linda r. coney – 24th april 2009 mom update linda r. coney 7 september, 2009

11
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Post on 22-Dec-2015

246 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 24th April 2009

MOM Update

Linda R. Coney

7 September, 2009

Page 2: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 7 Sept 2009

Outline

Target Taking Data/Operations Documentation Electrical Continued Run Plan …..

Page 3: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 7 Sept 2009

Target Operations & Data Taking

See information by Paul Hodgson, Chris Booth, Paul Smith Many congratulations on a very well done job! Thanks to Malcolm for getting everything ready to run! Ran 12 hours Saturday & 16 hours Sunday Used 11,803 target pulses Target operation studies

Searching for ideal timing wrt ISIS cycle Searching for ideal depth into beam Found edge of beam at injection for purposes of understanding what we need to avoid on

the outswing of our target Took data with modified voltages

Beam loss vs Particle Rate study Fix target timing and adjust dip depth Take data at 100 mV, 200 mV, 300 mV, 400 mV, 500 mV beam losses

Pion beam at 333 MeV/c Proton beam at 333 MeV/c Muon beam at 252 MeV/c with Decay Solenoid and w/o

Page 4: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 7 Sept 2009

Weekend Data

Run 945 Sept 06 2009 pion beam 333 MeV/c with 400mV losses

protons

Page 5: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 7 Sept 2009

Weekend Data

Run947_Sept062009_piBeam333MeVc_D2up5percent

Page 6: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 7 Sept 2009

Weekend Data

Run950_Sept062009_protonBeam333MeVc_D2nominal

Page 7: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 7 Sept 2009

Decay Solenoid Muon Beam

Run956_Sept062009_muBeam252MeVc_DS_ON_200pulses (L) Run957_Sept062009_muBeam252MeVc_DS_OFF_200pulses (R)

Page 8: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 7 Sept 2009

Preliminary:Beam Loss vs Particle Rate Study

first draft, means of distributions judged by eye, no error calcs, etc full analysis is to follow rates of beam loss seem very high because not yet been calibrated to nominals

last time the reduction factor was about 0.4, PH thinks more this time. unsure at present as to what units have for the GVA1 (why are no units for them, again to be sorted out

for full analysis)

Page 9: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 7 Sept 2009

Operations

Rehearsal of running good idea Updated documentation very helpful

Still need a few updates Some trips of beamline magnets DAQ having some trouble with new fADCs

Working to sort this out now “invalid” alarms constantly going off on alarm handler extremely

taxing/annoying

Page 10: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009

Linda R. Coney – 7 Sept 2009

Other

Documentation DAQ Electrical in hall Installation of PID detectors

Would like TOF1 KL

What is our run plan for Machine Physics given all that was done this weekend??

Page 11: Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009