line balancing ppt by wakil kumar
TRANSCRIPT
![Page 1: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/1.jpg)
Career Point Cares
CAREER POINT UNIVERSITY
MAJOR ASSIGNMENT
TOPIC: Line Balancing
Submitted By :- Mr. Wakil Kumar UID : K12467 Course: B.Tech, 1st year/ 2nd sem Branch: CSE
Submitted To :-Prof. Amardeep Kumar
Subject : Manufacturing (MEL120)
![Page 2: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/2.jpg)
Career Point Cares
Contents• The Line Balancing Problem• Things to consider• Terminology and Definitions• Minimum Work Element• Total Work Content• Workstation Process time• Cycle time• Precedence Constraints• Balance Delay• Method – Largest Candidate Rule
![Page 3: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/3.jpg)
Career Point Cares
The Line Balancing Problem
• The problem is to arrange the individual processing and assembly tasks at the workstations so that the total time required at each workstation is approximately the same.
• Nearly impossible to reach perfect balance
![Page 4: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/4.jpg)
Career Point Cares
Things to consider• Sequence of tasks is restricted, there is a
required order• Called precedence constraints• There is a production rate needed, i.e. how
many products needed per time period• Design the line to meet demand and within
constraints
![Page 5: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/5.jpg)
Career Point Cares
Minimum Work Element
• Dividing the job into tasks of a rational and smallest size
• Example: Drill a hole, can’t be divided• Symbol – Time for element j:• is a constant
ejT
ejT
![Page 6: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/6.jpg)
Career Point Cares
Total Work Content
• Aggregate of work elements
n
jejwc TT
1
![Page 7: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/7.jpg)
Career Point Cares
Workstation Process time
• The amount of time for an individual workstation, after individual tasks have been combined into stations
• Sum of task times = sum of workstation times
![Page 8: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/8.jpg)
Career Point Cares
Cycle time
• Time between parts coming off the line• Ideally, the production rate, but may need to
be adjusted for efficiency and down time• Established by the bottleneck station, that is
station with largest time
![Page 9: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/9.jpg)
Career Point Cares
Precedence Constraints
• Generally given, determined by the required order of operations
• Draw in a network style for understanding• Cannot violate these, an element must be
complete before the next one is started
![Page 10: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/10.jpg)
Career Point Cares
Balance Delay
• Measure of line inefficiency due to imbalances in station times c
wcc
nTTnTd
![Page 11: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/11.jpg)
Career Point Cares
Method – Largest Candidate Rule
• List elements in descending order of T• Assign elements to first station, from top to
bottom of list, minding constraints, and not causing sum to exceed cycle time
• Continue assigning elements to stations where each station < cycle time, largest assigned first, until all assigned
• EXAMPLE
![Page 12: Line balancing ppt By Wakil Kumar](https://reader036.vdocuments.mx/reader036/viewer/2022082409/58ecb1f61a28abba7c8b459d/html5/thumbnails/12.jpg)
Career Point Cares