lindenberg emirates company profile · lindenberg emirates represents lindenberg anlagen gmbh...
Embed Size (px)
TRANSCRIPT

LE-PROFILE | ver.3 | rev.5.0 | 14.12.2010
LINDENBERG-EMIRATES LLC

Company Profile 3~15
About Lindenberg Emirates 3
Scope of Activities 4
Completed Projects 5
Ongoing Projects 6~7
Representation of Lindenberg Anlagen 8
Company Organization Chart 9
Company Manpower Chart 10
Company Registration, Pre-qualification & Classification 11~13
Project References 14~15
Lindenberg Power Division 16~29
Division Profile 16~17
Scope of Activities 18
Typical Power Project Organization Chart 19
Featured Projects 20~28
Power Stations 29
Lindenberg Water & Drainage Division 30~40
Division Profile 30~31
Scope of Activities 31
Typical Water Project Organization Chart 32
Featured Projects 33~40
Quality, Health & Safety & Environment 41~42
Company Recourses 43~49
Workforce & Labour Camp 43
Store Facilities 44
Plant, Machinery, Vehicles & Equipments 45~49
Contact Information 50

3
About Lindenberg-Emirates
Located in the United Arab Emirates, with
its center of operation and main office in
Abu Dhabi, Lindenberg-Emirates LLC
specializes in Engineering, Procurement,
and Construction (EPC) mode of project
delivery.
Lindenberg-Emirates LLC employs manpower expertise in all aspects of contracting including civil
engineering, pipeline construction, turn-key industrial plants, mechanical and electrical installations,
and services to the electromechanical industry including testing, maintenance and operational work
which is fully supported by computer aided design (CAD) facilities, computerized project monitoring,
accounting, and cost control systems.
Company Details
Date Established: 20.11.2001
Ownership: UAE Partner 51%, Lindenberg Anlagen (Germany) 49%
Incorporated in: Abu Dhabi, United Arab Emirates
Principal Bankers: Arab Bank for Investment Foreign Trade MashreqbankNational Bank of Abu Dhabi HSBC BankNational Bank of Fujairah

4
Scope of Activities
Power Related Activities
Construction & Installation of Power Transmission and Distribution Networks
Installation of High Voltage Cables
Substation Turnkey Low, Medium and High Voltage & Package Substation Installation
High & Medium Voltage Switchgear & Transformer Installation
Submarine Cable Installation
Civil & Electro-mechanical General Contracting
Water Transmission & Distribution, Storm Water, Drainage & Irrigation Networks
EPC Projects of Water & Sewerage including Pumping Stations
Submarine Pipe Laying
Oil & Gas Related Activities
On Shore and Off Shore Oil and Gas Field Services
Maintenance Services for Oil/Gas Production Utilities
Technical Maintenance for Equipment, Industrial and Petroleum Plant
Repair & Maintenance Works
Repair and Maintenance of Pumping Stations, Sewerage Networks & Water Drainage Lines

5
Projects Successfully Completed in Abu Dhabi, UAE Project Value (AED)
Power Supply for Palaces and Hospitals (2001) 177 Million
Supply & Installation of Diesel Generators (2002) 13 Million
Power Supply for Palaces and Hospitals Stage3 (2004) 26 Million
Supply of Automatic Transfer Switches to ADDC (2006) 130 Thousand
Drainage Network at Marina Al Bateen, Abu Dhabi (2006) 196 Thousand
Water Networks at Al Qadra Village (2007) 16 Million
Water Transmission Line from Sweihan to Remah (2009) 26 Million
Water Supply to Sadiyat Island (2009) 108 Million
Sewerage and Surface Drainage Works (2009) 10 Million
Modification of Switching Stations in Abu Dhabi (2009) 17 Million
Water Transmission Lines inside Al Reem Island (2010) 56 Million

6
Ongoing Projects - Power Project Value (AED)
Power Supply for Palaces and Hospitals Stage3, Phase3 (2005) 103 Million
Security & Upgrading of 11kV Electrical Networks (2008) 40 Million
Installation of Underground Cables, Electrical Distribution
Equipment, OHL and Allied Works in Abu Dhabi (2009)
10 Million / year
Procurement of LV Panels Switchgear (2009) 17 Million
Electrical & Civil Eng. Works for Battery Energy Storage (2009) 142 Million
Replacement of 11 KV Switchgears and Substations (2010) 82 Million
Transfer of 11kV Load & Primary Substation in Abu Dhabi (2010) 19.7 Million
Fast Track Construction Works Contract in Eastern Region (Group 2) 12 Million
Fast Track Contract for 11KV & LV Networks in Central Region 1.7 Million
Transfer of Load to New 132/11 kV W24 and E01 Primary Substations 34 Million
EPC for 100 MW BESS Implementation in Abu Dhabi (2010) 200 Million

7
Ongoing Projects – Water & Drainage Project Value (AED)
Water Transmission Pipeline in Dubai (2007) 85 Million
Water Transmission Scheme inside Sadiyat Island (2008) 577 Million
Water Transmission Pipeline in Baniyas (2008) 86 Million
EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa
Floating Reservoir Station – Lot D (2010)
174.5 Million
Replacement of Existing Sewer Networks Inside Abu Dhabi Island (2010) 116 Million

8
Representation of Lindenberg Anlagen
Lindenberg Emirates represents Lindenberg Anlagen GmbH Germany for its products and services in
the United Arab Emirates.
Lindenberg Anlagen GmbH Germany is a world class leader in the design and manufacturing of Power
Generation System and has international presence in more than 72 countries.

9
Company Organization Chart
OPERATIONS DEPARTMENT
POWER DIVISION
WATER & DRAINAGE DIVISION
PLANT / WORKSHOP
DEPARTMENT
CIVIL DEPARTMENT
PURCHASINGDEPARTMENT
COST CONTROL DEPARTMENT
PLANNING DEPARTMENT
FINANCE & ACCOUNTS
DEPARTMENT
CONTRACTS DEPARTMENT
INFORMATION TECHNOLOGY DEPARTMENT
ESTIMATION & TENDERING
DEPARTMENT
DOCUMENT CONTROL
DEPARTMENT
CHAIRMAN
GENERAL MANAGER
LEGAL DEPARTMENT
BUSINESS DEVELOPMENT DEPARTMENT
HSE DEPARTMENT
RECRUITMENT DEPARTMENT
QA/QC DEPARTMENT
HR/ADMIN DEPARTMENT
Office Manager – 1 Exec. Sec / DC - 1
Senior Business Associate
Chief Operating Officer / MR
HR/Admin Manager
Recruitment Manager
Business Dev’t. Director
Head of Legal Department
HSE Manager
QA/QC Manager
Head of Power Division
Planning Dept. Manager
Plant Manager
Purchase Manager
Head of Estimation & Tendering
Contracts Manager
Senior IT Administrator
Civil Department Manager
Senior Document Controller
Corporate Finance Manager
Division Manager - LWD
Cost Control Manager
Sr. HR/A Officer – 1Personnel Officer – 1Admin Coordinator – 1Public Rel. Officers – 2Admin. Clerk – 1Doc. Controller – 1Camp Boss – 1Asst. Camp Boss – 2
Secretary - 1
Business Development Associate - 1
Sr. HSE Engineer – 1HSE Engineers – 9Safety Officers – 11Safety Asst. – 1Male Nurse – 1First Aider – 1
QA/QC Engineers – 3QA/QC Inspectors – 2Legal Advisor
Sr. Est. Eng’rs – 2Estimation Eng’rs – 2Secretary –1Doc. Controller –1
Secretary – 1
Proc’t Eng’rs – 2Asst. Proc. Eng’r – 1Purchase Officer– 1Secretary – 1
Workshop Engineer –1WS Superintendent –1F/men Mechanics – 3Mechanics – 9 WS Administrator – 1Storekeeper – 1Purchaser/Coord’r – 1
Design Engineers – 6Exec. Secretary – 1Secretary - 1Doc. Controller – 1Project Managers – 3Quantity Surveyor – 1Project Engineer – 1Project Support TeamForemenWork Crew
Design Engineer – 1Exec. Secretary – 1Secretary – 1Doc. Controller – 1Project Managers – 3Sr. Qty. Surveyors - 2Quantity Surveyor – 3Const’n Managers – 3Project Engineers – 2Project Support TeamForemenWork Crew
Project Manager – 1Quantity Surveyor – 1Const’n Manager – 1Project Engineer – 1Project Support TeamForemenWork Crew
Lead C.C. Engr – 1Cost Control Engr – 1
Accounts Manager – 1Treasury Manager – 1Bus. Sys Analyst – 1Chief Accountant – 1Sr. Accountants – 6Accountants – 3
Network Engineer – 1Asst. Network Eng. - 1Desktop Support – 1
Sr. Planning Eng’rs – 2Planning Engineers – 5
Sr. Administrator - 1
Exec. Sec / DC - 1

Engineers - All Discipline, 87
Electrician, 59
Drivers - All Discipline, 64
Foreman & Supervisors, 46
Pipe Fitters, 31
Land Surveyors, 20
Storekeepers / Timekeepers, 17
Project Managers / Dept. Heads, 35
Secretaries, 27
Accountants, 18
Safety -Officers/Inspectors,
16
Draftsman - All Discipline, 14
Document Controllers, 7
Planning & Cost Control, 8
Reception & Office Assistants, 20
Officers & Legal Advisors, 6
Administrators, 6
Coordinators, 5
QA/QC Engineers, 3
Mechanics, 27
Instrument Technicians / Fitters,
6
Painters, 6
Watchmen, 5
Welders, 14Cleaners / Office
Boy, 31
Charged Hands, 32
Operators, 57
Steel Fixers, 52
Masons, 54Carpenters, 94
Laborers, 286
10
Staff Category (Total: 489)
Skilled & Unskilled Workers (Total: 664)
Company Manpower Chart
Data as of 11-Aug-2010

11
Registration / Clients List
Lindenberg is registered / pre-qualified with the following companies / government agencies:
1. Abu Dhabi Distribution Company (ADDC) 8. Abu Dhabi Police General Head Quarters 15. Dubai Electricity & Water Authority (DEWA)
2. Abu Dhabi Future Energy Company (MASDAR) 9. Abu Dhabi Polymers Co. Ltd. (Borouge) 16. Mubadala Development Company
3. Abu Dhabi Gas Industries Ltd. (GASCO) 10. Abu Dhabi Sewerage Services Company (ADSSC) 17. Municipality of Abu Dhabi
4. Abu Dhabi Marine Operating Company (ADMA-OPCO) 11. Abu Dhabi Transmission & Despatch Company (TRANSCO) 18. National Central Cooling Co. PJSC (TABREED)
5. Abu Dhabi Ministry of Defense – Military Works Dept. 12. Abu Dhabi Water & Electricity Authority (ADWEA) 19. Sorouh Properties
6. Abu Dhabi National Oil Company (ADNOC) 13. Al Ain Distribution Company (AADC) 20.
7. Abu Dhabi Oil Refining Company (TAKREER) 14. ALDAR Properties PJSC 21. Tourism Development & Investment Company (TDIC)
Supervision Committee for the Expansion of
Abu Dhabi International Airport (SCADIA)
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21

12
1. Lindenberg Emirates is currently one of the 5
prequalified companies for the Sewerage
Tunnel Enhancement Project “STEP Project”
comprising of a 45 km tunnel of 5-meter
diameter at a depth of 40-45 meters. The
project is expected to be worth of 3 Billion
AED and will be executed together with a
consortium of Major Korean Construction
Companies.
2. Tender No. O-1506, STEP Deep Tunnel Sewer
Contract T-02
3. Tender No. O-1578, STEP Deep Tunnel Sewer
Contract T-03
Lindenberg is Prequalified & Tendering for ADSSC’s STEP Project:

13
Company Classification at Abu Dhabi Department of Planning & Economy
Sr. No. Field Scope of Works Category
1. WATER PROJECTS1. Water Transport Plants & Networks
2. Water Distribution Plants & Networks
1st
1st
2. ELECTRICAL PROJECTS1. Power Distribution Networks & Plants
2. Communications Networks
2nd
5th
3. SEWERAGE PROJECTS1. Main Sewerage Networks
2. Sewerage Sub-Networks & House Connections
5th
5th
4.MECHANICAL & ELECTRICAL WORKS
PROJECTS 1. Mechanical and Electrical Works 5th
5. BUILDING PROJECTS1. All types of Buildings
2. Metallic Constructions
5th
5th

14
Power Projects
SN Contract No. Contract Name Client Contract Value Award Date Consultant Status
1 R-99-0157Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and HospitalsADWEA AED 176,957,025 08.02.2000 Mott MacDonald Completed
2 G-1494Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and Hospitals, Stage-III Phase-III, Lot-1ADWEA AED 25,914,216 05.02.2003
Lahmeyer
International GmbHCompleted
3 G-1882Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and Hospitals (Stage-III Phase-III)ADWEA AED 103,122,825 07.08.2005
Lahmeyer
International GmbHCompleted
4 D-7150Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace
in Abu Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach PalaceADDC AED 40,667,381 05.05.2008
Ozen Levent
Power Engineering
Consultancy LLC
Completed
5 D-7720 Modification of Switching Stations in Abu Dhabi Island ADDC AED 16,999,999 06.10.2008 - Completed
6 D-9710/CLong Term Rate Agreement for Installation of Underground Cables, Electrical
Distribution Equipment, OHL and allied works in Abu Dhabi Eastern RegionADDC
AED 10,000,000 /
YEAR06.04.2009 - Ongoing
7 115979C13ERuwais Housing Complex Expansion – Phase III, Procurement of Electrical
Equipment – Low Voltage (LV) Panels SwitchgearADNOC AED 29,675,361 23.04.2009 - Ongoing
8 G-6334Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery
Energy Storage (42MW)ADWEA AED 142,271,120 23.11.2009 DECON Ongoing
9 D-6990 Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations ADDC AED 81,991,962 03.01.2010 Parsons Brinckerhoff Ongoing
10 D-10599Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi
Island & Eastern RegionADDC AED 19,683,403 10.02.2010 DECON Ongoing
11 D-10624Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu
Dhabi IslandADDC AED 34,028,598 25.05.2010 DECON Ongoing
12 G-6982.1Engineering, Procurement and Construction for 100 MW BESS Implementation in
Abu DhabiADWEA AED 199,968,434 30.11.2010 DECON Ongoing

15
Water & Drainage Projects
SN Contract No. Contract Name Client Contract Value Award Date Consultant Status
1 D-5630Urgent Works at Al Qadra Village Owned by
HH Sheikh Mansour Bin ZayedADWEA AED 16,877,777 15.04.2006 Italconsult Completed
2 N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed
3 N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas – Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007Tebodin Consultants &
EngineersCompleted
4 D-6972Linking of Delma Two (2) MGD RO Plant to Main Delma Reservoirs Construction
of 119 Water House ConnectionsADDC AED 4,633,941 06.08.2007
Dr. MH Ali El-Saie
Consulting EngineersCompleted
5 N-5807Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat /
Abu Dhabi IslandTRANSCO AED 569,594,995 20.01.2008
Tebodin Consultants
and EngineersOngoing
6 O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed
7 N-5386 Water Transmission Lines Inside Al Reem Island – Lot A TRANSCO AED 56,455,067 03.02.2008Tebodin Consultants
and EngineersCompleted
8 D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Ongoing
9 N-6821EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa Floating
Reservoir Station – Lot DTRANSCO AED 174,524,364 07.03.2010
ILF Consulting
EngineersOngoing
10 O-1463Works Associated with the Replacement of Existing Sewer Networks at Some
Sectors Inside Abu Dhabi Island - Category AADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Ongoing

Division Profile
Lindenberg Power Division provides expertise in implementing Electromechanical and
Instrumentation projects on turnkey basis, starting from the design stage to construction, testing and
commissioning and maintenance services for diverse industrial projects.
Having the expertise in turnkey contracting on many projects, the Power Division is very familiar
with all criteria necessary for the successful execution of Electromechanical projects. The Power
Division builds these mandatory requirements into all projects:
Reliable and efficient performance
Single-point responsibility
ISO-certified quality control procedures
Proven safety programs
Cost controls and reductions
Productive and on-time scheduling
16

Division Profile
The Power Division provides a dedicated technical and managerial team necessary to design and
construct new facilities or upgrades. By bringing together every aspect of a power project under a
single management team, the division provides economical and efficient solutions to meet the needs
of a diverse industry base.
The project management team comprised of specialists in the design, construction and operation of
complex type of projects. From concept through acceptance, the division provides the optimal
resources, equipment and services to meet all contractual requirements. The EPC team is
accountable for the following critical functions:
Planning, organizing and procedures
Scheduling and tracking
Cost control
Document control
Single-point customer contact
Progress reporting
17

Scope of Activities
Contracting works for Power Networks and Distribution Systems
Underground cable network including jointing, termination, testing and commissioning
Complete electrical and instrumentation works for Power Plants, Refineries, Power Stations, Desalination Plants and Sewerage Treatment Plants
Turnkey contracting works for LV / MV / HV Substations
EPC works for electric generators
Installation and commissioning of auxiliary powers, package substation, control panels and transmission lines
Contracting works for plant fire fighting and safety alarm systems, remote monitors, and fire suppression systems.
Control / MCC room fire suppression systems installation
Submarine Cable Installation
Industrial Building Construction
HVAC Works
LV / MV / HV Switchgear and Transformer Installation
Installation and Commissioning of Auxiliary Power Supplies
18

Typical Power Project Organization Chart
19
HEAD OF POWER DIVISION
OFFICE SUPPORT
Coordinator
Secretary
Draftsman
Storekeeper
Timekeeper
Watchman
HSE Engineer
QA/QC Engineer
HSE & QA/QC
Planning Engineer
QS
PLANNING & QS
Civil Engineer
Electrical Engineer
ENGINEERING
Construction Manager /
Project Engineer
CONSTRUCTION
Electrical Engineer Testing & Comm. Eng.
Mechanical Foreman
Mechanical Engineer Civil Engineer
Civil Foreman Electrical Foreman Draftsman (Electrical)
Draftsman (Electromech’l)
Design Coordinator
PROJECT MANAGER

20
Featured Projects
Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and Hospitals
Contract No. R-99-0157
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 176,957,025
Award Date 08.02.2000
Description Supply, Installation, Testing & Commissioning Works

21
Featured Projects
Supply and Installation of 8 Nos. 415 Volts Diesel Generators
Contract No. G-1206
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 13,039,984
Award Date 10.04.2002
Description Design, Supply, Installation, Testing and Commissioning of 8 Nos. 415
Volts Diesel Generators

22
Featured Projects
Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and Hospitals Stage-III Phase-III. Lot-1
Contract No. G-1494
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 25,914,216
Award Date 05.02.2003
Description Design, Supply, Installation Testing and Commissioning Works

23
Featured Projects
Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces & Hospitals (Stage-III Phase-III)
Contract No. G-1882
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 103,122,825
Award Date 07.08.2005
Description Design, Supply, Installation Testing and Commissioning including remote
control monitoring system, ISMS, and Medium Voltage Panels.

24
Featured Projects
Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace in Abu
Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace
Contract No. D-7150
Client Abu Dhabi Distribution Company (ADDC)
Value AED 40,667,381
Award Date 05.05.2008
Description Design, Supply, Installation Testing and Commissioning of 11KV
Switching Station & replacement of Switchgears, Control Panels, DC
system in Beach Palace Stations B4, B5 Stations & Standby power plant
in H.H.Shk Khalifa Switching station.

25
Featured Projects
Modification of Switching Stations in Abu Dhabi Island
Contract No. D-7720
Client Abu Dhabi Distribution Company (ADDC)
Value AED 16,999,999
Award Date 06.08.2008
Description Supply, Installation & Commissioning of RMU’s and Modification
of Transformer Panel to Feeder Panel in Switching Stations.
Long Term Rate Agreement for Installation of Underground Cables, Electrical Distribution Equipment, OHL and allied works in Abu
Dhabi Eastern Region
Contract No. D-9710/C
Client Abu Dhabi Distribution Company (ADDC)
Value AED 10,000,000 per year
Award Date 16.04.2009
Description Installation of Underground Cables, Electrical Distribution Equipments, OHL and Allied Works as per Work Order
Basis

26
Featured Projects
Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery
Energy Storage (42MW)
Contract No. G-6334
Client Abu Dhabi Water and Electricity Authority (ADWEA)
Value AED 142,271,120
Award Date 23.11.2009
Description Design & Construction of 10 Nos. BESS Substation & Installation Testing
Commissioning of NGK Batteries & Supply of Auxiliary Items.

27
Featured Projects
Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations
Contract No. D-6990
Client Abu Dhabi Distribution Company (ADDC)
Value AED 81,991,962
Award Date 03.01.2010
Description Design & Construction of 1 New 132/11 kV Substation & Modification of 11 kV Network and Replacement with new 11
kV Switchgear @ 2 nos. Substation.
Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical Equipment – Low Voltage (LV) Panels Switchgear
Contract No. 115979C13E
Client Abu Dhabi National Oil Company (ADNOC)
Value AED 29,675,361
Award Date 23.04.2009
Description Supply & Delivery of Low Voltage Panels Switchgear

28
Featured Projects
Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu Dhabi Island
Contract No. D-10624
Client Abu Dhabi Distribution Company (ADDC)
Value AED 34,028,598
Award Date 25.05.2010
Description Supply of 11kV Switchgear, DC System, LVAC, DMS System, Auxiliary Transformer and Joints & Terminations.
Installation of Power Cables, 11/0.415kV Package S/S and Civil Works i.e. Building, Trenching, etc.
Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi
Island & Eastern Region (2010)
Contract No. D-10599
Client Abu Dhabi Distribution Company (ADDC)
Value AED 19,683,403
Award Date 10.02.2010
Description EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil
and Pipeline Works.

29
Power Stations
Power Station with Diesel Engine for operation
on Diesel, Crude Oil and HFO
Turnkey Power Stations up to 12 MW
Powered with Diesel, Gas and Dual Fuel Engines
Power Station with Gas Engines Power Station with Dual Fuel Engines

Division Profile
In order to accommodate the brisk developments of UAE’s industry, Lindenberg Water and Drainage
Division was established to provide water and drainage solutions.
The Division has up-to-date working knowledge of is very well conversant with the requirements in
water supply and water distribution network. The necessary infrastructure, including manpower,
reliable sources of suppliers, equipment are readily available at our disposal.
30

Division Profile
The Water & Drainage Division is acknowledged as the premier provider of the highest quality
professional service in the field of water and drainage facilities; insuring absolute client satisfaction
through the expertise and experience of its people. The division aims to provide new technologies,
processes, and materials to build and deliver water and drainage facilities that are best suitable for
their class & area of usage.
Scope of Activities
Water Pipeline Networks
Water & Irrigation Reservoirs
Water & Sewerage Pumping Stations
Sewage Treatment Plants
Operation & Maintenance of SewerageNetworks and Pumping Stations
31

Typical Water & Drainage Project Organization Chart
32
DIVISION MANAGER
OFFICE SUPPORT
Civil Engineer
Electromech’l Engineer
Inst & Ctrl. Engineer
Planning Engineer
QS
HSE Engineer
QA/QC Engineer
Coordinator
Secretary
Draftsman
Storekeeper
Timekeeper
Watchman
Construction Manager /
Project Engineer
Civil Works Pipeline Works Chamber Works Electromechanical Works Inst’n & Control WorksWater Tank Works
(Concrete Construction)
Work Crew Land Surveyor Land Surveyor Land Surveyor E/W Work Crew I & C Work Crew
Civil Work Crew Pipeline Crew Chamber Crew
Site Engineer Site Engineer Site Engineer
CONSTRUCTION
PROJECT MANAGER
HSE & QA/QCPLANNING & QSENGINEERING
Foreman Civil Foreman Pipeline Foreman Chamber Foreman E/M Foreman I & C Foreman

33
Featured Projects
Urgent Works at Al Qadra Village Owned by HH Sheikh Mansour Bin Zayed
Contract No. D-5630
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 16,877,777
Award Date 15.04.2006
Description Supply, Construction & Maintain Water Supply Network

34
Featured Projects
DN 1000mm Transmission Pipeline from Sweihan to Remah
Contract No. N-4604
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 25,889,764
Award Date 23.07.2007
Description Supply, Construction, and Installation of Water Transmission Pipelines

35
Featured Projects
Water Supply to Sadiyat Island and Adjacent Areas – Lots A, B, & C
Contract No. N-2622.1
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 108,118,493
Award Date 22.07.2007
Description Supply, Construction, & Installation of Water Supply Network

36
Featured Projects
Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat / Abu Dhabi
Island
Contract No. N-5807
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 569,594,995
Award Date 20.01.2008
Description Construction of DI/CS Pipelines

37
Featured Projects
Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib)
Contract No. O-1047
Client Abu Dhabi Sewerage Services Company (ADSSC)
Value AED 10,400,000
Award Date 30.01.2008
Description Miscellaneous Sewerage and Drainage Works at Sas Al Nakheel & Sash
Shuhaib

38
Featured Projects
Water Transmission Lines Inside Al Reem Island – Lot A
Contract No. N-5386
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 56,455,067
Award Date 03.02.2008
Description Installation of DI/CS Pipelines

39
Featured Projects
Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway
Contract No. D-7310.1
Client Abu Dhabi Distribution Company (ADDC)
Value AED 94,037,448
Award Date 22.05.2008
Description Supply and Replacement of Water Transmission Pipelines

40
Featured Projects
EPC Works for Al Ain Distribution Network - Pipelines Umn Ghaffa Floating Reservoir Station - Lot D
Contract No. N-6821
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 174,524,364
Award Date 07.03.2010
Description EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and Pipeline Works.
Works Associated with the Replacement of Existing Sewer Networks at Some Sectors Inside Abu Dhabi Island - Category A
Contract No. O-1463
Client Abu Dhabi Sewerage Services Company (ADSSC)
Value AED 116,026,699
Award Date 13.06.2010
Description Construction, Replacement & Rehabilitation of Existing Sewer Lines and Manholes Inside Abu Dhabi Island.

QHSE Policy
LINDENBERG EMIRATES LLC establishes, implements and
maintains effective QHSE (Quality, Occupational Health & Safety
and Environmental) Management Systems in line with the
requirements of ISO 9001:2008, ISO 14001:2004 & OHSAS
18001:2007, to ensure that customer requirements are met.
This is carried out with the aim of enhancing customer
satisfaction. LINDENBERG EMIRATES LLC complies with
applicable Health, Safety and Environmental legal and other
requirements in order to prevent incidents, injury, ill health, and
pollution and to encourage the conservation of natural resources.
LINDENBERG EMIRATES LLC is committed to the continual
improvement of its QHSE Management Systems through setting
Objectives & Targets and continuously reviewing them; and by
providing training for employees to deal with their day to day
responsibilities safely, competently and in an environmentally
sustainable manner.
LINDENBERG EMIRATES LLC is committed to communicating the
QHSE policy to employees within the organization and to other
interested parties. The policy shall be reviewed periodically to
ensure its suitability, relevance and appropriateness at all times.
41
LINDENBERG EMIRATES LLC aims to pursue this policy by:
Instilling and promoting safety consciousness amongst
employees & sub-contractors to prevent ill health, injury
and incidents
Implementing innovative measures to continuously improve
its QHSE practices
Meeting applicable legal & other requirements
Communicating the policy to interested parties
Minimizing the generation of hazardous and toxic waste
where possible
Providing safe and healthy working environments for its
employees, customers, and subcontractors
Preventing the release, spill and leakage of harmful
substances into the environment, and taking immediate
action to contain any accidental discharge
Encouraging reducing, recycling and re-using materials
where possible.
AHMAD ZAABRI
General Manager
LE-IMS-Pol | rev. 0

42
QHSE Certificates & Membership
Lindenberg Emirates is an Integrated Management System (IMS) certified company and has
established, implemented and maintained an effective Quality, Occupational Health & Safety and
Environmental Management System, in line with the requirements of ISO 9001:2008, ISO 14001: 2004
and OHSAS 18001:2007 to ensure that customer satisfaction and requirements are being met.
British Safety CouncilOHSAS 18001:2007ISO 14001:2004ISO 9001:2008

Workforce and Labour Camp
Lindenberg-Emirates LLC employs almost 600 Skilled and Unskilled Labors. Labor Camps with all
modern facilities are established in Al Faya, Mussafah and Al Ain to accommodate the requirements of
the health & safety of the workforce.
43
Camp Location Size No. of RoomsCapacity
(No. of Occupants)
Al Faya 1,300 m2 96 864
Mussafah (M36) 876 m2 48 290
Al Ain 400 m2 28 180
TOTAL 2,576 m2 172 1,334

Store Facilities
Aside from Projects Sites Stores and Yards, two Main Stores of 30x20 m2 are operational at Mussafah
to help in storing & preserving the materials received for different projects, also used for storage of
our standard erection tools required during installation/ commissioning activities.
44

Plant, Machineries, Vehicles and Equipment
Lindenberg Emirates’ policy in Vehicles, Equipment and Machinery is to:
purchase and own all equipment to cover the project needs.
self-maintain these vehicles, equipment and machinery.
hire vehicles, equipment and machinery to prevent delays in the project execution.
45

List of Major Vehicles and Machineries
46
SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE
1 Backhoe Loader, CAT 422 E / JCB CX3 76 hp/ 1.25 m3 3 2007
2 Bulldozer Komatsu 25 hp, 6 cyl. 2 2009
3 Bus (Daewoo) 66 seater 1 2008
4 Bus (Tata) 66 seater 1 2006
5 Excavator, CAT 320CL / Komatsu PC 220 20 ton 3 2007
6 Excavator, Komatsu PC300 / CAT 330D 30 ton 5 2008 / 2009
7 Excavator, Komatsu PC400 40 ton 6 2008 / 2009
8 Fast Boat 34' 34 feet 1 2008
9 Fast Boat 38' 38 feet 1 2008
10 Flat Bed Truck Trailer 60 ton 4 2008
11 Hiab Truck (Nissan) 6.5 ton 3 2008
12 Low Bed Truck Trailer 70 ton 1 2008
13 Mobile Crane 55T 55 ton 1 2008
14 Mobile Crane 70T 70 ton 1 2008
15 Mobile Workshop (Nissan Truck) 8 ton 1 2008
Data as of 11-Aug-2010

List of Major Vehicles and Machineries
47
SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE
16 Motorcycle Suzuki 125 cc. 1 2009
17 Pickup Double Cabin (Toyota) 4x4 1 2006
18 Side Boom (Komatsu Pipe Lier) 58 ton 2 2009
19 Six Wheel Tipper (Volvo) 18 m3 2 2008
20 Skid Steer, CAT 216B 52 hp/0.26 m3 1 2007
21 Station (Ford / Toyota / Range Rover) 4x4 17 2007 / 2008
22 Tractor - Flatbed (Volvo / Scania) 50 ton 2 2008
23 Tractor - Lowbed (Volvo) 70 ton 1 2008
24 Water Tanker (Nissan) 3,000 gl 3 2008
25 Wheel Excavator, CAT M316D 16 ton 1 2008
26 Wheel Loader, CAT 950H 196 hp/ 3 m3 4 2007 / 2009
27 Wheel Loader, CAT 962H 211 hp/ 3.2 m3 5 2008
28 Wheel Loader, CAT 966H 262 hp/ 4 m3 2 2009
Data as of 11-Aug-2010

List of Other Machines and Equipments
48
SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE
1 Air Compressor, Diesel 289 CFM 6 2008
2 Air Compressor, Electric 200 L 2 2008
3 Asphalt Cutter FS 410D 5 hp 1 2008
4 Bar Bending Machine 4 hp/up 34 mm 6 2008
5 Bar Cutting Machine 4 hp/up 34 mm 6 2008
6 Concrete Mixer 750 750 L 1 2008
7 Concrete Mixer, BB350L 350 L 2 2008
8 Concrete Vibrator 4.8 hp 17 2008 / 2009
9 Dewatering Pumps 300 Cu.m/h 45 2008
10 Diesel Storage Tank 4000 USG 4000 ~ 12000 Gl 12 2008
11 Water Pump PTD306 Dia 3" 5 2008
12 Double Drum Roller Compactor 1.1 T 9 2008
13 Generator, Diesel 5 ~ 135 kVA 19 2008
14 Generator, Petrol 5 kVA 6 2008
15 Hand Spray Pump With Accessories 1/2 “ dia. 3 2008
Data as of 11-Aug-2010

List of Other Machines and Equipments
49
SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE
16 Jack Hammer for Air Compressor 34 kg. 6 2008
17 Jetting Pump 4" 4" dia. 4 2008
18 Pipe Carrier Saddles - 1 2008
19 Pipe Wrapping Machine - 2 2008
20 Plate Compactors 1850 H 12 2008
21 Power Cutter (handheld) 16" - 8 2009
22 Preassure Pump 1/2 " dia. 10 2008
23 Pipe Milling Machine - 2 2008
24 Rolle Craddles up to 60" 5 2008
25 Station (Ford / Toyota / Range Rover) 4x4 17 2007 ~ 2010
26 Submersible Pump 2" ~ 4" dia. 5 2008
27 Table Saw Bench - Power Cutter 315 mm / 4.5 hp 1 2008
28 Water Booster Pump 2" 2 2009
29 Welding Machine, Diesel 400 amp 8 2008
30 Welding Machine, Electric 400 amp 7 2008
Data as of 11-Aug-2010

Contact Information
50
We hope that the information given and detailed in this Company Profile is sufficient to illustrate the
potential and capabilities of Lindenberg. We will be pleased to provide further information on your
request. Kindly contact us.
Lindenberg Emirates LLc Lindenberg Water & Drainage Division
P.O. Box 42630, Abu Dhabi, (A Division of Lindenberg Emirates LLC)
United Arab Emirates Tel: +971 2 642 2576
Tel: +971 2 681 1061 Fax: +971 2 642 2579
Fax: +971 2 681 3655 E-mail: [email protected]
E-mail: [email protected]
Lindenberg Power Division Projects Office, Passport Road, Abu Dhabi
(A Division of Lindenberg Emirates LLC) Tel: +971 2 642 2131, Fax: +971 2 642 2031
Tel: +971 2 642 2576 Al Ain Office, Moujae Area, Al Ain
Fax: +971 2 642 2571 Tel: +971 3 755 8155, Fax: +971 3 755 8156
E-mail: [email protected]
Website: www.lindenberg.ae
*Each Project has its own Site Office(s)

P.O. Box 42630, Abu Dhabi, United Arab EmiratesTel: +971 2 6811061, Fax: +971 2 6813655
E-mail: [email protected]: www.lindenberg.ae