Linky Project EURELECTRIC – ESMIG Workshop 6 December 2012 To the customers’ equipments MV / LV transformer Control room LV network Telco network Meter PLC Data Concentrator GPRS Linky IS ERDF Information systems Suppliers Suppliers The Linky system IIII INTEROPERABLE (interchangeable equipments, standard communication protocols) IIII 2-WAYS COMMUNICATION IIII UPGRADABLE (system and components, step by step) 2

Upload: others

Post on 13-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Linky Project - Esmig · III Future developments based on PLC G3 • Real-time network operation • Integration of IPv6 (M2M) • EV III PLC G3 pilot : • 2000 meters in 2012 in

Linky Project

EURELECTRIC – ESMIG Workshop

6 December 2012

����

To the customers’

equipments

MV / LV

transformerControl room

LV networkTelco

network

Meter PLC Data Concentrator GPRS Linky IS

ERDF

Information

systems

Suppliers

Suppliers

The Linky system

IIII INTEROPERABLE (interchangeable equipments, standard communication protocols)

IIII 2-WAYS COMMUNICATION

IIII UPGRADABLE (system and components, step by step)

2

Page 2: Linky Project - Esmig · III Future developments based on PLC G3 • Real-time network operation • Integration of IPv6 (M2M) • EV III PLC G3 pilot : • 2000 meters in 2012 in

New advantages for the customer

Daily remote readings

70% of work done remotely

IIII Invoices bases on estimations

IIII Be at home for the reading

IIII Be at home for interventions

IIII Time between a demand and an intervention

Less than 24h

3

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

4

through the Linky system

by wire or radio

On the web

On an IHD

8 interfaces

Energy management

GIVE INFORMATION

MANAGE

Page 3: Linky Project - Esmig · III Future developments based on PLC G3 • Real-time network operation • Integration of IPv6 (M2M) • EV III PLC G3 pilot : • 2000 meters in 2012 in

5

III 3 main targets

Buildthe Linky IS

Checkthe roll-outprocesses

Confirm financial

hypothesis

III 300,000 customers & 2 regions

III Touraine

100.000 customers

Mainly rural

33 inh / km²

III Lyon

200.000 customers

Urban

1.750 inh / km²

III A 24 months pilot 2009 2010 2011

Substations preparation

Data concentrators installation

Meters installation

march march

Linky, an ambitious pilot

5

March 31st, 2011 : end of field operations. Main results

4,600 DC installed (99%)

250,000 meters changed (90%)

92% of the meters communicate

98% of tele-operations are achieved in less than 24 hours

30 mn (average) to replace a meter, 8 per day per fitter

1,500 meters changed per day (average)

Less than 1% claims

Pilot Deployment

A successfull roll-out !

III

III

III

III

III

III

III

6

Page 4: Linky Project - Esmig · III Future developments based on PLC G3 • Real-time network operation • Integration of IPv6 (M2M) • EV III PLC G3 pilot : • 2000 meters in 2012 in

Defining the benefits for ERDF

Reduction of non technical losses

Performance of interventions

Better asset managementand network operation

3 main domains

benefit from

Linky

% of each benefit

brought by the project

~ 55%

~ 40%

~ 5%

7

On the side of the costs,our pilot gave us strong hypothesis

2010 2011

Substations preparation

Data concentrators installation

Meters installation

march march2009

4,600 250,000

50%

INSTALLATION

PURCHASE

OTHER(IS, …)

~60%

~30%

~10%

~ 4.3billions €

8

Page 5: Linky Project - Esmig · III Future developments based on PLC G3 • Real-time network operation • Integration of IPv6 (M2M) • EV III PLC G3 pilot : • 2000 meters in 2012 in

Conclusion : a viable business case

IS & others

purchase

non

technical

losses

4

0

installation

performance

of

interventions

asset management

and network

operation

Linky « straight »

ERDF business

Benefits for

the society(EV, renewables,

services, …)

9

Key-points about the roll-out seen from ERDF

Work upon the data in order to facilitate operations

Work with the subcontractors

Consider the “2nd IS”, for roll-out

Get fast information about field operations

Maintain the link between Paris and operational teams

Collect, analyze and use customers’ reactions

CLEAR

THE WAY

PRIORITY TO

TRAINING

CREATE THE

RIGHT TOOLS

CHECK THE

DETAILS

1111

2222

3333

4444

Page 6: Linky Project - Esmig · III Future developments based on PLC G3 • Real-time network operation • Integration of IPv6 (M2M) • EV III PLC G3 pilot : • 2000 meters in 2012 in

Key-points about the roll-out seen from our customers

Use every mean of communication

Include communication in the replacement itself

Give them the choice

INFORM

EXPLAIN

RESPECT

1111

2222

3333

35 millions

2012 2013 2014 2015 2016 2017 2018 2019 2020

PURCHASE

NATIONAL &

LOCAL

RECRUITMENTSEX

PE

RIM

EN

TA

TIO

N

2

5

7 7 7 7

EXPERIMENTATIONS / G3 PURCHASE

G1 G3

90%

Next steps : national roll-out for Linky

Go !

Page 7: Linky Project - Esmig · III Future developments based on PLC G3 • Real-time network operation • Integration of IPv6 (M2M) • EV III PLC G3 pilot : • 2000 meters in 2012 in

Linky : the first step to achieve smart grids

III Future developments based on PLC G3• Real-time network operation• Integration of IPv6 (M2M)

• EV

III PLC G3 pilot : • 2000 meters in 2012 in Lyon• 5000 meters in 2013

III A new global partnership with major players• Promote G3-PLC in Internationally recognized standards organizations (IEEE, ITU, IEC,

ISO, etc.)

• Organize and operate the industry users group to maintain the G3-PLC specification and to insure interoperability

• Support utilities in its deployment• Promote G3-PLC in further applications

Linky : the first step to achieve smart grids

III « Linky grid » project by ERDF

• Geographical Information System

• MV / LV Grid operation management

• Network modernization

• Power quality

III Specific demonstrators with many partners

• Peak load management

• Load balancing on a regional scale

• Direct integration of renewable energy sources on the MV network

• Customer Information and services

Page 8: Linky Project - Esmig · III Future developments based on PLC G3 • Real-time network operation • Integration of IPv6 (M2M) • EV III PLC G3 pilot : • 2000 meters in 2012 in

III An extensive R&D programme

III The setting up of demonstrators in France and Europe

III Partnerships with a broad spectrum of companies, from the major distribution

utilities to innovative start-ups

Issy Grid

Houat & Hoëdic islands

Smart Grid Vendée

Linky pilots

Venteea

Greenlys

Smart Lyon

Nice Grid

15

Smart station

Linky : the first step to achieve smart grids

NEDO project

GRID4EU

Linky : the first step to achieve smart grids

III 6 major european utilities, 28 partners

III 6 demonstrators

III 4 years (2011-2015)

Work in coordination

III Define standards

III Guarantee the scalability of technologies

III Analyse smart grid cost-benefits

III Network optimization (supervision & automation)

III Renewables integration

III Peak load management

III DSM, EV, storage, micro grids

III Customer engagement

III Secure energy supply / network reliability