110.docx

Page 3: LION’S HILL RESIDENTIAL DEVELOPMENT …media.withtank.com/fa198e2f6c.pdf · LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT ... should

Lion’s Hill, Tamboerskloof – Traffic Impact Statement

1

1. INTRODUCTION

This traffic impact statement has been prepared by Aurecon SA (Pty) Ltd on behalf of

Lion’s Hill Development Company (Pty) Ltd in support of the development application for

erf 1526, Tamboerskloof. The project site is referred to as Lion’s Hill and is located

between Quarry Hill Road and De Hoop Avenue in Tamboerskloof. It is proposed that

the presently vacant land be developed to accommodate 1171 residential units of various

sizes. The development will cater for middle and high income tenants.

2. DEVELOPMENT LOCATION

The site, located in Tamboerskloof, is accessible from Quarry Hill Road and De Hoop

Avenue as shown in Figures 1 and 2. These are both local roads accommodating

two-way traffic and some undemarcated on-street parking.

Quarry Hill Road is a cul-de-sac, terminating in the entrance to an existing residential

development and will provide entrance to the site at two points. The two entrances will

serve 6 and 111 units respectively. The former will provide entrance and egress for the

six units. The latter entrance, providing entrance only, will be at the end of Quarry Hill

Road, opposite the existing turning embayment. Egress from the site for the 111 units

will be into De Hoop Avenue.

De Hoop Avenue is linked at one end into Quarry Hill Road, turning off close to Kloof

Nek Road. At the other end, De Hoop Avenue becomes Upper Albert Road, in a sharp

bend. The egress for the 111 units will be from the site onto De Hoop Avenue about

100 metres from the Upper Albert Road corner.

De Hoop Avenue provides extensive linkage to the local road network, allowing a variety

of choices with respect to entering onto Kloof Nek Road. This is discussed later.

3. DEVELOPMENT PROPOSAL

The development proposal is for the construction of 117 residential units in a multi-

structure, complex. The development is structured in such a manner as to create three

main segments and incorporates three separate parking areas. One provides for the

6 units whilst the other two each provide for 44 and 67 of the remaining residential units

respectively.

1 The development is such that it is possible to merge or split some units. It is thus possible that the final project will have one or two fewer but large units or more, but smaller units.

Page 4: LION’S HILL RESIDENTIAL DEVELOPMENT …media.withtank.com/fa198e2f6c.pdf · LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT ... should

2 Figure 1: Lion’s Hill site and local street network .

Page 5: LION’S HILL RESIDENTIAL DEVELOPMENT …media.withtank.com/fa198e2f6c.pdf · LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT ... should

3 Figure 2: Aerial view of site and local street netw ork.

Page 6: LION’S HILL RESIDENTIAL DEVELOPMENT …media.withtank.com/fa198e2f6c.pdf · LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT ... should

Lion’s Hill, Tamboerskloof – Traffic Impact Statement

4

The distribution of the units and required parking on the site is as shown in Table 1.

Table 1: Number and distribution of residential uni ts and required parking bays on

development site.

Block Location 3-Bed 2-Bed 1-Bed Total Bays

Quarry Hill (Small) 6 - - 6 12

Quarry Hill (Main) 8 24 12 44 88

De Hoop 12 39 16 67 134

Total 26 63 28 117 234

4. ON-SITE PARKING

The site is zoned R5 with a parking requirement of 1 bay per unit inclusive of visitors

parking and a visitors parking requirement of 1 bay per 4 units, i.e. a parking requirement

of 0.75 bays per apartment and 0.25 visitors bays per apartment.

Notwithstanding the above, the site allows for the City of Cape Town recommendations

for parking, 1.75 bay per unit plus 0.25 bays per unit for visitor parking; i.e. 2 bays per

unit, giving 234 parking bays. The site will incorporate a total of 237 parking bays and

thus exceeds the minimum requirement irrespective of the determination method.

These bays are apportioned directly to the units linked to each access as shown Table 1

with 3 additional bays.

5. INTERNAL CIRCULATION AND SITE ACCESS

The site is on a slope that runs down from Quarry Hill Road to De Hoop Avenue. In

order accommodate the topography, two separate access points are provided on Quarry

Hill Road, each linking to a small surface parking area at the entrance to under-building

parking for each main block.

The main Quarry Hill Road access will be at the end of Quarry Hill Road, in the turning

area in which Quarry Hill Road terminates. This entrance follows a natural contour at

the link to Quarry Hill Road and so appropriate slopes are achieved at the entrance.

This entrance serves 111 units and enters the road network at a point where there is no

passing traffic other than that from the adjacent property entrance.

The secondary entrance on Quarry Hill Road will be approximately 90m west of the

above entrance. This entrance is not ideally located, being on both a bend and a slope.

Page 7: LION’S HILL RESIDENTIAL DEVELOPMENT …media.withtank.com/fa198e2f6c.pdf · LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT ... should

Lion’s Hill, Tamboerskloof – Traffic Impact Statement

5

It is does however, more or less follow a contour line, allowing reasonable transition

profiles. Serving only 6 residential units and being along a cul-de-sac with only limited

development along its remaining length, the traffic volumes and speeds are such that

the access position should not represent safety problems provided that the detail design

for the entrance ensures adequate sight distance.

The De Hoop Avenue egress is about 100m from the point at which De Hoop Avenue

turns down into Upper Albert Road. De Hoop Avenue in this area is relatively flat and

sight distances are good. However, the development site has a relatively steep slope at

this point, requiring some cutting to achieve the appropriate transition profiles. These

will be detailed on the engineer’s drawings.

Refuse and emergency vehicles can be accommodated along both Quarry Hill Road and

De Hoop Avenue and an embayment for refuse vehicles is to be provided adjacent to

the De Hoop Avenue exit. Emergency vehicles will be able to access the site by means

of the through way, stopping in the visitor parking areas.

6. TRIP GENERATION AND DISTRIBUTION

The development will be in the form of apartments or flats and is expected to attract

medium to high-income residents. In terms of the National Department of Transport

“Trip Generation Rates” 2nd edition, a peak-hour trip generation rate of between 1.1 and

1.5 vehicle trips per residential unit may be expected. Many of the units are one-

bedroom apartments and it is thus suggested that the generated trips will not exceed

that shown in Table 2.

Table 2: Trip Generation based on Unit Type.

Unit Type Quantity Trip Rate Trips

1-Bed 28 1.1 31 2-Bed 63 1.5 95

3-Bed 26 1.5 39

117 165

The result of the above is an anticipated 165 peak hour vehicle trips, with a 75:25 Out-In

split in the morning and the reverse in the evening. These trips will distribute onto the

network in accordance with the permitted movement through the site, giving rise to a trip

pattern as shown in Table 3.

Table 3: Projected vehicle trip patterns.

AM In AM Out PM In PM Out Quarry Hill (Small) 3 7 7 3

Page 8: LION’S HILL RESIDENTIAL DEVELOPMENT …media.withtank.com/fa198e2f6c.pdf · LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT ... should

Lion’s Hill, Tamboerskloof – Traffic Impact Statement

6

Quarry Hill (Main) 40 116 De Hoop Avenue 116 40

Sub Totals 43 123 123 43 TOTAL 166 166

Note: The 1 trip discrepancy in the total reflected in the table from that in the text is due to rounding up of all numbers in splitting trips between access points.

In terms of the Provincial Administration of the Western Cape Road Access Guidelines of

2002, a development of this size requires only a traffic impact statement. A slightly

different interpretation may be obtained from the National Department of Transport

Manual for Traffic Impact Studies; PR 93/635 which recommends a traffic impact study at

150 peak-hour trips. However, the local traffic volumes are low and given the local road

network structure and access locations, the vehicular movement at the site entrances is

expected to have negligible impact on existing traffic and will not be impeded in any

meaningful way by existing local traffic. It is thus argued that a traffic impact statement

should suffice in this case. Furthermore, the site is located close to a number of schools,

two of which are within the same local area as a result of which the projected trip

generation rates are believed to be an over-estimate, children being able to walk to local

schools.

Trips that leave the immediate area are expected to be to and from the City Centre or

across Kloof Nek Road towards the Gardens area. The one potential concern relating to

vehicular traffic generated by this site thus relates to access to and from Kloof Nek Road.

Kloof Nek Road is on a significant incline and supports a relatively high and continuous

level of traffic. The road is not however subject to extreme congestion, with only limited

congestion during the peak periods. Of particular note is that Quarry Hill Road, and thus

one end of De Hoop Avenue, has its access onto Kloof Nek Road on a bend on a slope.

At this intersection however, Kloof Nek Road has a dedicated left turn lane whilst one of

the two lanes in the other direction provides a de facto right turn lane. Regular

observations of this intersection are that the number of vehicles waiting to turn right from

Kloof Nek Road into Quarry Hill Road rarely exceeds one and that although it would be

feasible to formalise a right turn lane, the impact on the free flow of Kloof Nek Road is

not considered justified.

In mitigation of concerns regarding access from and onto Kloof Nek Road, it is noted that

the development site has good access through the local road network, with as many as

13 separate intersections offering access from or onto the broader network, thus allowing

distribution of the traffic over a wide area. One of these, Burnside Road, joins Kloof Nek

Road at a signalised intersection. On this basis, it has not been considered warranted to

undertake a detailed analysis of any of the intersections. In support of this decision,

Page 9: LION’S HILL RESIDENTIAL DEVELOPMENT …media.withtank.com/fa198e2f6c.pdf · LION’S HILL RESIDENTIAL DEVELOPMENT QUARRY HILL ROAD, TAMBOERSKLOOF TRAFFIC IMPACT STATEMENT ... should

Lion’s Hill, Tamboerskloof – Traffic Impact Statement

7

frequent but unquantified peak hour observations of local traffic are that, during both

morning and evening peaks, in spite of overall traffic levels and the apparently awkward

movements owing to road alignments, there is rarely a queue development of more than

two or three cars at any of the intersections, either onto of from Kloof Nek Road. The

operation of Kloof Nek Road is generally such as to permit vehicles to enter and leave

side roads with only limited delay. Given the potential for broad distribution of the traffic,

the additional traffic generated by the site is not anticipated to have a measurable impact

on the performance of any of the local intersections or the local road network..

7. CONCLUSION AND RECOMMENDATION

It is concluded that the peak-hour vehicular trip generation will have negligible impact on

the local transport network, there being sufficient diversity of access opportunity such as

will minimise traffic movements at intersections with high levels of conflict, or onto

significantly congested roads.

It is further concluded that the development proposal makes adequate allowance for on-

site parking. However, although the on-site parking provision meets with the City of

Cape Town’s recommendations and is believed to be sufficient for the development, the

developers should ensure the proper allocation and management of parking during the

sale or letting of the residential units.

Provision is made for a refuse vehicle embayment on De Hoop Avenue thus avoiding the

need for regular incursion of large vehicles onto the site, the topography of which is

unsuited to such vehicles. In this regard, it is recommended that detailed development

planning makes appropriate provision for the storage of refuse adjacent to the refuse

vehicle embayment.

In terms of the access and egress points, particularly the minor Quarry Road entrance

and the De Hoop Avenue exit, it is recommended that the detailed engineer’s drawings

for the site access points clearly indicate achievement of adequate sight distances from

the access stop lines.

In conclusion, it is recommended that the development application not be disallowed on

the basis of parking provision or traffic factors.

WAYNE DUFF-RIDDELL Pr.Eng. PhD. Technical Director – Transportation Planning.