Page 1: Line balancing ppt By Wakil Kumar

Career Point Cares

CAREER POINT UNIVERSITY

MAJOR ASSIGNMENT

TOPIC: Line Balancing

Submitted By :- Mr. Wakil Kumar UID : K12467 Course: B.Tech, 1st year/ 2nd sem Branch: CSE

Submitted To :-Prof. Amardeep Kumar

Subject : Manufacturing (MEL120)

Page 2: Line balancing ppt By Wakil Kumar

Career Point Cares

Contents• The Line Balancing Problem• Things to consider• Terminology and Definitions• Minimum Work Element• Total Work Content• Workstation Process time• Cycle time• Precedence Constraints• Balance Delay• Method – Largest Candidate Rule

Page 3: Line balancing ppt By Wakil Kumar

Career Point Cares

The Line Balancing Problem

• The problem is to arrange the individual processing and assembly tasks at the workstations so that the total time required at each workstation is approximately the same.

• Nearly impossible to reach perfect balance

Page 4: Line balancing ppt By Wakil Kumar

Career Point Cares

Things to consider• Sequence of tasks is restricted, there is a

required order• Called precedence constraints• There is a production rate needed, i.e. how

many products needed per time period• Design the line to meet demand and within

constraints

Page 5: Line balancing ppt By Wakil Kumar

Career Point Cares

Minimum Work Element

• Dividing the job into tasks of a rational and smallest size

• Example: Drill a hole, can’t be divided• Symbol – Time for element j:• is a constant

ejT

ejT

Page 6: Line balancing ppt By Wakil Kumar

Career Point Cares

Total Work Content

• Aggregate of work elements

n

jejwc TT

1

Page 7: Line balancing ppt By Wakil Kumar

Career Point Cares

Workstation Process time

• The amount of time for an individual workstation, after individual tasks have been combined into stations

• Sum of task times = sum of workstation times

Page 8: Line balancing ppt By Wakil Kumar

Career Point Cares

Cycle time

• Time between parts coming off the line• Ideally, the production rate, but may need to

be adjusted for efficiency and down time• Established by the bottleneck station, that is

station with largest time

Page 9: Line balancing ppt By Wakil Kumar

Career Point Cares

Precedence Constraints

• Generally given, determined by the required order of operations

• Draw in a network style for understanding• Cannot violate these, an element must be

complete before the next one is started

Page 10: Line balancing ppt By Wakil Kumar

Career Point Cares

Balance Delay

• Measure of line inefficiency due to imbalances in station times c

wcc

nTTnTd

Page 11: Line balancing ppt By Wakil Kumar

Career Point Cares

Method – Largest Candidate Rule

• List elements in descending order of T• Assign elements to first station, from top to

bottom of list, minding constraints, and not causing sum to exceed cycle time

• Continue assigning elements to stations where each station < cycle time, largest assigned first, until all assigned

• EXAMPLE

Page 12: Line balancing ppt By Wakil Kumar

Career Point Cares

THANK YOU…