Page 1: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Lions Gate Secondary Wastewater Treatment Plant

Community Leaders’ Meeting

May 23, 2012Orbit 6192014

Page 2: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Lions Gate Secondary Wastewater Treatment Plant

Building a working relationship with the community to ensure the project meets the needs of local residents and the region.

2

Page 3: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Agenda

3

Page 4: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Four Key Project Objectives

Secondary Wastewater Treatment

Sustainability Environmental, Social, Economic

Integrated Resource Recovery

Community Integration

4

Page 5: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Existing Plant since 1961

5

Presenter
Presentation Notes
Background on the Existing Plant Built in 1961, and went through 3 stages of expansions for addition of sedimentation tanks (#5, 6, 7, 8) and digesters (#3, 4), and relocation of 54” outfall. The plant location is west of the Lions Gate bridge, on leased land that is being returned to Squamish Nation. Serves the North Shore Municipalities (West Vancouver, City of North Vancouver, District of North Vancouver, and First Nations).
Page 6: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

The Lions Gate Plant upgraded to secondary level treatment by 2020

Liquid waste continues to be managed safely, affordably, and effectively

6

Presenter
Presentation Notes
Metro Vancouver’s Integrated Liquid Waste and Resource Management Plan As identified in Metro Vancouver’s Integrated Liquid Waste and Resource Management Plan approved by the BC Minister of Environment in May 2011, Lions Gate Wastewater Treatment Plant should be upgraded to secondary treatment within 10 years in accordance with the Canada-wide strategy for the Management of Municipal Wastewater Effluent. The actions were confirmed by the Minster in the May 30, 2011 letter of approval supporting the upgrading to secondary level treatment for the Lions Gate Plant by 2020.
Page 7: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Location Map

Existing Treatment Plant Site

7

Presenter
Presentation Notes
Location of New Treatment Plant In 2008 Metro Vancouver purchased a 3 hectare property from BC Rails Properties Division. The property is 2km east of the existing site. located in the area of industrial land south of 1st St. and between Phillip and Pemberton Ave.
Page 8: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Launching of Outfall (1969)

8

Presenter
Presentation Notes
Outfall Lions Gate Outfall was installed as part of the Stage 3 expansion in 1969. The multi-port diffuser ensures the effluent is discharged at a high velocity and well mixed within the current of the First Narrows.
Page 9: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Four Key Project Objectives

Secondary Wastewater Treatment

Sustainability Environmental, Social, Economic

Integrated Resource Recovery

Community Integration

9

Page 10: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

May 11, 2011

Killer whales spotted in Burrard Inlet

The Province

Secondary Wastewater Treatment

10

Presenter
Presentation Notes
Objective 1 - Secondary Wastewater Treatment Metro Vancouver has a responsibility to protect and enhance the natural environment while ensuring liquid waste is managed affordably, safely and effectively. Burrad Inlet sustains a vibrant ecosystem.
Page 11: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Sustainability

Metro Vancouver Academy - Annacis Wastewater Centre

11

Presenter
Presentation Notes
Objective 2 – Sustainability Metro Vancouver’s sustainability objectives will be a key consideration in undertaking the business case analyses and designs that target achieving the maximum use of energy available from liquid waste, considering the integration of liquid waste and solid waste resources, using reclaimed water where appropriate, minimizing the greenhouse gas emissions, and making effective use of on-site stormwater. Annacis Wastewater Centre is one of Metro Vancouver’s Sustainability Academies. It was opened in the fall of 2011. The vision for the Centre is to support wastewater research and development, training and public education. The intent of the centre is to transform our approach to managing and treating wastewater, promoting energy reduction, reuse of materials and mitigating environmental impacts.
Page 12: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Integrated Resource Recovery

Fuel Electricity Heat

Water Nutrient12

Presenter
Presentation Notes
Objective 3 – Integrated Resource Recovery If the plant is designed to optimize generation and capture for use of these materials (fuel, electricity, heat, water, and nutrient), Metro Vancouver can reduce its energy costs, carbon footprint, effluent discharge, and environmental impact. Ideally, the plant would operate as a net energy provider, be carbon neutral, and displace potable water used by local industry by substituting treated effluent.
Page 13: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Annacis Wastewater Treatment Plant Codigestion Facility

13

Presenter
Presentation Notes
Objective 3 – Integrated Resource Recovery - This is the codigestion facility at Annacis Island Wastewater Treatment Plant. This facility receives select high strength industrial wastes and injects these into the plant’s solids handling process. Doing this allows us to turn products that would cost more to process if they are sent to the plant through the sewer system to a product that can be used to increase energy produced at the plant. This project received the 2011 Award of Excellence from the Canadian Water and Wastewater Association for the Implementation of Innovative Technologies.
Page 14: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Neighbourhood Energy Utility

14

Presenter
Presentation Notes
Objective 3 – Integrated Resource Recovery This is an environmentally-friendly community energy system that provides space heating and domestic hot water to all new buildings in Southeast False Creek (SEFC), including but not limited to the Olympic Village (source: https://vancouver.ca/sustainability/building_neu.htm).
Page 15: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Columbia Street Pump Station

Community Integration

15

Presenter
Presentation Notes
Objective 4 – Community Integration Building a working relationship with the community to ensure the project meets the needs of local residents and the region. Example for Community Integration: Columbia Street Pump Station
Page 16: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

New York Newtown Creek Wastewater Treatment Plant

16

Presenter
Presentation Notes
Objective 4 – Community Integration Located in Brooklyn’s Greenpoint community, Newtown Creek is the largest of New York City’s 14 wastewater treatment plants. Plant expansion and redesign have also included thoughtful development of the quarter-mile Newtown Creek Waterfront Nature Walk with its unique architectural features, plantings and environmental sculpture, as well as stunning views from the skywalk of New York City and the nearby industrial landscape.
Page 17: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Project Phases

17

Presenter
Presentation Notes
Project Phases Phase 1 - Project Definition Phase (2011 - 2013): Development of a Project Definition Report defining the complete scope of the work including an indicative/preliminary design and cost estimate for upgrading the LGWWTP to secondary treatment . Phase 1 also includes the assessment of and recommended procurement and contracting method for design and construction. Phase 2 - Detailed Design and Construction Phase (2014 - 2020) Completion of detailed design and construction for the Lions Gate Secondary Wastewater Treatment Plant following the development of a procurement plan based on the approval of the recommendation from Phase 1. The second phase will proceed with execution of the procurement method recommended in Phase 1 and lead to detailed design of the Lions Gate Secondary Wastewater Treatment Plant. The completion of construction will also include commissioning of the new plant and decommissioning of the existing plant.
Page 18: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Everybody Engaging Everything Early

Integrated Design Process18

Presenter
Presentation Notes
Integrative Design Process - An Integrative Design Process is adopted for the Phase 1 work in order to work collaboratively and interactively from the early planning stages. This process allows the design team to identify and better understand the design goals, and provides a forum to take advantage of complementary systems and design principles that can satisfy multiple design goals.
Page 19: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Integrated Design Process

Expert Advisors

Metro Vancouver Board and

Committees

IDP Facilitator

Metro Vancouver

Departments

Architectural & Community Integration

Team

Engineering Consultant

Team

Management Consultants

Public Advisory

Committee

Inter-governmental

Advisory Committee

Local Communities

19

Page 20: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Project Definition PhaseTimeline

20

Page 21: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Four Key Project Objectives

Secondary Wastewater Treatment

Sustainability Environmental, Social, Economic

Integrated Resource Recovery

Community Integration

21

Page 22: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Engagement and Consultation Process

22

Page 23: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Target Audiences

23

Public

Metro Vancouver Members

GovernmentAgencies

All Project Phases

First Nations

Advisory Committees

Presenter
Presentation Notes
Page 24: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Public Involvement

Opportunities through:

• A Public Advisory Committee

• Community Leaders’ Forum

• Public Meetings

24

Presenter
Presentation Notes
Page 25: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Public Advisory Committee11 members

Norgate Park Community Association

(2)

Environmental Interests

(3)

North Shore Business Interests

(3)

Non-affiliated citizens

(3)

Chair from membership

25

Presenter
Presentation Notes
 
Page 26: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Community Leaders’ Forum

In-depth discussion for:

• Individuals who have made contributions to the region, through:

community service,

academic contributions, and

involvement in environmental issues.

26

Page 27: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

27

2012Q2

Discovery and User RequirementsQ3

Feasibility Assessment and ScreeningQ4

Strategy Development and Evaluation

April May June July Aug Sept Oct Nov Dec

LGPACMeetings

Integrated Design Process

Workshops

Key Community

Leaders’Meetings

Public

Meetings

Key Milestones 2012

Page 28: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

28

2013Q1

Indicative Design and ProcurementQ2

Indicative Design and Procurement (Cont’d)Q3

Establish Project Budget

Q4Project Definition Report and Decision for Procurement and

Design-ConstructionJan Feb Mar April May June July Aug Sept Oct Nov Dec

LGPACMeetings

Integrated Design Process

Workshops Key

Community Leaders’Meetings

Public Meetings

Key Milestones 2013

Page 29: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

Next Steps

29

Community Leaders’ Follow-up:• May 23 - Meeting #1 Summary

• Fall - Meeting #2

• Fall – Public Meeting #1

Presenter
Presentation Notes
Page 30: Lions Gate Secondary Wastewater Treatment Plant...Secondary Wastewater Treatment 10 Objective 1 - Secondary Wastewater Treatment\爀 䴀攀琀爀漀 嘀愀渀挀漀甀瘀攀爀 栀愀猀

30

Contact Us

• Metro Vancouver Information Centre: 604-432-6200 (Monday to Friday from 8 a.m. to 4:30 p.m.)

• Email: [email protected] (please include ”Lions Gate” in the subject line)

Presenter
Presentation Notes
SLIDE XX – CONTACT US In terms of the follow-up to this meeting, MV will prepare a summary of this evening’s proceedings and your comments. We will not attribute the comments to individuals, but we will circulate the meeting summary for your review prior to finalizing it. Once completed, the meeting summary will be posted on our website as we do with all the results of our public meetings. As described previously we will invite you to another meeting this fall. If at that time you have suggestions for other attendees you can submit their names and contact information to us when we contact you. Finally we will be holding the first public meeting in the fall, and we’ll look forward to your input on that event.